PWS BASE Laundry 2027 Rev. 1..pdf
PDF 297 KB Posted
- Solicitation number
- FA568226Q0018
About this file
This is a Performance Work Statement for laundry and dry-cleaning services at Aviano Air Base, Italy, covering base services operations.
The contractor shall provide comprehensive laundry and dry-cleaning services including pickup, processing, and delivery of items from multiple base organizations and facilities. Services must be completed within two days of pickup or by the next scheduled delivery day, with pickups and deliveries occurring within 30 minutes of scheduled times. The contract covers five primary customer locations: VQ and TLF Lodging facilities (Monday/Wednesday/Friday pickups, 08:00-10:00), La Dolce Vita dining facility and Club Bella Vista/Falcon Hall (Wednesday pickups), FMO off-base location (Monday/Wednesday pickups), and IPE facility (on-call basis). Annual workload estimates range from approximately 1,000 items for La Dolce Vita to over 400,000 items for Aviano Inn Lodging, encompassing bed linens, towels, kitchen apparel, tablecloths, napkins, uniforms, and specialized protective equipment. The contractor must establish and maintain a Quality Control Plan, perform non-reimbursable repairs for contractor-caused damage, ensure items meet commercial industry cleanliness standards free from bacteria and microorganisms, and package items in clear plastic wrapping or hangers as appropriate. Performance thresholds allow no more than three valid complaints per month, with performance measured through customer complaints and Mission Owner inspections. Service is not required on Italian holidays or American holidays except for Lodging and Club facilities. The contractor must provide laundry carts for linen storage and transportation, obtain all required certifications and permits, and ensure management personnel are English-proficient for government correspondence and meeting participation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA568226Q00180001 - Ammendment 1.pdf | ||
| PWS BASE Laundry 2027 Rev.2.pdf | ||
| Contractor Assertion Template.docx | DOCX document | |
| Pricing Schedule Base Plus 4 Option Years Locked.xlsx | XLSX spreadsheet | |
| Solicitation - FA568226Q0018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
LAUNDRY AND DRY- CLEANING SERVICES
BASE SERVICES
CHAPTER
BASE SERVICES
TITLE
PAGE
1.
DESCRIPTION OF SERVICES
3-4
2.
SERVICES SUMMARY
4-5
3.
FURNISHED PROPERTY & SERVICES
4.
GENERAL INFORMATION
5-7
5.
APPENDICES
a. LINEN EXCHANGE PICK-UP AND DELIVERY
LOCATIONS AND SCHEDULE
b. AVIANO INN LODGING LINEN EXCHANGE
ESTIMATED WORKLOAD DATA
9-10
c. LA DOLCE VITA ESTIMATED WORKLOAD DATA 11
d. CONSOLIDATED CLUB ESTIMATED WORKLOAD DATA 12-13
e. FURNISHING MANAGEMENT SECTION WORKLOAD DATA 14
f. IPE 31 LRS/MGLRSP WORKLOAD DATA 15
1. DESCRIPTION OF SERVICE
The contractor shall provide all management, tools, equipment, labor and transportation, necessary to ensure that laundry and dry-cleaning services are performed for Aviano Air Base, Italy. Specifically, contractor will pick up soiled items from the list of authorized users on delivery schedule (Appendix A), launder or dry-cleaning services in accordance with the method(s) listed on the Estimated Workload Data Sheet (Appendices B through E) and return all clean items to the appropriate end user within specified time frame. Contractor must adhere to sanitation and cleanliness standards as required by local, regional, and national standards.
1.1. Operation Control
1.1.1. Laundry and Dry-Cleaning services are required for a variety of Aviano Air Base Organizations for diverse items, such as linen, tablecloths, kitchen clothing and other as specified in Appendices B, C, D, E & F.
1.1.2. The contractor shall be responsible for obtaining all certifications, licenses, permits, and associated documentation to perform all the required services listed in this Performance Work Statement.
