This is an Invitation to Bid (ITB) for the Marion County Department of Public Works for the construction of asphalt concrete resurfacing of various county roads in Marion County, Oregon. The project, identified as ECMS Number 2025-101, involves resurfacing six different road segments totaling approximately 15.5 miles, including Mckee School Road, Monitor-Mckee Road, 114th Avenue/Waypark Drive, 114th Avenue/W. Church Road, Saratoga Drive/Hook Road, and North Howell Road. The bid was published on March 3, 2025, with electronic bids due by 2:00 p.m. on March 25, 2025, and a virtual public bid opening scheduled immediately thereafter via Microsoft Teams. The contract period runs through September 30, 2025, with an estimated total project cost range of $3,000,000 to $4,500,000.
The project is locally funded and requires bidders to submit various mandatory forms, including a bid certification, bid bond, and first-tier subcontractor disclosure form. Bidders must be prequalified on the Oregon Department of Transportation (ODOT) list and comply with state prevailing wage rate requirements. The work includes cold plane pavement removal, asphalt concrete pavement repair, scrub seal treatment, aggregate shoulders, safety edge construction, guardrail installation, and mailbox support adjustments. Bidders must provide a 10% bid guarantee and carry specific insurance coverages, including $1,000,000 commercial general liability and $1,000,000 commercial auto liability. The project specifications require compliance with 2024 Oregon Standard Specifications for Construction and Marion County's specific technical requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARION COUNTY PUBLIC WORKS
INVITATION TO BID
FOR
THE CONSTRUCTION OF
ASPHALT CONCRETE RESURFACING OF
VARIOUS MARION COUNTY ROADS - REVISED
MARION COUNTY, OREGON
Bid Publication Date: March 3, 2025
Bid Opening: March 25, 2025
MARION COUNTY BID#: PW1651-25
OREGONBUYS BID SOLICITATION#: S-C25102-00012961
ECMS NO. 2025-101
ACCOUNTING PROJECT NO. 100267
MARION COUNTY BOARD OF COMMISSIONERS
Danielle Bethell
Colm Wills
Kevin Cameron
Commissioner
Commissioner
Commissioner
Brian Nicholas, Director of Public Works
I RENEWS: \1 ,�, /"7..$ I
Electronic copies of this Invitation To Bid and attachments, if any, can be obtained from the Marion County Procurement Portal at the URL:
https://contracts.co.marion.or.us/gateway/ https://contracts.co.marion.or.us/gateway/
PAGE INTENTIONALLY LEFT BLANK
TABLE OF CONTENTS
Page
INTRODUCTION
ATTACHMENT B – BID CERTIFICATION
Experience / References
ATTACHMENT C – BID BOND
PERFORMANCE BOND
LABOR AND MATERIALS PAYMENT BOND
ATTACHMENT D – DRUG & ALCOHOL TESTING POLICY CERTIFICATION
ATTACHMENT E – FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM INSTRUCTIONS ..17
FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM
SAMPLE CONSTRUCTION CONTRACT PW-[no.-year]
PROJECT WAGE RATES
Maps and Drawings
T-1 Mckee School Rd NE Typical Section
T-2 Monitor-Mckee Rd NE Typical Section
T-3 Monitor-Mckee Rd NE Typical Section
T-4 114th Ave / Waypark Dr NE Typical Section
T-5 114th Ave / W. Church Rd NE Typical Section
T-6 114th Ave / W. Church Rd NE Typical Section
T-7 Saratoga Dr / Hook Rd NE Typical Section
T-8 North Howell Rd NE Typical Section
RD356 Manhole Cover and Frames
RD360 Manhole Frame Adjustment
RD402 Midwest Guardrail System Types
RD404 Midwest Guardrail System Steel Post and Block
RD406 Placement of Guardrails on Slopes
RD407 Midwest Guardrail System W-Beam
RD409 Thrie Beam Guardrail
RD410 Thrie Beam Guardrail Transition
RD412 Midwest Guardrail System Installation at Bridge Deck Expansion Joint
RD416 Midwest Guardrail System Standard Hardware (Nuts, Bolts, Washers and Misc.)
