This document is a Questions and Answers document for the City of Lafayette's Starkey Building Renovation project (RFP-24-08-ACRD), involving a Design-Build construction opportunity for renovating a 1,200 square foot single-story structure into a community hub. The Q&A document, dated 07/17/2024 and 07/18/2024, covers multiple clarification points from potential bidders regarding project specifications, including scope limitations, design requirements, and project expectations. Key project elements include upgrading electrical and plumbing systems, potentially adding acoustic design features like group meeting monitors and outdoor speakers, and installing a new hot water heater, while excluding certain systems like fire alarms, sprinklers, and HVAC components.

The project will be procured as a Guaranteed Maximum Price (GMP) Design-Build contract, with the City of Lafayette responsible for permit costs, use taxes, water tap fees, and internet service installation. Design-build teams are expected to provide professional design services, particularly for low voltage systems, and must comply with prevailing wage requirements. No landscape architecture, drainage studies, or extensive environmental assessments are currently anticipated. The City will work collaboratively with the selected design-build team to verify existing conditions, as original building documentation is limited. Exterior work, such as an ADA ramp, may require additional planning or site development review.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - 1

Project RFP-24-08-ACRD - City of Lafayette: Starkey Building Renovation

Buying Organization City of Lafayette

No Question/Answer Question Date

Q1 Question: Landscape Architecture - RFP-24-08-ACRD

Does the City anticipate any Landscape Architecture Scope for this project?

Answer: At this time the City of Lafayette does not believe this is a required sub-consultant to include.

If the project scope changes, this consultant can be added at a later date.

07/17/2024

Q2 Question: Fee Requirements - RFP-24-08-ACRD

At the pre-proposal meeting, it was stated the the City was shifting from requesting a lump sum to a

GMP for fees. Can you please clarify how you would like fees to be presented in our submittal for the amended GMP?

Answer: This was answered in Addendum 1.

07/17/2024

Q3 Question: Hazardous Materials Report - RFP-24-08-ACRD

If the hazardous materials testing report is available before the deadline for submissions, would the client be able to disclose the results of that report?

Answer: This was answered in Addendum 1.

07/17/2024

Q4 Question: Stormwater/Drainage

In Section 2.4, the RFP mentions “All storm water drainage will require a re-work - including inlet at street.” Can more information be provided on the what the issue is and what the anticipated solution(s) are? Is it the “inlet at street” the Type R inlet in South Public Road? What needs to be re-worked regarding this inlet?

Answer: The City of Lafayette is excluding the parking lot from the project at this time and will address at a further date. Civil Engineering and inlet work should be excluded at this time.

07/17/2024

Q5 Question: Stormwater/Drainage

Is a drainage study required for this?

Answer: Please assume that a drainage study is not required.

07/17/2024

Q6 Question: Stormwater/Drainage

Are there any existing drainage reports that can be shared with us?

Answer: At this time there are no drainage reports for this building.

07/17/2024

Q7 Question: General Site

What type of ADA ramp is preferred? (concrete, metal, etc.)

Answer: We will explore design options with the selected design build but would prefer concrete

07/17/2024

Q8 Question: General Site

Are there any as-builts or previous civil plans or reports that can be shared with us?

Answer: There are no as-builts or civil plans for this building.

07/17/2024

No Question/Answer Question Date

Q9 Question: General Site

Are there any recent survey documents that can be shared? (ALTA topo survey, geotech report, environmental reports, etc.)

Answer: There are no current surveys but the City will explore the files further.

07/17/2024

Q10 Question: Contract Type

The current RFP is written as a Lump Sum Design-Build project. However, per the site walk it was mentioned that the RFP will be revised to reflect a GMP Design-Build project, please confirm.

Answer: This was answered in Addendum One

07/18/2024

Q11 Question: Internet Service

Will the city be responsible for providing internet service to the existing building, or do you want the GC to carry this cost? If by GC, does the city have a preferred ISP?

Answer: The City will be responsible to bring service to the building. The design builder is responsible for design and pathway.

07/18/2024

Q12 Question: Permit Fees and Use Tax

Will permit fees and use tax be assessed for this project, or will they be waived? If accessed, will the city be responsible for these costs, or should the Design-Build team be carrying an allowance for said costs?

Answer: Permit costs and Use Tax will be paid by the City. Design/Builder required to submit plans to acquire necessary permits but the City will pay the cost.

