PERFORMANCE WORK STATEMENT (PWS) SUMMARY
This Performance Work Statement establishes a three-year contract running from 1 April 2026 through 31 March 2029 for preventative maintenance, inspection, and repair work of airfield lighting systems at U.S. Army Garrison (USAG) Bavaria across three military communities: Tower Barracks in Grafenwoehr, Rose Barracks in Vilseck, and Hohenfels. The contractor must provide all labor, equipment, supplies, materials, transportation, tools, supervision, and management necessary to maintain, inspect, repair, and replace components of airfield lighting control systems in compliance with FAA Advisory Circular 150/5340-26C and manufacturer specifications. The contractor must possess a valid master electric/electronic certificate (Meisterbrief) and ensure personnel complete specialized training in either Precision Approach Path Indicator (PAPI) or Medium Intensity Approach Light System (MALS) courses. Key responsibilities include developing and maintaining a Quality Control Plan within five calendar days of contract award, submitting a comprehensive work plan within ten calendar days, performing scheduled preventive maintenance (monthly, bimonthly, quarterly, semiannual, and annual inspections), responding to emergency repair requests within two hours with verbal estimates and two business days with written estimates, and providing inspection reports within fifteen working days of completion.
The contractor must work Monday through Friday, 0730-1600 hours, excluding U.S. federal and German host nation holidays, maintaining adequate staffing for uninterrupted task performance. Cost proposals for repairs exceeding 25 percent of equipment replacement value or €2,500 require prior written Government approval. All work certificates must be completed in quadruplicate and submitted with supporting documentation within three working days. The contractor bears responsibility for all tool and material costs, proper personnel qualifications, security compliance, and hazardous material management. Government-provided utilities include water and electrical power. Monthly financial status reports tracking expenditures against contract line items must be submitted within seven workdays of month-end, and the contractor must report all labor hours through the System for Award Management (SAM) Service Contract Reporting system by October 31 annually.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks)
1 April 2026 - 31 March 2029
Part 1 General Information
1. General: This is a non-personal services contract to provide Airfield Lighting and Control Monitoring Maintenance, Inspection and Repair Service. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government.
1.1 Description of Services/Introduction: The contractor shall provide all management, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Airfield Lighting and Control Monitoring Maintenance and Repair Service as defined in this Performance Work Statement (PWS). The contractor shall perform to the standards in this contract. This includes the planning, coordination, and surveillance of the activities necessary to ensure disciplined work performance and timely resources application to accomplish all tasking under the contract. The contractor shall be responsible for maintaining communication with the Contracting Officer (CO) and the Government Program Manager (GPM), and to immediately notify both the CO and the GPM of any problems that would prevent timely performance of this contract. The contractor is responsible for and required to implement, and maintain management control systems necessary to plan, organize, direct, and control all activities under this contract.
1.2 Background: The Directorate of Public Works (DPW), USAG Bavaria has a equirement for maintenance and service repair contract. The contractor shall be responsible for all costs to maintain the proper operating condition and repair of all
ALMCS.
1.3 Scope: The contractor shall perform all required inspections and maintenance of the airfield lighting control and monitoring system located at USAG Bavaria - Grafenwoehr (Tower Barracks), Vilseck (Rose Barracks), and Hohenfels (HOH).
Contractor shall be responsible for all costs incurred to maintain the proper operating condition and repair of all the Airfield Lighting Control Systems. Work performance under this contract shall include the maintenance, repair, upgrades, service and replacement of any and all defective or worn parts of all components, devices and equipment required to maintain or repair the Airfield Lighting Control Systems, in accordance with manufacturer instructions and specifications and herein subject to the terms and conditions of this contract. The Contractors work and responsibility shall include all planning, administration and management necessary to provide all operation, preventive maintenance, service and all repair work, as specified. The work shall be conducted within strict compliance with all applicable Federal, State and local laws, regulations, codes, technical references and manufacturer instructions. This contract shall include service maintenance and repair for all Airfield Lighting Control Systems located at USAG Bavaria.
1.4 Objectives: The airfield lighting control system is the interface between the air traffic control tower and the airfield lighting systems. It is essential that the system be reliable. The contractor shall maintain and keep the new Airfield Lighting Contol and Monitering System current and in good working order.
