PWS.docx

DOCX document 137 KB Posted

Attached to
Repair of Guidance and Navigation Components (Multi NSN)
Solicitation number
FA811720R0019
Issued by

About this file

This performance work statement outlines repair requirements for guidance and navigation components from multiple national stock numbers. The contractor shall provide repair services including disassembly, inspection, maintenance, reassembly, testing and delivery of items to a serviceable condition. Repairs must meet original equipment manufacturer specifications and pass final acceptance testing. The contractor is responsible for replacement of any parts that do not meet inspection requirements or are unserviceable. Delivery performance and quality metrics are defined, and the contractor must meet reporting requirements. Relevant details are provided on repair procedures, engineering support, quality assurance, packaging and other technical requirements.

View the file

Other files

File Type Posted
DID 81107A.pdf PDF
DID 81832.pdf PDF
CDRL.pdf PDF
DID 81250B.pdf PDF
Schedule.pdf PDF
DID 80727A.pdf PDF
DID 80639E.pdf PDF
DID 81249B.pdf PDF
DID 81804A.pdf PDF
DID 80125B.pdf PDF
Synopsis.doc DOC document
DID 80441C.pdf PDF
DID 81656B.pdf PDF
DID 80126B.pdf PDF
DID 81803.pdf PDF
DID 80229D.pdf PDF
DID 81634C.pdf PDF
DID 80969.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE SUSTAINMENT CENTER

TINKER AIR FORCE BASE, OKLAHOMA 73145

Performance Work Statement (PWS)

TYPE OF WORK: Repair of Boeing Guidance and Navigation Components

PURCHASE REQUEST:

REVISION: DATE: 10 Mar 2020

PREPARED BY:

Vincent West

422 SCMS/GUMA

TINKER AFB, OK. 73145-3031

DSN 336-5879

REVISION SHEET

Note: All revisions to the contents of this PWS will now be listed on this Revision Sheet. The original content of this PWS will not be removed, but will be superseded or added to by the paragraph revisions shown on this page.
Revision Date ParagraphParagraph is added or revised to read as follows:

PREFACE SHEET

END ITEM RECEIVED AS
END ITEM TO BE DELIVERED AS
END ITEM NO
NATIONAL STOCK NO(S)
PART NO(S)
NATIONAL STOCK NO(S)
PARTS NO(S)
1
5985-01-374-7496 01
4000-03000-11
Same
Same
2
5895-01-590-7642
816-30100-5
Same
Same
3
5985-01-376-4538
4000-08000-11
Same
Same
4
5985-01-470-2026
4000-04000-15
5895-01-549-6743
4000-04000-17
5
5985 01 549 6743
4000-04000-17
Same
Same
6
5985-01-470-2028
4000-21000-11
5895-01-549-6744
4000-21000-13
7
5985 01 549 6744
4000-21000-13
Same
Same
8
6130-01-378-1476
830800-605
Same
Same
9
6605-01-357-4519

and/or 6605-01-296-9809

34065750-023

34065750-022

6605-01-357-4519
34065750-023
6605-01-380-4930
833000-607
Same
Same
11
6615-01-021-3681
156555-01-02
Same
Same
12
6615-01-107-2571
163447-03-01,

163447-01-01 675-11067-601

6615-01-107-2571
163447-03-01
13
6645-01-416-0412
830300-605
Same
Same
14
7025-01-530-5032
13221618-07
Same
Same
15
8145-01-232-5163
7450-1
Same
Same
16
5895-01-373-9108
4000-05000-07
Same
Same
17
5895-01-375-2104
4000-02000-05
Same
Same
18
5895-01-375-8743
4000-09000-07
Same
Same
19
6605-01-475-3774
831000-611
Same
Same
20
6610-01-171-0849
077-014-001
Same
Same
21
6615-00-303-6728
4004303-901
Same
Same
22
6615-01-162-6713
139100-02-01
Same
Same
23
5985-01-550-1540
4000-01000-11
Same
Same
24
6605-01-357-7912

