This document is a Part History Summary for various fire protection system components located at buildings across Aviano and Ghedi Air Bases in Italy. It details 771 individual part replacements that occurred between November 2023 and August 2024, including sprinkler pipes, valves, detectors, pull stations, and other fire protection equipment. The summary provides the building number, quantity, part description, replacement date, location, and maintenance notes for each item.
The related federal contract opportunity is for Fire Protection System Maintenance and Repair services at the Aviano and Ghedi Air Bases, to be awarded as a firm-fixed price commercial item contract under FAR Part 12 and FAR Part 13 Simplified Acquisition Procedures. The solicitation number is FA568224Q0009, and the U.S. Air Forces in Europe - Air Forces Africa is the procuring agency.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bldg# Q.ty Part Description Date Replaced Location Description Note
43 4 Hose UNI45 20MT 19-Jan-24 External cabinet Maintenance routine
43 4 Hose cabinet 23-Feb-24 Semiannual standpipes
110 1 Sprinkler room sign 14-Mar-24 Maintenance routine
113 1 Pull station Conventional 06-Nov-23 Garage Semiannual Detection
113 1 Sprinkler room sign 14-Mar-24 Maintenance routine
116 1 Safecrash 04-Mar-24 Maintenance routine
116 1 Sprinkler room sign 14-Mar-24 Maintenance routine
147 5 Hose UNI45 20MT 04-Mar-24 Maintenance routine
147 1 Sprinkler room sign 14-Mar-24 Maintenance routine
147 5 Hose saddle 28-Jun-24 Maintenance routine
149 4 Hose UNI45 20MT 04-Mar-24 Maintenance routine
170 1 Sprinkler room sign 14-Mar-24 Maintenance routine
170 2 Sprinkler pendant 68° 21-Jun-24 Maintenance routine
170 1 Sprinkler wrench 21-Jun-24 Maintenance routine
172 1 Sprinkler room sign 14-Mar-24 Maintenance routine
172 2 VVF Caps 19-Apr-24 EMRL 002
179 1 Sprinkler room sign 14-Mar-24 Maintenance routine
179 2 VVF caps 19-Apr-24 EMRL 002
179 1 Ali50En 13-Jun-24 Maintenance routine
179 1 Sprinkler pendant 68° 21-Jun-24 Maintenance routine
179 1 Sprinkler vertical 68° 21-Jun-24 Maintenance routine
411 2 DN 150 butterfly valve 26-Jun-24 Maintenance routine
411 5 glycerated manometers 01-Aug-24 Maintenance routine
430 1 Sprinkler room sign 05-Feb-24 Maintenance routine
430 1 Sprinkler room sign 14-Mar-24 Maintenance routine
430 7 fire hoses 30 mt 14-Aug-24 Maintenance routine
554 1 FD-851-RE Therm det 09-Apr-24 Maintenance routine
554 3 smoke sensor SD-851E 21-Jun-24 Maintenance routine
600 1 Notifier FD-851 RE 06-Mar-24 Semiannual Detection
600 1 Notifier B401 06-Mar-24 Semiannual Detection
600 2 CWSS-RW-S5 06-Mar-24 Semiannual Detection
606 1
MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO)
26-Jun-24 EMRL 002
898 1 SD-851E Notifier 22-Jul-24 Annual Detection
904 1 acoustic optical device CWSS-RW-S5 28-Mar-24 Semiannual Detection
904 1 smoke sensor SD-851E 28-Mar-24 Semiannual Detection
907 1
MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO) 16-May-24
EMRL 002
907 1 VVF Cap 27-Jun-24 Maintenance routine
914 1 Sprinkler room sign 19-Mar-24 Maintenance routine
919 1
MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO) 03-Jun-24
EMRL 002
919 2 SD-851E Notifier 24-Jul-24 Annual Detection
