PWS 131st AG WASH.pdf

PDF 722 KB Posted

Attached to
Virkon Vehicle Treatment PA Army National Guard W912KC26QA004
Solicitation number
W912KC26QA004
Issued by

View the file

Other files

File Type Posted
Vendor Questions W912KC26QA004 as of 18 DEC 25.xlsx XLSX spreadsheet
PWS 131st Virkon Treatment with updated Building Location and Pictures.pdf PDF
IMG_6467.jpeg JPEG file
IMG_6457.jpeg JPEG file
IMG_6454.jpeg JPEG file
IMG_6455.jpeg JPEG file
IMG_6451.jpeg JPEG file
IMG_6465.jpeg JPEG file
IMG_6461.jpeg JPEG file
IMG_6456.jpeg JPEG file
IMG_6447.jpeg JPEG file
IMG_6471.jpeg JPEG file
IMG_6453.jpeg JPEG file
IMG_6463.jpeg JPEG file
IMG_6468.jpeg JPEG file
IMG_6469.jpeg JPEG file
IMG_6452.jpeg JPEG file
IMG_6459.jpeg JPEG file
IMG_6470.jpeg JPEG file
IMG_6449.jpeg JPEG file
IMG_6460.jpeg JPEG file
IMG_6462.jpeg JPEG file
IMG_6448.jpeg JPEG file
IMG_6464.jpeg JPEG file
IMG_6458.jpeg JPEG file
IMG_6450.jpeg JPEG file
PWS 131st AG WASH with updated Building Location.pdf PDF
Vendor Questions W912KC26QA004 as of 16 DEC 25.xlsx XLSX spreadsheet
W912KC26QA004.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Agricultural Disinfectant Equipment Cleaning

FOR

131st Transportation Company Deployment to European Command

(EUSCOM)

Pennsylvania Army National Guard (PA ARNG), With

Firm Fixed Pricing (FFP)

Period of Performance (POP)

26 January 2026 through 30 January 2026

PWS

Agricultural Disinfectant Equipment Cleaning

131st Transportation Company

1.0. General

1.1. The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform field services, as defined in this PWS.

1.2. Background: The 131 TC requires an Agricultural Sanitization of their equipment traveling to

EUCOM. The work and certification of sanitization will meet the regulatory requirements for equipment traveling to Europe.

1.3. Period of Performance (PoP). The PoP shall be 26 JAN 2026 through 30 JAN 2026. The contractors will be on site for no more than 5 days and will start on 26 JAN 2025 and end with final equipment sanitization no later than 30 JAN 2026.

1.4. General Information:

1.4.1. Place and Performance of Services: The sanitization process will occur at the wash rack between area 11 and area 12 at Fort Indiantown Gap, Annville PA 17003. A map identifying the exact location will be provided as an exhibit to this PWS.

1.4.1.1. Telework: The Government will not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2. Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented.

Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3. The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2. Recognized Holidays: The following are recognized US holidays. The contractor shall perform services on these days:

1.4.2.1. New Year's Day: January 1st

1.4.2.2. Martin Luther King, Jr.'s Birthday

1.4.2.3. President's Day

1.4.2.4. Memorial Day

1.4.2.5. Juneteenth National Independence Day: June 19

1.4.2.6. Independence Day: July 4th

1.4.2.7. Labor Day

1.4.2.8. Columbus Day

1.4.2.9. Veteran's Day: November 11th

1.4.2.10. Thanksgiving Day

1.4.2.11. Christmas Day

1.4.3. Quality Control (QC). NOT APPLICABLE

1.4.4. Quality Assurance (QA). NOT APPLICABLE

1.4.5. Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the POC. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of

Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the

Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1. For contractors requiring Common Access Card (CAC): NOT APPLICABLE.

1.4.5.2. For contractors that do not require a CAC but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with PMR 525-2

Annex C Appendix 2 Para 1-4, and any applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a Government representative).

1.4.5.3. Awareness Training (AT) Level 1. NOT APPLICABLE

1.4.5.4. iWATCH Training: NOT APPLICABLE

1.4.5.5. Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to

COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all

Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6. Use of Government Information Systems (IS) and access to Government networks. NOT

APPLICABLE.