and/or 6605-01-318-5607 6605-01-335-5991 890600-7

890600-5 890600-6

6605-01-357-7912

890600-7

25
6605-01-481-1856

and/or 6605-01-354-0466 6605-01-389-4727 34078600-315

34078600-312 34078600-314

6605-01-481-1856

34078600-315

26
6605-01-357-8976

and/or 6605-01-341-6241 890500-11

890500-10

6605-01-357-8976

890500-11

27
6605-01-389-0775

and/or 6605-01-354-0467 890500-203

890500-202

6605-01-389-0775

890500-203

28
6605-01-353-0943

and/or 6605-01-313-1810 34078600-008

34078600-007

6605-01-353-0943

34078600-008

Table of Contents

REVISION SHEETii
PREFACE SHEETiii
1DESCRIPTION OF SERVICES/GENERAL INFORMATION1
1.1PURPOSE1
1.2PROGRAM MANAGEMENT1
1.3MEETINGS AND CONFERENCES1
1.4QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS2
1.5OBSOLESCENCE STATEMENT3
1.6CONDEMNATION CANDIDATES4
1.7SUPPORT EQUIPMENT (SE), INCLUDING SPECIAL TOOLS (ST) AND SPECIAL TEST EQUIPMENT (STE)4
1.8PRECIOUS METALS RECOVERY PROGRAM: Not applicable.6
1.9NUCLEAR HARDNESS REQUIREMENT6
1.10CONFIGURATION MANAGEMENT6
1.11PARTS CONTROL PROGRAM6
1.12COUNTERFEIT PREVENTION PLAN (CPP)7
1.13OZONE DEPLETING SUBSTANCES (ODS)9
1.14LEAD (Pb) FREE ELECTRONICS10
1.15TECHNICAL ORDER MAINTENANCE10
1.16CONTRACTOR IDENTIFICATION10
1.17GENERAL WORK REQUIREMENTS11
1.18SPECIFIC WORK REQUIREMENTS11
1.19SPECIAL REQUIREMENTS15
1.20SAFETY AND HEALTH REQUIREMENTS15
1.21PRODUCTION SURGE PLAN15
1.22MISSION ESSENTIAL SERVICES16
1.23DELIVERY SCHEDULE16
1.24INFORMATION REQUESTS17
1.25REPORTING REQUIREMENTS17
2SERVICE SUMMARY18
2.1SERVICE SUMMARY18
3GOVERNMENT PROPERTY22
3.1GOVERNMENT FURNISHED MATERIAL, EQUIPMENT, AND PROPERTY22
3.2DISPOSITION OF GOVERNMENT PROPERTY22
3.3REPORTING LOSS OF GOVERNMENT PROPERTY23
3.4DISCREPANCIES INCIDENT TO SHIPMENT24
APPENDIX A25
Definitions25
APPENDIX B29
Applicable Documents, Technical Orders, Directives, and Technical Guidance29
APPENDIX C33
Contractor Full-Time Equivalent Reporting33
APPENDIX D34
Data Item Description (DID) List34
APPENDIX E37
Category of Repair Descriptions37
APPENDIX F38
Commercial Asset Visibility Air Force38

vi

FD2030-19-02348

DESCRIPTION OF SERVICES/GENERAL INFORMATION

PURPOSE

The purpose of the Performance Work Statement (PWS) is to define the repair requirements for the items specified on the Preface Sheet of this PWS. The Contractor is responsible for having the repair capabilities to include appropriate technical data, repair documents, and license agreements, required to accomplish this repair. The Contractor is responsible for the scheduled delivery of a quality product.

PROGRAM MANAGEMENT

The Contractor shall provide program management to support all repair/overhaul efforts and engineering support The Contractor Program Managers (PM) shall be available to interface on a day to day basis with the Government Sustainment Program Managers. Contractor’s Program Managers shall ensure that a prompt response is provided to communications received from the Government.

The Contractor’s Program Managers shall also act as the focal point for all Engineering Change Proposal (ECP) (ref par. 1.10.1).

MEETINGS AND CONFERENCES

The Contractor shall meet as mutually agreed upon for Program Management Review (PMR) meetings to discuss the current sustainment contract and review technical issues. Meetings can be held at a third party vendor facility, at the program facility, or as mutually determined to meet a particular need. Meeting may be via telephone, video conference, or face to face. Meetings shall follow the format laid out in (DIDs) DI-ADMN-81249B and DI-ADMN-81250B.

The Contractor shall also support additional meetings (e.g., teleconferences, Technical Interchange Meetings (TIM), etc.) with the Government as mutually agreed upon.

COLLABORATIVE FORECASTING

The Contractor shall participate with the Government in collaborative forecasting meetings. These open communications will facilitate better planning by both organizations.

The Government and the Contractor shall jointly develop a collaborative forecasting process within six months after award. This process may be later modified by mutual agreement.

The meetings will be held face to face at a mutually agreed upon location; or by Video Teleconferencing (VTC); or by phone conference. At a minimum, meetings will be held semi-annually with one held in conjunction with PMR and the other semi-annual via VTC or phone conference The Government will identify the items that will be discussed during the meetings. The Contractor may recommend to the Government PM items to be discussed and will disclose any information and records that facilitate the collaborative forecasting process.

The Government will provide a minimum of 24 months of anticipated requirements. The requirements forecasts are for planning purposes only and are not a commitment by the Government of future procurement of the services discussed.