07/18/2024

Q13 Question: Geotech Report

If required, will the owner perform a geotechnical investigation, or should the design-build teams account for this cost in their proposal?

Answer: A geotech report has not been completed. The City will work with the Design Builder if required on who will procure.

07/18/2024

Q14 Question: Hazardous Material Testing

Please confirm that asbestos sampling has been completed and results will be provided when available.

If abatement is required, will that work be completed by the owner or GC?

Answer: This question was answered in Addendum One.

07/18/2024

Q15 Question: Kitchen Appliance(s)

Please confirm the only kitchen appliance that should be carried in the cost proposal is a countertop height refrigerator.

Answer: The City will purchase Kitchenette equipment such as the refrigerator.

07/18/2024

Q16 Question: LV Basis of Design

Please provide basis of design / owner expectations for low voltage: AV, data, security (cameras / card readers), etc.

Answer: This question was answered in Addendum One

07/18/2024

Q17 Question: LV Design Costs

Is the design-build team expected to carry low voltage design services in their proposed fee?

Answer: The Design Builder needs to include design services for the low voltage as described in addendum one.

07/18/2024

Q18 Question: FFE Design Costs

Is the design-build team expected to carry FFE design services in their proposed fee?

Answer: At this time, the design builder does not need to carry design services for FF&E.

07/18/2024

Q19 Question: Original Building Plans

Are there any building plans from when the original structure was built that can be shared with the respondents?

Answer: Existing documents will be made available but these are very limited. It is the Design Builders require to verify all existing conditions.

07/18/2024

Q20 Question: Prevailing Wages

Are there any prevailing wages associated with this project? If so, can you provide the wage determination?

Answer: Prevailing Wage will be required.

07/18/2024

Q21 Question: Subcontractors / Subconsultants

Part I: Project Team on page 14 of 18 asks the respondent to identify “subcontractors”. However, due to the current status of the project it is not possible to identify subcontractors – please confirm this item is referring to subconsultants of the design team and not subcontractors.

Answer: Correct. The Design Builder needs to identify the professional design team not sub-contractors.

07/18/2024

Q22 Question: ALTA Survey

Does the City have a current ALTA survey that they can share, or is this something that needs to be included in the design fee?

Answer: An Alta Survey is not available at this time.

07/18/2024

Q23 Question: Environmental Concerns

Are there any environmental concerns regarding the site that need to be accounted for (i.e. protected species, floodplain, etc)?

Answer: We will investigate any environmental concerns with the selected design builder but do not believe any exist at this time.

07/18/2024

Q24 Question: Right of Way Work

Is there any work anticipated in the city ROW?

Answer: We do not believe this is a requirement of the project.

07/18/2024

Q25 Question: Planning or Site Dev Review

Will this project require planning or site development review?

Answer: Any exterior work (ADA ramp etc.) may require planning or site development review.

Q26 Question: Stormwater

Will this project require any stormwater analysis / drainage reports and/or is there any stormwater work anticipated?

Answer: We do not anticipate this type of work at this time.

07/18/2024

Q28 Question: Fire Alarm / Fire Sprinkler

Please confirm no fire alarm or fire sprinkler work will be required with the renovation to the existing structure.

Answer: We do not anticipate needing fire alarm or sprinkler work at this time.

07/18/2024

Q31 Question: Acoustic Design

Should acoustic design/engineering be accounted for in design?

Answer: Part of the project includes having a monitor for group meetings and potentially adding outdoor speakers.

07/18/2024

Q32 Question: Upgrade Electrical and Plumbing

Please confirm that respondents should account for electrical and plumbing system upgrades to include: new electrical panel (bring everything to current code) and all new water service lines.

Answer: That is correct.

07/18/2024

Q33 Question: Hot Water Heater

Please confirm bidders should account for a new hot water heater.

Answer: Yes, please include a water heater.

07/18/2024

Q34 Question: Furnace and CU

Please confirm that the furnace and condensing unit will not be replaced during this renovation work.

Answer: We are not anticipating that at this time.

07/18/2024

Q35 Question: Tap Fees Anticipated?

Are there any tap fees anticipated with this project? If so, who is responsible for tap fees – the owner or the design-build team?

Answer: Any water tap fees would be paid for by the City.

Questions & Answers - 1