PWS Attachment 4 - ARL Equipment Management Standing Operating Procedure - APPENDIX J_lifting devices.pdf

PDF 202 KB Posted

Attached to
Total 100% SMALL BUSINESS SET-ASIDE FOR Preventative Maintenance and Repair Services for Hoisting/Lifting Equipment
Solicitation number
W911QX26QA081
Issued by

About this file

This is Appendix J of the ARL Equipment Management Standard Operating Procedure, addressing lifting devices safety and maintenance requirements. The appendix does not address products or services required for procurement; rather, it establishes internal Army Research Laboratory procedures for managing lifting equipment in accordance with OSHA regulations and referenced technical standards including TB 43-0142, Army Regulations 385-10, 385-40, and 750-1.

The appendix defines lifting devices as any equipment used to raise, lower, hold, or position loads, including cranes, forklifts, hoists, slings, and related components. All new, extensively repaired, or altered lifting devices must receive rated load tests and functional tests prior to initial use, with written certification provided by authorized maintenance personnel. Devices idle for one year or more require functional testing at 100 percent rated load before use. Inspection protocols include daily operator-performed inspections, monthly documented inspections for critical crane components, and periodic inspections at 12-month intervals or prior to use after six-month idle periods. Chain slings, nylon straps, and wire ropes require monthly and annual inspections per 29 CFR 1910.184. Failed load tests trigger Lockout/Tagout procedures with notification to the Safety Office, branch chief, and stationary equipment manager. Responsibilities are assigned to supervisors (ensuring operator training and PMCS documentation), operators (safe operation and PMCS performance), and the Equipment Management Cell (tracking load testing and annual inspections). All inspection and test results must be maintained in equipment maintenance records or retained at job sites by end users and supervisors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARL EQUIPMENT MANAGEMENT

STANDARD OPERATING PROCEDURE

ARL EQUIPMENT MANAGEMENT SOP

APPENDIX J

LIFTING DEVICES

REFERENCES:

1. TB 43-0142

2. Occupational Safety and Health Act (OSHA) of 1970 and the standards adopted therein, Department of Labor (OSHA Standards are available from the Superintendent of Documents, Government Printing Office, Washington, DC 20402).

3. Ars 385-10,385-40,750-1

4. TMs 5-725, and 9-1300-206

5. TBs 43-0142, 9-352, 9-1100-804-15, and 43-0209

6. DA PAM 750-1

PURPOSE:

This appendix prescribes responsibilities, procedures, and guidance for implementing the requirements of the Occupational Safety and Health Act (OSHA) of 1970, as amended to date, to be used in the accomplishment of safety inspections and testing of lifting devices.

GENERAL:

Lifting devices are considered any device or component used to raise, lower, hold, or position a load from one location or elevation to another. Examples of lifting devices include forklift trucks, cranes, manual or motorized pallet jacks, hoists, wreckers, A-frames, slings, ropes, wire ropes, hooks, O-rings, pear rings, spreader bars or lifting clamps, beams, jacks, safety stands, and jack stands. Lifting fixtures are considered any device or assembly of devices used to facilitate attachment of a load to a lifting device. Examples of lifting fixtures include an H-beam with nylon slings, wire rope with spreader bars or rope with lifting clamps.

Testing:

1. Prior to initial use, all new, extensively repaired, or altered lifting devices shall be given a rated load test. Inspections will be performed using authorized maintenance personnel or a maintenance activity in accordance with (IAW) TB 43-0142 who will provide the organization with written certification of load testing to the using activity.

2. Prior to initial use, all new, extensively repaired, or altered lifting devices shall be given a functional test to determine operability of the equipment. Functional testing requirements are indicated in the applicable appendix of TB 43-0142. Before performing the functional test, the proper operation of brakes and limit, locking, and other safety devices shall be tested under no-load conditions.

3. Lifting devices that have been idle for 1 year or more shall be functionally tested at 100 percent of the rated load prior to use.