The Government will retain item management responsibility for all items.

The Contractor shall provide a status report on a mutually agreed to basis in accordance with (DI-MGMT-81928) in contractor format.

QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS

The Contractor shall establish, document, and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with contract requirements. Each end-item identified to the Government shall be inspected and delivered to the Government as serviceable asset.

The Contractor shall assist the Defense Contract Management Agency (DCMA) investigation of all Deficiency Reports (DRs) submitted against reportedly defective items repaired by the Contractor to determine the root cause for deficiencies reported by the customer. The Contractor shall ensure each DR is processed in accordance with (IAW) T.O. 00-35D-54, USAF Deficiency Reporting and Investigating System. When the Contractor receives a DR, quality deficiency report (QDR) or teardown deficiency report (TDR), the Contractor shall ensure DRs include: Analysis of data to determine extent and cause of deficiencies, analysis of trends in processes or performance of work to prevent recurrence, and introduction of required improvement, corrections, and monitoring of the effectiveness of corrective action taken. Timely correction and reporting of defects found and corrective action to prevent repeated discrepancies shall be an integral part of the Contractor’s procedures. Corrective action will extend to the performance of all subcontractors. When defective trends begin to develop or when the specific cause(s) of defects that render a product unserviceable cannot be identified and corrected without an evaluation of an exhibit, such exhibit(s) shall be requested by the Contractor for purposes of investigation.

The Contractor shall report any Government Furnished Property (GFP), for the work accomplished as outlined in this PWS that is damaged, malfunctioning, or otherwise unsuitable for use to the ACO using a Report of Shipping (Item) and WebSDR. Reports shall be accomplished in accordance with the current issue of T.O. 00-35D-54.

The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly, to determine that the standards of performance and technical conformance meet the requirements of this PWS. Upon completion of the quality audit, the Contractor shall incorporate into the repair process such corrective action(s) as are necessary to eliminate the cause(s) of any defects as directed by the ACO.

The Contractor shall support quality assurance reviews to be conducted at the site of repair at the request of the Government throughout the contract period.

The Contractor shall support a quality acceptance review by the DCMA representative at the site of repair for each end item generated under the terms of this contract.

Requests for deviation/waiver shall be submitted to the PCO through the ACO. Work shall not be initiated on assemblies/components affected by deviation/waiver pending approval/disapproval. Requests shall include the consideration to be provided if the government accepts the deviation and, where applicable, the following: contract number; NSN and P/N of end item and lowest part/assembly affected, a complete description of the contract requirement affected and the nature of the deviation, effect on cost/price and delivery schedule, description of deviation/waiver, number of units (and serial numbers as applicable) to be delivered in this configuration, any impacts to logistics support element, justification for deviation/waiver, and information on remedial or corrective actions to prevent recurrence.

Government Industry Data Exchange Program (GIDEP) The Contractor shall participate in the GIDEP practices described below in accordance with the DOD-wide practice outlined in Topic 26A of the Defense Acquisition Desk book (DAD). The Contractor shall review GIDEP ALERTs/ Problem Advisories, and other GIDEP Failure Experiences Reports (FER) for potential impact to hardware both in repaired and delivered items. The Contractor shall notify the PCO, via Telecom or Electronic communication within two (2) business days of discovery if a FER will negatively impact system performance. For FERs that identify parts or materials that are noncompliant to hardware specification or drawings but do not affect performance requirements of production items, the Contractor shall dispose of the parts or material through its internal quality assurance processes. The Contractor shall review GIDEP Diminishing Manufacturing Sources and Material Shortages (DMSMS) notices for applicability to the operational hardware being delivered. The Contractor shall identify GIDEP related failures and/or material acquisition problems at each Program Management Review (PMR) and Technical Interchange Meeting (TIM). The Contractor shall support GIDEP urgent Data Request (UDR) efforts and, when applicable, take advantage of the Calibration Procedures, Metrology Documents, and Technical Manuals available at no cost to GIDEP participants to reduce the overall contract cost.

The following (DIDs) DI-QCIC-80125B (Alert/Safe-Alert Report) and DI-QCIC-80126B (Alert Response) will detail the requirement in Paragraph 1.4.8.1

OBSOLESCENCE STATEMENT

The Contractor is responsible for identifying sources for required components prior to commencing work under this contract. Upon receipt of the contract or subsequent delivery order, the Contractor shall identify any required components that are no longer available. Within thirty (30) calendar days after receipt of this contract or subsequent delivery order, the Contractor shall notify the ACO in writing if it is unable to perform the contract or delivery order due to unavailability of required components, and that there is no suitable substitute available for such component. The notification shall include supporting documentation showing the Contractor has made a reasonable effort to obtain the parts and is unable to do so. The government may consider an equitable adjustment in the specification, delivery time/or price rather than terminating the contract or delivery order.

