PWS FES SCBA 2025.pdf
PDF 341 KB Posted
- Attached to
- Respiratory Protection Testing and Maintenance
- Solicitation number
- W911S825QA019
About this file
This Performance Work Statement (PWS) details a non-personal services contract for the Respiratory Protection Program (RPP) Maintenance and Repair for Joint Base Lewis-McChord (JBLM) Fire & Emergency Services (FES). The contract requires the contractor to provide technician-level maintenance and servicing of respiratory protection equipment, including annual inspection, testing, and repair of MSA G1 face pieces, self-contained breathing apparatus (SCBA), rapid intervention team rescue systems, escape packs, and confined space air carts. Additional services include 5-year hydrostatic testing of air cylinders, annual inspection of air reservicing compressors, and quarterly air compressor sampling and recalibration.
The contract period is one 12-month base period with four 12-month option periods. The contractor must comply with OSHA, NFPA, and other relevant standards, maintaining equipment to ensure emergency responders have properly maintained respiratory protection. Key deliverables include a Service Delivery Plan within 30 calendar days of contract award, monthly reports by the 10th working day of each month, and various training certifications. The contractor must provide trained and certified technicians, maintain detailed documentation, and respond to emergency service calls within 2 hours and normal service calls within 24 hours of the agreed-upon service date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Joint Base Lewis-McChord (JBLM) Fire & Emergency Services (FES)
Respiratory Protection Program (RPP) Maintenance and Repair
(Version 2.0) 12 August 2025
Part 1 General Information
1. General: This is a non-personal services contract to provide Respiratory Protection Program (RPP) Equipment Maintenance and Repair for the JBLM FES. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1. Description of Services/Introduction. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other non-personal services necessary to perform Maintenance and Repair Services as defined in this Performance Work Statement. The Contractor shall perform these services in accordance with the most current commercial industry standards, codes and regulations, National Fire Protection Association (NFPA) 1852 “Standard of Selection, Care, and Maintenance of Open-Circuit Self-Contained Breathing Apparatus (SCBA), NFPA 1989 “Standard on Breathing Air Quality for Emergency Services Respiratory Protection” and other governing directives and standards.
1.2. Background. The purpose of this contract is to perform Inspection, Testing and Maintenance (ITM) for JBLM Fire and Emergency Services RPP. Performance of ITM required services requires specialized technical skills currently not available internal to the installation.
1.3. Objectives. Provide properly maintained and tested respiratory protection equipment for emergency responders at JBLM FES per OSHA and NFPA requirements.
1.4. Scope. Contractor shall plan, program, administer, manage, and execute all work necessary to provide the specified services in this PWS. The Contractor shall provide all personnel, management, tools, supplies, equipment, transportation, and labor necessary to perform maintenance and repair services as defined in this PWS. All services shall be in accordance with the most current National Fire Protection Association 1852 “Standard of Selection, Care, and Maintenance of Open-Circuit Self-Contained Breathing Apparatus (SCBA) and other governing directives and standards. The Contractor shall comply with all applicable Department of Defense, Army, Air Force, federal, state, and local laws, regulations, codes, technical manuals, and acceptable commercial industry practices in the delivery of required services.
The scope of this contract is to provide technician level maintenance and servicing of listed components in paragraph 5.5 of this PWS to include:
a. ANNUAL INSPECTION, SERVICE, TESTING AND REPAIR (ISTR) OF FACE
PIECES (MSA G1).
b. ANNUAL INSPECTION, SERVICE, TESTING AND REPAIR (ISTR) OF (MSA G1)
SELF-CONTAINED BREATHING APPARATUS (SCBA).
c. ANNUAL INSPECTION, SERVICE, TESTING AND REPAIR (ISTR) OF (MSA G1)
RAPID INTERVENTION TEAM RESCUE SYSTEMS (RIT).
d. 5-YEAR HYDROSTATIC TESTING OF SCBA AIR CYLINDERS.
e. ANNUAL INSPECTION AND SERVICE (MSA G1) ESCAPE BOTTLE
REGULATOR SERVICE.
f. ANNUAL INSPECTION, SERVICE, TESTING AND REPAIR (ISTR) OF CONFINED
SPACE AIR CARTS.
g. ANNUAL INSPECTION, SERVICE, TESTING AND REPAIR (ISTR) OF AIR
RESERVICING COMPRESSOR (STATIONARY AND MOBILE)
h. CONDUCT QUARTERLY AIR SAMPLING, PROVIDE REPORT AND
RECALIBRATION OF AIR COMPRESSOR
1.5. PERIOD OF PERFORMANCE.
The period of performance shall be for one (1) Base Period of 12 months and four (4) 12-month option periods.