921 1 Sprinkler room sign 05-Feb-24 Maintenance routine
921 2 Sprinkler vertical 68° 21-Jun-24 Maintenance routine
921 1 Notifier DNRE addressable pipeline detector 12-Jul-24 Maintenance routine
921 1 Notifier NFXI-OPT 12-Jul-24 Maintenance routine
925 1 Sprinkler room sign 05-Feb-24 Maintenance routine
925 1 Notifier Smoke det. OPT 14-Mar-24 Semiannual Detection
925 1 tifier DNRE addressable pipeline detec 14-Mar-24 Semiannual Detection
925 1 Notifier sampling tube 0.3-0.6 m 14-Mar-24 Semiannual Detection
Part History Summary 2023-24
APPENDIX L
Appendix L 27 August 24 1
925 1 Notifier AM2000CL 17-May-24
925 2 M710 Notifier 24-May-24 Maintenance routine
925 8 Sprinkler vertical 68° 21-Jun-24 Maintenance routine
925 2 Sprinkler pendant 68° 21-Jun-24 Maintenance routine
925 1 Escutcheon 1/2" 21-Jun-24 Maintenance routine
925 1 Fire Department Container 26-Jul-24 Maintenance routine
933 1 Sprinkler room sign 05-Feb-24 Maintenance routine
933 1 VVF Caps 19-Apr-24 EMRL 002
933 2 Sprinkler pendant 68° 21-Jun-24 Maintenance routine
944 1 Glass pull station 04-Dec-23 Semiannual Detection
946 1 Indicator 30-Nov-23 Semiannual Detection
946 1 gate valve 25-Jun-24 Maintenance routine
946 1 pressure gauge 28-Jun-24 Maintenance routine
946 1 glycerated manometers 01-Aug-24 Maintenance routine
1000 1 Fire Pump Impeller Seal 22-Jul-24 Maintenance routine
1000 1 Motor pump muffler 01-Aug-24 Maintenance routine
1000 1 Notifier Module M710 12-Aug-24 Maintenance routine
1013 1 pull station glass 09-Aug-24 Maintenance routine
1014 3 smoke sensor SD-851E 02-May-24 Annual Detection
1016 1 Notifer CWSS-RW-S5 12-Jul-24 Maintenance routine
1029 1 Sprinkler room sign 06-Jun-24 Maintenance routine
1029 1 Dry valve accelerator 26-Jun-24 Maintenance routine
1032 1 OML Testa pneumatica 21-Dec-23 Maintenance routine
1032 1 Sprinkler room sign 06-Jun-24 Maintenance routine
1032 1
MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO) 10-Jul-24
EMRL 002
1035 1
MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO) 12-Jul-24
EMRL 002
1035 1 Pull station Glad 12-Jul-24 EMRL 002
1035 1 Notifier Module M701 14-Aug-24 Maintenance routine
1037 1
MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO) 31-Jul-24
EMRL 002
1046 1
LOWARA SV6003F75 PUMP SEAL KIT
COMPLETE O-RING PUMP BODY
08-Feb-24 Inside Fire pumps station EMRL 013
1046 1 FLOW METER DN80 UP TO 130 M3 08-Feb-24 Inside Fire pumps station EMRL 013
1046 1 Manual pull station NBG-12 10-Apr-24 Annual Detection
1046 2 Overpressure valve 1" 28-May-24 Maintenance routine
1046 2 glycerated manometers 01-Aug-24 Maintenance routine
1048 1 Notifier Smoke det. OPT 08-Jan-24 Semiannual Detection
1063 1 AM1000 notifier 11-Dec-23 Semiannual Detection
1063 1 Visual/Acoustic Signalling Device 24-May-24 Maintenance routine
1063 1 Flexible hose 28-May-24 EMRL 002
1078 1 M701 Notifier 16-Jan-24 EMRL
1078 1 M701 Notifier 31-Jan-24 Semiannual Detection
1078 1 Sprinkler room sign 06-Jun-24 Maintenance routine
1099 1 Sprinkler wrench 21-Jun-24 Maintenance routine
1100 1 Notifier Therm det TDIFF 20-Mar-24 Maintenance routine
1133 1 Ali50En 04-Jun-24 Maintenance routine
1163 1 Sprinkler room sign 07-May-24 Maintenance routine
1173 1 Notifier Smoke det. OPT 20-Jun-24 Annual Detection