4. In the event of a load test failure the device will be Locked Out/Tagged Out (LO/TO) IAW with the Organizational LO/TO SOP and be properly marked to alert all personnel to ensure their safety. When a LO/TO occurs, an email will be sent to the Safety Office with copy to the branch chief, his/her supervisor and the stationary equipment manager to ensure the proper maintenance personnel are notified to have the equipment repaired.

Inspections:

1. All lifting devices will be inspected periodically at the specified intervals IAW TB 43- 0142/OSHA standards.

2. Any device found not to be within tolerance with the applicable technical manual or technical bulletin will be LO/TO and repaired ASAP or turned in.

3. Any item deemed uneconomically repairable will be turned in to Defense Logistics Agency Disposition Services or disposed of to ensure it can no longer be used and is not a threat to the personnel safety.

4. All chain slings, nylon straps and wire ropes will be inspected for serviceability by the operator prior to use, monthly and annual IAW TB 43-0142 and 29 CFR 1910.184I(3)(i)&(ii). All documentation will be kept at the work site.

a. Daily inspection of lifting devices shall be performed by the operator before use. Also prior to use, lifting devices that have been idle for 1 month or more, but less than 6 months, will be given an inspection in accordance with daily inspection criteria, plus a thorough, documented inspection of wire ropes, crane hooks, and crane hoist chains in accordance with the criteria in Appendix A, paragraph A-2 of TB 43-0142. Daily inspections should comply with the criteria specified in the appropriate technical manual for the device or the applicable appendix of TB 43-0142. Manufacturer’s manuals will also be used for commercial equipment as available.

b. For cranes, monthly documented inspections shall be conducted on critical items in use such as hooks, wire ropes, brakes, and hoist chains. Operator or Unit Maintenance personnel who are technically experienced and qualified may be designated to perform these inspections. Specific inspection requirements are indicated in Appendix A of TB 43-0142.

c. Periodic inspections shall be conducted by unit maintenance personnel, assisted by operator/crew personnel, at least every 12 months and prior to the use of lifting devices which have been idle for 6 months or more. Periodic inspection criteria found in the appropriate appendix of TB 43-0142, manufacturer’s documentation, and applicable equipment TMs shall be used to determine serviceability of the equipment.

d. Periodic inspections of lifting devices for handling hazardous materials such as ammunition and explosives, molten metals, acids, strong caustics, and flammable and toxic materials shall include a functional test. The periodic inspection and functional test procedures shall be repeated before handling any load heavier than that lifted in the last functional test. The heaviest load shall never exceed the load rating of the lifting device.

e. Inspection and test results shall become part of the maintenance record of the lifting device. All other inspection records for lifting devices will be kept at the job site and maintained by the end user and their supervisor.

RESPONSIBILITIES:

1. SUPERVISOR: The supervisor is responsible to ensure employees are trained and licensed on the equipment they are operating. They must also ensure operators are performing daily preventative maintenance checks and services (PMCS), prior to use inspections and documenting them.

2. OPERATOR: The operator is responsible for the safe operation of the equipment, operator level PMCS and documenting that all checks are performed at the proper intervals.

3. EQUIPMENT MANAGEMENT CELL (EMC): The EMC will ensure load testing is completed before a new item is issued to the customer, after major repairs to the lift systems or when modifications are made. They will also track the annual inspections of lifting devices with the exception of ropes, straps, slings and chains.

