AMENDMENT 0002 - Fire Protection System Maintenance and Repair Service, Aviano and Ghedi AB
Solicitation number
FA568224Q0009
Issued by

About this file

This document is a Part History Summary for various fire protection system components located at buildings across Aviano and Ghedi Air Bases in Italy. It details 771 individual part replacements that occurred between November 2023 and August 2024, including sprinkler pipes, valves, detectors, pull stations, and other fire protection equipment. The summary provides the building number, quantity, part description, replacement date, location, and maintenance notes for each item.

The related federal contract opportunity is for Fire Protection System Maintenance and Repair services at the Aviano and Ghedi Air Bases, to be awarded as a firm-fixed price commercial item contract under FAR Part 12 and FAR Part 13 Simplified Acquisition Procedures. The solicitation number is FA568224Q0009, and the U.S. Air Forces in Europe - Air Forces Africa is the procuring agency.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bldg# Q.ty Part Description Date Replaced Location Description Note

43 4 Hose UNI45 20MT 19-Jan-24 External cabinet Maintenance routine

43 4 Hose cabinet 23-Feb-24 Semiannual standpipes

110 1 Sprinkler room sign 14-Mar-24 Maintenance routine

113 1 Pull station Conventional 06-Nov-23 Garage Semiannual Detection

113 1 Sprinkler room sign 14-Mar-24 Maintenance routine

116 1 Safecrash 04-Mar-24 Maintenance routine

116 1 Sprinkler room sign 14-Mar-24 Maintenance routine

147 5 Hose UNI45 20MT 04-Mar-24 Maintenance routine

147 1 Sprinkler room sign 14-Mar-24 Maintenance routine

147 5 Hose saddle 28-Jun-24 Maintenance routine

149 4 Hose UNI45 20MT 04-Mar-24 Maintenance routine

170 1 Sprinkler room sign 14-Mar-24 Maintenance routine

170 2 Sprinkler pendant 68° 21-Jun-24 Maintenance routine

170 1 Sprinkler wrench 21-Jun-24 Maintenance routine

172 1 Sprinkler room sign 14-Mar-24 Maintenance routine

172 2 VVF Caps 19-Apr-24 EMRL 002

179 1 Sprinkler room sign 14-Mar-24 Maintenance routine

179 2 VVF caps 19-Apr-24 EMRL 002

179 1 Ali50En 13-Jun-24 Maintenance routine

179 1 Sprinkler pendant 68° 21-Jun-24 Maintenance routine

179 1 Sprinkler vertical 68° 21-Jun-24 Maintenance routine

411 2 DN 150 butterfly valve 26-Jun-24 Maintenance routine

411 5 glycerated manometers 01-Aug-24 Maintenance routine

430 1 Sprinkler room sign 05-Feb-24 Maintenance routine

430 1 Sprinkler room sign 14-Mar-24 Maintenance routine

430 7 fire hoses 30 mt 14-Aug-24 Maintenance routine

554 1 FD-851-RE Therm det 09-Apr-24 Maintenance routine

554 3 smoke sensor SD-851E 21-Jun-24 Maintenance routine

600 1 Notifier FD-851 RE 06-Mar-24 Semiannual Detection

600 1 Notifier B401 06-Mar-24 Semiannual Detection

600 2 CWSS-RW-S5 06-Mar-24 Semiannual Detection

606 1

MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO)