1174 2 DN 150 anti-vibration joint 25-Jun-24 Maintenance routine
1174 5 Hose Reels 01-Jul-24 Annual Detection
1174 1 Motor pump muffler 02-Aug-24 Maintenance routine
1175 1 Sprinkler room sign 10-Jun-24 Maintenance routine
Appendix L 27 August 24 2
1204 1 Sprinkler wrench 20-Jun-24 Maintenance routine
1204 1 Notifier DSE-HW 25-Jul-24 Maintenance routine
1204 3 Hose 30 m UNI 45 26-Jul-24 Maintenance routine
1204 1 Safe crash 14-Aug-24 Maintenance routine
1226 2 Notifier Indicator 20-Feb-24 Semiannual Detection
1226 1 FD-851-RE Therm det 31-Jul-24 Emergency call
1226 1 Notifier Horn 05-Aug-24 Maintenance routine
1227 1 UNI 70 Standpipe 14-Mar-24 EMRL 002
1227 1 Control Valve 6" 29-May-24 Maintenance routine
1227 1 pressure gauge 19-Jul-24 Maintenance routine
1229 1 Sprinkler room sign 11-Mar-24 Maintenance routine
1229 6 Sprinkler vertical 68° 20-Jun-24 Maintenance routine
1229 1 Sprinkler wrench 20-Jun-24 Maintenance routine
1230 2 Notifier Therm det TDIFF 21-Jun-24 Annual Detection
1234 1 SD-851E Notifier 29-Jul-24 Annual Detection
1237 1 Sprinkler room sign 10-Jun-24 Maintenance routine
1243 1 SD-851E Notifier 24-Jul-24 Annual Detection
1302 1 Sprinkler room sign 19-Mar-24 Maintenance routine
1302 1 electric pump pressure switch 25-Jun-24 Maintenance routine
1302 1 pressure gauge 25-Jun-24 Maintenance routine
1307 1 Sprinkler room sign 19-Mar-24 Maintenance routine
1307 1 Escutcheon 1/2" 20-Jun-24 Maintenance routine
1307 1 Notifier SD 851-E 30-Jul-24 Annual Detection
1335 1 Sprinkler room sign 13-Mar-24 Maintenance routine
1335 2 Sprinkler pendant 79° 20-Jun-24 Maintenance routine
1335 1
MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO)
19-Jul-24 EMRL 002
1338 2 Detector FD-851HTE A 23-Jan-24 Semiannual Detection
1338 2 Smoke detector Base B401 23-Jan-24 Semiannual Detection
1342 1 Sprinkler room sign 13-Mar-24 Maintenance routine
1342 1 Sprinkler pendant 79° 20-Jun-24 Maintenance routine
1379 1 Sprinkler room sign 13-Mar-24 Maintenance routine
1379 2 pressure gauge 25-Jun-24 Maintenance routine
1379 1 DN 150 anti-vibration joint 25-Jun-24 EMRL 002
1380 11 Notifier Smoke det. OPT 14-Feb-24 Semiannual Detection
1380 1 Sprinkler room sign 13-Mar-24 Maintenance routine
1391 1 Sprinkler room sign 12-Mar-24 Maintenance routine
1396 2 Notifier FD-851 HTE 10-Jul-24 Maintenance routine
1396 2 Notifier B401 10-Jul-24 Maintenance routine
1403 1 VVF Caps 19-Apr-24 EMRL 002
1403 5 Notifier NFXI-OPT 01-Aug-24 Annual Detection
1403 4 Notifier B501 AP 01-Aug-24 Annual Detection
1403 1 Notifier CWSS-RW-S5 01-Aug-24 Annual Detection
1404 1 Sprinkler room sign 12-Mar-24 Maintenance routine
1404 1 Notifier Indicator 13-Mar-24 Semiannual Detection
1404 1 Sprinkler box 10-Jul-24 Maintenance routine
1404 6 Sprinkler pendant 68° 10-Jul-24 Maintenance routine
1404 1 American Hose Pipe 07-Aug-24 Maintenance routine
1404 1 Safe crash 07-Aug-24 Maintenance routine
1405 1 Sprinkler room sign 12-Mar-24 Maintenance routine
1407 1 Safecrash 20-Feb-24 Maintenance routine
1407 1 Notifier Smoke det. OPT 01-Mar-24 Maintenance routine
1407 1 Pull station 06-Jun-24 Maintenance routine
1411 1 Sprinkler room sign 12-Mar-24 Maintenance routine