1.5 General Information
1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor shall be responsible for the inspection, repair, and maintenance of systems and components associated with
409th CSB Ver 7 20240913
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS facilities identified in the real property records, as required throughout the duration of this contract. All work shall be performed by properly trained, skilled, and qualified personnel, whether employed directly or through subcontractors.
To meet the technical qualifications of this contract and ensure compliance with FAA Advisory Circular 150/5340-26C – Maintenance of Airport Visual Aid Facilities, the Contractor must possess a valid master electric/electronic certificate (Meisterbrief). Additionally, either the Contractor or designated subcontractor personnel must have successfully completed at least one of the following specialized training courses:
• Precision Approach Path Indicator (PAPI) System course
• Medium Intensity Approach Light System (MALS) course
The Contractor shall submit a proposed Quality Control Plan (QCP) to the Contracting Officer (KO), via the Contracting Officer’s Representative (COR), within five (5) calendar days of contract award for Government review and acceptance. As part of the QCP submission (Technical Exhibit B, Deliverable #A001), the Contractor shall include copies of the Meisterbrief certificate and the relevant course completion certificate(s) to verify compliance with the above requirements.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within five (5) days. If the Government has provided comments, the Contractor shall then have three (3) days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing.
Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than thirty (30) days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
a. A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.
b. How will the Contractor monitor work to ensure that performance complies with all deliverables (etc. timelines, deadlines, and goals)?
c. How will the Contractor monitor work to ensure that performance complies with all specifications and requirements of the contract, including clauses?
d. How will the Contractor monitor and ensure staff qualifications remain current and valid including DOCPER processes/approvals throughout contract performance?
e. How will the Contractor ensure all keys issued will remain controlled items (Paragraph 1.7 Key Control)?
f. How will the Contractor inventory and track maintenance of all Government Provided Equipment / Materials?
g. How will the Contractor identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future?
h. How will the Contractor file and save all Quality Control related documents for the life of the contract plus 5 years?
1.5.1.1 RESERVED
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within four (4) working hours of identifying those issues. Verbal reports shall be followed up by written reports within two (2) days. (Technical Exhibit B, Deliverable# A002).
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds). The Government retains the right to evaluate all services required by the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work. If any of the services performed do not con-form to contract requirements, the Contractor shall perform the services again at no additional cost to the Government.
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day last Monday in May Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th
Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.3.2 Host Nation Holidays: Work shall not be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.
German national and local holidays are:
New Year’s Day January 1st Epiphany January 6th Good Friday Varies Easter Monday Varies Labor Day May 1st Ascension Day Varies Whit Monday Varies Corpus Christ Varies Assumption Day August 15th Day of German Unity October 3rd All Saints’ Day November 1st 1st Christmas December 25th 2nd Christmas December 26th
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility operating hours occur between the hours of 0730 to 1600 Monday through Friday. The Government facility is The Government facility is open for operations during the recognized U.S. Holidays identified in paragraph 1.5.3.1 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.
1.5.4.2 Government Facility Operating Hours: RESERVED
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0730 to 1600 Monday through Friday. The facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contractor to the Contracting Officer. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons.
1.5.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.) The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within ten (10) days after date of contract award (Technical Exhibit B, Deliverable# A003). The Government will review and either accept or return their comments to the Contractor within ten (10) days. The Contractor shall then have three (3) days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty (30) days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.
1.5.5 Training Holidays: USAREUR has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS
Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.
1.5.6 Place of Performance: The work to be performed under this contract will be performed throughout USAG Bavaria Airfields/Helipads/Airfield Lightings: Grafenwoehr [TB], Vilseck [RB] and Hohenfels [HOH]. A map of USAG Bavaria Airfields/Helipads are located at Technical Exhibit (TE) section, as is a list of all Airfield Lightings (Runway, Taxiway, Obstruction Lights etc.) located on various spots/buildings.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: Reserved
1.6.2 Personnel Security Clearance Requirements: Reserved
1.6.3 Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16) Installation Access Control or (AE) Regulation 604-1 for Germany specific contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or (AE) Regulation 604-1, the regulation takes precedent.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
AE Reg 190-16 (and AE 190-16-G German translation) can be found on the following website:
https://home.army.mil/bavaria/4715/3926/0933/AER-190-16.pdf
1.6.3.1 In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within three (3) calendar days after contract award (Technical Exhibit B, Deliverable # A004). The log must at a minimum contain the following information: Employees name and expiration date of installation pass. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log (Technical Exhibit B, Deliverable # A005).