26-Jun-24 EMRL 002

898 1 SD-851E Notifier 22-Jul-24 Annual Detection

904 1 acoustic optical device CWSS-RW-S5 28-Mar-24 Semiannual Detection

904 1 smoke sensor SD-851E 28-Mar-24 Semiannual Detection

907 1

MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO) 16-May-24

EMRL 002

907 1 VVF Cap 27-Jun-24 Maintenance routine

914 1 Sprinkler room sign 19-Mar-24 Maintenance routine

919 1

MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO) 03-Jun-24

EMRL 002

919 2 SD-851E Notifier 24-Jul-24 Annual Detection

921 1 Sprinkler room sign 05-Feb-24 Maintenance routine

921 2 Sprinkler vertical 68° 21-Jun-24 Maintenance routine

921 1 Notifier DNRE addressable pipeline detector 12-Jul-24 Maintenance routine

921 1 Notifier NFXI-OPT 12-Jul-24 Maintenance routine

925 1 Sprinkler room sign 05-Feb-24 Maintenance routine

925 1 Notifier Smoke det. OPT 14-Mar-24 Semiannual Detection

925 1 tifier DNRE addressable pipeline detec 14-Mar-24 Semiannual Detection

925 1 Notifier sampling tube 0.3-0.6 m 14-Mar-24 Semiannual Detection

Part History Summary 2023-24

APPENDIX L

Appendix L 27 August 24 1

925 1 Notifier AM2000CL 17-May-24

925 2 M710 Notifier 24-May-24 Maintenance routine

925 8 Sprinkler vertical 68° 21-Jun-24 Maintenance routine

925 2 Sprinkler pendant 68° 21-Jun-24 Maintenance routine

925 1 Escutcheon 1/2" 21-Jun-24 Maintenance routine

925 1 Fire Department Container 26-Jul-24 Maintenance routine

933 1 Sprinkler room sign 05-Feb-24 Maintenance routine

933 1 VVF Caps 19-Apr-24 EMRL 002

933 2 Sprinkler pendant 68° 21-Jun-24 Maintenance routine

944 1 Glass pull station 04-Dec-23 Semiannual Detection

946 1 Indicator 30-Nov-23 Semiannual Detection

946 1 gate valve 25-Jun-24 Maintenance routine

946 1 pressure gauge 28-Jun-24 Maintenance routine

946 1 glycerated manometers 01-Aug-24 Maintenance routine

1000 1 Fire Pump Impeller Seal 22-Jul-24 Maintenance routine

1000 1 Motor pump muffler 01-Aug-24 Maintenance routine

1000 1 Notifier Module M710 12-Aug-24 Maintenance routine

1013 1 pull station glass 09-Aug-24 Maintenance routine

1014 3 smoke sensor SD-851E 02-May-24 Annual Detection

1016 1 Notifer CWSS-RW-S5 12-Jul-24 Maintenance routine

1029 1 Sprinkler room sign 06-Jun-24 Maintenance routine

1029 1 Dry valve accelerator 26-Jun-24 Maintenance routine

1032 1 OML Testa pneumatica 21-Dec-23 Maintenance routine

1032 1 Sprinkler room sign 06-Jun-24 Maintenance routine

1032 1

MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO) 10-Jul-24

EMRL 002

1035 1

MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO) 12-Jul-24

EMRL 002

1035 1 Pull station Glad 12-Jul-24 EMRL 002

1035 1 Notifier Module M701 14-Aug-24 Maintenance routine

1037 1

MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO) 31-Jul-24

EMRL 002

1046 1

LOWARA SV6003F75 PUMP SEAL KIT

COMPLETE O-RING PUMP BODY

08-Feb-24 Inside Fire pumps station EMRL 013

1046 1 FLOW METER DN80 UP TO 130 M3 08-Feb-24 Inside Fire pumps station EMRL 013

1046 1 Manual pull station NBG-12 10-Apr-24 Annual Detection

1046 2 Overpressure valve 1" 28-May-24 Maintenance routine

1046 2 glycerated manometers 01-Aug-24 Maintenance routine

1048 1 Notifier Smoke det. OPT 08-Jan-24 Semiannual Detection

1063 1 AM1000 notifier 11-Dec-23 Semiannual Detection

1063 1 Visual/Acoustic Signalling Device 24-May-24 Maintenance routine

1063 1 Flexible hose 28-May-24 EMRL 002

1078 1 M701 Notifier 16-Jan-24 EMRL

1078 1 M701 Notifier 31-Jan-24 Semiannual Detection

1078 1 Sprinkler room sign 06-Jun-24 Maintenance routine

1099 1 Sprinkler wrench 21-Jun-24 Maintenance routine

1100 1 Notifier Therm det TDIFF 20-Mar-24 Maintenance routine

1133 1 Ali50En 04-Jun-24 Maintenance routine

1163 1 Sprinkler room sign 07-May-24 Maintenance routine

