PWS Appendix D Submittals.pdf

PDF 195 KB Posted

Attached to
AMENDMENT 0002 - Fire Protection System Maintenance and Repair Service, Aviano and Ghedi AB
Solicitation number
FA568224Q0009
Issued by

About this file

This document is an Appendix D to a Performance Work Statement (PWS) that details the maintenance and repair requirements for fire protection systems at Aviano and Ghedi Air Bases in Italy. The PWS Appendix lists the contractor submittals required, such as ITM (Inspection, Testing, and Maintenance) service report forms, quality control plan, safety data sheets, organizational chart, and other operational documents. The submittals have specific due dates, ranging from submission with the bid proposal to within 10 working days after contract award. The appendix also outlines the weekly, monthly, and quarterly reporting requirements for the ITM services.

The related federal contract opportunity is a solicitation (FA568224Q0009) issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa for fire protection system maintenance and repair services at the two air bases in Italy. The services will be acquired using FAR Part 12 procedures for commercial items and FAR Part 13 simplified acquisition procedures. The solicitation seeks firm-fixed price quotes from contractors to perform the required maintenance and repair work in accordance with the PWS and host nation laws.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX D

MAINTENANCE AND REPAIR OF FIRE PROTECTION SYSTEMS

AT AVIANO AND GHEDI ABs, ITALY

Q.ty

158 every week

421 every 6 months

N/A

N/A

Note:

‐ ITM service reports (see above table)

‐ Smoke detector cleaning reports

‐ Part History Summary

‐ Work Order Tracker

‐ Metrics

PWS

paragraph

2.1

4.2.3

4.2.2

1.3.1.2.3

1.3.1.2.3

4.2

4.2.1

4.4

1.4.2

1.3.1.4

1.5.3.3

1.3.2.2

1.3.3.4

1.3.1.3

1.3.1.5

3.2.1

4.4.3.1

To be submitted no later than ten (10) working days after contract award

Timing

To be submitted no later than five (5) working days after contract award

To be submitted no later than five (5) working days after contract award

To be submitted no later than five (5) working days after contract award

To be submitted no later than five (5) working days after contract award

To be submitted with the Bid proposal

To be submitted with the Bid proposal

To be submitted with the Bid proposal

To be submitted with the Bid proposal

Within two (2) working days from the contract award

To be submitted no later than ten (10) working days after contract award

To be submitted at least ten (10) working days prior to the intended use of the hazardous material

CONTRACTOR'S SUBMITTALS

ITM service report forms

Notification signs

Quality Control Plan (QCP)

Submittal type

SDS (safety Data sheet)

ITM service schedule

Operational Safety Plan

Contractor contact information

Organizational chart

Emergency request service report form

Extraordinary Maintenance request service report form

To be submitted right after the pre‐performance meeting or within ten (10) working days after contract award, whichever is first

(*) Every month there will be a week where the contractor will delivery 158 Monthly ITM reports instead of the Weekly ones. Every 13 weeks, the contractor will delivery 158 Quarterly ITM reports instead of the Weekly or Monthly ones.

WEEKLY SUBMITTALS

The number of the ITM reports can change depending on the ITM forms that the contractor will submit.

For Example, in buildings where the Standpipe Hoses are connected to the distribution line of the Wet Sprinkler System, it is acceptable to have a single ITM combo‐report for both of them ether to have two separate ITM reports.

OTHER SUBMITTALS

To be submitted no later than ten (10) working days after contract award

Within two (2) working days from the contract award

To be submitted with the Bid proposal

Employee Qualifications

Employee D‐21 Qualification Schedule

(if not already qualified and certified)

Copy of UNI and NFPA Norms

Employee D‐21 Qualification (if available)

Metrics form To be submitted no later than five (5) working days after contract award

Employee roster and base pass requests

Updated Appendix C

Emergency Request Service Reports

Extraordinary Maintenance Request Service Reports

Semiannual/Annual ITM reports

Weekly* ITM reports

Decription

27 June 2024