1.6.3.2 The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within three (3) calendar days (Technical Exhibit B, Deliverable # A006).
1.6.3.3 Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within three (3) calendar days (Technical Exhibit B, Deliverable # A007).
1.6.3.4 For contractors that do not require CACs, but require access to a DOD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014- 05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.3.5 Common Access Cards (CAC): N/A
1.6.3.5.1 Reserved
https://home.army.mil/bavaria/4715/3926/0933/AER-190-16.pdf
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS
1.6.4 Background Checks: Army in Europe (AE) Regulation 604-1 provides guidance pertaining to background checks for U.S. and Host Nation Contractors.
1.6.4.1 U.S. Citizen: Contractors that work with or teach youth under the age of 18 years are subject to local and stateside background checks. The Requiring Activity Manager will determine the extent of background checks required. The Contractor
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the stateside background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within five (5) days of receipt by the Contractor, identifying such with the appropriate contract number (Technical Exhibit B, Deliverable # A008).The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within five (5) days of receipt by the Contractor, identifying such with the appropriate contract number (Technical Exhibit B, Deliverable # A009).When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.
1.6.4.2 Local Nationals and Third Country Nationals: Local national and third country national Contractors that work with or teach youths under the age of 18 years are subject to background checks as determined by the Requiring Activity Manager.
As a minimum prior to beginning performance, Contractors employing local national and third country nationals shall furnish the Contracting Officer via the COR and the Requiring Activity Manager a Polizeiliches Fuehrungszeugnis, issued within the previous four months, no later than five (5) days after contract award (Technical Exhibit B, Deliverable # A010). Forwarding correspondence from the Contractors shall identify the associated contract number. The Requiring Activity Manager will determine the favorability of the Polizeiliche Fuehrungszeugnis and notify the Contractor. The Contractor shall forward a copy of unfavorable Polizeiliche Fuehrungszeugnis to the Contracting Officer via the COR and the Requiring Activity Manager within five (5) days of receipt, identifying such with the appropriate contract number. Local nationals and third country nationals agree to the same employee termination provisions as stated for U.S. Citizens (see paragraph 1.6.4.1 above, in particular, same requirements to replace the employee (and within timeframe noted) when results of background check are unfavorable).
1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.
1.6.7 Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation provost marshal office, director of emergency services, or security office. Contractor workforce must comply with all personal identification verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.8 Threat Awareness Reporting Program. Per AR 381-12, Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b. Training may be requested to the installation Counterintelligence office at ACI (66th MI) Mailbox: usarmy.wiesbaden.66-mi-bde.list.2d-mi-bn-lni@army.mil.
1.7 Key Control: Reserved
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication mailto:usarmy.wiesbaden.66-mi-bde.list.2d-mi-bn-lni@army.mil mailto:usarmy.wiesbaden.66-mi-bde.list.2d-mi-bn-lni@army.mil
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS
Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: The following personnel are considered key personnel by the Government: The Contractor shall provide a Program/Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Program/Contract Manager, who shall act for the Contractor when the Program/Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer no later than five (5) calendar days after contract award or during the post-award meeting. (Technical Exhibit B, Deliverable # A011).
Acceptance of the CV by the Contracting Officer is required before these individuals are permitted to perform any task on this contract. The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between 0730 – 1600 hrs. (Monday through Friday). Qualifications for all key personnel are listed below:
a. Program Manager and Alternate Contract Manager: The Contractor shall provide a Project Manager (PM) who is responsible for the performance of the work. The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The name of the PM shall be provided to the KO/COR within five
(5) days after contract award and shall be reachable via Email and/or phone during normal duty hours. In the circumstances when the PM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence.
b. Quality Control Manager: Reserved
c. Systems Administrator: Reserved
d. Special Qualifications: The Contractor shall inspect, repair and maintain systems and components associated with facilities listed in real property records as required throughout this contract utilizing properly trained, skilled, and qualified employees or subcontractor personnel. Contractor shall possess a master electric/electronic certificate (Meisterbrief) in addition, the contractor or subcontractor must have completed one of the following courses to meet the requirements of this contract in order to comply with the regulations of FAA - AC No.: 150/5340-26C - Maintenance of Airport Visual Aid Facilities:
- PAPI (Precision Approach Path Indicator System) course
- MALS (Medium Intensity Approach Light System) course
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.1 Reserved
1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee.