1173 1 Notifier Smoke det. OPT 20-Jun-24 Annual Detection

1174 2 DN 150 anti-vibration joint 25-Jun-24 Maintenance routine

1174 5 Hose Reels 01-Jul-24 Annual Detection

1174 1 Motor pump muffler 02-Aug-24 Maintenance routine

1175 1 Sprinkler room sign 10-Jun-24 Maintenance routine

Appendix L 27 August 24 2

1204 1 Sprinkler wrench 20-Jun-24 Maintenance routine

1204 1 Notifier DSE-HW 25-Jul-24 Maintenance routine

1204 3 Hose 30 m UNI 45 26-Jul-24 Maintenance routine

1204 1 Safe crash 14-Aug-24 Maintenance routine

1226 2 Notifier Indicator 20-Feb-24 Semiannual Detection

1226 1 FD-851-RE Therm det 31-Jul-24 Emergency call

1226 1 Notifier Horn 05-Aug-24 Maintenance routine

1227 1 UNI 70 Standpipe 14-Mar-24 EMRL 002

1227 1 Control Valve 6" 29-May-24 Maintenance routine

1227 1 pressure gauge 19-Jul-24 Maintenance routine

1229 1 Sprinkler room sign 11-Mar-24 Maintenance routine

1229 6 Sprinkler vertical 68° 20-Jun-24 Maintenance routine

1229 1 Sprinkler wrench 20-Jun-24 Maintenance routine

1230 2 Notifier Therm det TDIFF 21-Jun-24 Annual Detection

1234 1 SD-851E Notifier 29-Jul-24 Annual Detection

1237 1 Sprinkler room sign 10-Jun-24 Maintenance routine

1243 1 SD-851E Notifier 24-Jul-24 Annual Detection

1302 1 Sprinkler room sign 19-Mar-24 Maintenance routine

1302 1 electric pump pressure switch 25-Jun-24 Maintenance routine

1302 1 pressure gauge 25-Jun-24 Maintenance routine

1307 1 Sprinkler room sign 19-Mar-24 Maintenance routine

1307 1 Escutcheon 1/2" 20-Jun-24 Maintenance routine

1307 1 Notifier SD 851-E 30-Jul-24 Annual Detection

1335 1 Sprinkler room sign 13-Mar-24 Maintenance routine

1335 2 Sprinkler pendant 79° 20-Jun-24 Maintenance routine

1335 1

MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO)

19-Jul-24 EMRL 002

1338 2 Detector FD-851HTE A 23-Jan-24 Semiannual Detection

1338 2 Smoke detector Base B401 23-Jan-24 Semiannual Detection

1342 1 Sprinkler room sign 13-Mar-24 Maintenance routine

1342 1 Sprinkler pendant 79° 20-Jun-24 Maintenance routine

1379 1 Sprinkler room sign 13-Mar-24 Maintenance routine

1379 2 pressure gauge 25-Jun-24 Maintenance routine

1379 1 DN 150 anti-vibration joint 25-Jun-24 EMRL 002

1380 11 Notifier Smoke det. OPT 14-Feb-24 Semiannual Detection

1380 1 Sprinkler room sign 13-Mar-24 Maintenance routine

1391 1 Sprinkler room sign 12-Mar-24 Maintenance routine

1396 2 Notifier FD-851 HTE 10-Jul-24 Maintenance routine

1396 2 Notifier B401 10-Jul-24 Maintenance routine

1403 1 VVF Caps 19-Apr-24 EMRL 002

1403 5 Notifier NFXI-OPT 01-Aug-24 Annual Detection

1403 4 Notifier B501 AP 01-Aug-24 Annual Detection

1403 1 Notifier CWSS-RW-S5 01-Aug-24 Annual Detection

1404 1 Sprinkler room sign 12-Mar-24 Maintenance routine

1404 1 Notifier Indicator 13-Mar-24 Semiannual Detection

1404 1 Sprinkler box 10-Jul-24 Maintenance routine

1404 6 Sprinkler pendant 68° 10-Jul-24 Maintenance routine

1404 1 American Hose Pipe 07-Aug-24 Maintenance routine

1404 1 Safe crash 07-Aug-24 Maintenance routine

1405 1 Sprinkler room sign 12-Mar-24 Maintenance routine

1407 1 Safecrash 20-Feb-24 Maintenance routine

1407 1 Notifier Smoke det. OPT 01-Mar-24 Maintenance routine

1407 1 Pull station 06-Jun-24 Maintenance routine

1411 1 Sprinkler room sign 12-Mar-24 Maintenance routine

1411 10 Notifier Smoke det. OPT 17-Apr-24 Maintenance routine

1411 4 Ansul Caps 24-May-24 Popeyes Hood Maintenance routine

1412 2 Notifier Smoke det. OPT 27-Mar-24 Semiannual Detection

Appendix L 27 August 24 3

1412 1 acoustic optical device CWSS-RW-S5 27-Mar-24 Semiannual Detection

1412 1 Sprinkler room sign 07-May-24 Maintenance routine

1413 1 Patch microphone Mass notification 23-Jan-24 Mass notification Maintenance routine

