This is a Performance Work Statement (PWS) for group aerobic classes at Patrick Space Force Base (SFB), Florida. The contractor shall supply all personnel, portable sound systems, headsets, tools, materials, supervision, and other items necessary to operate aerobics classes at the Patrick SFB Fitness Center for one base year plus four available option years. The contractor must provide up to 500 classes per contract year, with 50-100 classes each of the following types: Yoga, High-Intensity Interval Training (HIIT), Power Cycle, Cardio/Pop Dance, Pilates, Total Body Pump, and Body Conditioning. Classes will be conducted weekly, Monday through Friday, between 0500–2000 hours, with each class lasting 45–60 minutes. The contractor must provide the class schedule in PDF format for fitness center approval and must ensure all instructors hold current national certification from recognized institutes such as The Cooper Institute, NETA, AFPA, AAAI-ISMA, Spinning, FiTOUR, BTS, ASFA, or PTIA. All instructors must maintain current American Red Cross or American Heart CPR/AED certification and First Aid cards, as well as liability insurance of at least $100,000 naming Patrick SFB.
The contractor is responsible for recruiting and scheduling qualified instructors, designating a contract manager and alternate(s) to the contracting officer and Fitness & Sports Manager (FSM), and ensuring instructors are briefed on current fitness trends and music selection. Instructors must arrive at least 10 minutes prior to class start time and provide official sign-in sheets to the FSM upon completion of each class. Sign-in sheets must be submitted by month-end to be counted as conducted classes. The contractor must notify the FSM at least 30 minutes in advance if a class cannot be conducted or if an instructor will be delayed. Classes may be cancelled with FSM approval when participation falls below 5 patrons per class for more than three consecutive classes of the same format. The contractor must submit monthly invoices to the verifying official for all classes conducted, with payment made via Government Purchase Card (GPC). The government shall provide utilities and room/floor space at no cost to the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Questions and Answers.docx | DOCX document | |
| 26QB037 CSS Rev1.docx | DOCX document | |
| 26QB037 RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
1. Description of work: Provide Group Aerobic Classes
SCOPE OF WORK: The contractor shall supply all personnel, portable sound system, headset, tools, materials, supervision and other items necessary to offer group exercises classes as set forth in this PWS at Patrick Space Force Base (SFB), Florida. The contractor shall perform to the standards in this contract will provide the expertise needed to operate aerobics schedule at PATRICK SFB Fitness Center for the current year and 4 available option years.
a. Location & Amount: Provide a variety of fitness or wellness classes at PATRICK SFB not to exceed 500 classes per contract year. The following breakout is a description and amount of each class type required for each year:
50-100 Classes of each:
Yoga- (stretch, flow, power, or equivalent) classes which focus on stretching, flexibility and balance
High-intensity interval training (HIIT, or equivalent)- exercise for shorter periods of extremely demanding physical activity combined with even shorter rest periods to maximize calorie burn.
Power Cycle (or equivalent) - intense indoor cycling class designed to boost cardiovascular endurance.
Cardio/Pop Dance (or equivalent )- upbeat dance class inspired by popular music to improve coordination and cardiovascular health.
Pilates (or equivalent)- focuses on controlled movements to strengthen the core, improve posture and enhance flexibility and muscle tone
Total Body Pump (or equivalent)- a barbell-based resistance training workout designed to sculpt and tone
Body Conditioning (or equivalent)- workouts combining resistance training, cardio intervals and core work to build muscle and improve endurance
2. Personnel
a. The contractor will recruit, and schedule qualified instructors who possess at a minimum a current national certification from one of the following certification institutes in cycling: The Cooper Institute, National Exercise Trainers Association (NETA), American Fitness Professionals Association (AFPA), American Aerobic Association International/International Sports Medicine Association (AAAI-ISMA), Spinning, FiTOUR, Body Training Systems (BTS), American Sports and Fitness Association (ASFA), Personal Training Institute of America (PTIA) or any other Air Force Services Activity (AFSVA) recognized institution. All instructors must possess a current American Red Cross or American Heart, Cardiopulmonary Resuscitation, (CPR) and Automated External Defibrillator (AED) card and First Aid Card. All required instructor certifications and liability insurance naming PATRICK SFB in the minimum policy of $100,000.00 must be current and valid and on file at the fitness center and local contracting office prior to commencing work. The contractor will maintain certifications and insurance throughout the entire period of performance. All instructors must be familiar with the fitness center emergency action plan (EAP). The contractor will coordinate with the Fitness & Sports Manager (FSM) for the EAP introduction.
b. The contract manager will be responsible for the performance work statement (PWS). The name of the contract manager and the alternate(s) will be designated in writing to the contracting officer and the (FSM).
c. Contract personnel shall present a neat appearance and be easily recognizable.
