DID_CDM.pdf

PDF 125 KB Posted

Attached to
T56 Series 3. 0/-15 and 3. 5/-15A Joint Follow on Contract
Solicitation number
FA812125R0017
Issued by

About this file

This document is a Data Item Description (DID) for the Contract Depot Maintenance (CDM) Production Report (DI-PSSS-81995), detailing a standardized two-part monthly reporting requirement for maintenance production. The report is designed to provide the government with comprehensive information about maintenance activities, including monthly production figures, asset accountability, performance schedules, anticipated production, and unresolved problems.

Part I of the report requires detailed documentation across multiple data blocks, including item identification, contract line items, quantities received and repaired, serviceables shipped, condemned items, and production forecasts. Part II is a narrative production summary triggered by specific conditions such as missed production forecasts, discrepancies between current forecast and contract scheduled quantity, or anticipated future production challenges. The report format is structured to capture cumulative and monthly data, enabling government oversight of depot-level maintenance contract performance.

View the file

Other files

File Type Posted
2776994_RDL_REPORT.pdf PDF
4046836_ATTACH.pdf PDF
DID1.pdf PDF
4049353_ATTACH.pdf PDF
4020219_RDL_REPORT.pdf PDF
2776978_RDL_REPORT.pdf PDF
2777385_RDL_REPORT.pdf PDF
2776687_RDL_REPORT.pdf PDF
TOA.xlsx XLSX spreadsheet
SPI6.pdf PDF
4046862_ATTACH.pdf PDF
4049335_ATTACH.pdf PDF
2777369_RDL_REPORT.pdf PDF
Skill REQ.pdf PDF
2776714_RDL_REPORT.pdf PDF
2778029_RDL_REPORT.pdf PDF
PWS_Attach_K.pdf PDF
PWS_Attach_K2.pdf PDF
SPI3.pdf PDF
SPI9.pdf PDF
SPI.pdf PDF
CAVAF_Report_Matrix.pdf PDF
4046876_ATTACH.pdf PDF
SPI4.pdf PDF
SPI10.pdf PDF
PWS_Attach_N.pdf PDF
PWS_Attach_J.pdf PDF
3696726_RDL_REPORT.pdf PDF
SPI7.pdf PDF
4046879_ATTACH.pdf PDF
2777340_RDL_REPORT.pdf PDF
2777904_RDL_REPORT.pdf PDF
4049339_ATTACH.pdf PDF
GFM_MISTR.pdf PDF
2777441_RDL_REPORT.pdf PDF
4020247_RDL_REPORT.pdf PDF
1728882_RDL_REPORT.pdf PDF
2776654_RDL_REPORT.pdf PDF
4049331_ATTACH.pdf PDF
4050282_RDL_REPORT.pdf PDF
4049322_ATTACH.pdf PDF
PWS_Appendix_A.pdf PDF
CAVAF.pdf PDF
PWS_Attach_K1.pdf PDF
4049299_CDRL1_REPORT.pdf PDF
4019057_RDL_REPORT.pdf PDF
1882341_ATTACH.pdf PDF
2777431_RDL_REPORT.pdf PDF
DID_CAV.pdf PDF
GFP.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 107 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT

Number: DI-PSSS-81995 Approved Date: 20150904 AMSC Number: 9576 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFMC/A4) Project Number: PSSS-2015-009 Applicable Forms: N/A Use/Relationship: The Contract Depot Maintenance (CDM) Production Report is a two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.

a. This Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This DID may be used on any depot level maintenance contract.

Requirements:

1. Format. This report shall be provided in the format of Table I.

2. Content. The report shall consist of two parts and contain the following information:

a. Part I:

(1) As of date: The year, month and day applicable to the report. Data must be through the end of the month.

(2) Block 1, Issuing/Procuring Agency. Include address and Point of Contact.

(3) Block 2, Contractor and activity address code (AAC). The name of the business and the DoDAAC assigned to your business for shipment of material.

(4) Block 3, Contract number and Program or Weapon System supported.

(5) Block 4, Government item manager or technical Point of Contact.

(6) Block A, Item identification. The National Stock Number (NSN), A-1 is the Federal Supply Class (FSC) and A-2 is the National Item Identification Number (NIIN) of the item being reported.

(7) Block B, Delivery/Call Order number. When the awarded contract is a call/delivery order type, this is the applicable order number. When an item is awarded on more than one order, it is repeated for each order until completed. If the current report completes the call, the word “completed” will be added.

(8) Block C, The contract line item number (CLIN). The CLIN assigned to the NSN in the contract.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Source: http://assist.dla.mil -- Downloaded: 2024-11-20T17:17Z Check the source to verify that this is the current version before use.

DI-PSSS-81995

(9) Block D, The document/voucher number the item was received under. The document number listed on the shipping documentation the item was received against.

(10) Block E, Quantity on contract or call. E-1 is the quantity of the end items to be repaired on each call/delivery order or contract quantity when orders do not apply. E-2 is the total quantity scheduled for repair cumulative to date.

(11) Block F, Reparables received. Number of reparable items received for repair. F-1 is the quantity of reparables received during the report month. F-2 is the quantity of reparables received cumulative from the start of the contract through report month.

(12) Block G, Reparables inducted into repair during report month.

(13) Block H, Reparables on hand. Number of reparables on hand waiting induction into repair.

(14) Block I, Quantity produced. The quantity produced during the month.

(15) Block J, Serviceables shipped. Serviceables shipped from repair facility. J-1 is the serviceables shipped through report month. J-2 is serviceables shipped cumulative from start of contract.

(16) Block K, Serviceables on hand. The quantity of serviceables on hand awaiting shipping action.

(17) Block L, Quantity condemned. The quantity condemned. L-1 is the quantity condemned during report month. L-2 is the quantity condemned cumulative from start of contract.

(18) Block M, Forecast to complete. The quantity of items scheduled to be produced next month.

(19) Block N, Report date. Enter date of report.

b. Part II, Production problems. Report shall be in narrative format and only required if:

(1) Previous reports production forecast was not shipped.

(2) Current forecast does not equal contract scheduled quantity.

(3) Contract anticipates a problem in the near future.

TABLE I. Contract Depot Maintenance (CDM) Production Report format.

CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT Month and As-Of Date

(YYYYMMDD)

Part I

1. ISSUED BY: 2. CONTRACTOR AND ACTIVITY ADDRESS CODE 3. CONTRACT NUMBER/PRGM/WS 4. GOVERNMENT ITEM MANAGER OR TECHNICAL POC

DURING REPORT PERIOD/TOTAL TO DATE

A.

ITEM

IDENTIFICATION

B.

DELIVERY/

CALL NUMBER

C.

CONTRACT

LINE ITEM

(CLIN)

D.

DOCUMENT/

VOUCHER

NUMBER

E.

QTY ON

CONTRACT

OR

DO/CALL

F.

REPARABLES

RECEIVED

G.

QTY

IND TO

WORK

H.

REPS ON

HAND

I.

QTY

PROD

J.

SERVICEABLES

SHIPPED

K.

SERV ON

HAND

L.

QTY

CONDEMNED

M.

FORECAST PROD

N.

REPORT DATE

FSC NIIN

1 2 1 2 3 1 2 1 2 1 2

Part II, Production Summary

End of DI-PSSS-81995.