1.6. GENERAL INFORMATION.
1.6.1. Federal Observed Holidays. The Contractor shall not perform work during federally observed holidays.
New Year’s Day (January) Labor Day (September) Martin Luther King Jr.’s Day (January) Columbus Day (October) President’s Day (February) Veteran’s Day (November) Memorial Day (May) Thanksgiving Day (November) Juneteenth (June) Christmas Day (December) Independence Day (July) Holidays added through Executive Order
1.6.2. Hours of Operation. The Contractor is responsible for conducting business, between the hours of 8:00 AM – 5:00 PM, Monday through Friday except federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.3 Operation Other Than Normal Schedule. For maintenance and repair work not completed at the end of standard work hours the Contractor may continue work beyond standard work hours to complete a maintenance or repair job only when approved by the Contracting Officer Representative. The Government will not pay the contractor for overtime work.
1.6.4. Place of Performance. Under this contract, the work will be performed at Joint Base Lewis- McChord (JBLM), Washington. This contract defines JBLM as JBLM-Main, JBLM-North, JBLM-McChord Field and other unspecified areas of responsibility. JBLM is a United States military installation largely located in Pierce County, Washington.
1.6.4.1 Coordination Point of Contact (POC)
Contractor shall coordinate with JBLM FES point of contact listed below for dates and times servicing will take place.
Point of Contact:
Robert Appling, Robert.l.appling.civ@army.mil, 253-381-1671
1.6.4.2 Emergency Service Calls. An emergency service call is an onsite response to a designated location, within twenty-four (24) hours, for services that require immediate attention. Contractor shall be notified by JBLM Lewis Main Fire Department to service mobile and installed air compressors. At the conclusion of the service call, the COR shall be informed on the status of the equipment.
1.6.4.3 Normal Service Calls. Response to Normal Service Calls: The contractor shall respond and be on site within seventy-two (72) hours during normal work hours when called by the COR.
The contractor shall attend to any condition of the equipment that requires immediate action to eliminate hazards to personnel, prevent loss or damage to government property, restore essential services or as determined by the COR. Otherwise, the contractor shall proceed to the work location and survey the needed repair, and within 1 work days provide to the COR an estimated time and cost of repairs. The contractor shall inform the COR of projected downtime and estimated time for repair. The contractor shall commence the repair work after approval from the Contracting Officer (KO). All repair work shall be accomplished in accordance with the manufacturer’s instructions.
The contractor work to correct the identified deficiency shall start within 1 work day after issuance of task order and be completed within 30 work days. Once the problem condition is repaired, the technician/contractor shall notify the COR.
1.6.4.4. Unscheduled Service Call Reporting. A record of the report shall be submitted monthly with the date and time of the service call, the location, the repairs performed, and the name of the technician performing the repairs. This reporting shall be included in the regular monthly report.
1.6.5 Payment. Contractor shall receive payment only when scheduled task or work, as outlined in this PWS, is completed. Partial payment is not authorized for incomplete task or work unless mailto:Robert.l.appling.civ@army.mil approved by the COR and the KO. Contractor reports shall be submitted and approved by the COR before payment is authorized.
1.6.5.1 Payment by Government Credit Card. All repairs in excess of the threshold specified in the CLIN structure shall be paid utilizing the government credit card up to a maximum of $2,500.00.
1.6.6. Personnel Identification. Identification of all personnel who will perform inspections by name, title, and type of inspection each is authorized to perform.
1.6.7. Security Requirements. The Contractor shall comply with JBLM security regulations:
JBLM Regulation 210-1, Fort Lewis Post Regulations, Chapter 7, section XVII; JBLM Regulation 190-16, Access to and Conduct While upon Joint Base Lewis-McChord; and JBLM Regulation 190-5, Installation Traffic Code. Contractor employees shall display either Contractor-provided identification badges or the identification badges issued under the RAPIDGate Program. If the Contractor does not participate in the RAPIDGate program, it shall submit the proposed design for its employee identification badge to the COR no later than 13 calendar days before the contract start date for approval. The Contractor-provided identification badge shall be made of nonmetallic material, easily readable and include the employee's name, the Contractor's name, and a recent color photograph of the employee. Anticipate delays in getting commercial vehicles on base and allow time for commercial vehicles to reach their destination by driving designated routes at posted speed limits through JBLM. Procedures for commercial vehicle access to JBLM are subject to change without prior notice.