1411 10 Notifier Smoke det. OPT 17-Apr-24 Maintenance routine
1411 4 Ansul Caps 24-May-24 Popeyes Hood Maintenance routine
1412 2 Notifier Smoke det. OPT 27-Mar-24 Semiannual Detection
Appendix L 27 August 24 3
1412 1 acoustic optical device CWSS-RW-S5 27-Mar-24 Semiannual Detection
1412 1 Sprinkler room sign 07-May-24 Maintenance routine
1413 1 Patch microphone Mass notification 23-Jan-24 Mass notification Maintenance routine
1413 1 Sprinkler room sign 07-May-24 Maintenance routine
1413 1 Hose UNI 45 20 MT 28-May-24 Maintenance routine
1413 1 Notifier AM2000CL 02-Jul-24 Extraordinary Maintenance
1413 2 M720 Notifier 02-Jul-24 Extraordinary Maintenance
1420 1 Sprinkler room sign 07-Jun-24 Maintenance routine
1420 1 Notifier Smoke det. OPT 25-Jul-24 Annual Detection
1420 1 pull station glass 08-Aug-24 Annual Detection
1420 1 Notifier pull station 08-Aug-24 Annual Detection
1420 1 Notifier Indicator 08-Aug-24 Annual Detection
1420 1 Notifier Module M701 08-Aug-24 Annual Detection
1422 3 Hose UNI45 20MT 23-Jan-24 Weekly Maintenance
1422 1 Sprinkler wrench 20-Jun-24 Maintenance routine
1423 2 Notifier Smoke det. OPT 11-Jan-24 Semiannual Detection
1423 2 Heat Detector NFXI-TFIX58 17-Jun-24 Annual Detection
1423 1 Sprinkler wrench 20-Jun-24 Maintenance routine
1424 6 Hose UNI45 20MT 05-Mar-24 Maintenance routine
1425 1 flow switch 26-Jun-24 Maintenance routine
1426 3 Hose UNI45 20MT 23-Jan-24 Weekly Maintenance
1427 1 Hose UNI45 20MT 23-Jan-24 Weekly Maintenance
1427 9 Hose UNI45 20MT 05-Mar-24 Maintenance routine
1427 1 Sprinkler room sign 12-Mar-24 Maintenance routine
1427 1 Sprinkler room sign 14-Mar-24 Maintenance routine
1427 1 Pull Station 17-Jul-24 Annual Detection
1428 4 Hose UNI45 20MT 23-Jan-24 Weekly Maintenance
1428 1 Safe crash 07-Mar-24 Maintenance routine
1428 1 gate valve 25-Jun-24 Maintenance routine
1428 1 Notifier Indicator 26-Jun-24 Annual Detection
1428 1
1 MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO) 16-Jul-24
EMRL 002
1428 1 Notifier NFXI-OPT 16-Jul-24 Maintenance routine
1430 1 Sprinkler wrench 20-Jun-24 Maintenance routine
1431 3 Notifier NFXI-TDIFF 09-Jul-24 Annual Detection
1431 2 Notifier DSE-HW 12-Jul-24 Maintenance routine
1434 27 Notifier Smoke det. OPT 13-Mar-24 Semiannual Detection
1434 1 UNI 70 FDC CUP 13-May-24 EMRL 002
1435 1 Overpressure valve 3/4" 28-May-24 Maintenance routine
1435 1 Notifier Smoke det. OPT 01-Jul-24 Annual Detection
1442 29 Notifier NFXI-OPT 31-Jul-24 Annual Detection
1445 10 UNI 45 Standpipe 04-Mar-24 EMRL 002
1445 1 Sprinkler room sign 04-Mar-24 Maintenance routine
1445 1 Notifier DSE1-EN 24-Jul-24 Annual Detection
1445 1 Pull Station 24-Jul-24 Annual Detection
1446 1 Sprinkler room sign 07-Jun-24 Maintenance routine
1446 2 Hose 30 m UNI 45 29-Jul-24 Maintenance routine
1448 1 Sprinkler room sign 13-Mar-24 Maintenance routine
1448 1 Sprinkler box 20-Jun-24 Maintenance routine
1448 6 Sprinkler vertical 68° 20-Jun-24 Maintenance routine
1448 1 Sprinkler wrench 20-Jun-24 Maintenance routine
1459 1 Notifier Smoke det. OPT 01-Mar-24 Semiannual Detection
1459 1 Power supply ALI50EN 26-Jun-24 EMRL 002
1459 1 Pull station 26-Jun-24 EMRL 002
1462 1 Sprinkler wrench 20-Jun-24 Maintenance routine
Appendix L 27 August 24 4