CONDEMNATION CANDIDATES

The Contractor shall repair all items unless the ACO provides direction in writing that a particular item is excluded from these requirements. The Contractor shall report end items that have been determined to be Beyond Economical Repair (BER) in which the repair cost will exceed 75% of the Firm Fixed Price (FFP) without PCO approval. The contractor shall provide pictures of each BER item in JPEG format, as well as the estimated cost of hours and parts to bring the part to serviceable condition. Under no circumstances shall the Contractor continue work until BER is approved and a funded Over and Above mod has been awarded.The contractor shall also include documentation listed in 1.4.2-1.4.8.1 of this document with each BER request. The Contractor shall report condemnation candidates to the PCO through the ACO within thirty (30) calendar days of discovery. The Contractor shall not condemn repairable or recoverable items without prior approval of the PCO through the ACO. The Contractor shall ensure non-repairable items are disposed of IAW the Contractor’s Government-approved property procedures.

The Government reserves the right to accept or reject the BER assessment by the Contractor.

The disposition of condemned items will be determined on a case-by-case basis by the PCO.

SUPPORT EQUIPMENT (SE), INCLUDING SPECIAL TOOLS (ST) AND SPECIAL TEST EQUIPMENT (STE) The Contractor shall provide the necessary equipment required to disassemble, analyze, troubleshoot, repair, and test assets, assemblies and/or parts that are maintained under this contract The SE required to accomplish the scope of work to be completed on end-items under this contract is listed in the Technical Orders (TOs) or original equipment manufacturers (OEM) repair procedures listed in Appendix B of this PWS. If the equipment specified in the TO or OEM repair procedures is not designated as Government furnished in this contract, the Contractor shall be responsible for furnishing identical or suitable substitute SE from commercial sources.

If the Contractor intends to substitute SE, a list of the proposed substitute SE shall be provided to the PCO with the proposal. If a Pre-Award Survey (PAS) is required, at the time of the PAS conference, the Contractor shall demonstrate to the PAS team that suitable substitute SE can be acquired and meets the standards stipulated in the technical data or OEM repair procedures by the following actions:

1. Displaying drawings, schematics, or specifications which illustrate that the prospective Contractor understands the exact nature of the work to be performed and the SE required performing the tasks.

Explaining the capabilities of substitute SE to ensure that it is adequate to perform the specified testing requirements.

Defining how substitute SE will be designed, built, and calibrated without assistance from the Government, by an internal engineering capability, or the services of a recognized outside engineering agency as approved by the cognizant engineering activity.

The Contractor shall show documentation certifying the accuracy of all calibrated SE to the ACO prior to work performed as outlined in the PWS.

Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO prior to performing work. The Contractor shall ensure SE calibration is maintained throughout the performance of this contract. Upon request, the Contractor shall show calibration data to the ACO for each SE item as follows:

a. SE part number and serial number

b. Date calibrated

c. Calibration due date

d. Calibration source

e. Calibration procedure used

f. Is and was data

g. Facsimile of the current stamped calibration sticker affixed to SE item

h. Verification of full performance compliance IAW this PWS for SE items that received a limited calibration or not requiring calibration

i. Traceability to the National Institute of Standards and Technology Repair Line & Support Equipment Maintenance.

All Test Stands and Support Equipment used on this contract shall be maintained by the Contractor to perform as intended when the Test Stands and equipment were originally provided to the Contractor. Any items or components of these Test Stands or equipment shall be replaced or repaired by the Contractor to maintain performance and reliability of the Test Stands and Support Equipment as originally provided to the Contractor. Support for equipment items that are central managed shall be coordinated with the managing organization.

The Contractor shall maintain all slave aircraft items used for test and evaluation of repaired items on this contract. Any worn or unserviceable slave aircraft items shall be inducted for repair under current Delivery Orders and shipped in place. All other aircraft slave items shall be repaired by the Contractor.

The Contractor shall maintain an accurate inventory of all support equipment components delineating identification data (e.g. NSN, part number, noun, etc.) quantity, value, location, condition, etc. A report shall be provided semi-annually delineating the same.

PRECIOUS METALS RECOVERY PROGRAM: Not applicable.

NUCLEAR HARDNESS REQUIREMENT

Overall nuclear hardness of the system/subsystem shall not be reduced due to the repair procedures. Nuclear hardness requirements cannot be waived. The Contractor shall notify the PCO if the work degrades the nuclear hardness of the item within one (1) business day of determination. The Contractor shall not continue maintenance actions until Government approval is obtained from the PCO.