1.1.3. The service shall include loading, unloading, segregating, transporting, and obtaining necessary documentation (counting sheet customer/delivery note contractor) for items picked up or delivered.
1.1.4. The contractor shall pick up and deliver to facilities within 30 minutes of scheduled time frame, in accordance with Appendix A.
1.1.5. The contractor shall complete all work required within two days from pick-up time, or by the next scheduled delivery day. Items requiring an extended turnaround time must be coordinated with the designated Mission Owner prior to performance of service.
1.1.6. Any item not delivered within the two-day turnaround time, to the Aviano Lodging Facility, and not delivered within the next schedule run, to all other facilities (Appendix A), will be considered lost if not found and returned, by contractor, within 15 days. In case of lost items, the contractor shall reimburse the Government, the exact replacement cost of re-acquiring a new item(s).
1.1.7. Completed items shall be in conformance with commercial industry standards and/or practices for quality of cleanliness, pressing, appearance and packaging. The items shall not only be cleaned in the sense of being free from soil and stains, but also free from bacteria, fungi and microorganism.
1.1.8. All items shall be wrinkle-free and packaged in clear plastic wrapping or hangers, as appropriate, in accordance with Appendices B, C, D, E & F.
1.1.9. Contractor-caused damage shall be repaired on a non-reimbursable-basis utilizing conforming materials. The contractor shall replace all missing buttons of matching color and similar appearance and quality. Contractor-damaged items which cannot be repaired, must be replaced or the value of the item is reimbursed by the contractor.
1.2. Documentation and handling procedures
1.2.1. An itemized schedule for each pick-up and drop-off location must be submitted monthly to the designated Mission Owner (MO) no later than the 3rd workday of the following month.
1.2.2. Counting of items to be laundered will be accomplished by the government personnel at each pick-up location and verified by the Contractor at the end of each laundering. A copy of each counting sheet will be retained by both parties. If there are discrepancies between the counts, the Contractor will address such discrepancies on a case-by-case basis.
1.2.3. Quantities and sizes of items returned laundered will be annotated on the Delivery Ticket and verified by a government representative by signing this ticket, which will be retained by both parties.
1.3. Performance Requirements
1.3.1. Items found not conforming to the requirements of contract specifications, shall be re-laundered at no additional cost to the Government. After they are re-cleaned, the contractor shall pack these items separately and mark each bundle “Attention Mission Owner”.
1.3.2. The contractor along with the Mission Owner will determine if there are any items considered unserviceable and non-repairable during the pick-up phase, if feasible. If the determination cannot be done during the pick-up phase, but only after the laundering then the Contractor shall contact the MO to notify the issue, and the Contractor shall return the indicated items using a separate packaging.
However, it is up to the Contractor to accept performing a trial laundering of items that have undefinable/non-conventional stains (oil, permanent marker, shoe polish etc.).
2. SERVICE SUMMARY (SS)
Performance Objective PWS Para. Performance
Threshold Remedy
Contractor shall provide Laundry and Dry-Cleaning services to Aviano AB Organizations.
1.1.1 and 1.1.3
Customer complaint/ Mission Owner periodic inspection. No more than 3 valid complaints per month
Any service not performed within the required performance threshold will be reported in the annual evaluation (CPARS)
Contractor shall provide 2-day turnaround time service, with delivery and pick up at specific location
1.1.4 and 1.1.5 and 1.1.6
Customer complaint/ Mission Owner periodic Inspection. No more than 3 valid complaints per month
Any service not performed within the required performance threshold will be reported in the annual evaluation (CPARS)
Performance Objective PWS Para. Performance Threshold
Remedy
Deliver clean and sanitized items Packaged appropriately
1.1.7 and 1.1.8
Customer complaint/ Mission Owner periodic inspection. No more than 3 valid complaints per month
Any service not performed within the required performance threshold will be reported in the annual evaluation (CPARS)
Perform non-reimbursable repairs
1.1.9 Customer
complaint/Mission Owner periodic inspection No more than 3 valid complaints per month
Any service not performed within the required performance threshold will be reported in the annual evaluation (CPARS)
Counting of items to be laundered accomplished by the Gov’t and verified by the contractor after laundering
1.2.2 Customer
complaint/Mission Owner periodic inspection No more than 3 valid complaints per month
Any service not performed within the required performance threshold will be reported in the annual evaluation (CPARS)