A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes. (Technical Exhibit B, Deliverable # A012).
1.13 Contractor Travel: Reserved
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS
1.14 Other Direct Costs (ODCs): Reserved
1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.17 The use of propaganda violates DoD Commercial Use of Imagery Guidelines stated at http://www.defenseimagery.mil/products/dodimagery/commercialuse.html The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
1.18 Non-Disclosure Statements: Reserved
1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI (Technical Exhibit B, Deliverable # A013).
The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer.
In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20 Phase In /Phase Out Period: Reserved
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:
1.21.1 Host Nation Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)), and applicable Host Nation Safety Laws and Regulations.
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel (Technical Exhibit B, Deliverable #A014). Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1).
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.
http://www.defenseimagery.mil/products/dodimagery/commercialuse.html http://www.usace.army.mil/
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS
(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen (15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase.
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt.
(ii) Long trousers.
(iii) Steel-toed safety boots.
(iv) Hard hat.
1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes. In particular, within the requirements of the German Safety and Health Protection Regulation for Construction Sites, Baustellenverordnung (BaustellV) (current version in effect), the Contractor shall coordinate all work at the site, including development of plans and providing advance notices.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the Contractor shall comply with the non-exclusive list of duties described in this paragraph. If the Contractor determines that additional activities are required to fully comply, the Contractor shall ensure that compliance with the laws is complete. The duties include:
(a) Conditions of construction and operational activities to be considered include but are not limited to:
(i) For all construction activities meeting the following criteria: the work is scheduled to last longer than 30 working days and more than 20 workers are occupied simultaneously, or the volume of work is scheduled to exceed 500 person days, or the work presents particular tasks, e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater).
(b) If the Contractor determines that the BaustellV, dated 10 June 1998, applies, the Contractor shall prepare a Safety and Health Protection Plan (SIGE) as required under that regulation. The SIGE shall be submitted two weeks prior to mobilization. In addition, the Contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator must meet minimum training and experience requirements required under Host Nation laws.
(c) The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:
(i) Maintenance of tools and equipment.
(ii) Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.
(iii) Modifying performance periods for such work, taking into consideration the site conditions.
(iv) Organizing cooperation between different employers and Contractors without employees.
(v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed, and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.
1.21.1.2 The Contractor shall complete and provide safety notifications required by host nation authorities and will provide documented proof to the Contracting Officer via the COR, no later than ten (10) days (Deliverable # A015) that such notifications were made.
1.21.1.3 Reserved
1.22 Environmental Compliance: The following provides information on Environmental Compliance.
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS
1.22.1 Environmental Compliance Plan and Program:
The Contractor shall ensure that all of its operations and activities conform to the USAG Bavaria's environmental policy requirements. The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on USAG Bavaria installations are conducted in accordance with the USAG Bavaria Spill Prevention and Response Plan, Solid Waste Policy, Final Governing Standards-Germany, and applicable German environmental laws/standards.
If contract requires the use of hazardous materials/substances, the Contractor shall, prior to mobilization, inform the Contracting Officer (KO)/Contracting Officer Representative (COR) of the types and amount of hazardous materials needed to be brought onto the Garrison in order to fulfill their contractual requirements. Contractor shall also provide the Safety Data Sheets, storage requirements and proposed storage locations for the hazardous material. The KO/COR shall provide a copy of this information to the Garrison Fire Department and the Environmental Division.
Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Germany and applicable German environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the DPW Environmental Division.
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department.