RD417 Midwest Guardrail System End Sections
RD419 Midwest Guardrail System Grading For Terminals
RD420 Midwest Guardrail System Non-Flared Energy-Absorbing Terminal
RD442 Midwest Guardrail System Typical Layouts at Bridge Ends
RD443 Midwest Guardrail System Typical Layouts For Embankments
RD450 Guardrail Anchors (Steel)
RD451 Wood Breakaway Posts
RD482 Midwest Guardrail System Type 3 (Nested W-Beam)
RD610 Asphalt Concrete Pavement (ACP) Details
RD615 Surface Edge Details
RD1030 Sediment Barrier Type 2, 3 and 4
TM500 Pavement Marking Standard Detail Blocks
TM502 Pavement Marking Standard Detail Blocks
TM503 Pavement Marking Standard Detail Blocks
TM515 Pavement Markers
TM517 Recessed Pavement Markers
TM530 Intersection Pavements Markings (Crosswalk, Stop Bar & Bike Lane Stencil)
TM800 Tables, Abrupt Edge and PCMS Details
TM810 Temporary Pavement Markings
TM820 Temporary Barricades
TM821 Temporary Sign Supports
TM822 Temporary Sign Supports
TM841 Intersection Work Zone Details
TM850 2-Lane, 2-Way Roadways
TM855 2-Lane, 2-Way Roadways
V-1 Vicinity Map
PAGE INTENTIONALLY LEFT BLANK
INTRODUCTION
1.1 Description of Work
Construction includes asphalt concrete paving, scrub sealing, and installing guardrail as called for in the Specifications and such additional Incidental Work as requested by the Engineer. The estimated cost range is $3,000,000 to $4,500,000
1.2 Requests for Clarification or Changes
As stated in section 00120.15 of the General Conditions for Marion County, any clarification of Plans and Specifications needed by the Bidder shall be submitted to Marion County at least five days prior to the date of Bid Closing. Failure to request clarification or changes in a timely manner shall be deemed acceptance of all the terms and conditions of the Procurement.
1.3 Time, Place and Methods of Receiving Bids
Submit electronic bids as specified in Special Provisions 00120.45 by 2:00 p.m. on March 25, 2025. Bids will be considered time-stamped and received by the Agency at the time they are uploaded to the Procurement Collaboration Portal at:
https://contracts-marioncountygcc.msappproxy.net/gateway/.
It is the Bidder’s responsibility to ensure that bids are received by the Agency prior to the stated submission deadline at the specified email or physical address. Bids, withdrawals or modifications submitted after the time set for receiving bids will not be opened or considered.
PUBLIC BID OPENING
Electronic Bids will be opened and read in Building 1, Marion County Public Works, 5155 Silverton Road NE Salem, Oregon, Bids for the work described above will be opened and read virtually by the Single Point of Contact on Tuesday, March 25, 2025, at 2:00 pm, immediately following Bid Closing. A Microsoft Teams meeting will be held at 2:00 PM for the Bid Opening following the specific time included in the Bid Opening Date. Be sure to have MS Teams access available on your computer or mobile phone and follow the following link Construction of Asphalt Concrete Resurfacing of Various Marion County Roads.
Bid results will be posted by 10:00 a.m. the next business day on the OregonBuys website at https://oregonbuys.gov/bso/ under the solicitation number listed above.
1.4 Revision or Withdrawal of Bids
Refer to section 00120.60 of the General Conditions for Construction for Marion County.
1.5 Time for Completion of Work
Complete all Work to be done no later than September 30, 2025. (Also see Special Provisions 180.50(h))
Recording of the elapse of Calendar Days, if specified, will begin on the day the Contractor begins On-Site Work as defined in 00110.20.
1.6 Funding
This project is Locally Funded
1.7 Project Information
Information pertaining to this Project may be obtained from the following person at Marion County Public Works, 5155 Silverton Road NE, Salem, Oregon 97305-3802:
Alicia Jones 503-373-4320 PWcontracts@co.marion.or.us https://contracts-marioncountygcc.msappproxy.net/gateway/ https://teams.microsoft.com/l/meetup-join/19%3ameeting_NWNmZGZjMmEtMDM2MS00ZDllLWI2MDYtYmIyMTU2YTYyMzZh%40thread.v2/0?context=%7b%22Tid%22%3a%22716bee54-8eb8-46d6-a628-9178fc88015e%22%2c%22Oid%22%3a%22fcf74c35-b670-4df4-9e21-ec8815f754d9%22%7d https://oregonbuys.gov/bso/ mailto:contracts@co.marion.or.us
1.8 Bid Guarantee
No bid shall be considered unless it is accompanied by a surety bond, cashier’s check, certified check, or irrevocable letter of credit by an insured institution, as defined in ORS 706.008, of the bidder in the amount of ten percent (10%) of the bid per 00120.40(e).
The county shall return the bid security to all bidders upon the execution of the contract. The county shall retain bid security if a bidder who is awarded a contract fails to promptly and properly execute the contract.
1.9 Applicable Specifications
The Standard Specifications applicable to the Work on this Project are the 2024 Oregon Standard Specifications for Construction, Parts 00200 through 03000, published by the Oregon Department of Transportation (ODOT) and available for download on the ODOT website at:
https://www.oregon.gov/odot/Business/Pages/Standard_Specifications.aspx
The General Conditions applicable to the Work on this Project are the General Conditions for Construction for Marion County (v2024), Part 00100, available for download on the Marion County website at:
https://www.co.marion.or.us/PW/Engineering/Pages/default.aspx.