3. FURNISHED ITEMS
3.1. Items
3.1.1. The government is responsible for providing only the items to be laundered.
3.2. Contractor-Furnished Property
3.2.1. Contractor shall provide laundry carts for storage and transportation of linens to and from facilities. Contractor shall provide empty carts requested by activity personnel and/or the COR.
Empty carts shall be left at locations during pick-up of dirty linens for the next scheduled pick-up.
4. GENERAL INFORMATION
4.1. Quality Control Plan (QCP)
4.1.1. The contractor shall establish and maintain a thorough Quality Control Plan (QCP) that ensures:
professional laundry services meet standards required by this PWS. This QCP shall accompany the contractor’s proposal.
4.1.2. Monthly records of all inspections conducted by the contractor and necessary corrective action-taken shall be made available to the Mission Owner by the 5th working day of the following month.
4.1.3. The Mission Owner shall include a back-up plan in the event of delivery vehicle breakdown and laundry equipment failure. This plan shall be presented to the Mission Owner no more than five (5) working days after award of the contract. COR shall be included in the QCP.
4.2. Government Quality Assurance
4.2.1. The Government shall evaluate Contractor’s performance by implementing random sampling/surveillance and customer complaint as specified in the Government Performance Plan.
4.3. Lost and found property.
4.3.1. The Contractor shall inspect and remove any items found in the pockets of clothing or amongst soiled linen, prior to their treatment, and return them to the Mission Owner.
4.4. Contractor Personnel
4.4.1. Designated management personnel shall be required to speak, read and understand all correspondence in the English language without the aid of a dictionary. In addition, must be proficient.
enough to actively participate in the required meetings with government personnel.
4.5. Security Requirements
4.5.1. Contractor personnel entering the government installation shall abide by all security and safety.
standards of the installation.
4.5.2. The contractor must obtain pass and identification documentation for all personnel employed.
under this contract to enter this installation. The following forms will be obtained from the Contracting Office.
USAFE IMT 79, Request for Base Entry Identification 31 SFS/S3LE FORM 79, Request for Base Entry Identification
4.6. Hours of Operation, Holidays and Down days
4.6.1. Pick-up and delivery of items will be accomplished in accordance with Appendix A.
Service will not be required on Italian Holidays. American holidays, Wing down days and, family days are non-service days except for Lodging (TLF included) and Club. Delays may be expected occasionally during Wing exercises at certain pick up and drop off locations. Contractor will not be held responsible for delays caused by these circumstances, nor will they be provided additional compensation for such delays.