1.4.5.7. Army Training Certification Tracking System (ATCTS): NOT APPLICABLE

1.4.5.8. Information Assurance (IA) Training. NOT APPLICABLE

1.4.5.9. Information Assurance (IA)/Information Technology (IT) certification. NOT

APPLICABLE

1.4.5.10. Protection of Personally Identifiable Information (PII). NOT APPLICABLE

1.4.5.11. OPSEC Training: NOT APPLICABLE

1.4.5.12. OPSEC SOP/Plan. NOT APPLICABLE.

1.4.5.13. Access to Classified Information. NOT APPLICABLE.

1.4.5.14. Threat Awareness and Reporting Program (TARP). NOT APPLICABLE.

1.4.6. Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.6.1. Key Control. NOT APPLICABLE

1.4.6.2. Lock Combinations: NOT APPLICABLE

1.4.7. Special Qualifications, NOT APPLICABLE.

1.4.8. Post Award Conferences/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, POC and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the

Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the

Government.

1.4.9. Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. For purposes of this contract, the CM is the Dining Facility Manager (DFM) and will be referred to as CM/DFM. The name of this person, and an alternate who shall act for the contractor when the CM/DFM is absent, shall be designated in writing to the KO. The CM/DFM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM/DFM shall work through the POC to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM/DFM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM/DFM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10. Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non- Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1. The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media

(i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract;

procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States

Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12. Contractor Travel: NOT APPLICABLE.

1.4.13. Data Rights: NOT APPLICABLE

1.4.14. Organizational Conflicts of Interest: Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCls, as defined in

FAR Subpart 9.5. The contractor shall notify the POC immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the POC to avoid or mitigate any such OCI. The contractor's mitigation plan will be determined to be acceptable solely at the discretion of the POC and in the event the POC unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the POC may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15. Phase In/Phase Out Periods (PIPOs). NOT APPLICABLE

2.0. Definitions and Acronyms

2.1. Definitions:

2.1.1. Acceptable Quality Level: This is the maximum percent defective, the maximum number of defects per hundred units, or the number of defects in a lot that, for purposes of sampling inspection, can be considered satisfactory.

2.1.2. Commercial And Government Entity (CAGE) Code: An identification code assigned to the contractor and is required by the POC (property administrator) and contractor from the defense logistics service center. The cage code is also required on the annual government facilities report. Use DD form

2051 to request the cage code.

2.1.3. Contractor: A supplier or contractor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.4. Contracting Officer: A government official with authority to enter into, administer, and/or terminate government contracts.

2.1.5. Contracting Officer's Representative: An individual from the functional activity appointed by the

KO and delegated specific authority to monitor contract performance and to perform specific contract administration functions.

2.1.6. Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.7. Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.8. Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.9. Physical Security: Actions that prevent the loss or damage of government property. And a method of hand drying that uses paper towels in a dispenser.

2.1.10. Quality Assurance: The government procedures to verify that services being performed by the contractor are performed according to acceptable standards.

2.1.11. Quality Control: All necessary measures taken by the contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.12. Subcontractor: One that enters into a contract with a prime contractor. The government does not have privity of contract with the subcontractor.

2.2. ACRONYMS:

AQL Acceptable Quality Level

AR Army Regulation

ARNG Army National Guard

AT Awareness Training

AT/OPSEC Antiterrorism/Operational Security

CAGE Commercial and Government Entity Code

CM Contract Manager

POC Contracting Officer Representative

DA Department of the Army

DFARS Defense Federal Acquisition Regulation Supplement

DoD Department of Defense

FAR Federal Acquisition Regulation

EUCOM European Command

FM Field Manual

GFP/M/E/S Government Furnished Property/Material/Equipment/Services

HQDA Headquarters, Department of the Army

IA Information Assurance

IS Information System(s)

KO Contracting Officer

NLT No Later Than

OCI Organizational Conflict of Interest

PA Pennsylvania

POC Point of Contact

PoP Period of Performance

PRS Performance Requirements Summary

PWS Performance Work Statement

QA Quality Assurance

QA. Quality Assurance

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Program

SCR Service Contract Reporting

TE Technical Exhibit

TEU Twenty Foot Equivalent Unit

3.0. Government Furnished Property, Materials, Equipment, and Services. None

3.1. Property. The Government will provide a worksite, all water and electrical requirements.

3.1.1. Government shall provide all necessary operators, equipment, and command and control of staging equipment to lift/move equipment and vehicles through the wash & sanitization process.

3.2. Materials. None

3.3. Equipment. None

3.4. Services. None

3.5. Utilities. Potable water and existing electrical outlets to support Agricultural Disinfectant Operations will be provided at no cost to the Contractor. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount. The contractor will have access to utilize 20 amp single phase 120v receptacles in the provided buildings. The contractor will have access to obtain potable water in Building 6-201 on Fort Indiantown Gap via standard size hose bibs with an output of 35 PSI at 4.7 GPM from 3/4" pipe.