1.6.8. Post Award Conference/Periodic Progress Meetings. The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The KO and COR will meet no less than annually with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
1.6.9. Contracting Officer’s Representative (COR). The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract; performs inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinates availability of Government furnished property, and provides site entry of Contractor personnel. A letter of designation issued to the Contractor states the responsibilities and limitations of authority of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10. Contractor Personnel Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive 5500.07-R, “Joint Ethics Regulation,” Contractor employees must avoid being improperly influenced in the execution of their duties under the contract. Particular attention should be directed to acceptance of gifts/ gratuities, and non-disclosure of sensitive or classified information. The Contractor shall ensure employee conduct complies with 41 U.S.C. 2101-2107 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The Contractor shall ensure no Contractor employees conduct politically related activities or events on the JBLM facilities.
1.6.10.1 Disputes With Customers Or Other Government Personnel. The contractor shall verbally notify the COR of unresolved disputes in receiving support from or providing support to customers or other contractors. This notification shall take place within two (2) hours from the time the dispute occurs, and the contractor shall follow-up in writing within two (2) work days.
1.6.10.2 Safety Requirements And Reports. The contractor shall perform work in a safe manner and comply with Occupational Safety & Health Administration (OSHA) and Engineering Manual (EM) 385-1-1, Safety and Health Requirements, Department of the Army, Corps of Engineers, 1996.
1.6.10.3 Accident And Damage Reports. The contractor shall provide a verbal report to the COR, as soon as possible, but not later than four hours after each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. The contractor shall provide a completed copy of required Accident Investigation Reports to the COR within five (5) calendar days of each occurrence. The contractor shall comply with OSHA and EM 385-1-1, Section 1, for record keeping and reporting of all accidents.
1.6.11 NOT USED
1.6.12. Antiterrorism (AT) and Operations Security (OPSEC)
1.6.12.1. AT Level I training. All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 13 calendar days after contract start date and within 13 calendar days of new employees commencing performance. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR within 7 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://jko.jten.mil/courses/AT-level1/launch.html
1.6.12.2. Access and General Protection/Security Policy and Procedures. Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.12.3. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (Army Directive 2014‐05/AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative); or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.12.4. iWATCH Training. IWatch is simply a common awareness program much like Community Watch. Contractor employees with an area of performance within an Army controlled installation, facility or area shall view the iWatch video and review information at the website:
https://www.bliss.army.mil/iWATCH/. This training informs employees of the types of behavior to watch for and instructs employees to report suspicious activity to JBLM law enforcement or
911. This training shall be completed within (13) calendar days of contract award and within (13) calendar days of new employees commencing performance. The Contractor shall furnish a list of affected Contractor and subcontractor employees (names and signatures) that have completed the training within seven (7) calendar days after completion of training.
1.6.12.5. Operations Security (OPSEC) Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete four (4) OPSEC classes: OPSEC 1301 Fundamentals; OPSEC Awareness for Military Members, DOD Employees, and Contractors; Social Media and Operations Security Training; and Social Networking. These shall be completed within (14) calendar days after contract start date. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR within (14) calendar days after completion. These courses are available online at the following websites:
a. http://www.lewis-mcchord.army.mil/des/OPSEC%20Training/index.htm
b. OPSEC 1301 OPSEC Fundamentals (4 Hours)
c. http://cdsetrain.dtic.mil/opsec/index.htm OPSEC Awareness for Military Members, DOD Employees, and Contractors (45 minutes)
d. HTTPS://IA.SIGNAL.ARMY.MIL/SMS.ASP (Social Media and Operations
Security Training)
e. http://iase.disa.mil/eta/sns_v1/sn/launchPage.htm (Social Networking) http://www.lewis-mcchord.army.mil/des/OPSEC%20Training/index.htm http://www.lewis-mcchord.army.mil/des/OPSEC%20Training/index.htm http://cdsetrain.dtic.mil/opsec/index.htm https://ia.signal.army.mil/SMS.ASP http://iase.disa.mil/eta/sns_v1/sn/launchPage.htm
1.6.12.6. Emergency Services. The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor shall notify the COR one (1) day following any accident that requires medical treatment. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
1.7. QUALITY CONTROL AND QUALITY ASSURANCE. The Contractor shall implement an effective Quality Control Program.
1.7.1. Quality Control Program (QCP). The contractor is required to control the quality of service, delivery, and offer to the Government for acceptance only services that conform to contract requirements. The contractor is responsible for the delivery of quality services and supplies to the Government. Perfect performance is not required for the control of quality to be satisfactory. Specific service delivery must be in substantial compliance with contract requirements and be suitable for the intended purpose of the contract. The overall control of quality must meet the specified performance thresholds for each required service. The Contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with this PWS. The QCP must be forwarded to and accepted by the Contracting Officer’s Representative (COR). The Contractor’s QCP is a means by which the Contractor assures that the work complies with the requirements of the contract. The QCP shall be delivered no later than thirty (30) calendar days after the contract award date of the base period. When changes are made, an electronic copy of a comprehensive written QCP shall be submitted to the KO and COR within five (5) working days before the effective date of the change.