Italian Holidays (No service Days)
January 01 New Year’s Day January 06 Epiphany Local PSD (April) Easter Monday April 25 Liberation Day May 01 Italian Labor Day June 02 Republic Day August 15 Assumption Day November 01 All Saint’s Day December 08 Immac. Concep. Day December 25 Christmas Day December 26 Saint Stephen’s Day
American Holidays (Service only to Lodging -VQ and TLF- and Consolidated Club)
Martin Luther King’s Day 3rd Monday in January President’s Day 3rd Monday in February Memorial Day Last Monday in May
Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day 2nd Monday in November Thanksgiving 4th Thursday in November
APPENDIX A
LINEN EXCHANGE PICK-UP AND DELIVERY LOCATIONS AND SCHEDULE
The contractor shall pick up and deliver to the listed facilities within the specified time frame and on the Scheduled days as follows:
UNITS
SQUADRON
LOCATION
(BLDG #)
PICK-UP
DELIVERY
TIME
FRAME
VQ (Lodging)
31 FSS
1484 (Area F) Mon/Wed/Fri 08:00-10:00
TLF (Lodging)
31 FSS
1480-81 (Area F) Mon/Wed/Fri 08:00-10:00
TLF (Lodging)
31 FSS
1482-83 (Area F) Mon/Wed/Fri 08:00-10:00
La Dolce Vita
31 FSS
1412 (Area F) Wednesday 08:00-10:00
Club Bella Vista & 1404 (Area F) Wednesday 08:00-10:00 Falcon Hall
31 FSS
1467 (Area F) Wednesday 08:00-10:00
FMO (Off Base)
31 CES
Aviano Industrial Area
Mon/Wed 08:00-10:00
IPE
31 LRS/MGLRSP
933 (Area F) On Call 08:00-10:00
APPENDIX B
AVIANO INN LODGING LINEN EXCHANGE ESTIMATED WORKLOAD DATA
ITEMS DESCRIPTION ITEM# ANNUAL PACKAGE
ESTIMATE REQUIREMENTS
001 5,000 5 per bundle
002 5,000 5 per bundle
003 15,000 5 per bundle
004 15,000 5 per bundle
005 1,500 5 per bundle
006 2,000 5 per bundle
007 60,000 15 per bundle
008 7,000 25 per bundle
009 250 5 per bundle
010 2,000 2 per bundle
011 5,000 2 per bundle
012 100 2 per bundle
Sheets single bed, white or colored
Fitted Sheets single white or colored
Sheets double bed, white or colored various sizes
Fitted Sheets double bed, white or colored various sizes
Red Bed Spread single bed Red color various sizes
Red Bed Spread double bed, Red color various sizes
Pillowcases white or colored various sizes
Pillowcases with zipper, white or colored, various sizes
Sheets (baby crib) white or colored, various sizes
Mattress pad single bed various sizes and colors
Mattress pad double bed various sizes and color
Blankets wool various sizes and colors
Baby Crib blankets various sizes
013 200 5 per bundle
ITEMS DESCRIPTION ITEM# ANNUAL
ESTIMATE
PACKAGE
REQUIREMENTS
Bed spread quilted single Gold and various color
014 1,500 individually wrapped
Bed spread quilted double Gold and various colors
015 2,500 individually wrapped
Thermo blankets white single bed various sizes and color
016 1,500 individually wrapped
Thermo blankets white double Bed various sizes and color
017 5,500 individually wrapped
Bath towel various sizes and color
018 42,000 5 per bundle
Hand towel various sizes and color
019 30,000 10 per bundle
Wash cloth various sizes and color
020 40,000 25 per bundle
Dish cloth, large, any color 021 3,500 20 per bundle
Dish cloth, small, any color 022 3,500 25 per bundle
Bathmat various sizes and color
023 30,000 10 per bundle
Pillows 024 3,000 individually wrapped
Lodging Jacket 025 30 individually wrapped
Quilted spread Double Suite VQ
026 150 individually wrapped
Mattress pad double with zip 027 50 individually wrapped
Mattress pad single with zip 028 30 individually wrapped
Laundry and Dry Cleaning will be performed as specified on labels found on above list of items.
Like items (color and type) will be bundled together.