1413 1 Sprinkler room sign 07-May-24 Maintenance routine

1413 1 Hose UNI 45 20 MT 28-May-24 Maintenance routine

1413 1 Notifier AM2000CL 02-Jul-24 Extraordinary Maintenance

1413 2 M720 Notifier 02-Jul-24 Extraordinary Maintenance

1420 1 Sprinkler room sign 07-Jun-24 Maintenance routine

1420 1 Notifier Smoke det. OPT 25-Jul-24 Annual Detection

1420 1 pull station glass 08-Aug-24 Annual Detection

1420 1 Notifier pull station 08-Aug-24 Annual Detection

1420 1 Notifier Indicator 08-Aug-24 Annual Detection

1420 1 Notifier Module M701 08-Aug-24 Annual Detection

1422 3 Hose UNI45 20MT 23-Jan-24 Weekly Maintenance

1422 1 Sprinkler wrench 20-Jun-24 Maintenance routine

1423 2 Notifier Smoke det. OPT 11-Jan-24 Semiannual Detection

1423 2 Heat Detector NFXI-TFIX58 17-Jun-24 Annual Detection

1423 1 Sprinkler wrench 20-Jun-24 Maintenance routine

1424 6 Hose UNI45 20MT 05-Mar-24 Maintenance routine

1425 1 flow switch 26-Jun-24 Maintenance routine

1426 3 Hose UNI45 20MT 23-Jan-24 Weekly Maintenance

1427 1 Hose UNI45 20MT 23-Jan-24 Weekly Maintenance

1427 9 Hose UNI45 20MT 05-Mar-24 Maintenance routine

1427 1 Sprinkler room sign 12-Mar-24 Maintenance routine

1427 1 Sprinkler room sign 14-Mar-24 Maintenance routine

1427 1 Pull Station 17-Jul-24 Annual Detection

1428 4 Hose UNI45 20MT 23-Jan-24 Weekly Maintenance

1428 1 Safe crash 07-Mar-24 Maintenance routine

1428 1 gate valve 25-Jun-24 Maintenance routine

1428 1 Notifier Indicator 26-Jun-24 Annual Detection

1428 1

1 MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO) 16-Jul-24

EMRL 002

1428 1 Notifier NFXI-OPT 16-Jul-24 Maintenance routine

1430 1 Sprinkler wrench 20-Jun-24 Maintenance routine

1431 3 Notifier NFXI-TDIFF 09-Jul-24 Annual Detection

1431 2 Notifier DSE-HW 12-Jul-24 Maintenance routine

1434 27 Notifier Smoke det. OPT 13-Mar-24 Semiannual Detection

1434 1 UNI 70 FDC CUP 13-May-24 EMRL 002

1435 1 Overpressure valve 3/4" 28-May-24 Maintenance routine

1435 1 Notifier Smoke det. OPT 01-Jul-24 Annual Detection

1442 29 Notifier NFXI-OPT 31-Jul-24 Annual Detection

1445 10 UNI 45 Standpipe 04-Mar-24 EMRL 002

1445 1 Sprinkler room sign 04-Mar-24 Maintenance routine

1445 1 Notifier DSE1-EN 24-Jul-24 Annual Detection

1445 1 Pull Station 24-Jul-24 Annual Detection

1446 1 Sprinkler room sign 07-Jun-24 Maintenance routine

1446 2 Hose 30 m UNI 45 29-Jul-24 Maintenance routine

1448 1 Sprinkler room sign 13-Mar-24 Maintenance routine

1448 1 Sprinkler box 20-Jun-24 Maintenance routine

1448 6 Sprinkler vertical 68° 20-Jun-24 Maintenance routine

1448 1 Sprinkler wrench 20-Jun-24 Maintenance routine

1459 1 Notifier Smoke det. OPT 01-Mar-24 Semiannual Detection

1459 1 Power supply ALI50EN 26-Jun-24 EMRL 002

1459 1 Pull station 26-Jun-24 EMRL 002

1462 1 Sprinkler wrench 20-Jun-24 Maintenance routine

Appendix L 27 August 24 4

1464 29 Notifier Smoke det. OPT 06-Mar-24 Semiannual Detection

1464 1 Sprinkler room sign 13-Mar-24 Maintenance routine

1464 1 Notifier Indicator 19-Mar-24 Maintenance routine

1467 17 Hose UNI45 20MT 19-Jan-24 Maintenance routine

