PWS - 5BW_HC NLC Chapel Pew Refresh.pdf
PDF 310 KB Posted
- Attached to
- 5 BW/HC NLC Chapel Pew Refresh, Minot AFB, ND
- Solicitation number
- FA452826QKM08
About this file
This is a Performance Work Statement (PWS) for the Northern Lights Chapel Pew Refresh project at Minot Air Force Base, North Dakota, dated August 5, 2026, issued by the 5th Bomb Wing Chapel.
The contractor must remove and dispose of existing upholstery and padding from all chapel pews and kneelers, then install new padding and upholstery based on government-provided material specifications. The scope includes 32 largest pews (156" x 16" x 3"), 2 large pews (137" x 16" x 3"), 2 small pews (82" x 16" x 3"), 1 center clergy seat (17" x 22" x 3"), 2 side clergy seats (16" x 21" x 3"), and 62 kneelers (72" x 6" x 2"). An optional line item allows for wood refinishing, including sanding, staining to match existing wood, and application of protective clear coat. The PWS will be amended upon contract award if the optional refinishing work is not selected. All work must be performed on-site; pews may be removed from their wooden peg floor anchoring system as needed. The contractor must provide all tools, materials, and equipment; dispose of waste at an off-base location in compliance with Federal, State, local, and base environmental regulations; maintain professional appearance; clean the work area daily and upon completion; and minimize disruption to religious services held Monday-Friday 12:00-12:30 pm and Sunday 9:00 am-12:00 pm. Base access requires current REAL ID-compliant identification, state-issued ID, or U.S. passport, along with current automobile insurance and vehicle registration. Contractor employees must provide date of birth, social security number, and vehicle registration upon arrival at Minot AFB.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Northern Lights Chapel Pew Refresh
Minot AFB, ND
August 5, 2026
1. Overview
The 5th Bomb Wing Chapel has a requirement to refresh the pews in the Northern Lights Chapel on Minot Air Force Base, ND. The requirement includes removal of old upholstery and padding and replacing it with new pew and kneeler upholstery and padding, with the option of refinishing the wood of the pews.
1.1. The Performance Work Statement (PWS) will be amended as required upon contract award to remove the refinishing requirement if the optional work is not awarded.
2. Scope of Work
2.1. The Contractor will provide all tools, materials, and equipment required to remove and dispose of current upholstery and padding on all existing chapel pews and kneelers located in the
Northern Lights Chapel. The contractor will dispose of waste at an off-base location in accordance with all Federal, State, local, and base environmental laws and regulations.
2.2. The Contractor must install new padding and upholstery to all existing chapel pews and kneelers located in Northern Lights Chapel based on material specifications provided by the
Government.
2.3. As an option, the Contractor will include a separate line item in the submitted quote for the refinish or renewal of the current clear-stained wood components on the pews (to include sanding, staining to match existing wood, and applying a protective clear coat).
2.3.1. The PWS will be amended as required upon contract award to remove the refinishing requirement if the optional work is not awarded.
2.4. Pew and Kneeler Specifications:
• Largest Pews: 156” x 16” x 3” (Qty. 32)
• Large Pews: 137” x 16” x 3” (Qty. 2)
• Small Pews: 82” x 16” x 3” (Qty. 2)
• Clergy Seats (Center): 17” x 22” x 3” (Qty. 1)
• Clergy Seats (Side): 16” x 21” x 3” (Qty. 2)
• Kneelers: 72” x 6” x 2” (Qty. 62)
2.5. The cushions for the pews and kneelers are attached to the pews themselves, and the pews are anchored to the floor on a wooden peg system which is bolted to the floor. The work must be done on site. The pews can be removed from the pegs in order to attach new upholstery if required.
3. General Requirements
3.1. The Contractor and all representatives must present a professional appearance proper to the duties performed.
3.2. The Contractor must clean the work area daily and upon completion of the installation of padding and upholstery.
3.3 The Contractor must complete the work outlined in this PWS with minimal impact to religious services which are held in the chapel and must stop work during all listed religious service times. Religious service times include, but are not limited to, Monday through Friday from 12:00 pm – 12:30 pm, Sunday 9:00 am – 12:00 pm. Services scheduled outside of the listed times are rare but must be accommodated by the Contractor.
3.4. The Government may stop or delay work at Minot AFB due to weather, exercises, or mission necessities. This requirement is not considered mission essential. The Contractor is not expected to continue work during weather emergencies or national emergencies. The Contractor must listen to local radio, television, or other alerting systems to learn the condition of the base. When applicable the Contracting Officer will notify the Contractor of the delay or closure.
5. Base Access
5.1. A current REAL ID-compliant driver’s license, state-issued identification card, or U.S.
passport, and a current automobile insurance document and vehicle registration will be required to gain access to Minot AFB.
5.2. Contractor employs will be required to provide their date of birth, social security number, and vehicle registration information upon arrival at Minot AFB.
File details come from the government source that posted it. Updated .