CONFIGURATION MANAGEMENT

Engineering Change Proposal (ECP): The Contractor shall submit to the PCO, who shall inform the appropriate government entity of any change notice, design change notice, engineering order, engineering change order, engineering change notice, specification change notice or other change that would affect the configuration of the item. Any changes made without written approval from the contracting agency shall require removal at the Contractor’s expense. The Contractor shall request government approval of all ECP changes, including substitute parts changes, through Notice of Revision (NOR) within five (5) calendar days of receipt of the Delivery Order. ECPs shall be submitted in accordance with (DID) DI-SESS-80639D. ECPs submitted shall be technically accurate, complete, clearly written, and systematically account for the proposed configuration changes. The NOR is forwarded to the custodian of each specification, drawing, associated list, or other applicable document(s) so they can make the required documentation changes.

Configuration Change: Changes to the configuration shall be made only when approved by the Cognizant Engineer. Examples of such changes are ECPs generated as the result of diminishing sources, reliability and maintainability, safety, and preferred spares. Records shall be maintained which readily and systematically account for configuration changes from the baseline configuration.

PARTS CONTROL PROGRAM

The Contractor shall establish, document, and maintain an internal parts control program (PCP) for the work associated with this PWS.

The Contractor shall establish the Program Parts Selection List (PPSL) for an end-item or system from the applicable documents in the following order of precedence:

a. TO Illustrated Parts Breakdown (IPB)

b. OEM Parts List.

Contractor shall obtain approval through the PCO to use any parts not contained in the PPSL. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the applicable end-item or system TO IPB or OEM Parts List if there is no TO IPB . The Contractor shall notify the PCO via e-mail of any configuration discrepancies noted between the applicable IPB and OEM Parts List, the engineering drawings, and the current configuration of the end-item. The Contractor shall obtain written authorization from the cognizant engineering activity through the PCO for deviations from the IPB or OEM Parts List prior to implementation.

Contractor shall ensure all Contractor Furnished Material (CFM) or parts used for replacement equals or exceeds the quality of the original material or parts. The material or parts shall be entirely suitable for repair of the end item for its intended purposes, and shall be completely interchangeable without alterations of either the subassemblies or the end item. The Contractor shall only use replacement parts purchased directly from the end-item OEM or purchased from DLA. In the event that parts are not available from either of these two sources for a pending repair operation, the Contractor shall receive written authorization from the cognizant engineering activity through the PCO for any deviations from the aforementioned sources. In the instance that surplus components are available, the cognizant engineering activity reserves the right to approve or disapprove the material. Contractor shall obtain written authorization for its usage from the cognizant engineering activity through the PCO.

The Contractor shall keep records for the life of the contract to allow traceability of the sourcing of replacement parts for each end item repaired. These records shall be furnished for inspection upon Government request.

COUNTERFEIT PREVENTION PLAN (CPP)

Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with (DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE AS5553C, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.

At a minimum, the CPP shall address:

Applicability: The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.

Parts Availability and Use of Parts Brokers: The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553C, paragraph 4.1.1, 4.1.2.e., appendix A) Procurement Policies: The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, which shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553C, paragraph 4.1.2, 4.1.3, appendix B, C, D) Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The Contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The Contractor shall require completion of a trade study, documented within the CPP that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553C, paragraph 4.1.2, 4.1.3, appendix B, C, D) Detection and Avoidance Responsibilities: The Contractor shall establish processes for the review and approval of Contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553C, paragraph 4.1.4, 4.1.5, appendix E) Testing and Verification: The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553C, paragraph 4.1.4, appendix E) Configuration Identification and Traceability: The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts, unless: a) the Contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the Contractor has provide timely notification to the government. (Ref. AS5553C, paragraph 4.1.6, appendix F) Counterfeit Notification and Reporting: The Contractor shall report in writing to the Procuring Activity within thirty (30) calendar days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI). The PCO shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30-day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553C, paragraph 4.1.7, appendix G) Counterfeit Prevention Training: The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the Contractor to their personnel.

Note - If DFARS 252.246-7007 is applicable and included in the resultant contract, the requirements outlined in section 1.12 above will not be imposed.

OZONE DEPLETING SUBSTANCES (ODS)

1.13.1 The requirement, including available technical documentation, and believe that it does not require the contractor use class i ozone depleting substances (ods) identified in air force policy, nor is it written so that it can only be met by the use of a Class I ODS.