The Special Provisions applicable to the Work on this Project are enclosed in this Invitation To Bid (ITB). The Special Provisions shall be understood to supersede the Standard Specifications and General Conditions by modification and/or supplement. All number references in the Special Provisions shall be understood to refer to the section or subsection of the Standard Specifications or General Conditions bearing like numbers.
1.10 Prevailing Wage Rate Requirements
This Project is subject to Oregon prevailing wage rate law (BOLI), and any amendments in effect at the time of solicitation. The existing State prevailing wage rates last published at least 10 Calendar Days prior to the Bid Closing apply to this Project, unless modified by Addendum.
1.11 Mandatory Submission Forms
The following forms must be completed, signed and returned with the Bidder’s submission package as one pdf file:
Bid Schedule – Attachment A Bid Certification – Attachment B Bid Bond (or other Bid Guarantee as allowed in 00120.40(e)) – Attachment C Drug and Alcohol Testing Policy Certification – Attachment D
NOTE: All mandatory submission forms must be combined and submitted as one pdf file.
The following form must be completed, signed and returned within two (2) hours of the Bid Closing:
First-Tier Subcontractor Disclosure Form – Attachment E
The Agency may consider any Bid that does not include the mandatory submission forms identified in this section, filled out completely and appropriately endorsed, to be non-responsive. The Agency reserves the right to waive minor informalities and irregularities in determining the responsiveness of individual Bids. Non-responsive Bids shall not be considered for award.
1.12 Bid Evaluation
The Agency will perform an analysis of the bids to determine if any significantly unbalanced items are to the detriment of the Agency per Section 00120.70 of the General Conditions. The Agency reserves the right to reject any such bid that is mathematically and materially unbalanced. A materially unbalanced bid is when the https://www.oregon.gov/odot/Business/Pages/Standard_Specifications.aspx https://www.co.marion.or.us/PW/Engineering/Pages/default.aspx
Agency determines that an award to the Bidder submitting a mathematically unbalanced bid likely will not result in the lowest ultimate cost to the Agency.
1.13 Time Limit of Unsettled Disputes
No action, suit or other legal proceedings shall be maintained by any party thereto against another party hereto upon any claim or cause of action arising out of the Contract or breach thereof or anything done in connection therewith unless commenced within one (1) year of the Final Acceptance of Work under this Contract. All claims or causes of action in any way resulting from this Contract shall be deemed barred unless action or suit thereon shall have been commenced within such time.
1.14 Contract Expiration Date
Contract 2025-101 expires on September 30, 2026
ATTACHMENT A – BID SCHEDULE
USE FILLABLE BID SCHEDULE – DOWNLOAD FROM THE AGENCY’S PROCUREMENT
COLLABORATION PORTAL
ATTACHMENT B – BID CERTIFICATION
The Honorable Board of County Commissioners Marion County Courthouse Salem, Oregon 97301
Commissioners:
The Undersigned, hereinafter called the Bidder, declares that the only person or parties interested in this Bid are those named herein; that this Bid Certification is in all respects fair and without fraud; that it is made without collusion with any official or employee of the County, and without any connection or collusion with any person making another certification on this Contract.
The Bidder also certifies to the following:
A. Noncollusion:
• The price(s) and amount of this Bid have been arrived at independently and without consultation, communication, or agreement with any other contractor, bidder, or potential bidder except as disclosed on a separately attached statement.
• Neither the price(s) nor the amount of this Bid, and neither the approximate price(s) nor approximate amount of this Bid has been disclosed to any other firm or person who is a bidder or potential bidder, and they will not be disclosed before the opening of bids.
• No attempt has been made or will be made to induce any firm or person to refrain from bidding on this contract, to submit a bid higher than this Bid, or to submit any intentionally high or noncompetitive bid or other form of complementary bid.
• This Bid is made in good faith and not pursuant to any agreement or discussion with, or inducement from, any firm or person to submit a complementary or other noncompetitive bid.
• The Bidder, its affiliates, subsidiaries, officers, directors, and employees are not currently under investigation by any governmental agency and have not in the last four years been convicted of or found liable for any act, prohibited by State or Federal law in any jurisdiction, involving conspiracy or collusion with respect to bidding on any public contract except as described on a separately attached statement.
• The Bidder understands and acknowledges that the above representations are material and important and will be relied on by Marion County, in awarding the contract(s) for which this Bid is submitted. The Bidder understands that any misstatement in this Certification is and shall be treated as fraudulent concealment from Marion County, of the true facts relating to the submission of bids for this contract.
B. Noninvolvement in Any Debarment and Suspension:
The Bidder, its owners, directors, and officers:
• Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
• Have not within a three-year period preceding this Bid been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property.