4.0. Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1. General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1. All

Contractor provided equipment shall be clearly marked and stored separately from Government property.

Upon completion or termination of this contract, the Contractor shall remove all Contractor-owned equipment/property. If the Contractor does not remove Contractor-owned items NLT four (4) calendar days after the conclusion of the contract, the Government will dispose of the items at the contractor’s expense.

4.2. Materials: The Contractor shall provide all materials and supplies necessary to meet the requirements under this PWS.

4.2.1. Safety Equipment: The contractor shall provide all safety and personal protective equipment necessary to fulfill the requirements of this contract and be maintained in good operating order and meet all Federal, State, local and base requirements.

4.3. Equipment: The Contractor shall provide equipment necessary to meet the requirements under this

PWS.

4.4. Contractor Furnished Vehicles and Equipment: Contractor Furnished Vehicles and Equipment

(CFVE) used in the performance of this award shall meet, and be maintained IAW applicable Federal, State, and Local safety and environmental requirements. The designated Government official may inspect contractor furnished vehicles and equipment at any time, on demand, and direct that unsafe, unserviceable, or otherwise un-roadworthy vehicles or dangerous equipment be taken out of service and, if specified for cause, removed from the installation with which the contractor shall promptly comply.

Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.5. General. Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.6. Secret Facility Clearance. NOT APPLICABLE

4.7. Contractor Security Clearance: NOT APPLICABLE

5.0. Requirements: The contractor shall:

5.1. General: Provide pre-deployment agricultural disinfection (AgSan) services for customer to meet

EUCOM requirements in compliance with AFPMB TG31 utilizing Virkon- S at a 1:100 dilution ratio.

The Government is responsible for ensuring that the equipment is clean and free of debris prior to the application of Virkon. Contractor shall ensure all equipment is disinfected within the period of performance.

5.2. The contractor shall purchase, transport and provide required amount of AFPMB TG31 utilizing

Virkon-S solution to perform these services as indicated in Paragraph 1.1. The government will not provide these materials.

5.3. All Virkon runoff will be captured inside a containment system and the contractor will take off site and dispose of properly. The Contractor will be required to include containment berms to collect all waste water post rinsing of the vehicles. Contractor will ensure each lane with associated containment is a minimum of 60’ length by 20’ width to accommodate the largest dimensions of government equipment to be disinfected.

5.4. Contractor shall contain, collect, and dispose of hazardous and non-hazardous wastes and residues generated as a result of this contract, and dispose of all wastes off of Fort Indiantown Gap, PA at disposal sites authorized by federal, state, and local laws and regulations for no additional cost. Contractor shall conduct any sampling necessary to properly characterize any wastes prior to disposal, and shall properly document all such waste determinations. Work shall be performed in accordance with all federal, state, and local laws and regulations. Contractor shall take responsibility for the cleanup for spills that may occur from their supplies or equipment during the operation, at no cost to the Government.

5.5. Contractor shall allow access of installation personnel to monitor, inspect, and/or sample any products used by or wastes generated by the Contractor. Installation personnel may be required to wear appropriate PPE to perform this task.

5.6. Price for delivery, set-up, tear down, fuel, and removal with related equipment are inclusive. The

Contracting Officer will notify the contractor in writing should performance end prior to the period of performance.

5.7. Complete tracking sheets daily, to document the pieces being sanitized which will be provided to the unit POC.

5.8. Complete a dilution record sheet daily, to document the proper dilution and mixing of the Virkon solution to include pH testing results.

5.8.1. The contractor will utilize a circulation pump to maintain uniform mixing of the solution within the batch tank, thereby preventing settling and ensuring consistent application strength as improperly mixed solution could damage equipment due to the corrosive nature of the solution.

5.9. The contractor will apply some physical marking on each piece of equipment after it has been decontaminated.

5.10. The contractor shall be responsible and bound by all OSHA regulations (https://www.osha.gov/);

Armed Forces Pest Management Board Technical Guide No. 31 and Supplement 1 and 3 (attached), Defense Transportation Regulation 4500.9-R-Part V.( https://www.ustranscom.mil/dtr/dtrp5.cfm); and the

US Army Environmental and Health Requirements Manual (EM 385-1-1). Where the standards conflict, the contractor shall perform to the higher standard.