LEAD (Pb) FREE ELECTRONICS The use of lead (Pb) free solder and/or components/assemblies in the repair of the subject items is considered a potential safety risk and is therefore prohibited. All requirements related to Pb-free Tin (Sn) items also apply to Pb-free Zinc and other metallurgical alloys known to demonstrate whisker formation, when used for electronic soldering or electronic component finish. The contractor shall ensure that the risks associated with lead (Pb)-free solder and finishes are fully considered and effectively mitigated. The Contractor shall provide case-by-case notifications to the cognizant engineering activity through the PCO if lead (Pb) free solder and/or components/assemblies must be considered, and will assist the cognizant engineering activity in assessing the risk associated with the use of such materials. The Contractor shall obtain approval from the PCO before proceeding.

The contractor shall avoid the use of alloys known to be susceptible to whisker formation in electronic soldering and finishing. When approved lead (Pb) free solder and/or components/assemblies are used in the repair of the subject items, the Contractor shall ensure the affected items are marked in accordance with IPC J-STD-609, "Marking, Symbols and Labels of Leaded and Lead-Free Terminal Finish Materials Used in Electronic Assembly.”

The contractor shall avoid the use of alloys known to be susceptible to whisker formation in electronic soldering and finishing, when approved, the contractor shall comply with GEIA-STD-0005-1, GEIA-STD-0005-2, and GEIA-STD-0006 to assure the performance, compatibility, reliability, safety and verifiability of Pb-free product(s). This compliance requirement shall include special design considerations, manufacturing process controls, test and qualification requirements, quality inspection and screening, marking and identification, maintenance and repair processes, and other steps taken to mitigate risks to ensure the reliability and quality of hardware for the intended application.

TECHNICAL ORDER MAINTENANCE

The Contractor shall maintain all TOs and other technical directives applicable to the work requirements in an updated and current status according to T.O. 00-5-1, Technical Order System, and TO 00-5-3, Technical Order Life Cycle Management. Suggested changes to Technical Data shall be submitted in accordance with (DID) DI-TMSS-80229D. The Contractor shall consider the impact of a TO change on costs, schedules, and any other pertinent factors. A written evaluation, along with specific backup data for those changes which impact the Contractor’s performance, shall be provided to the PCO within ten (10) calendar days after receipt of updated TO and directives. The Contractor shall not incorporate these technical order changes until approved by the PCO.

CONTRACTOR IDENTIFICATION

Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

GENERAL WORK REQUIREMENTS

The work performed under this contract is to repair the items specified on the Preface Sheet of this PWS. The work encompasses the disassembly, cleaning, inspection, maintenance, re-assembly, testing, and finishing actions required to return the item to a serviceable condition. The work shall be accomplished IAW documents as specified in Appendix B. Additional TOs, directives and other publications listed in Appendix B will be used as guidance to support the repair stipulated in this PWS.

When a particular repair is constrained for lack of repair materials that are not, and shall not be immediately available, the Contractor may request authorization to cannibalize subassemblies or parts between failed inducted assets in order to expedite repairs. Cannibalization requests shall be sent to the PCO for approval through the Equipment Specialist. Such cannibalization actions should only be considered upon exhaustion of all other sources of repair materials. The Contractor shall not initiate any cannibalization action unless such action shall satisfy all repair material requirements for the item in question. The Contractor shall not remove any piece parts from serviceable units. The Contractor shall replace, at the Contractor’s expense, all cannibalized subassemblies with repaired or new subassemblies and replace all cannibalized parts with new parts. The Contractor shall ensure the contract delivery schedule is not negatively affected by the removal of any subassemblies or parts from any inducted end item. The Contractor shall not condemn cannibalized end items or subassemblies without prior approval. The Contractor shall maintain configuration control of these items at all times. Exchanges should not cause damage to government property, loss of warranty, or cause the Government to incur any additional costs.

NSNs and Part Numbers are subject to change as the baseline changes at the system level. Such configuration changes may drive Contract Line Item Number (CLIN) additions and/or deletions, as mutually agreed in writing between the government and the Contractor. Form, fit, function and interface (F3I) capabilities shall not be changed, modified, or altered except when approved by Government Configuration Control Board (CCB) and an Engineering Change Proposal (ECP) has been submitted by the Contractor and approved by the Government. In addition, it typically describes how the proposed change will be implemented along with providing estimated schedules and associated costs.

SPECIFIC WORK REQUIREMENTS

Receipt and Handling: The Contractor shall perform a receiving visual inspection upon receipt for any shipping or packaging damage. Items received which are damaged, misidentified, misdirected, or incomplete shall be reported through WebSDR. If disposition is not received than contractor shall notify the PCO, with the WebSDR information Inspection: The Contractor shall inspect each item for serviceability/repairable condition as part of repair, as called out in Appendix E. Contractor’s inspection and repair documents shall reflect all inspections/repair steps required for each specific part.