• Are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State, or local) with commission of any of the offenses enumerated in the preceding paragraph of this Certification; and
• Have not within a three-year period preceding this Bid had one or more public transactions (Federal, State, or local) terminated for cause or default.
Where the prospective primary participant is unable to certify to any of the statements in this Certification, the prospective primary participant shall attach an explanation to this Bid.
List exceptions in writing on one or more pages, as necessary, with the heading, “Certification Exceptions, Bid Insert,” and attach all pages to this Bid Certification. For each exception noted, indicate to whom the exception applies, initiating agency, and date(s) of action.
C. Lobbying Activities:
To the best of my knowledge and belief, that:
• No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
• If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer of employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions to the ODOT Procurement Office - Construction Contracts Unit, MS# 2-2, 3930 Fairview Industrial Drive SE, Salem, Oregon 97302-1166. Copies of Standard Form-LLL are available at the above location.
• This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this Certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required Certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
• The prospective participant also agrees by submitting his or her Bid that he or she shall require that the language of this Certification be inserted in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.
D. Compliance With Oregon Tax Laws:
• By signature on this Bid, the undersigned hereby certifies under penalty of perjury that the undersigned is authorized to act on behalf of Bidder, that the undersigned has authority and knowledge regarding Bidder’s payment of taxes, and that Bidder is, to the best of the undersigned's knowledge, not in violation of any Oregon Tax Laws. For purposes of this certification, "Oregon Tax Laws" means a state tax imposed by ORS 320.005 to 320.150 (Amusement Device Taxes), ORS 403.200 to 403.250 (Tax For Emergency Communications), and ORS Chapters 118 (Inheritance Tax), 314 (Income Tax), 316 (Personal Income Tax), 317 (Corporation Excise Tax), 318 (Corporation Income Tax), 321 (Timber And Forestland Tax), 323 (Cigarettes And Tobacco Products Tax), and the elderly rental assistance program under ORS 310.630 to 310.706, and any local taxes administered by the Department of Revenue under ORS 305.620.
E. Employee Drug Testing Program:
• Pursuant to ORS 279C.505(2), that the bidder has an employee drug testing program in place, and will maintain such program for the entire period of this contract. Failure to maintain such program shall constitute a material breach of contract.
F. Nondiscrimination:
• Pursuant to ORS 279A.110, that the Bidder has not discriminated and will not discriminate against a disadvantaged business enterprise, a minority-owned business, a woman-owned business, a business that a service-disabled veteran owns, or an emerging small business in obtaining any required subcontracts. The Bidder understands that it may be disqualified from bidding on this public improvement project if the Agency finds that the Bidder has violated subsection (1) of ORS 279A.110.
G. Use of Registered Subcontractors:
• That all subcontractors performing work on this public improvement contract will be registered with the Construction Contractors Board or licensed by the State Landscape Contractors Board in accordance with ORS 701.035 to 701.055 before the subcontractors commence work under this contract.
H. Incorporation of All Addenda:
• The Bidder has incorporated into this Bid all Addenda issued for this Project.
• The Bidder understands and acknowledges that the Agency will provide all Addenda only by publishing them on the OregonBuys website. Addenda may be downloaded from the OregonBuys website.
• The Bidder shall be responsible for diligently checking the OregonBuys website for Addenda. Bidders should check the web site at least weekly until one (1) week prior to the designated time to receive bids and daily thereafter.
• By submitting this Bid, the Bidder assumes all risks associated with its failure to access all Addenda and waives all claims, suits, and actions against the State, Agency, the Agency's governing commission and its members, and their officers, agents, and employees that may arise out of the Bidder's failure to access all Addenda, in spite of any contingencies such as website failure, down-time, service interruptions, and corrupted, inaccurate, or incomplete Addenda or information.
The Bidder declares that the Bidder has carefully examined the Specifications and other proposed Contract Documents; that the Bidder personally has made an examination of the site of the proposed Work and has made the necessary investigations to determine the conditions to be encountered independently of the indications in the Specifications. The applicable Standard Specifications, General Conditions, Special Provisions, and other Contract Documents bound herewith are by reference a part of this Bid Certification.
The Bidder agrees to accept as full payment for the Work herein proposed or the materials to be furnished the amount computed as determined by the provisions of this Invitation To Bid and based on the following Bid Certification, it being expressly understood that the unit prices listed are independent of the exact quantities involved, where unit prices apply.
The Bidder further declares the total amount of work, expressed in dollars, Bidder’s company reasonably believes it is capable of bonding at any one time: $ . The Bidder declares the portion of this amount which remains available at time of completion of this form is $ .
The Bidder further agrees that the provisions required by ORS 279C.840 shall be included in the Contract.
The bidder is prequalified on the Oregon Department of Transportation (ODOT) list for the Work categories requested for this Project.