5.11. In addition to complying with ALL Federal, State, and Local Environmental Laws and Regulations, the contractor must also follow the Fort Indiantown Gap Hazardous Waste Management Plan (HWMP) procedures.

5.12. Contractor will provide a listing of all vehicles and equipment that it performed the service on. This will include vehicle/equipment type, bumper number and serial number. This will be provided to the government No Later than 24 hours after the completion of this service.

5.13. The contractor will provide, in writing, to the POC the following information 15 days prior to the execution of this contract:

5.13.1. Local Contractor POC Details.

5.13.2. Name and location of the contractor.

5.13.3. POC and contact information of the contractor.

5.13.4. Hours of operation of the contractor.

5.14. Other things to consider:

5.14.1. The contractors will have a heated building to work inside that will hold a minimum of two trucks and 4 trailers at a time. The unit will be responsible for drawing and turning in the building.

5.14.2. The government will provide electrical hook ups (multiple 120V outlets) and multiple water hook ups for garden hoses.

5.14.3. The government will provide certification of equipment after sanitization of equipment.

5.14.4. Provide the EUCOM references, put in 6.0 Applicable Publications:

5.14.5. AFPMB TG31: Operation washdown and Agricultural Inspection Preparation of Military

Conveyances and Equipment; Defense Travel Regulation Part V, Chapter 505

5.15. Government Responsibilities.

5.15.1. The Government will provide the area and facilities to conduct this service. The unit will be responsible for drawing and turning in the building.

5.15.2. Government will provide a complete listing of vehicles and other equipment that will be decontaminated. This list will be in contained in technical exhibit 3.

5.15.3. The Government will provide a map of the final location of the sanitization site, on FTIG, either as a Google map or other type of commercially available at the time of issue of the award.

5.15.4. The Government will provide vehicle drivers to move vehicles to wash area, to drive vehicles into the decontamination area and to drive vehicles to sterile area.

5.15.5. The Government will provide the contractor washed vehicles, free of dirt and debris both inside and outside.

5.15.6. The government will provide POC information, in writing, to the contractor with the following information 15 days prior to the execution of this contract:

5.15.6.1. Primary POC: CPT Jason Hadley, FTIG, Cell: 201-874-3733

5.15.6.2. Alternate POC: SFC Christopher Utter, Allentown, Cell: 610-248-8186

5.16. Safety.

5.16.1. Accident/Injury Reporting. Immediately upon the occurrence of a job-related injury that meets the

Serious Incident Report (SIR) criteria, the contractor will complete the SIR form and submit to the POC for processing. Incidents that occur that are outside the SIR criteria will be the responsibility of the contractor to maintain. Any incidents that are questionable shall be referred to the POC for clarification.

5.17. Service Contract Reporting:

5.17.1. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau (or your organization) via a secure data collection site.

5.17.2. The contractor shall completely fill in all required data fields using the following web address:

https://sam.gov. Log in and select Entity Registrations and then select Service Contract Reporting.

5.17.3. The Contractor shall report the required information annually by October 31, for services performed under this contract during the preceding Government fiscal year (October 1-September 30).

The DoD Guidebook for Service Contract Reporting in SAM, available on the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr. The General Services

Administration (GSA) has also posted additional guidance such as quick start guides, informational videos, and frequently asked questions, that can be accessed by going to https://sam.gov and searching the

“HELP” section. The SAM Federal User Guide is also available in the “HELP” section for comprehensive instructions on navigating SAM. Contractors requiring assistance using SAM should contact the Federal Service Desk at https://www.fsd.gov.

6.0. Applicable Publications: Publications applicable to this PWS are listed below:

Publication

(Chapter/Page)

Date of

Publication

Mandatory or

Advisory

Website

Federal Acquisition Regulation Mandatory https://www.acquisition.gov/?q=browsef ar

Defense Federal Acquisition

Regulation Supplement

Mandatory http://www.acq.osd.mil/dpap/dars/dfarsp gi/current/index.html or https://www.acquisition.gov/dfars

DoDM 1000.13-M-V1

DoD Identification (ID) Cards

(Enclosure 2, paragraph 3.b)

01/23/2014

(Change 1:

07/28/2020)

Mandatory http://www.esd.whs.mil/Directives/issua nces/dodm

Federal Information Processing

Standards (FIPS) Publication 201-2

Personal Identity Verification (PIV) of Federal Employees and

Contractors

(paragraph 9)

August 2013 Mandatory http://nvlpubs.nist.gov/nistpubs/FIPS/NI

ST.FIPS.201-2.pdf https://www.acquisition.gov/?q=browsefar https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars http://www.esd.whs.mil/Directives/issuances/dodm http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf

DoDM 5200.2 Procedures for the

DoD Personnel Security Program

(PSP)

04/03/2017 Mandatory https://www.esd.whs.mil/Directives/issu ances/dodm/

DoDI 5200.46

DoD Investigative and Adjudicative

Guidance for Issuing the Common

Access Card (CAC)

09/09/14

(Change 1:

05/04/2018)

Mandatory https://www.esd.whs.mil/Directives/issu ances/dodi/

Homeland Security Presidential

Directive (HSPD)-12

Policy for a Common Identification

Standard for Federal Employees and

Contractors

08/27/2004 Mandatory https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11

Department of Defense Privacy and

Civil Liberties Programs

01/29/2019 ances/dodi/

DoD 5400.11-R

Department of Defense Privacy

Program

05/14/2007 Mandatory https://www.esd.whs.mil/Directives/issu ances/dodm/

DoDD 8140.01

Cyberspace Workforce Management

10/05/2020 ances/dodd/

DoD 8570.01-M

Information Assurance Workforce

Improvement Program

12/19/2005

(Change 4:

11/10/2015)

DoD 5220.22-M

National Industrial Security Program

Operating Manual (NISPOM)

02/28/2006

(Change 2:

05/18/2016)

Army Directive 2014-05

Policy and Implementation

Procedures for Common Access Card

Credentialing and Installation Access for Uncleared Contractors

03/07/2014 Mandatory https://armypubs.army.mil/ProductMaps/

PubForm/ArmyDir.aspx

AR 25-2

Information Assurance

04/04/2019

Mandatory http://armypubs.army.mil/ProductMaps/

PubForm/AR.aspx https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

AR 530-1

Operations Security

09/26/2014 Mandatory http://armypubs.army.mil/ProductMaps/

PubForm/AR.aspx

AR 525-13

Antiterrorism

12/09/2019 Mandatory http://armypubs.army.mil/ProductMaps/

PubForm/AR.aspx

AR 381-12

Threat Awareness and Reporting

Program (TARP)

(Section II, ¶ 2-4.b)

06/01/2016 Mandatory http://armypubs.army.mil/ProductMaps/

PubForm/AR.aspx

EUCOM References

AFPMB TG31: Operation washdown and Agricultural Inspection

Preparation of Military Conveyances and Equipment

10/06/2021 Mandatory https://www.acq.osd.mil/eie/afpmb/docs/ techguides/tg31.pdf

EUCOM References

Defense Travel Regulation:

Part V, Chapter 505

10/02/2025 Mandatory https://www.ustranscom.mil/dtr/part-v/dtr_part_v_505.pdf

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

DD 2051-1

Request for Information/ Verification of Commercial and Government

Entity (CAGE) Code

FEB 2005 https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/ dd2051-1.pdf

ANY FORMS YOU NEED

http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2051-1.pdf https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2051-1.pdf

TECHNICAL EXHIBIT 1

Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential tasks. The performance threshold briefly describes the minimum acceptable levels of services required for each task. These thresholds are critical to mission success.

Surveillance should be limited to those tasks critical to successful contractor performance.

This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

PWS

Paragraph Task Performance Standard

Acceptable

Quality Level

(AQL)

Surveillance

Method & By

Whom

5.1

Provide pre-deployment agricultural disinfection

(AgSan) services.

Contractor must be on site and ready to perform service no later than

08:00 AM, 26 JAN,

2026.

Contractor provides the service as described in the performance standard 100% of the time.

The unit POC shall monitor by being present at the time the contractor is to start services.

5.3

All Virkon runoff will be captured inside a containment system, and the contractor will take off site and dispose of properly.

The Contractor will be required to include containment berms, minimum of 60’ length by 20’ width, to collect all wastewater post rinsing of the vehicles.

Contractor provides the service as described in the performance standard 100% of the time.

The unit POC shall monitor by being present at the time the contractor is to start services to confirm.

5.7

Complete tracking sheets daily

Contractor will complete tracking sheets daily, to document the pieces being sanitized.

Contractor provides the service as described in the performance standard 100% of the time.

The contractor will provide the

Government POC daily

5.8

Complete a dilution record sheet

Contractor will complete a dilution record sheet daily, to document the proper dilution and mixing of the Virkon solution to include pH testing results.

Contractor provides the service as described in the performance standard 100% of the time.