Basic repair requirements: The Contractor shall provide the necessary labor, materials, parts, facilities and equipment required to disassemble, analyze, troubleshoot, repair, and test assets, assemblies and/or parts that are maintained or repaired under this contract. These services also include alignment, adjustment, calibration, testing, movement, storage and reporting status related services to the repair and return of items to the users. Work performed under this work specification includes all actions necessary to ensure that the repair activity returns the serviceable end item with the same form, fit, function, and testability to the Government, including updating to the latest hardware/software configuration approved and funded by the government. The extent of repair required to assure a serviceable end item efficiently serves its intended purpose shall be determined by the inspection, test, bench check, and required disassembly. Repaired items shall pass all OEM specifications, validated by the Special Test Equipment final acceptance test. Any component parts that do not meet specified inspection requirements, or if there is any doubt as to its serviceability or longevity shall be replaced at the Contractor’s expense. This includes any part requiring replacement due to catastrophic failure, fatigue failure, or normal deterioration.

If there is no Appendix E, the contract makes no distinction between categories of repair.

If the TO does not address the repair of consumable parts, this part shall be replaced with a new part.

In the case of utilizing a developed repair for salvaging a recoverable part, Contractor shall propose their repair procedure along with substantiating documents for evaluation and possible approval. This request for evaluation must be submitted to the cognizant engineering office for approval through the PCO. The Government will not be responsible for any costs associated with development of any repair procedures unless those procedures have been negotiated and approved by the PCO.

Over and Above: The Contractor shall execute Over and Above at the request of the PCO in the following areas: surge operations, any required proposals, missing components, and as requested or directed by the PCO. Over and Above repairs will only be considered for work discovered during the course of performing maintenance and repair efforts that are:

1. Within the general scope of the contract; and

2. Not covered by the line item(s) for the basic work under the contract

3. Necessary in order to satisfactorily complete the contract The Contractor shall complete a supply discrepancy report using webSDR for missing parts within two (2) calendar days after the asset is removed from the shipping container and shall be reported to the PCO through the ACO. The Contractor shall obtain approval from the PCO prior to performing over and above work or work outside of scope.

End Item Identification and Marking: The Contractor shall ensure each repaired end item is permanently and legibly marked with the end item part number, serial number, and Contractor's identification. This identification shall include the Contractor's CAGE and the date of repair. The identification shall be permanently affixed to the end item IAW Technical Order 00-25-260, Asset Marking and Tracking item Unique Identification (IUID) Marking Procedures.

Item Unique Identification (IUID) of Government Property: For assets under contract, IUID requirements are specified in Defense Federal Acquisition Regulation Supplement (DFARS) 252-211.7003, Item Identification and Valuation and Department of Defense (DoD) 4100.39-M, Federal Logistics Information System (FLIS). The Contractor shall ensure all assets subject to marking are recorded in the DoD IUID Registry.

IUID Marking Plan: The Contractor’s IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130, DoD Standard Practice Identification Marking of US Military Property (DID) DI-MGMT-81803. The plan must be approved by the ordering agency’s system Engineer prior to implementation.

IUID Marking Activity and Verification Report: The Contractor shall provide an IUID Marking Activity and Verification Report IAW (DID) DI-MGMT-81804A. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality.

Engineering Services: The Contractor shall provide engineering support for the NSNs identified in this PWS to resolve shortfalls and deficiencies concerning safety, supportability, reliability, availability, and maintainability. Engineering efforts may include, but are not limited to: identifying and correcting obsolete parts and Diminishing Manufacture Sources and Material Shortages (DMSMS), performing engineering analysis, mishap/safety investigations, prototyping, assess and resolve materiel deficiencies, reverse engineering, modeling, simulation, and providing engineering data. Requirements will be detailed and cited in mutually agreed upon separately funded task orders accompanied by a task specific PWS and other applicable documents.

Quality Acceptance and Processing:

Quality acceptance of each end item shall be performed prior to packaging and transportation. Quality acceptance shall be performed by DCMA at the repair site. Quality acceptance documentation for each end-item shall be maintained by the Contractor as part of the item document package throughout the life of the contract.

Following quality acceptance by DCMA QAR, the Contractor shall notify the Production Management Specialist (PMS) via email of the completion of repaired end-items. The contractor shall ship each asset in accordance with Ship to Instructions provided in the Order for the asset’s repair. Within one (1) business day of shipment, the Contractor shall provide proof of shipment through delivery of an acceptance in CAVAF under Proof of Shipment. The Proof of Shipment shall include the carrier and tracking number.

Preservation, Packaging, and Packing:

The Contractor shall package the items IAW the Air Force Material Command (AFMC) Form 158 (Packaging Requirements).

The Contractor shall ship assets IAW the AFMC Form 158, preservation, packaging, and packing requirements stated in the contract. The term “Preservation, Packaging, and Packing” is to mean the entire package; this includes, but is not limited to the assets’ wraps, barriers, cushioning, blocking, bracing, and unit intermediate containers.