Acknowledgement of receipt of addenda:
No. ____ Date: ____________ No. ____ Date: ____________ No. ____ Date: ____________ No. ____ Date: ____________ No. ____ Date: ____________
[The remainder of this page intentionally left blank.]
Experience / References
The information on this form may be utilized by Marion County to consider whether a Bidder has met the standards of responsibility set forth in ORS279C.375.
Current Contracts in Force/Previous Experience – minimum of three required of similar nature with public sector work.
Contract #1 Location (city/state) Owners Name Type of Work % Completed Estimated Completion Date
Contract #2 Location (city/state) Owners Name Type of Work % Completed Estimated Completion Date
Contract #3 Location (city/state) Owners Name Type of Work % Completed Estimated Completion Date
References – minimum of two project owner references and two subcontractor references.
#1 Project Owner Reference Reference Name Business or Employer Telephone Project Name/$ Amount
#2 Project Owner Reference Reference Name Business or Employer Telephone Project Name/$ Amount
#1 Subcontractor Reference Reference Name Business or Employer Telephone Project Name/$ Amount
#2 Subcontractor Reference Reference Name Business or Employer Telephone Project Name/$ Amount
The name of the Bidder who is submitting this Bid Certification is:
Company:
(Print or Type)
Address:
(Print or Type)
City, State Zip
(Print or Type) which address is the address to which all communications considered with this Bid Certification and with the Contract shall be sent.
The names of the principal officers of the corporation submitting this Bid and Bid Certification or of the partners, if the Bid Certification is submitted by a partnership, or of all persons interested in this Bid Certification as principals, are as follows:
Dated this day of , 20 .
Construction Contractor’s Board Registration Number Firm Name
Signature of Bidder
Name Print or Type
Title Print or Type
Telephone No.
Email Address:
Tax ID #
Business Organization: (Check one)
Corporation Limited Liability Company Joint Venture
Partnership Sole Proprietorship Other
ATTACHMENT C – BID BOND
KNOW ALL PERSONS BY THESE PRESENTS, that
, hereinafter called the Principal, and , a Corporation organized and existing under and by virtue of the laws of the state duly authorized to do surety business in the
State of Oregon as Surety, are held and firmly bound unto Marion County hereinafter called the County, in the sum of Dollars ($ ), for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS BOND IS SUCH THAT, WHEREAS, the Principal herein is herewith submitting his or its Bid Proposal for said Bid Proposal, by reference thereto, being hereby made a part hereof.
NOW THEREFORE, if the said Bid Proposal submitted by the said Principal be accepted, and the Contract be awarded to said Principal, and if the said Principal shall execute the proposed Contract as required by the bidding and the Contract Documents within the time set by said Documents, then this obligation shall be void.
If the Principal shall fail to execute the proposed Contract, the Surety hereby agrees to pay to the County the sum as liquidated damages.
Signed and sealed this day of , 20 .
Principal
By:
A certified copy of the Agent’s Power-of-Attorney must be Attached hereto. Surety
By:
Attorney-in-Fact
Bond No.
PERFORMANCE BOND
(NOTE: CONTRACTORS MUST USE THIS FORM, NOT A SURETY COMPANY FORM)
KNOW BY ALL PERSONS BY THESE PRESENTS:
We the undersigned as PRINCIPAL (hereinafter called CONTRACTOR), and a corporation organized and existing under and by virtue of the laws of the state of duly authorized to do surety business in the state of Oregon and named on the current list of approved surety companies acceptable on federal bonds and conforming with the underwriting limitations as published in the Federal Register by the audit staff of the Bureau of Accounts and the U.S. Treasury Department and is of the appropriate class for the bond amount as determined by Best's Rating System, as SURETY, hereby hold and firmly bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, to pay to MARION COUNTY as OBLIGEE (hereinafter called MARION COUNTY), the amount of Dollars ($ ) in lawful money of the United States of America.
WHEREAS, the CONTRACTOR entered into a contract with MARION COUNTY dated , 20 , which Contract is hereunto annexed and made a part hereof, for accomplishment of the project described as follows: .
NOW, THEREFORE, the condition of this obligation is such that if the CONTRACTOR shall promptly, truly and faithfully perform all the undertakings, covenants, terms, conditions, and agreements of the aforesaid contract and having performed its obligations thereunder, then this obligation shall be null and void; otherwise it shall remain in full force and effect until the expiration of any statutes of limitation or ultimate repose applicable to claims against Principal arising out of said Contract or for as long as CONTRACTOR is liable under the Contract, whichever is later.