1.7.2. Quality Assurance. The Government will perform Quality Assurance oversight of the contractor using the Quality Assurance Surveillance Plan (QASP) to ensure acceptable levels of contract performance are achieved. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable quality level(s) (AQL). Government surveillance of Contractor performance is not limited to the Performance Objectives as outlined in this PWS. If a performance standard was not met or a contract performance was not accomplished, the COR will initiate and provide the Contractor a non-conformance report. The Contractor will be given a time line after notification to correct the deficiency in accordance with requirements of the contract. Deficiencies that cannot be corrected within the identified time line will be reported to the KO.
1.7.3. Quality Assurance Surveillance Plan (QASP). The QASP is compiled utilizing the same performance objectives as identified in the "Performance Requirements Summary (PRS)," (PWS Para. 7.1). The contractor's Quality Control Program and contract performance will be evaluated as shown in the PRS. If re-performance of a service is required, the original inspection results will be recorded as unsatisfactory. When overall monthly performance for a required service meets or exceeds the performance threshold, the rating is satisfactory. Only the original inspection results by the Government will be used to make this evaluation. Failure to meet the performance threshold for a required service means that service for the observation period is unsatisfactory. Each service will be evaluated during each observation period, which is generally one month.
1.7.4. Performance Evaluation Meeting. Performance evaluation meetings may be required when requested by the Government or contractor, refer to para 1.6.8 for additional information.
1.8. Environmental Requirements: ISO 13001- As Implemented By JBLM Public Works Environmental Policy
1.8.1. Hazardous Materials. For any hazardous materials, the Contractor shall submit an initial list of hazardous materials to be used (including unit of measure and Safety Data Sheet for each product). A copy of these documents must be submitted to the Joint Base Lewis-McChord (JBLM) Pollution Prevention Program () (usarmy.jblm.id-readiness.list.dpw-hm-inventory@army.mil) prior to commencement. These items must be reviewed by Pollution Prevention and authorized for use if they are not already on the JBLM installation Authorized Use List. The Contractor shall not use any hazardous materials not authorized by Pollution Prevention. For any in-use hazardous materials, the Contractor shall submit a hazardous material inventory on HJB Form 953 noting the hazardous materials used, the units of measure, quantities used, storage locations, and other information indicated on the form. This inventory shall be submitted at the end of the project. [If the project goes into a new calendar year, the Contractor shall also submit a copy of this inventory (accounting for all hazardous materials) by 14 January.] For any hazardous materials stored on JBLM, this inventory shall be submitted by the 14th day following the calendar year quarter in which the hazardous materials were used or stored. All HJB 953 inventories shall be submitted electronically and addressed to the Contracting Officer or the COR with usarmy.jblm.imcom.list.dpw-hminventory@mail.mil included in the carbon copy (“cc”) line of the email. Questions regarding the form may be directed to the JBLM Pollution Prevention Program (966-6469).
1.8.2. Sustainable Acquisition. In order to comply with federally mandated sustainable acquisition requirements and Department of Defense (DOD) and Department of the Army (DA) Green Procurement Program (GPP) policies, Joint Base Lewis-McChord (JBLM) requires the purchase, supply, and use of environmentally preferable products and services. Program elements include: recovered material products, energy and water efficient products, alternative fuels and fuel efficiency, bio-based products, non-ozone depleting substances, and environmentally preferable products. These elements are described on the Office of Federal Procurement Policy website http://www.whitehouse.gov/omb/procurement_index_green/ and http://sftool.gov/GreenProcurement. Additionally, the JBLM Guide to Sustainable Acquisition for Construction is available in the “Reference Manuals” section of the JBLM Design Standards webpage (http://www.lewis-mcchord.army.mil/designstandards/index1.htm). The Contractor shall comply with all applicable Federal, DOD, Army, and JBLM sustainable acquisition laws and policies. If compliant products are unavailable or determined to be impracticable based on cost or performance, the Contractor shall contact the Contracting Officer or the COR for further guidance.