1464 29 Notifier Smoke det. OPT 06-Mar-24 Semiannual Detection
1464 1 Sprinkler room sign 13-Mar-24 Maintenance routine
1464 1 Notifier Indicator 19-Mar-24 Maintenance routine
1467 17 Hose UNI45 20MT 19-Jan-24 Maintenance routine
1467 1 Sprinkler room sign 11-Mar-24 Maintenance routine
1467 1 M710 Notifier 11-Mar-24 Semiannual Detection
1467 4 VVF Caps 19-Apr-24 EMRL 002
1467 1 DN80 wafer valve 04-Jul-24 Maintenance routine
1476 2 Notifier Smoke det. OPT 14-Feb-24 Semiannual Detection
1476 1 Sprinkler room sign 13-Mar-24 Maintenance routine
1476 4 Notifier Smoke det. OPT 02-Jul-24 Maintenance routine
1478 1 Sprinkler room sign 12-Mar-24 Maintenance routine
1481 2 Notifier NFXI-TDIFF 10-Jul-24 Annual Detection
1483 1 Notifier NFXI-OPT 11-Jul-24 Annual Detection
1484 1 Sprinkler room sign 14-Mar-24 Maintenance routine
1484 12 Fire lance 28-Jun-24 Maintenance routine
1500 1
MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO)
17-Jun-24 EMRL 002
5100 1 Notifier AM2000CL 10-Jun-24 Emergency
5303 1 Pull staion 06-Jun-24 Maintenance routine
5303 3 Notifier heat detector 06-Jun-24 Maintenance routine
5308 1
MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO)
06-Jun-24 EMRL 002
5315 2 Pull Station 04-Jun-24 EMRL 002
7300 1 UNI 45 20 MT Stand pipe 02-May-24 EMRL 002
7300 1 M720 Notifier 28-May-24 Maintenance routine
7300 1 Sprinkler room sign 07-Jun-24 Maintenance routine
7810 3 Notifier Smoke det. OPT 05-Mar-24 Semiannual Detection
15023 1 Notifier FD851RE 27-Feb-24 EMRL 026-2023
1029-3 1 SD-851E Notifier 22-Jul-24 Annual Detection
1046-1 1
MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601
(ELCO) 11-Jul-24
EMRL 002
1078-1 1 Pull station 31-Jan-24 Semiannual Detection
1122-5 1 Pull station 20-Dec-23 Semiannual Detection
1122-5 1 Sprinkler room sign 16-May-24 Maintenance routine
1122-5 1 AM4000 Notifier 28-May-24 Maintenance routine
1122-5 1 Sprinkler wrench 21-Jun-24 Maintenance routine
1122-5 6 Sprinkler vertical 68° 21-Jun-24 Maintenance routine
1122-5 1 Sprinkler box 21-Jun-24 Maintenance routine
1204-3 1 AM1000 notifier 20-Dec-23 Maintenance routine
1204-3 4 M710 Notifier 20-Dec-23 Maintenance routine
1204-3 1 Sprinkler room sign 18-Mar-24 Maintenance routine
1204-3 1 Sprinkler room sign 18-Mar-24 Maintenance routine
1204-3 1 Sprinkler box 20-Jun-24 Maintenance routine
1204-3 1 Sprinkler wrench 20-Jun-24 Maintenance routine
1204-3 6 Sprinkler vertical 68° 20-Jun-24 Maintenance routine
1204-3 1 pressure gauge 22-Jul-24 Maintenance routine
1204-3 2 glycerated manometers 01-Aug-24 Maintenance routine
1407-1 1 Module M701 01-Mar-24 Maintenance routine
1410-8 1 Sprinkler room sign 19-Mar-24 Maintenance routine
1711-4 2 Pull station 02-Jul-24 Maintenance routine
1711-4 1 Notifier PAN1-EU 02-Jul-24 Maintenance routine
7300-2 1 Motor pump muffler 02-Aug-24 Maintenance routine
7300-3 1 Dry valve gasket kit 26-Jun-24 Extraordinary Maintenance
7300-3 2 pressure gauge 06-Aug-24 Maintenance routine
910-9 1 Sprinkler wrench 02-Jul-24 Maintenance routine
Appendix L 27 August 24 5
916-01 1 Notifier AM1000N 15-Mar-24 Maintenance routine
916-01 1 Electric panel lever 19-Aug-24 Pump N°2 Maintenance routine
940A 1 Notifier Smoke det. OPT 21-Jun-24 Maintenance routine
Appendix L 27 August 24 6