The contractor will provide the

Government POC daily

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS

Paragraph/Title

Frequency Number of

Copies

Medium/Format Submit To

5.12 Contractor

Details

15 days prior to the execution of this contract:

1 Electronic/E-mail POC/POC

TECHNICAL EXHIBIT 3

Estimated Workload Data

Type Variant Length Width Height Weight Quantity

Container

20FT

MILVAN

240 in 96 in 96 in 5400lbs

FIFTH WHEEL

ASSEMBLY N/A

103 in 93 in 32 in 2880 lbs

GENERATOR

SKID

MOUNTED MEP-802A

50 in 32 in 36 in 825 lbs

GENERATOR

SKID

MOUNTED MEP-831

39 in 28 in 30 in 325 lbs

GENERATOR

SKID

MOUNTED MEP-803A

62 in 32 in 37 in 1250 lbs

SHP EQP

CONT TRK

MTD

SECM-LT

198 in 84 in 86 in 11500 lbs

TRAILER,

FLAT BED

M872 490 in 96 in 106 in 17390 lbs

TRAILER,

FLAT BED M872A1

490 in 96 in 104 in 18490 lbs

TRAILER,

FLAT BED M872A2

490 in 96 in 106 in 19280 lbs

TRAILER,

FLAT BED M872A3

490 in 96 in 106 in 19179 lbs

TRAILER,

FLAT BED M872A4

526 in 96 in 106 in 18800 lbs

TRUCK,

CARGO 5 TON M1083A1P2

274 in 96 in 112 in 28889 lbs

HMMWV M1165A1 194 in 87 in 77 in 7230 lbs 1

TRUCK,

CARGO 2.5 T M1078A1P2

268 in 96 in 149 in 23120 lbs

TRUCK,

WRECKER

M984A2

WWN

402 in 140 in 112 in 53100 lbs

TRUCK,

TRACTOR M915A5

312 in 130 in 126 in 26080 lbs

TRAILER,

CARGO MTV M1095

228 in 96 in 83 in 9626 lbs

TRAILER,

HMMWV M1101

136 in 86 in 100 in 1400 lbs

TRAILER,

CARGO LMTV M1082

210 in 96 in 79 in 7000 lbs

TRAILER,

WATER

BUFFALO M149A2

161 in 80 in 76 in 2900 lbs

TECHNICAL EXHIBIT 4

Equipment Density List

Item ID Model/

Variant

Bumper

Number

Serial Number NSN Length Width Height Weight

C13825 20FT CEU N/A N/A 8115001682275 240 in 96 in 96 in 5400lbs

C13825

20FT CEU N/A N/A 8115001682275

240 in 96 in 96 in 5400lbs

F60598

FIFTH

WHEEL

131-T69

40116250M567

2510014588253

103 in 93 in 32 in 2880 lbs

G11966

MEP-802A

NA FZ10468

6115012747387

50 in 32 in 36 in 825 lbs

G18358

MEP-831

FZA07531

6115012853012

39 in 28 in 30 in 325 lbs

G74711

MEP-803A

FZ44376

6115012755061

62 in 32 in 37 in 1250

G74711

MEP-803A

FZ45987

6115012755061

62 in 32 in 37 in 1250

S25681

SECM-LT

131-70

329334-RIA-2068

4940015489064

198 in 84 in 86 in 11500

S70159

M872A2

T-209A

TG200524/NX05XM

2330011195837

490 in 96 in 106 in 19280

M872A3

T-206A

M872A31899/NX0B1P

2330011421385

490 in 96 in 106 in 19179

T-223A

M872A32267/NX0BCH

T-211A

M872A31940/NX0B2W

M872A4

T-101A

23415/NX135V

2330014970706

526 in 96 in 106 in 18800

S70159 M872A4 T-207B 23421/NX1361 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-107A 23427/NX1367 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-227B 23433/NX136D 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-122B 23436/NX136G 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-110A 23439/NX136K 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-204A 23442/NX136N 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-201B 23445/NX136R 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-208B 23451/NX136X 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-213B 23454/NX1370 2330014970706 526 in 96 in 106 in 18800