Asset Damages: The Contractor shall initiate a Supply Deficiency Report (SDR) in accordance with DLM 4000.25, Vol. 2, Chap. 17, and Reporting of Supply Discrepancies upon receipt of assets received in other than the contracted packaging requirements (coded data or Special Packaging Instructions (SPI) drawings). The PCO may authorize the following exceptions to these requirements when no damage has occurred:

1. Items packaged before the current SPI date.

1. An alternate pack may be used, provided the prime ALC approves and issues a deviation number, which would be annotated on the exterior container.

1. The next larger size fast pack, PPP-B-1672, type I or type II may be used for shipments with priorities 01-08 with approval.

1. The use of the next larger standard pack container for unserviceable items.

Shipping Documentation and Delivery:

The Contractor shall ensure that all items shipped are marked with the appropriate condition code.

The Contractor shall ensure the appropriate tag is attached showing the actual condition of each item shipped:

1. Serviceable tag is DD Form 1574/1574-1 (Yellow).

1. Unserviceable (repairable) tag is DD Form 1577-2/1577-3 (Green).

1. Unserviceable (condemned) tag is DD Form 1577/1577-1 (Red).

Shipments under this contract shall be by Commercial Bill of Lading (CBL) by the fastest traceable means.

Items repaired as a result of a confirmed quality deficiency shall be shipped at the Contractor’s expense.

Reusable Containers: Contractors shall maximize the use of reusable containers by reclaiming and reusing containers marked as “Reusable Container” for the return of assets to the contract designated activity. When shipping containers are received that meet the requirements of the AFMC Form 158, and are suitable for return shipment of serviceable assets, they shall be reclaimed, stored and protected for reuse. Unserviceable containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158. Contractor shall do a webSDR report when assets are received incorrect or containers damage beyond use to receive new replacement containers.

Manufacture/Procurement of Containers: Manufacturing or procurement of fiberboard or wood containers and the costs associated with these functions shall be in accordance with the terms of the contract. Special design containers or fixtures of metal or plastic construction shall not be manufactured or procured without prior approval of the program manager/item manager. Negotiation shall be conducted through the applicable ACO.

Excess Material: The Contractor shall package any Government owned material being reclaimed by the Government which is excess to contract fulfillment in accordance with contract terms. Packaging instructions for material not covered in the contract shall be obtained from the PCO.

SPECIAL REQUIREMENTS

Reliability and Maintainability (R&M) Requirements: The Contractor shall meet R&M requirements. R&M requirements will be met when the system/sub-system/component has passed all tests required by applicable TOs, drawings, specifications and regulations.

Environmental Stress Screening (ESS): The Contractor will only be required to perform Environmental Stress Screening if expressly required in the individual technical order or OEM repair instructions.

Electrostatic Discharge (ESD) Control Requirements: All electrical/electronic items containing components in Federal Stock classes 5905, 5955, 5961, 5962, 5963, and 7042 are classified as ESD controlled items. (Reference MIL-HDBK-773, Paragraph 5.1). The Contractor shall handle, replace, and package such items according to MIL-STD-1686C and MIL-HDBK-263B.

SAFETY AND HEALTH REQUIREMENTS

While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The Contractor shall notify the (ACO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two (2) business days, for any damage to government property less than $500,000.00 during the execution of the contract.

Mishap notifications shall contain, as a minimum, the following information:

1. Contract, Contract Number, Name and Title of Person(s) Reporting

1. Date, Time and exact location of accident/incident

1. Brief Narrative of accident/incident (Events leading to accident/incident)

1. Cause of accident/incident, if known

1. Estimated cost of accident/incident (material and labor to repair/replace)

1. Nomenclature of equipment and personnel involved in accident/incident

1. Corrective actions (taken or proposed)

1. Other pertinent information If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.

PRODUCTION SURGE PLAN

In the event that the Department of Defense (DoD) experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements. The Contractor is required to provide the Government a surge plan IAW (DID) DI-MGMT-80969. A CDRL and DID are associated with the surge requirement. After being notified of the surge demand in writing, the Contractor may see additional orders and/or will see the priority status elevated on current orders. The Contractor may do one or more of the following to fill the demand:

1. The Contractor will maintain a certain level of safety stock of components to draw from to perform additional repair.

1. Add additional shifts to increase production within the Contractor and with suppliers.

1. The contractor will work with the various manufacturing sites and their supply chains to expedite production. The contractor will be notified in advance of, and be given the opportunity to negotiate; any expedite charges that might apply at the time of surge. Contractual requirements for production of this contract are addressed in Part I.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .