About this file
This is a Performance Work Statement (PWS) for the removal and overhaul of MTU Main Propulsion Diesel Engine Power Units from two T-EPF 1 Class vessels: USNS Spearhead and USNS Fall River. The contract, issued by the Department of the Navy Military Sealift Command, requires the contractor to remove eighty (80) power units from each vessel and prepare them as rotable spares. The work consists of two phases: power pack removal from the Beaumont Reserve Fleet in Beaumont, Texas, beginning upon award through September 15, 2026, and overhaul and long-term storage at an MTU facility extending one year post-award. The power units are Model 20V8000M71L MTU diesel engines, with removal work requiring an Authorized MTU Original Equipment Manufacturer (OEM) representative and all contractor-furnished labor, tools, and materials except for 160 government-furnished transportation cases. Specific removal requirements include arranging for HAZMAT disposal, renting equipment such as forklifts and air compressors, fabricating wooden crates for scrap metal, and coordinating shipping to the overhaul facility.
The overhaul phase differentiates between the two vessel sources: units from ex-Spearhead require cleaning and polishing due to low operating hours, while units from ex-Fall River require full cleaning and overhaul to return to service. All work must comply with OEM specifications per NAVSEA technical manuals and MTU maintenance schedules. The contractor must conduct preliminary inspections, prepare final documentation including photographs of "as-found" and completed conditions, submit bi-monthly progress reports during the overhaul phase, and preserve all units for long-term storage with proper labeling and packaging. The solicitation (N3220526Q7188) for this work is an RFQ with a quote submission deadline of July 14, 2026, at 12:00 p.m. EDT, with anticipated award to Rolls Royce Solutions America as the sole source vendor on July 28, 2026. This is not a small business set-aside and incorporates commercial item acquisition procedures under FAR Part 12.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA-harvesting_Redacted.pdf | ||
| WD Aiken South Carolina.txt | TXT text file | |
| Solicitation - N3220526Q7188.pdf | ||
| CDRL B001-2.pdf | ||
| WD Beaumont Texas.txt | TXT text file | |
| CDRL A001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T-EPF 1 CLASS VESSEL
| PROPULSION, MACHINERY | (CONTRACT NUMBER) |
| (DATE) | |
| WORK ITEM NO. 200 CATEGORY "A" | MSC |
(T-EPF 1 CLASS) EQUIPMENT HARVESTING
1.0 ABSTRACT:
1.1 This item describes the requirement to remove spare equipment from the Ex-Spearhead and the ex-Fall River and overhaul for use as rotable spares.
| 2.0 | REFERENCES/ENCLOSURES: |
| 2.1 | NAVSEA TECH MANUAL S9233-EM-MMC-010, MAIN PROPULSION DIESEL ENGINE OPERATION, MAINTENANCE, SERVICE, SPECIAL TOOLS, TROUBLESHOOTING, AND REPAIR MANUAL: MODEL 20V8000M71L |
| 2.2 | NAVSEA TECH MANUAL S9233-EM-MMC-010 REV 04, EQUIPMENT TECHNICAL MANUAL FOR MAIN PROPULSION DIESEL ENGINE PARTS MANUAL MODEL: 20V8000M71L |
| 2.3 | MTU MAINTENANCE SCHEDULE DIESEL ENGINE 20V8000M71L, MANUAL: MS500094/10E |
| 3.0 | ITEM LOCATION/DESCRIPTION/QUANTITY: |
| 3.1 | USNS Spearhead Power Pack Item Description/Manufacturer’s Data: |
| 3.1.1 | Four (4) MTU Main Propulsion Diesel Engines Model: 20V8000M71L |
| 3.1.2 | Quantity: Eighty (80) Power Units |
| 3.1.3 | Location: Port and Starboard Main Engine Rooms |
| 3.2 | USNS Fall River Power Pack Item Description/Manufacturer’s Data: |
| 3.2.1 | Four (4) MTU Main Propulsion Diesel Engines Model: 20V8000M71L |
| 3.2.2 | Quantity: Eighty (80) Power Units |
| 3.2.3 | Location: Port and Starboard Main Engine Rooms |
3.4 Contractor Furnished Material/Bill of Materials:
3.4.1 All consumable material not listed in 4.0 shall be contractor furnished.
4.0 GOVERNMENT FURNISHED MATERIAL/SERVICES:
4.1 Government Furnished Material:
4.1.1 Transportation Cases, QTY. 160, Part Number F6792877
5.0 NOTES:
5.1 Period of Performance:
5.1.1 Upon Award – 15 September 2026, Power Pack Removal
5.1.1.A Exact dates within window above to be determined upon award.
5.1.2 Upon Award – One Year Post Award, Power Pack Overhaul
5.2 Place of Performance:
5.2.1 Beaumont Reserve Fleet, Beaumont, TX: Power Pack Removal
5.2.2 MTU Facility: Power Pack Overhaul
5.3 The following equipment can be removed as an entire assembly. Each assembly will include the associated parts listed below:
| Description |
| Part Number |
| QTY |
| Location |
Main Engine Power Packs (ex-Spearhead)
| EX56901300002/90 |
| 80 |
| Port and Starboard Main Engine Rooms |
Main Engine Power Packs (ex-Fall River)
| EX56901300002/90 |
| 80 |
| Port and Starboard Main Engine Rooms |
5.4 After material listed in Paragraph 5.3 is overhauled, provide temporary storage of the material until the end of the period of performance.
| 6.0 | QUALITY ASSURANCE REQUIREMENTS: |
| 6.1 | All work specified in this Work Item shall be in compliance with the OEM specifications. |
7.0 STATEMENT OF WORK:
7.1 Provide the service of an Authorized MTU Original Equipment Manufacturer (OEM) Representative to remove power packs listed in paragraph 3.1.
7.2 Contractor shall furnish labor, tools, and additional materials except where specified as GFM.
7.3 MSC will provide OEM cases listed in paragraph 4.1 at the Beaumont Reserve Fleet. Access to the vessel and movement of the containers, tools, and personnel to and from the vessel will be coordinated by the Beaumont Reserve Fleet.
7.4 Contractor shall remove power units called out in section 3.0 and prepare for shipping using OEM cases provided in paragraph 4.1.
7.4.1 Contractor to remove applicable access panels for equipment movement within the vessel.
7.4.2 Contractor is to account for renting fork truck for movement of equipment onboard vessel.
7.4.3 Contractor is to account for renting an air compressor as the vessels’ onboard air compressors have been decommissioned.
7.4.4 Contractor to arrange for HAZMAT (coolant) disposal; MARAD can provide contact for services/tote rental.
7.4.5 Contractor to provide a 4x8 wooden crate per engine to contain scrap metal.
7.4.6 Contractor to arrange for shipping of transportation cases to overhaul facility.
7.5 Additional parts not accounted for will be the subject of a change order.
7.6 Contractor shall prepare the removed power packs for use as rotable spares.
7.6.1 The power units from ex-Spearhead have few hours. Clean and polish the power packs.
7.6.2 Clean and overhaul to return to service the power units from ex-Fall River.
7.6.3 Upon completion, preserve removed power units for long term storage.
7.7 Inspection/Test:
7.7.1 Contractor shall conduct preliminary inspections on all completed work before calling for an official test using reference 2.1.1 as guidance.
7.7.2 All testing shall be accomplished to the satisfaction of the Contracting Officer’s Representative.
7.7.3 Accomplish a final reassembled layout inspection and final packaging inspection to the satisfaction of the Contracting Officer’s Representative. Record all measurements, parts replaced and reassembly checklists with each power unit. A copy of each power unit report shall be provided to the Contracting Officer’s Representative.
7.7.4 Notify MSC when power units are prepared for return shipment.
7.7.5 Fabricate and install a label on the sides and top of each shipping container with the following information:
MSC T-EPF CLASS VESSEL SHORE BASE SPARES
REQUISITION #:
(Quantity) Description of Contents
WEIGHT: ____ LBS
CUBE: __” X __” X __”
7.8 Documentation:
7.8.1 Upon completion of the removal and packaging of all equipment from the vessel, submit a typed written report to the Contracting Officer’s Representative providing the “As Found” condition for each item listed in 3.2 (with photographs) recording the condition of the material and final packaging for shipment is complete.
7.8.2 While power pack units are under the control of the OEM, submit bi-monthly inventory and progress reports in accordance with provided Contract Data Requirement Lists (CDRLs).
7.8.3 Upon completion of the overhaul the power pack units, submit a typed written report to the Contracting Officer’s Representative providing the overhauled condition for each item listed in 3.2 (with photographs) recording the condition of the material and the final packaging for shipment is complete.
8.0 GENERAL REQUIREMENTS: NONE