Dress shall always conform to base standards.
d. The aerobics contractor is reminded that employment of Off-Duty Military Personnel are subject to guidelines set forth in the NONAPPROPRIATED FUND
PERSONNEL PROGRAM MANAGEMENT AND ADMINSTRATION PROCEDURES
GUIDE Section 3.8, paragraphs 3.8.1 through 3.8.4.1.
3. Quality Control
a. The head contractor of the group aerobics contract shall ensure that all work performed under this PWS meets the quality standards established in paragraph 8.
b. The head contractor is responsible for obtaining the proper pass and identification for instructors that will allow access to base to facility in accordance with all applicable local Security Forces policies and or procedures.
4. Physical Security
The contractor shall be responsible for safeguarding all government equipment provided.
5. Hours of Operation
a. Classes will be conducted weekly, (Monday-Friday) between the hours of 0500 –2000 hours totaling up to 500 classes per contract year. Length of class instruction will be 45- 60 minutes long, and must comply with Air Force Standards list in IAW AFI 34-266.
b. The aerobics class type and time will be mutually agreed upon, between the fitness center staff and the contractor. Contractor will provide a draft schedule/program of classes and will execute said schedule upon approval by the fitness center.
6. Conservation of Utilities
The contractor shall instruct their employees that when class instruction is completed all utilities should be turned off, per Fitness & Sports Managers’ internal policy and procedures.
7. Government Furnished Utilities and Services
The government shall provide without cost to the contractor the utilities and room/floor space necessary to accomplish the tasks specified in this PWS.
8. Specific Tasks
a. Ensure that certified aerobics instructors are available to conduct scheduled classes as specified in paragraph 5a and 5b.
b. The contractor will provide the necessary portable sound system and supplies required for a headset for class instruction.
c. Provide the FSM or appointed fitness center representative with a copy of each instructor’s certifications.
d. If a class cannot be conducted or the instructor is delayed the FSM or appointed fitness center representative must be informed at least 30 minutes prior to the scheduled start of class. If the FSM or appointed representative cannot be informed with sufficient notice, they must be informed immediately.
e. Contract manager will ensure instructors are briefed on current trends of instruction to include updating and upgrading music selection to ensure selection is appropriate. The contract manager is responsible for keeping instructors abreast of pertinent information from the FSM or representative.
f. The FSM or designated representative will verify completion of work. In order to complete this task, the contractor will provide copy of official sign-in sheet to the FSM or designated representative upon completion of the class. Sign-in sheets not submitted in the correct timeframe (by the end of month in which the class was conducted) will not be counted as a class conducted.
g. Instructors should be present at least ten (10) minutes prior to scheduled class to prepare and acquire sign-in sheet.
h. Instructors will notify a member of fitness center staff of any injuries to participants; the fitness center staff member will fill out the Fitness Center Incident Report and provide a copy to the contractor for their records.
i. The aerobics contract will be required to submit monthly invoices to the verifying official for all classes conducted. Invoices will be reviewed for accuracy and paid by the Government Purchase Card (GPC).
j. Scheduled classes will be cancelled with the approval of the FSM or authorized representative (applies to low participation numbers). For the purpose of this PWS low participation number will be considered below 5 patrons per class for more than three consecutive aerobics classes of the same format, i.e. yoga. Aerobic contractor will be notified via email 72 hours in advance of any class cancellations. *note aerobics contractor will provide email address to FSM or designated representative after contract is awarded for the purpose of communicating the aspects of this contract.
k. Aerobic contractor will produce a schedule in PDF format of the aerobics classes for fitness center approval. The fitness center will print the schedule(s) at no cost to the contractor.
| 1. Description of work: Provide Group Aerobic Classes |
| 2. Personnel |
| 3. Quality Control |
| 5. Hours of Operation |
| 6. Conservation of Utilities |
| 7. Government Furnished Utilities and Services |
| 8. Specific Tasks |
File details come from the government source that posted it. Updated .