Additional information is available from the JBLM Sustainable Acquisition Program at (253) 966- 6466 or usarmy.jblm.imcom.list.dpw greenprocurement@ mail.mil.
1.8.3. Environmental Management System (EMS). The JBLM EMS conforms to the criteria defined in the international standard, ISO 13001:2004 Environmental Management Systems – Requirements with guidance for use. In accordance with EMS procedures, the Contractor shall be familiar with the JBLM environmental policy and shallensure that this information is considered and incorporated into this project. The installation policy can be found at mailto:usarmy.jblm.id-readiness.list.dpw-hm-inventory@army.mil http://www.whitehouse.gov/omb/procurement_index_green/ http://sftool.gov/GreenProcurement http://www.lewis- mcchord.army.mil/publicworks/sustainability/EMS/environ_policy.aspx (click on JBLM Policy). Additional information regarding the JBLM EMS is available from the installation EMS Coordinator (253-966-6470). An environmental awareness training resource is available to the Contractor at http://www.lewismcchord.army.mil/publicworks/sustainability/EMS/EnvTraining.aspx.
1.8.4. Environmental Coordination. The Contractor shall comply with all Joint Base Lewis- McChord (JBLM) environmental requirements, including the most current installation Regulation 200-1 (Environmental Protection and Enhancement). Regulation 200-1 is available in the “Reference Manuals” section at the JBLM Design Standards website at http://www.lewis-mcchord.army.mil/designstandards/index1.htm.
1.9. Utilities
1.9.1. Utilities. The Government will not provide utilities other than what is available in the facility for Contractor’s use. Government utilities will be used only in the performance of tasks outlined in this PWS. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities. The Contractor shall not change or modify any utility system or component without prior COR review and written approval. The Contractor shall reimburse the Government for lost, damaged, or misappropriated property for which Contractor personnel are responsible.
PART 2
DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions:
2.1.1. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2. Contractor-Acquired Property. Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
2.1.3. Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government.
Note: The only individual who can legally bind the Government.
2.1.4. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
http://www.lewismcchord.army.mil/publicworks/sustainability/EMS/EnvTraining.aspx http://www.lewis-mcchord.army.mil/designstandards/index1.htm
2.1.5. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports. Electronic delivery is permitted if agreed and written in the contract.
2.1.6. Equipment. A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
2.1.7. Government-Furnished Property. (NOT APPLICABLE TO THIS CONTRACT)
2.1.8. Government Property. (NOT APPLICABLE TO THIS CONTRACT
2.1.9. Material. Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.
2.1.10. Non-Personal Services. The personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non- personal service contracts are authorized by the Government in accordance with FAR 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.11 Part. A piece or segment of something such as an object, which combined with other pieces makes up the whole. A component that can be separated from or attached to a system.
2.1.12. Property. All tangible property, both real and personal.
2.1.13. Provide. To furnish, as in Government-furnished property, or to acquire, as in Contractor-acquired property.
2.1.13. Quality Assurance. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.14. Quality Assurance Surveillance Plan. An organized document written by the Government specifying the surveillance methodology used for surveillance of Contractor performance.
2.1.16. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.17. SubContractor. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the sub-Contractor.
2.1.18. Wide Area Work Flow (WAWF). A secure web based system for electronic invoicing, receipt, and acceptance. WAWF allows Government vendors to submit and track invoices and receipt/acceptance documents over the web and allows Government personnel to process those invoices in a real-time, paperless environment.
2.1.19. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.20. Work Week. Monday through Friday, unless specified otherwise.
2.2. Acronyms:
ANSI American National Standards Institute AQL Acceptable Quality Level AR Army Regulation COR Contracting Officer’s Representative FAR Federal Acquisition Regulation GFP Government-Furnished Property ITM Inspect, Test, and Maintain KO Contracting Officer POC Point of Contact PRS Performance Requirements Summary SCBA Self-Contained Breathing Apparatus OSHA Occupational Safety and Health Administration PWS Statement of Work QA Quality Assurance QASP Quality Assurance Surveillance Plan QCP Quality Control Program TE Technical Exhibit WAWF Wide Area Work Flow
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Utilities. Not Applicable to this contract.
PART 4
CONTRACTOR-FURNISHED ITEMS AND SERVICES
4. CONTRACTOR-FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General. The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Vehicles. The Contractor vehicles shall be maintained in good operating order and meet all Federal, State, local, and JBLM requirements. This includes but is not limited to compliance with environmental laws, weight restrictions, and safety requirements. The Contractor shall not perform vehicle maintenance or repair on Government property unless classified as an emergency or as approved by the COR.
4.3. Permits, Taxes, and Business Licenses. The Contractor shall, at its own expense, obtain all necessary permits, pay licenses/taxes applicable to the business carried on under this contract.
4.4 Required Certifications. The Contractor shall, at its own expense, obtain all necessary certifications necessary to perform repairs and services under this contract in accordance with the following standards:
a. OSHA 1910.134, Respiratory Protection,
b. NFPA 1852, Standard on Selection, Care and Maintenance of Open-Circuit
Self-Contained Breathing Apparatus (SCBA)
c. NFPA 1989, Standard on Breathing Air Quality for Emergency Services
Respiratory Protection
Required certifications shall include:
a. MSA Certified Air Mask Repair Education Certified (C.A.R.E)
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. Service Delivery Plan. Contractor shall prepare and provide a Service Delivery Plan to the COR for review within 30 calendar days after contract award. The contractor shall maintain, update, and edit the provided Service Delivery Plan as any changes occur. Technical Exhibit 2 (TE-2), provided by the Government, will show a list and previous inspection dates of equipment that requires ITM and will serve as the basis to create a work schedule for the service delivery plan. The TE-2 shall be examined closely by the contractor for needed changes on a monthly basis and equipment as required. The following shall be addressed in the Service Delivery Plan:
management (staffing matrix, training, and maintaining qualified personnel), operational procedures for the delivery of required services including the facility scheduling, Quality Control Plan, Safety Plan, environmental management, and record keeping and reporting. The inspection schedule provided to the Government shall be amended throughout the year. The Equipment Scheduling Plan shall be organized into twelve sections, each titled with a month of the year, and have listed in each section the equipment serial numbers / Identification markings and ITM services that will be scheduled/provided during that month.
5.2. ITM. The contractor shall perform operational ITM on equipment including face pieces, regulators, SCBA, air cylinders, escape bottles and air carts.
5.2.1. ITM Program. The JBLM Directorate of Emergency Service (DES) and the contractor shall work together to implement a planned ITM program, as defined in the NFPA. The plan shall be used to prevent and correct deficiencies with the systems, minimize system failure and service interruptions, extend component life, and maximize operating efficiency. The contractor shall coordinate all scheduled ITM with the DES. This coordination shall be accomplished by the contractor before proceeding with any ITM or repairs on DES equipment. Contractor shall coordinate with the DES POC/manager in advance to allow for a scheduling timeline. At the conclusion of ITM and repair, the contractor shall inform the originally notified DES POC/manager that the maintenance work is completed for that day or will continue the next workday.
5.2.2. Work Area Cleanliness. It is the contractor’s responsibility to ensure the work area is cleaned up after performing maintenance. Contractor caused debris, spills, soiling the area, ground erosion or other messes shall be completely cleaned up, remediated and repaired before departing the area.
5.3. Planned Work Schedule. Once per month after the contract is awarded the contractor and COR shall review the current inspection, testing, and maintenance schedule for all pieces of equipment maintained under this contract. After review, if deemed necessary, the contractor shall submit to the COR a revised work schedule for review.
5.6 DOCUMENTATION
5.6.1 General Documentation. Contractor will provide JBLM FES with a copy of all documentation associated with this contract no later than 30 days after each period of performance ends. This includes (but is not limited to) detailed repair records, test results, contract charges, non-contract charges (separate invoices), etc. The records should include the full serial number of the component(s) repaired and/or tested.
5.6.2. ITM, REPAIR AND REPORTS. The contractor shall submit the monthly report of work completed on the equipment serviced during that month. Reports shall be created with the use of an Excel compatible program, the COR must accept the final contractor submitted template of these forms. Forms shall be included in the service delivery plan. The contractor shall supply a copy to the Government and keep a copy of the compressed air certification, hydro-test results and any other documentation as required by regulation.
5.6.3. Monthly Report. The contractor shall maintain a record of the reports for ITM and repairs for each contract year. The report shall include a serial number / identification number listing of all tested devices. The contractor shall submit the monthly report electronically to the COR by the tenth (10th) working day of the month following the month that the work was performed prior to invoicing. The monthly report shall contain the actual cost breakdown and repair work labor hours used and a summary of all work performed. The additional parts and materials costs shall be shown on the report. The report shall include the names and job titles of all employees servicing the equipment. In summary all ITM maintenance and repairs mentioned in this PWS shall be consolidated on the monthly report.
5.6.4. Monthly Invoicing. The contractor shall invoice on a monthly basis in the WAWF system.
The WAWF instructions are in given in FAR Clause 252.232-7006 of this contract. Each month shall include a list of all tested devices from the Technical Exhibit 1 (TE-1), and attach to the invoice with the total cost of ITM for the month. Include invoicing for all CLINs serviced on the same WAWF submission each month.
5.7 INSPECTION AND ACCEPTANCE TERMS.
5.7.1 INSPECTION Services will be inspected and accepted at each facility of service.
Acceptance will be on site of service and acceptance will be conducted by Government KO, COR, or QA.
5.7.2 AUTHORITY. Any questions, disputes or uncertainties pertaining to technical, fire, safety, or industry matters will rely on the recommendations of the Fire Department representative to research the matter and respond with reliable information. All schedules of performance and work shall be submitted electronically to the KO and COR.
5.7.3 PERFORMANCE THRESHOLD. The performance threshold for a required service is the established level of quality control by which the service for the observation period is deemed satisfactory or unsatisfactory.
5.8 Replacement Parts and Materials
5.8.1. Replacement Parts and Material. Parts shall be new and shall be of equal size and capacity to existing parts and shall be of equal or better quality than existing parts. All parts shall be warranted against defects or failure for a minimum period of one (1) year. Any new or replaced part that fails within one (1) year after installation shall be replaced, including labor, at no cost to the Government.
5.8.2. Materials Material shall be of at least equivalent material, strength, and design, as specified by the manufacturer.
5.8.3. Unavailability of Replacement Parts. In case where replacement parts and material are not available to satisfy the requirement of this contract, the Contractor shall submit an alternative solution to the COR to keep the equipment in operation. A COR approval (verbal or written) must be obtained before proceeding with the alternative solution. The Contractor shall provide the following information: Parts required and the estimated completion time.
PART 7
TECHNICAL EXHIBITS
7.1 PERFORMANCE REQUIREMENTS SUMMARY. The Contractor performance requirements are summarized into performance objectives that relate directly to standards of performance required to meet mission essential needs. The performance threshold briefly describes the minimum acceptable overall levels of service required for each required service. These thresholds are critical to mission success.
7.2. DELIVERABLES. The contractor shall provide products to the COR in accordance with the instructions included in the PWS paragraphs indicated for each deliverable and listed within in Technical Exhibit 1 (TE-1).
TECHNICAL EXHIBIT TABLE
Technical Exhibit # Name # Pages TE-1 Equipment Quantities and Service Schedule
Requirements
TECHNICAL EXHIBIT 1
SERVICE REQUIREMENT SERVICE SCHEDULE QUANTITIES
1. Inspect, Service, Test and Repair of MSA G1 Face Pieces
ANNUALLY AND AS
REQUIRED
2. Inspect, Service, Test and Repair of MSA G1 Self-Contained Breathing Apparatus
ANNUALLY AND AS
REQUIRED
3. Inspect, Service, Test and Repair of MSA G1 Rapid Intervention Team (RIT) Rescue Systems
ANNUALLY AND AS
REQUIRED
4. Inspect, Service, Test and Repair of MSA 5-Min Escape Packs
ANNUALLY AND AS
REQUIRED
5. Inspect, Service, Test and Repair of Confinded Space Air Carts
ANNUALLY AND AS
REQUIRED
6. Perform 5-Year Hydrostatic Air Cylinder Service (45 min/ 60 Min)
EVERY 5 YEARS PER
CYLINDER
7. Annual Inspection, Service, Testing And Repair (ISTR) of Air Reservicing Compressors (Eagle)
ANNUALLY AND AS
REQUIRED
8. Conduct Quarterly Air Compressor Air Sampling And Recalibration
QUARTERLY PER UNIT 16
TECHNICAL EXHIBIT 1
SERVICE REQUIREMENT SERVICE SCHEDULE QUANTITIES
1. Inspect, Service, Test and Repair of MSA G1 Face Pieces
ANNUALLY AND AS REQUIRED 163
2. Inspect, Service, Test and Repair of MSA G1 Self-Contained Breathing Apparatus
ANNUALLY AND AS REQUIRED 115
3. Inspect, Service, Test and Repair of MSA G1 Rapid Intervention Team (RIT) Rescue Systems
ANNUALLY AND AS REQUIRED 10
4. Inspect, Service, Test and Repair of MSA 5-Min Escape Packs
ANNUALLY AND AS REQUIRED 6
5. Inspect, Service, Test and Repair of Confinded Space Air Carts
ANNUALLY AND AS REQUIRED 2
6. Perform 5-Year Hydrostatic Air Cylinder Service (45 min/ 60 Min)
EVERY 5 YEARS PER CYLINDER 230
7. Annual Inspection, Service, Testing And Repair (ISTR) of Air Reservicing Compressors (Eagle)
ANNUALLY AND AS REQUIRED 4
8. Conduct Quarterly Air Compressor Air Sampling And Recalibration
QUARTERLY PER UNIT 16
PART 7-APPENDIX LISTING
7.1 PERFORMANCE REQUIREMENTS SUMMARY. The Contractor performance requirements are summarized into performance objectives that relate directly to standards of performance required to meet mission essential needs. The performance threshold briefly describes the minimum acceptable overall levels of service required for each required service.