S70159 M872A4 T-217B 23457/NX1373 2330014970706 526 in 96 in 106 in 18800

S70159 M872A4 T-102A 23416/NX135W 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-103A 23419/NX135Z 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-106A 23425/NX1365 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-223B 23431/NX136B 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-108A 23434/NX136E 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-109A 23437/NX136H 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-111A 23440/NX136L 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-128B 23443/NX136P 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-102B 23446/NX136S 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-104A 23449/NX136V 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-210B 23452/NX136Y 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-214B 23455/NX1371 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-217A 23458/NX1374 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-206B 23420/NX1360 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-202A 23423/NX1363 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-215B 23426/NX1366 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-219B 23429/NX1369 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-230B 23435/NX136F 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-123B 23438/NX136J 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-218A 23441/NX136M 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-205A 23444/NX136Q 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-203B 23447/NX136T 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-213A 23450/NX136W 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-211B 23453/NX136Z 2330014970706 526 in 96 in 106 in 18800

S70159 M872A4 T-216B 23456/NX1372 2330014970706 526 in 96 in 106 in 18800

S70159 M872A4 T-220B 23459/NX1375 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-222B 23460/NX1376 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-228B 23463/NX1379 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-225A 23466/NX137C 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-129B 23469/NX137F 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-219A 23472/NX137J 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-224B 23461/NX1377 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-229B 23464/NX137A 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-125B 23470/NX137G 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-228A 23473/NX137K 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-121B 23465/NX137B 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-124B 23468/NX137E 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-127B 23471/NX137H 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-230A 23474/NX137L 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-113A 40FE0443091029181 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-118A 40FE0443291029179 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-121A 40FE0443391029191 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-123A 40FE0443591029189 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-128A 40FE0443691029198 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-130B 40FE0443891029185 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-127A 40FE0443X91029138 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-116A 40FE0443191029142 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-115A 40FE0443091029195 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-120A 40FE0443291029196 2330014970706 526 in 96 in 106 in 18800

S70159 M872A4 T-224A 40FE0443491029183 2330014970706 526 in 96 in 106 in 18800

S70159 M872A4 T-124A 40FE0443591029192 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-129A 40FE0443791029193 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-117B 40FE0443891029199 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-212B 40FE0443X91029186 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-116B 40FE0443191029187 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-117A 40FE0443191029190 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-120B 40FE0443391029188 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-122A 40FE0443491029197 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-212A 40FE0443691029184 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-221A 40FE0443891029140 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-118B 40FE0443991029180 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-115B 40FE0443091029200 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-119A 40FE0443291029182 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-112B 40FE04430S1044303 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-104B 40FE04433S1044201 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-209B 40FE04434S1044305 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-205B 40FE04435S1043714 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-202B 40FE04437S1043715 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-112A 40FE04439S1044302 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-204B 40FE0443XS1043711 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-201A 40FE04430S1043717 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-103B 40FE04435S1044202 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-210A 40FE04436S1044306 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-106B 40FE04437S1044203 2330014970706 526 in 96 in 106 in 18800

S70159 M872A4 T-101B 40FE04439S1043716 2330014970706 526 in 96 in 106 in 18800

S70159 M872A4 T-105B 40FE04430S1044205 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-207A 40FE04431S1043712 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-208A 40FE04432S1044304 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-203A 40FE04433S1043713 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-111B 40FE04437S1044301 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872A4 T-105A 40FE04439S1044204 2330014970706 526 in 96 in 106 in 18800 lbs

S70159 M872 T-110B M8721122/NX04TA 2330010398095 490 in 96 in 106 in 17390 lbs

S70159 M872A1 T-107B TG202864/NX0D1V 2330011098006 490 in 96 in 104 in 18490 lbs

S70159 M872A1 T-108B TG203357/NX0DGC 2330011098006 490 in 96 in 104 in 18490 lbs

S70159 M872A1 T-109B TG203542/NX13SF 2330011098006 490 in 96 in 104 in 18490 lbs

T41515 M1083A1P2 52 10TANHFF4CS741434/NL 2320015498610 274 in 96 in 112 in 28889 lbs

T41515 M1083A1P2 60 10TANHFF7CS747387/NL 2320015498610 274 in 96 in 112 in 28889 lbs

T41515 M1083A1P2 50 10TANHFF9CS747116/NL 2320015498610 274 in 96 in 112 in 28889 lbs

T56383 M1165A1 131-01 335559/NZ30WP 2320015402017 194 in 87 in 77 in 7230 lbs

T59448 M1078A1P2 12 10TBMAU53BS720324/NH 2320015498577 268 in 96 in 149 in 23120 lbs

T59448 M1078A1P2 62 10TBMAU53BS720338/NH 2320015498577 268 in 96 in 149 in 23120 lbs