1.23 Required Training: The following provides information on training requirements.
1.23.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas will complete AT Level I Training within thirty (30) calendar days (Technical Exhibit B, Deliverable # A016) after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor will submit certificates of completion (Technical Exhibit B, Deliverable # A017) for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within five (5) calendar days after training is completed by all employees and subcontractor personnel. AT Level I awareness training is available online at https://atlevel1.dtic.mil/at or by request to the garrison Force Protection office at AT/FP Mailbox: usarmy.bavaria.id-europe.list.dptms-at-fp@army.mil.
Contractor personnel shall complete refresher training (Technical Exhibit B, Deliverable # A018) every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies.
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within Two (2) days after completion of the training (Technical Exhibit B, Deliverable # A019).
1.23.2 OPSEC Training: According to AR 530-1, new contractor employees must complete Level I OPSEC training within 30 calendar days after they report for duty. (Technical Exhibit B, Deliverable # A020). Verification of the training shall be provided to the COR within five (5) calendar days after completion of the training. All contractor employees must complete annual OPSEC awareness training. (Technical Exhibit B, Deliverable # A021). Verification of the training shall be provided to the COR within five (5) calendar days after completion of the training. OPSEC Level I training is available at:
https://securityawareness.dcsa.mil/opsec/index.htm.
If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC.
Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within five (5) calendar days after completion of the training (Technical Exhibit B, Deliverable # A020).
1.23.3 Suspicious Activity Reporting Program training/iWATCH Training: The contractor and all associated subcontractors will brief all employees on the local suspicious activity reporting program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training will be completed within 30 calendar days https://atlevel1.dtic.mil/at mailto:usarmy.bavaria.id-europe.list.dptms-at-fp@army.mil https://securityawareness.dcsa.mil/opsec/index.htm
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS after the contract is awarded and within 30 calendar days after new employees commence contract performance (Technical Exhibit B, Deliverable # A022), with the results reported to the COR within 7 calendar days after the contract is awarded.
Training may be requested to the garrison Force Protection office at AT/FP Mailbox: usarmy.bavaria.id-europe.list.dptms-at-fp@army.mil (Technical Exhibit B, Deliverable # A022).
1.23.4 Information Assurance (IA) Training Reserved
1.23.5 Personally Identifiable Information (PII): Reserved
1.24 Authorization to Perform Services in Germany
1.24.1 Contractors performing services in the Federal Republic of Germany (FRG) shall comply with German law. The Contractor shall determine whether performance requires registration with German authorities or authorization to do business in Germany and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the Contractor shall determine what documents or authorization its employees and any subcontractor employees must possess to work in Germany. The Contractor shall ensure affirmatively that its employees and subcontractor employees possess such documents or authorizations.
1.24.2 Contractor employees who: (a) are not nationals of Germany or other European Union countries; (b) are not members of the force, the civilian component or their dependents; or c) do not have assimilated status under Articles 71, 72, or 73 of the Supplementary Agreement to the NATO SOFA shall possess work and residence permits.
1.24.3 By acceptance of and performance under this contract, the Contractor affirms that it has complied with the requirements above. Compliance with this requirement and German law is a material contract requirement. Noncompliance by the Contractor or subcontractor at any tier shall be grounds for issuing a negative past performance evaluation and terminating this contract for default.
1.25 Notice to Proceed: Reserved
1.26 Electromagnetic Compatibility Directive: Reserved
1.27 Government Property and Services: Reserved
1.28 Conventional Forces Europe (CFE) Treaty Verification Inspection: Contractor-owned or controlled structures and containers located on U.S. Government installations are subject to short-notice inspections by CFE treaty inspection teams.
The Government will endeavor to provide the Contractor as much notice as possible in the event of such inspections. The contractor shall provide access to such structures and containers at the request of the Government. The Contractor shall report such inspections to the KO through the COR in writing within ten (10) calendar days of completion of the inspection.
Contractor-owned or controlled structures and/or containers on U.S. installations may have to be inspected to comply with the CFE treaty even if Contractor personnel are unavailable to provide access. Any costs borne by the Contractor or any impact on contract performance as a result of the inspection will be a matter of negotiation between the Contractor and the KO.
Preventative Maintenance, Inspection and Repair Work of Airfield Lightings at USAG Bavaria (Tower, Rose, Hohenfels Barracks) PWS
409th CSB Ver 7 20240913
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Contracting Officer – means a person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. Department of Defense Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart
202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, contracting officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2,…