ARL EQUIPMENT MANAGEMENT SOP AS OF 25 MAR 25_NJS_090723_.pdf
1. INTRODUCTION:
2. APPLICABILITY:
3. OBJECTIVES:
4. RESPONSIBILITIES OF PERSONNEL:
APPENDIX A:
COMMAND MAINTENANCE AND FLOW OF DA FORM 2404S:
EZ PASS USE:
APPENDIX B: ACCIDENT PROCEDURES ACCIDENT OCCURANCE
ACCIDENT OCCURANCE OFF POST:
APPENDIX C:
NON-STANDARD EQUIPMENT PMCS
STANDARD MILITARY EQUIPMENT PMCS
COLLECTION AND DISPOSITION OF DA FORM 2404S
APPENDIX D: DISPATCHING (TRIP TICKETS)
HOW TO COMPLETE TRIP TICKET USER INSTRUCTIONS:
APPENDIX E: MAINTENANCE CONTROL
WORK ORDER PROCESS:
STEPHENSON EQUIPMENT MAINTENANCE (SEI):
UNSCHEDULED MAINTENANCE AND REPAIRS:
Completed Repairs:
Directorate Hired Maintenance:
GSA-LEASED EQUIPMENT:
STATIONARY EQUIPMENT:
LIFTING DEVICES:
TURN IN OF MOBILE EQUIPMENT:
APPENDIX F:
GENERAL:
References:
RESPONSIBILITIES:
PROCEDURES:
APPENDIX G: MARKING EQUIPMENT
LICENSE PLATES:
APPENDIX H: EQUIPMENT CLASSIFICATION
COMPUTATION OF REPAIR COST ESTIMATES
MAINTENANCE EXPENDITURE LIMITS (MELs)
PURPOSE:
APPENDIX I: FUEL MANAGEMENT
PROCEDURES:
FUEL ORDERING AND TRACKING:
PLACING A FUEL ORDER USING DLA:
PLACING FUEL ORDER USING CREDIT CARD:
SITE STORAGE LOCATIONS:
VEHICLE IDENTIFICATION LINK (VIL) KEYS:
FUEL FOR GSA VEHICLES:
APPENDIX J LIFTING DEVICES
PURPOSE:
GENERAL:
Testing:
Inspections:
RESPONSIBILITIES:
APPENDIX K DRIVER’S TRAINING SOP
PURPOSE:
SAFETY:
RESPONSIBILITY:
LICENSE REQUIREMENTS:
OPERATOR LICENSE INQUIRIES:
DRIVER AND EQUIPMENT OPERATOR SELECTION:
LICENSE INSTRUCTORS AND LICENSE EXAMINERS (LI/LES):
CONTROL AND ISSUANCE OF DRIVERS/EQUIPMENT PERMIT:
RENEWALS, SUSPENSIONS, AND REVOCATIONS:
SUSTAINMENT TRAINING:
MECHANICAL OR GROUND SUPPORT EQUIPMENT:
PROGRAM OF INSTRUCTION (POI):
TRAINING SUPPORT PACKAGES
ADDITIONAL INSTRUCTIONS:
APPENDIX L:
ARMY WARRANTY MANAGEMENT PROGRAM
Objectives: The objectives of the Army Warranty Program are to achieve and sustain a cost-effective warranty program for Army materiel. To minimize user burden and promote user satisfaction. Control warranty execution to ensure maximum user and benefi...
Applicability: The Army Warranty Program applies to all standard and non-standard tactical and non-tactical equipment assigned to ARL.
Warranty Coordinator:
1. Warranty Coordinator will be appointed in writing.
2. Review and coordinate the Material Developer (MATDEV) warranty execution procedures within MFPs, warranty TB, and related warranty data to ensure effective execution of warranties.
3. Develop local written instructions for warranty execution and management within command.
4. Execute warranties according to published procedures.
5. Coordinate warranty actions between their activities and commercial service sources (local dealer or manufacturer) or the MATDEV as specified in the warranty TB. Such coordination does not include resolution of contractual issues.
6. Establish and maintain a register to control equipment and components under warranty.
7. Maintain subordinate warranty coordinator appointment orders on file.
8. Verify local warranty claims that are completed by Army units or contractors.
9. Provide warranty information to customers, as needed.
APPENDIX N:
APPENDIX O:
EXEMPTIONS
POLICIES
PROCEDURES
WALK-THROUGH USAGE REVIEW PROCEDURES
ANNEX 1 FORMAL REPORT
APPENDIX P: VEHICLE RESERVATIONS

Signed ARL Equipment Manager SOP.pdf