T63093 M984A2

WWN

22-31 10TGJ6Y166S088573/NP 2320014928224 402 in 140 in

112 in 53100 lbs

T88858 M915A5 224 1FUJATCG0BLAZ3160/NP 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 220 1FUJATCG0BLAZ3224 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 208 1FUJATCG1BLAZ3183 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 203 1FUJATCG2BLAZ3161 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 125 1FUJATCG0BLAZ3174 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 114 1FUJATCG0CLAZ3371 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 112 1FUJATCG1BLAZ3202 2320015522922 312 in 130 in

126 in 26080

T88858 M915A5 117 1FUJATCG2BLAZ3175 2320015522922 312 in 130 126 in 26080 in lbs

T88858 M915A5 116 1FUJATCG0BLAZ3210 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 129 1FUJATCG1BLAZ3166 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 221 1FUJATCG1CLAZ3346 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 111 1FUJATCG2BLAZ3189 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 211 1FUJATCG2BLAZ3192 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 222 1FUJATCG3BLAZ3170 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 126 1FUJATCG3BLAZ3217 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 212 1FUJATCG4BLAZ3159 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 121 1FUJATCG4BLAZ3212 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 115 1FUJATCG5BLAZ3185 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 225 1FUJATCG5BLAZ3221 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 228 1FUJATCG5CLAZ3379 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 107 1FUJATCG6BLAZ3227 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 210 1FUJATCG7BLAZ3169 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 120 1FUJATCG7CLAZ3304 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 123 1FUJATCG8BLAZ3181 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 223 1FUJATCG9BLAZ3190 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 104 1FUJATCG9BPAS8381 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 202 1FUJATCGXBLAZ3182 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 105 1FUJATCGXBPAS8387 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 110 1FUJATCG2BLAZ3211 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 209 1FUJATCG3BLAZ3184 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 205 1FUJATCG3BLAZ3220 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 127 1FUJATCG4BLAZ3176 2320015522922 312 in 130 in

126 in 26080

T88858 M915A5 102 1FUJATCG4BPAS8403 2320015522922 312 in 130 126 in 26080

T88858 M915A5 109 1FUJATCG5BLAZ3199 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 215 1FUJATCG5CLAZ3253 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 128 1FUJATCG6BLAZ3194 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 103 1FUJATCG6BPAS8385 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 207 1FUJATCG7BLAZ3172 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 213 1FUJATCG7CLAZ3349 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 229 1FUJATCG8BLAZ3228 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 204 1FUJATCG9BLAZ3206 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 130 1FUJATCG9CLBR1394 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 113 1FUJATCGXBLAZ3196 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 106 1FUJATCGXBPAS8390 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 230 1FUJATCG2BLAZ3225 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 122 1FUJATCG3BLAZ3198 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 101 1FUJATCG3BPAS8392 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 124 1FUJATCG4BLAZ3193 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 226 1FUJATCG5BLAZ3168 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 108 1FUJATCG5BLAZ3204 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 201 1FUJATCG5CLAZ3351 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 119 1FUJATCG6BLAZ3213 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 219 1FUJATCG6CLAZ3259 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 214 1FUJATCG7BLAZ3205 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 118 1FUJATCG8BLAZ3164 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 217 1FUJATCG9BLAZ3173 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 218 1FUJATCG9BLAZ3223 2320015522922 312 in 130 in

126 in 26080

T88858 M915A5 227 1FUJATCGXBLAZ3179 2320015522922 312 in 130 126 in 26080

T88858 M915A5 216 1FUJATCGXBLAZ3215 2320015522922 312 in 130 in

126 in 26080 lbs

T88858 M915A5 206 1FUJATCGXCLAZ3233 2320015522922 312 in 130 in

126 in 26080 lbs

T95555 M1095 T-50 10TDC1520ES757917 2330014491776 228 in 96 in 83 in 9626 lbs

T95555 M1095 T-52 10TDC1529ES757916 2330014491776 228 in 96 in 83 in 9626 lbs

T95992 M1101 T-72 14596/NW1XG2 2330013875443 136 in 86 in 100 in 1400 lbs

T95992 M1101 T-68 14597/NW1XG3 2330013875443 136 in 86 in 100 in 1400 lbs

T96564 M1082 T-67A TL-211261EHJW/PB0ET2 2330014491775 210 in 96 in 79 in 7000 lbs

W98825 M149A2 N/A N/A 2330011087367 161 in 80 in 76 in 2900 lbs

W98825 M149A2 N/A N/A 2330011087367 161 in 80 in 76 in 2900

Technical Exhibit 4

MAP

////////////////////////////////////////////////////////////END OF PWS/////////////////////////////////////////////////////////////////////