PWS_Attach_N.pdf

PDF 124 KB Posted

Attached to
T56 Series 3. 0/-15 and 3. 5/-15A Joint Follow on Contract
Solicitation number
FA812125R0017
Issued by

About this file

This document is a Performance Work Statement (PWS) Attachment N providing Supplemental Packaging Instructions for T56 engine repair and maintenance contract components. The packaging guidelines cover specific National Stock Number (NSN) items including torquemeters, turbine rotor assemblies, compressor modules, RGB components, fuel-related items such as valves, nozzles, filters, and pumps. Key packaging requirements include:

Contractors must adhere to precise preservation, packaging, and packing specifications for shipped assets, with detailed instructions for handling discrepancies, container selection, and damage mitigation. Notable requirements include maximizing reusable container usage, obtaining prior approval for special design containers, properly marking material condition code tags, and following specific packaging protocols for items with residual fuel. The document provides exceptions for packaging variations and outlines procedures for addressing asset damages, excess materials, and container manufacturing, emphasizing compliance with contractual terms and coordination with the Administrative Contracting Officer (ACO).

View the file

Other files

File Type Posted
2776994_RDL_REPORT.pdf PDF
4046836_ATTACH.pdf PDF
DID1.pdf PDF
4049353_ATTACH.pdf PDF
4020219_RDL_REPORT.pdf PDF
2776978_RDL_REPORT.pdf PDF
2777385_RDL_REPORT.pdf PDF
2776687_RDL_REPORT.pdf PDF
DID_CDM.pdf PDF
TOA.xlsx XLSX spreadsheet
SPI6.pdf PDF
4046862_ATTACH.pdf PDF
4049335_ATTACH.pdf PDF
2777369_RDL_REPORT.pdf PDF
Skill REQ.pdf PDF
2776714_RDL_REPORT.pdf PDF
2778029_RDL_REPORT.pdf PDF
PWS_Attach_K.pdf PDF
PWS_Attach_K2.pdf PDF
SPI3.pdf PDF
SPI9.pdf PDF
SPI.pdf PDF
CAVAF_Report_Matrix.pdf PDF
4046876_ATTACH.pdf PDF
SPI4.pdf PDF
SPI10.pdf PDF
PWS_Attach_J.pdf PDF
3696726_RDL_REPORT.pdf PDF
SPI7.pdf PDF
4046879_ATTACH.pdf PDF
2777340_RDL_REPORT.pdf PDF
2777904_RDL_REPORT.pdf PDF
4049339_ATTACH.pdf PDF
GFM_MISTR.pdf PDF
2777441_RDL_REPORT.pdf PDF
4020247_RDL_REPORT.pdf PDF
1728882_RDL_REPORT.pdf PDF
2776654_RDL_REPORT.pdf PDF
4049331_ATTACH.pdf PDF
4050282_RDL_REPORT.pdf PDF
4049322_ATTACH.pdf PDF
PWS_Appendix_A.pdf PDF
CAVAF.pdf PDF
PWS_Attach_K1.pdf PDF
4049299_CDRL1_REPORT.pdf PDF
4019057_RDL_REPORT.pdf PDF
1882341_ATTACH.pdf PDF
2777431_RDL_REPORT.pdf PDF
DID_CAV.pdf PDF
GFP.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 107 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T56 PWS Attachment N – Supplemental Packaging Instructions

05 November 24

NSN Item Supplemental Packaging Information

2840-01-111-4765OJ Torquemeter Primary Container NSN 8115-00-953-1825. Use SPI F 01- 111-4765 for Alternate Packing method.

2840-01-294-7878 Turbine Rotor Assy. Primary Container NSN 8145-01-449-7707OJ

2840-01-338-2990 Compressor Module Contractor Container NSN 8145-01-204-7393

2840-01-487-1830 Compressor Module Contractor Container NSN 8345-01-204-7393

2840-01-487-2997OJ Turbine Rotor Assy. Primary Container NSN 8145-01-449-7707OJ

2840-01-492-9017OJ RGB Primary Container NSN 8145-00-887-1949OJ

2915-00-626-3123OJ Paralleling Valve Items with residual fuel – use SPI F WF-117-2012; ‘ZZ’ Markings IAW AFI 24-2013, 4.3.3

2915-00-655-1933OJ Fuel Nozzle Items with residual fuel – use SPI F WF-117-2012; ‘ZZ’ Markings IAW AFI 24-2013, 4.3.3

2915-00-859-2915OJ High Pressure Fuel Filter

Items with residual fuel – use SPI F WF-117-2012; ‘ZZ’ Markings IAW AFI 24-2013, 4.3.3

4320-00-654-3617OJ Fuel Pump Items with residual fuel – use SPI F WF-117-2012; ‘ZZ’ Markings IAW AFI 24-2013, 4.3.3

PRESERVATION, PACKAGING, AND PACKING FOR REPAIR CONTRACTS

1. Preservation, Packaging, and Packing Requirements: Assets shipped or received shall meet the preservation, packaging, and packing requirements stated in the contract.

The term “preservation, packaging, and packing” is to mean the entire package; this includes, but is not limited to the assets’ wraps, barriers, cushioning, blocking, bracing, and unit intermediate containers.

2. Packaging Discrepancies: If assets are received in other than the contracted packaging requirements (coded data or Special Packaging Instructions (SPI) drawings) the Contractor shall initiate a Supply Deficiency Report (SDR) IAW AFJMAN 23-215, Reporting of Supply Discrepancies upon receipt of asset. The prime packaging specialist at Com (405) 739-3545 may authorize the following exceptions to these requirements.

Exceptions when no damage has occurred are as follows:

a. Items packaged before the current SPI date

b. An alternate pack may be used, provided the prime Program Office approves and issues a deviation number, which would be annotated on the exterior container

c. The next larger size fast pack, PPP-B-1672, type I or type II may be used for shipments with priorities 01-08 with approval

d. The use of the next larger standard pack container for unserviceable items

3. Asset Damages: Damages to assets or containers, attributed to negligence, will be referred to the ACO for action. Damages attributed to improper preservation, packaging, packing, or marking will also be referred to the ACO for action IAW AFJMAN 23-215, Reporting of Supply Discrepancies.

4. Reusable Containers: Contractors shall maximize the use of reusable containers by reclaiming and reusing containers marked as “Reusable Container” for the return of assets to the contract designated activity. Cost reimbursements or material replenishment associated with operation shall be negotiated as part of the contract.

5. Manufacturer/Procurement of Containers: Manufacturing or procurement of fiberboard or wood containers and the costs associated with these functions shall be IAW the terms of the contract. Special design containers or fixtures of metal or plastic construction shall not be manufactured or procured without prior approval of the program manager / item manager. Negotiation shall be conducted through the applicable ACO.

6. Excess Material: Government owned material in excess to contract fulfillment and being reclaimed by the Government should be packaged IAW contract terms. Packaging instructions for material not covered in the Contract shall be from the ACO.

7. Condition: Material condition code tags will be placed inside the package along with the repaired asset, and also attached to the outside of the shipping container.

File details come from the government source that posted it. Updated .