These thresholds are critical to mission success.
Appendix 1
APPENDIX 1
PERFORMANCE OBJECTIVE PWS
PARA.
PERFORMANCE STANDARD PERFORMANCE REQUIREMENT
1. Documentation 5.6.1. Contractor will provide JBLM FES with a copy of all documentation associated with this contract no later than 30 days after each period of performance ends.
95% accurate record reporting
2. ITM, Repairs and Reports 5.6.2.
The contractor shall submit the monthly report of work completed on the equipment serviced during that month.
95% accurate record reporting
3. Monthly Report 5.6.3. The contractor shall maintain a record of the reports for ITM and repairs for each contract year.
The report shall include a serial number / identification number listing of all tested devices. The contractor shall submit the monthly report electronically to the COR by the tenth (10th) working day of the month following the month that the work was performed prior to invoicing.
95% accurate record reporting
4. Emergency Service Calls 1.6.4.2. An emergency service call is an onsite response to a designated location, within twenty-four (24) hours, for services that require immediate attention.
Within 2 hrs +- of call
5. Normal Service Calls 1.6.4.3. The contractor shall respond and be on site within seventy-two (72) hours during normal work hours when called by the COR.
Within 24 hrs of agreed upon date of service
7.2. DELIVERABLES.
The contractor shall provide the following products to the COR in accordance with the instructions included in the PWS paragraphs indicated for each deliverable.
Appendix 2
DELIVERABLES PWS
PARA
METHOD REQUIRED DATE
Service Delivery Plan 5.1. Shall be Microsoft Office 2013 compatible, submitted via electronic mail to the COR.
Report may be in contractor format.
Initial: Within thirty (30) calendar days after contract award.
Subsequent: Annually and update as required.
Monthly Reports and Records
5.6.4, 5.6.5
Shall be Microsoft Office 2013 compatible, submitted via electronic mail to the COR.
Report may be in contractor format.
Provided by the tenth (10th) working day of the month following the month during which the work was performed prior to invoicing.
OPSEC Training Certificates
1.6.13
Shall be Microsoft Office 2013 compatible, submitted via electronic mail to the COR.
Report may be in contractor format.
Initial: Complete within ten (10) calendar days after contract award.
Subsequent: Annually and update as additional contractor personnel perform under contract.
Anti-terrorism Training Certificates
1.6.12.
Shall be Microsoft Office 2013 compatible, submitted via electronic mail to the COR.
Report may be in contractor format.
Initial: Complete within ten (13) calendar days after contract award.
Subsequent: Annually and update as additional contractor personnel perform under contract.
iWatch Training List 1.6.12.
Shall be Microsoft Office 2013 compatible, submitted via electronic mail to the COR.
Report may be in contractor format.
Initial: Complete within ten (10) calendar days after contract award.
Subsequent: Annually and update as additional contractor personnel perform under contract.
Provide proof of trained and certified repair technician for
4.4 Shall be Microsoft
Office 2013 compatible or PDF format, Initial: All technicians shall provide proof ten
(10) days after contract service of the specific type and manufacturer of system.
submitted via electronic mail to the COR and the Contract Specialist.
award and before any ITM. All newly employed contractor technicians shall provide proof before performing work under this contract.
Provide proof of personnel who are registered, licensed, or certified by a state or local authority or nationally recognized testing laboratory.
1.7.1- 1.7.2.
Shall be Microsoft Office 2013 compatible or PDF format, submitted via electronic mail to the COR and the Contract Specialist.
Initial: All technicians shall provide proof ten
(10) days after contract award and before any ITM. All newly employed contractor technicians shall provide proof before performing work under this contract.
Appendix 1