1467 1 Sprinkler room sign 11-Mar-24 Maintenance routine

1467 1 M710 Notifier 11-Mar-24 Semiannual Detection

1467 4 VVF Caps 19-Apr-24 EMRL 002

1467 1 DN80 wafer valve 04-Jul-24 Maintenance routine

1476 2 Notifier Smoke det. OPT 14-Feb-24 Semiannual Detection

1476 1 Sprinkler room sign 13-Mar-24 Maintenance routine

1476 4 Notifier Smoke det. OPT 02-Jul-24 Maintenance routine

1478 1 Sprinkler room sign 12-Mar-24 Maintenance routine

1481 2 Notifier NFXI-TDIFF 10-Jul-24 Annual Detection

1483 1 Notifier NFXI-OPT 11-Jul-24 Annual Detection

1484 1 Sprinkler room sign 14-Mar-24 Maintenance routine

1484 12 Fire lance 28-Jun-24 Maintenance routine

1500 1

MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO)

17-Jun-24 EMRL 002

5100 1 Notifier AM2000CL 10-Jun-24 Emergency

5303 1 Pull staion 06-Jun-24 Maintenance routine

5303 3 Notifier heat detector 06-Jun-24 Maintenance routine

5308 1

MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO)

06-Jun-24 EMRL 002

5315 2 Pull Station 04-Jun-24 EMRL 002

7300 1 UNI 45 20 MT Stand pipe 02-May-24 EMRL 002

7300 1 M720 Notifier 28-May-24 Maintenance routine

7300 1 Sprinkler room sign 07-Jun-24 Maintenance routine

7810 3 Notifier Smoke det. OPT 05-Mar-24 Semiannual Detection

15023 1 Notifier FD851RE 27-Feb-24 EMRL 026-2023

1029-3 1 SD-851E Notifier 22-Jul-24 Annual Detection

1046-1 1

MURATA ELECTRONICS 23mm 12V piezo buzzer PKB24SPCH-3601

(ELCO) 11-Jul-24

EMRL 002

1078-1 1 Pull station 31-Jan-24 Semiannual Detection

1122-5 1 Pull station 20-Dec-23 Semiannual Detection

1122-5 1 Sprinkler room sign 16-May-24 Maintenance routine

1122-5 1 AM4000 Notifier 28-May-24 Maintenance routine

1122-5 1 Sprinkler wrench 21-Jun-24 Maintenance routine

1122-5 6 Sprinkler vertical 68° 21-Jun-24 Maintenance routine

1122-5 1 Sprinkler box 21-Jun-24 Maintenance routine

1204-3 1 AM1000 notifier 20-Dec-23 Maintenance routine

1204-3 4 M710 Notifier 20-Dec-23 Maintenance routine

1204-3 1 Sprinkler room sign 18-Mar-24 Maintenance routine

1204-3 1 Sprinkler room sign 18-Mar-24 Maintenance routine

1204-3 1 Sprinkler box 20-Jun-24 Maintenance routine

1204-3 1 Sprinkler wrench 20-Jun-24 Maintenance routine

1204-3 6 Sprinkler vertical 68° 20-Jun-24 Maintenance routine

1204-3 1 pressure gauge 22-Jul-24 Maintenance routine

1204-3 2 glycerated manometers 01-Aug-24 Maintenance routine

1407-1 1 Module M701 01-Mar-24 Maintenance routine

1410-8 1 Sprinkler room sign 19-Mar-24 Maintenance routine

1711-4 2 Pull station 02-Jul-24 Maintenance routine

1711-4 1 Notifier PAN1-EU 02-Jul-24 Maintenance routine

7300-2 1 Motor pump muffler 02-Aug-24 Maintenance routine

7300-3 1 Dry valve gasket kit 26-Jun-24 Extraordinary Maintenance

7300-3 2 pressure gauge 06-Aug-24 Maintenance routine

910-9 1 Sprinkler wrench 02-Jul-24 Maintenance routine

Appendix L 27 August 24 5

916-01 1 Notifier AM1000N 15-Mar-24 Maintenance routine

916-01 1 Electric panel lever 19-Aug-24 Pump N°2 Maintenance routine

940A 1 Notifier Smoke det. OPT 21-Jun-24 Maintenance routine