Whenever CONTRACTOR shall be declared by MARION COUNTY to be in default under the Contract Documents for the project described herein, the SURETY may promptly remedy the default, or shall promptly complete the project in accordance with the Contract Documents and the project Specifications with a contractor approved by MARION COUNTY. SURETY, for value received, further stipulates and agrees that all changes, extensions of time, alterations, or additions to the terms of the Contract or Specifications for are within the scope of the SURETY's undertaking on this bond, and SURETY hereby waives notice of any such change, extension of time, alteration or addition to the terms of the or to the Work or to the Specifications. Any such change, extension of time, alteration or addition to the terms of the or to the Work or to the Specifications shall automatically increase the obligation of the Surety hereunder in a like amount, provided that such increase shall not exceed twenty-five percent (25%) of the original amount of the obligation without the consent of the Surety.
This obligation shall continue to bind the PRINCIPAL and SURETY, notwithstanding successive payments made hereunder, until the full amount of the obligation is exhausted.
No right of action shall accrue on this bond to or for the use of any person or corporation other than MARION COUNTY, its respective heirs, executors, administrators, successors or assigns.
If more than one SURETY is on this bond, each SURETY hereby agrees that it is jointly and severally liable for obligations on this bond.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this day of , 20 .
SURETY CONTRACTOR
By: By:
Title: Title:
Street Address Street Address
City State ZIP City State ZIP
Phone Number Phone Number
Bond No.
LABOR AND MATERIALS PAYMENT BOND
(NOTE: CONTRACTOR MUST USE THIS FORM, NOT A SURETY COMPANY FORM)
KNOW ALL PERSONS BY THESE PRESENTS:
We the Undersigned as PRINCIPAL and a corporation organized and existing under and by virtue of the laws of the state of , and duly authorized to do surety business in the state of Oregon and named on the current list of approved surety companies acceptable on federal bonds and conforming with the underwriting limitations as published in the Federal Register by the audit staff of the Bureau of Accounts and the U.S. Treasury Department and which carries an "A" rating and is of the appropriate class for the bond amount as determined by Best's Rating System, as SURETY, hereby hold and firmly bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, unto MARION COUNTY and ODOT, as duel OBLIGEE, in the sum of Dollars ($ ) in lawful money of the United States of America, for the payment of that sum for the use and benefit of claimants as defined below.
The condition of this obligation is such that whereas the PRINCIPAL entered into a contract with MARION COUNTY dated , 20___, which contract is hereunto annexed and made a part hereof, for accomplishment of the project described as follows: .
NOW THEREFORE, if the PRINCIPAL shall promptly make payments to all persons, firms, subcontractors, corporations and/or others furnishing materials for or performing labor in the prosecution of the Work provided for in the aforesaid , and any authorized extension or modification thereof, including all amounts due for materials, equipment, mechanical repairs, transportation, tools and services consumed or used in connection with the performance of such Work, and for all labor performed in connection with such Work whether by subcontractor or otherwise, and all other requirements imposed by law, then this obligation shall become null and void; otherwise this obligation shall remain in full force and effect, until the expiration of any statutes of limitation or ultimate repose applicable to claims against Principal arising out of said Contract or for as long as CONTRACTOR is liable under the Contract, whichever is later, subject, however, to the following conditions:
1. A claimant is as specified in ORS 279C.600 to 279C.620.
2. The above-named PRINCIPAL and SURETY hereby jointly and severally agree with the OBLIGEE and its assigns that every claimant as above-specified, who has not been paid in full, may sue on this bond for the use of such claimant, prosecute the suit to final judgment in accordance with ORS 279C.610 for such sum or sums as may be justly due claimant, and have execution thereon. The OBLIGEE shall not be liable for the payment of any judgment, costs, expenses or attorneys' fees of any such suit.
PROVIDED, FURTHER, that SURETY for the value received, hereby stipulates and agrees that all changes, extensions of time, alterations to the terms of the or to Work to be performed thereunder or the Specifications accompanying the same shall be within the scope of the SURETY's undertaking on this bond, and SURETY does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the or to the Work or to the Specifications. Any such change, extension of time, alteration or addition to the terms of the contract or to the Work or to the Specifications shall automatically increase the obligation of the SURETY hereunder in a like amount, provided that the total of such increases shall not exceed twenty-five percent (25%) of the original amount of the obligation without the consent of the SURETY.
This obligation shall continue to bind the PRINCIPAL and SURETY, notwithstanding successive payments made hereunder, until the full amount of the obligation is exhausted, or if the full amount of the obligation is not exhausted and no claim is pending resolution, until such time as no further claims can be made pursuant to law with regard to the above-described project, by any claimant specified in ORS 279C.600.
If more than one SURETY is on this bond, each SURETY hereby agrees that it is jointly and severally liable for all obligations of this bond.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this day of , 20 .
SURETY CONTRACTOR
By: By:
Title: Title:
Street Address Street Address
City, State Zip
Phone Number Phone Number
ATTACHMENT D – DRUG & ALCOHOL TESTING POLICY CERTIFICATION
Has your firm established and implemented a drug and alcohol policy and testing program that complies with ORS 279C.505 for public improvement contracts?