APPENDIX C
LA DOLCE VITA DINING FACILITY ESTIMATED WORKLOAD DATA
ITEMS DESCRIPTION ITEM# ANNUAL
ESTIMATE
PACKAGE
REQUIREMENTS
Napkins 001 1,000 50 per bundle
Shirt for cooks, short and long sleeves different colors
002 50 individually wrapped
Trousers for cooks, different colors 003 50 individually wrapped
Apron for cooks, different colors With or without bib
004 50 10 per bundle
Jacket for cooks, different colors 005 50 individually wrapped
Potholders for cooks Different colors
006 50 5 per bundle
Chef hat for cooks Different colors
007 50 individually wrapped
Frock long with sleeves Different colors
008 50 individually wrapped
Normal Tablecloth 009 200 10 per bundle by color
Big Tablecloth 010 100 10 per bundle by color
Round Tablecloth 011 100 10 per bundle by color
Table Skirt 012 30 5 per bundle by color
Wash cloth (Rags) 013 300 50 per bundle
APPENDIX D
CONSOLIDATED CLUB ESTIMATED WORKLOAD DATA
ITEMS DESCRIPTION ITEM# ANNUAL
ESTIMATE
PACKAGE
REQUIREMENTS
Wash cloth various sizes and color
001 100 25 per bundle
Hand towel various sizes and color
002 100 20 per bundle
Trouser for cooks different color
003 250 individually wrapped
Shirt for cooks, short and long sleeves different colors
004 250 individually wrapped
Apron for cooks different colors with or without bib
005 1,000 10 per bundle
Parka jacket 006 50 individually wrapped
Normal tablecloth 007 3,000 20 per bundle by color
Big tablecloth 008 5,000 20 per bundle by color
Round tablecloth 009 800 20 per bundle by color
Table skirt 010 100 5 per bundle by color
Polo cotton 011 50 individually wrapped
Potholders for cook different colors
012 40 5 per bundle
Window drape various type 013 40 individually wrapped
Napkins 014 20,000 50 per bundle by color
Chef hat for cook different color
015 50 individually wrapped
Tablecloth row various colors
016 20 5 per bundle
ITEMS DESCRIPTION ITEM# ANNUAL
ESTIMATE
PACKAGE
REQUIREMENTS
Big Tablecloth Round various colors
017 400 5 per bundle
Bath Towel various colors
018 25 5 per bundle
Laundry and Dry Cleaning will be performed as specified on labels find on above list of items.
APPENDIX E
FURNISHING MANAGEMENT SECTION
ESTIMATED WORKLOAD DATA
ITEMS DESCRIPTION ITEM# ANNUAL PACKAGE
ESTIMATE REQUIREMENTS
Mattress Pad/Cover white 001 800 individually wrapped
Double Mattress (Sanitizing) 002 220 individually wrapped
Single Mattress (Sanitizing) 003 220 individually wrapped
Easy chair cushion cover (Back) 004 600 individually wrapped
Easy chair cushion cover (Seat) 005 600 individually wrapped
APPENDIX F
INDIVIDUAL PROTECTIVE ELEMENT
ESTIMATED WORKLOAD DATA
ITEMS DESCRIPTION ITEM# ANNUAL PACKAGE
ESTIMATE REQUIREMENTS
A-3 Bag / Flying Bag cotton 001 360 Individually wrapped
JLIST coat / Biological Suit 002 360 Individually wrapped
JLIST trousers / Biological Suit 003 360 Individually wrapped
Glove inserts / White Gloves 004 360 5 Pair Bundle
IOTV Vest / Body Armor 005 100 Individually wrapped
Sleeping Bag / Modular 006 50 Individually wrapped
Parka 007 50 Individually wrapped
Pants / Cold Weather 008 50 Individually wrapped
| 1. DESCRIPTION OF SERVICE |
| 1.1. Operation Control |
| 1.2. Documentation and handling procedures |
| 1.3. Performance Requirements |
| 2. SERVICE SUMMARY (SS) |
| 3.1. Items |
| 3.2. Contractor-Furnished Property |
| 4. GENERAL INFORMATION |
| 4.1. Quality Control Plan (QCP) |
| 4.2. Government Quality Assurance |
| 4.3. Lost and found property. |
| 4.4. Contractor Personnel |
| 4.5. Security Requirements |
| 4.6. Hours of Operation, Holidays and Down days |
| Italian Holidays (No service Days) |
| American Holidays (Service only to Lodging -VQ and TLF- and Consolidated Club) |
| APPENDIX A |
| APPENDIX B |
File details come from the government source that posted it. Updated .