Q&A #1.pdf

PDF 741 KB Posted

Attached to
District Five Operations Construction of Bay Walls & Installation of Electric
Solicitation number
ITB-15107
Issued by
Volusia County, Florida

About this file

This is a Questions and Answers document issued by the Florida Department of Transportation, District Five, in response to bidder inquiries regarding the construction of bay walls and installation of electrical infrastructure at the Orlando Operations facility (Advertisement Number DOT-ITB-5012-OBWE). The project scope includes constructing framed walls within equipment storage bays and performing electrical work encompassing new breakers, motorized roll-up door operators, and LED lighting fixtures with emergency backup capability. The document addresses ten specific technical questions regarding lighting control, emergency light placement and quantity, wall pack relocation, receptacle installation, conduit requirements, and circuit specifications. Key clarifications include confirmation that each bay will have one regular LED light and one 90-minute emergency light controlled by a switch inside bay 1, that one wall-mounted emergency light will be installed over the man door, that all electrical work must be installed in conduit, and that the single receptacle at the man door will be located in Bay #1. The mandatory site visit and pre-bid meeting occurred on February 23, 2026, with price proposals due by March 10, 2026, at 10:00 AM EST, and public bid opening scheduled for 11:00 AM the same day. The selection committee meeting is set for March 16, 2026, at 9:30 AM EST, with contract work anticipated to begin March 19, 2026, and completion required by June 1, 2026.

All bidders must be registered in MyFloridaMarketplace, possess a Florida General Contractor's or Builder's license, and maintain general liability insurance with combined bodily injury limits of at least $200,000 per person and $300,000 each occurrence, plus property damage insurance of at least $200,000 each occurrence. Compensation will be provided as a lump-sum payment upon final completion and acceptance of the work. No specific budget amount, set-asides for disadvantaged enterprises, or incumbent vendors are identified in the procurement materials. Out-of-state corporations, limited liability companies, and limited partnerships must be authorized to do business in Florida. All bids must be submitted electronically in PDF format (maximum 25 MB) to D5.Purch@dot.state.fl.us, with the MFMP Transaction Fee applying to all vendor payments.

View the file

Other files

File Type Posted
Addendum 1- Selection Meeting Date CHANGE.pdf PDF
Q&A#2.pdf PDF
DOT-ITB-26-5012-OBWE COMPLETE.pdf PDF
Q&A #1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Transportation

RON DESANTIS

GOVERNOR

719 S. Woodland Boulevard DeLand, Florida 32720-6834

JARED W. PERDUE, P.E.

SECRETARY

Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov

Questions and Answers #1

ADVERTISEMENT NUMBER: DOT-ITB-5012-OBWE

DESCRIPTION: District 5, Orlando Ops Construction of Bay Walls & Installation of Electric

DATE: 2/23/2026

1. What will control the 2 new bay lights in each unit?

RESPONSE: All 2x4 lights will be control by a light switch installed on the inside of bay 1, by man door, from electrical box.

2. The garage door at each entrance get a wall mount emergency 1 or 8?

RESPONSE: No, only wall mount emergency one (1) over man door

3. What is the approximate distance the interior all pack be relocated (how many feet from existing location)?

RESPONSE: If we all are talking about wall pack – Wherever the wall packs lights are in the inside transferred to outside but center of opening.

Because of the bulkhead of roll-up doors, we will need to also move the existing conduit from the inside wall to the outside wall.

4. What is the meaning when the phase use (at man door)?

RESPONSE: The new 3-0 door that is being installed on bay #1

5. How many emergency lights do you want installed 1 or 8?

RESPONSE: 2x4 integral emergency battery backup one (1) per bay, and one (1) by man door on the inside of bay

6. Will the garage door have a wall switch at each entrance if so height and what side looking outside to in?

RESPONSE: All push buttons will be on gang box next to man door inside of bay, will need to run low voltage from box to motor via conduit, 48” from floor.

7. All electrical work to be in conduit or just dedicated home runs needed?

RESPONSE: Conduit

8. Each bay gets 2 - 2x4 one regular and one 90m emergency back up?

RESPONSE: Each bay will have one (1) regular LED and one (1) 90m emergency light.

9. The emergency lights over the door do you want it to have its own circuit?

RESPONSE: No

10. The one receptacle to be installed at man door. Which bay is that! From electrical panel box 1 through 4?

RESPONSE: Bay #1-man door side of bay