Yes No
I hereby certify that the information provided on this form is true and accurate to the best of my knowledge.
Please print or type:
Company Name
Name/Title
Address
Signature
Date
ATTACHMENT E – FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM INSTRUCTIONS
Instructions for Submitting Form
Submittal of the First-Tier Subcontractor Disclosure Form is mandatory for all public improvement project bids estimated to exceed $100,000. Submit the First-Tier Subcontractor Disclosure Form in one of the following manners:
• By filling out the Subcontractor Disclosure Form included in the Invitation To Bid and submitting it, in PDF format, together with the Bid documents to the Agency’s Procurement Collaboration Portal at the time designated for receipt of Bids; or
• By removing it from the Invitation To Bid, filling it out, signing and dating in ink, and submitting it separately, in PDF format, to the “My Company Info” page within the Agency’s Procurement Collaboration Portal; or
• By removing it from the Invitation To Bid, filling it out, signing and dating in ink and submitting it separately in a sealed envelope to the receptionist at Marion County Public Works, Building 1, 5155 Silverton Road NE, Salem Oregon 97305. The envelope shall be plainly labeled “First-Tier Subcontractors for Bid on “Santiam River (Gates) Bridge” (see Invitation To Bid cover page).
Instructions for First-Tier Subcontractor Disclosure
Use the First-Tier Subcontractor Disclosure Form to disclose all subcontracts included in the Bid that are equal to or greater than the following:
1. Five percent (5%) of the total project Bid or $15,000, whichever is greater, or
2. $350,000 regardless of the percentage of the total project Bid
Disclose the following information for each subcontractor:
• The name of the subcontractor
• The category of work that the subcontractor will be performing
• The dollar amount of the subcontract
If your Bid includes no subcontractors or if your Bid includes no contracts that are equal to or greater than the disclosure criteria, above, you are still required to submit the form, with the appropriate box checked or enter "NONE" on the first line.
THE AGENCY MUST REJECT BIDS if the Bidder fails to submit the disclosure form with this information by the stated deadline.
FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM
Project Name
ECMS Contract #
Bid Opening Date
Name of Bidding Contractor
CHECK THIS BOX IF YOU WILL NOT BE USING ANY FIRST-TIER SUBCONTRACTORS OR IF YOU
ARE NOT SUBJECT TO THE DISCLOSURE REQUIREMENTS (SEE INSTRUCTIONS).
FIRST-TIER SUBCONTRACTORS
Firm Name Dollar Amount
Category of Work
(Attach additional sheets as necessary)
SAMPLE CONSTRUCTION CONTRACT PW-[no.-year]
This Contract, made and entered into by and between Marion County, A Political Subdivision of the State of Oregon, acting by and through its duly elected, qualified, and acting Board of Commissioners, hereinafter called the "Agency" and, [Contractor] hereinafter called the "Contractor" for the Project entitled: [project title here].
WITNESSETH
Contractor, in consideration of the sum of [contract amount] (the “Contract Price”), to be paid to the Contractor by County in the manner and at the time hereinafter provided, and subject to the terms and conditions provided in the Invitation To Bid and other Contract Documents, all of which are incorporated herein by reference, hereby agrees to perform all Work described and reasonably inferred from the Contract Documents. Contractor shall provide for and furnish all necessary machinery, tools, apparatus, equipment, supplies, materials and labor, and do all things in accordance with the applicable Plans and Specifications, and in accordance with such alterations and modifications of the same as may be made by the County.
This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the Contractor.
1. Contractor shall pay all contributions or amounts due the Industrial Accident Fund from such Contractor or Subcontractor incurred in the performance of the contract.
2. Contractor shall not permit any lien or claim to be filed or prosecuted against the state, county, school district, municipality, municipal corporation or subdivision thereof, on account of any labor or material furnished.
3. Contractor agrees to pay the Department of Revenue all sums withheld from employees pursuant to ORS
316.167.
4. Contractor shall indemnify, defend, save and hold harmless the Agency and its officers, employees, agents and volunteers, the State of Oregon, Oregon Transportation Commission and its members, Department of Transportation and its officers, employees and agents from and against any and all claims, actions, liabilities, damages, losses, or expenses, including attorneys’ fees, arising from a tort, as now or hereafter defined in ORS 30.260, caused, or alleged to be caused, in whole or in part, by the negligent or willful acts or omissions of Contractor or any of the officers, agents, employees or subcontractors of the Contractor (“Claims”). It is the specific intention of the Parties that State shall, in all instances, except for Claims arising solely from the negligent or willful acts or omissions of State, be indemnified by the Contractor and subcontractor from and against any and all Claims.
Any such indemnification shall also provide that neither Contractor and subcontractor nor any attorney engaged by Contractor and subcontractor shall defend any claim in the name of Marion County or the State of Oregon or any agency of the State of Oregon, nor purport to act as legal representative of the State of Oregon or any of its agencies, without the prior written consent of the Oregon Attorney General.
The State of Oregon may, at anytime at its election assume its own defense and settlement in the event that it determines that Contractor is prohibited from defending the State of Oregon, or the Contractor is not adequately defending the State of Oregon’s interests, or that an important governmental principle is at issue or that it is in the best interests of the State of Oregon to do so. The State of Oregon reserves all rights to pursue claims it may have against Contractor if the State of Oregon elects to assume its own defense.
5. Money due to Contractor under and by virtue of this Contract may be returned for the use of the Agency;
or, in case no money is due, Contractor’s surety may be held until such suit or suits, action or actions, claim or claims for injuries or damages as aforesaid shall have been settled and suitable evidence to that effect furnished to the County; except that money due the Contractor will not be withheld when the Contractor produces satisfactory evidence that Contractor is adequately protected by public liability and property damage insurance.
6. THAT in consideration of the faithful performances of all of the obligations, both general and special, herein set out and in consideration of the faithful performance of the Work as set forth in this Contract, the applicable Invitation to Bid, Plans, Specifications, Bid, and all general and detailed specifications and plans which are a part hereof, and in accordance with the directions of the Agency and to its satisfaction, the Agency agrees to pay to the said Contractor the amount earned, as determined from the actual quantities of work performed and the prices and other basis of payment specified, and taking into consideration any amounts that may be deductible under the terms of the Contract, and to make such payments in the manner and at the time provided in the Contract.
7. In the event the Board of Commissioners of the Agency reduces, changes, eliminates, or otherwise modifies the funding for any of the services identified, the Contractor agrees to abide by any such decision, including termination of service.
8. The Agency delegates to the Marion County Engineer the authority and responsibility for issuing approvals, providing notices, receiving notices, issuing directives, authorizing change orders, and avoiding and resolving disputes.
9. This contract may be increased by twenty-five (25) percent over the original contract amount to include additional work for the projects specified in the contract, upon mutual agreement of both parties.
10. Contractor, its assignees and successors in interest agree to comply with the requirements of the Marion
County Public Works Department Federally Funded Transportation Program Title VI Plan, herein incorporated by this reference, as follows:
a. Compliance with Regulations.
The Contractor shall comply with the Regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation (hereinafter DOT), Title 49, Code of Federal Regulations, part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract.
b. Nondiscrimination.
The Contractor, with regard to the Work performed during the contract, shall not discriminate on the grounds of race, color, sex, or national origin in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The Contractor shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations.
c. Solicitations for Subcontracts, including Procurement of Materials and Equipment.
In all solicitations either by competitive bidding or negotiations made by the Contractor for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Contractor of the Contractor’s obligations under this Contract and the Regulations relative to nondiscrimination on the ground of race, color, sex, or national origin.
d. Information and Reports.
The Contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information and its facilities as may be determined by Agency or the Oregon Department of Transportation to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information, the Contractor shall so certify to Agency or the Oregon Department of Transportation as appropriate, and shall set forth what efforts it has made to obtain the information.
e. Sanctions for Noncompliance.
In the event of the Contractor’s noncompliance with the nondiscrimination provisions of this Contract, Agency and the Oregon Department of Transportation shall impose such contract sanctions as it or the Federal Highway Administration may determine to be appropriate including, but not limited to:
1. Withholding of payments to the contractor under the Contract until the Contractor complies, and/or;
2. Cancellation, termination, or suspension of the Contract, in whole or in part.
11. Incorporation of Provisions.
The Contractor shall include the provisions of paragraphs (1) through (6) in every subcontract, including procurement of materials and leases of equipment, unless exempt by state or federal Regulations or directives issued pursuant thereto. The Contractor shall take such action with respect to any subcontractor or procurement as Marion County may direct as a means of enforcing such provisions including sanctions for noncompliance.
12. Independent Contractor.
The Contractor is a separate and independently established business, retains sole and absolute discretion over the manner and means of carrying out the Contractor’s activities and responsibilities for the purpose of implementing the provisions of this Contract, and maintains the appropriate license/certifications, if required under Oregon Law. Notwithstanding the preceding sentence, Agency reserves the right to determine schedule for the work to be performed and to evaluate the quality of the completed performance.
This Contract shall not be construed as creating an agency, partnership, joint venture, employment relationship or any other relationship between the Parties other than that of independent parties. The Contractor is acting as an “independent contractor” and is not an employee of Agency, and accepts full responsibility for taxes or other obligations associated with payment for services under this Contract. As an “independent contractor”, Contractor will not receive any benefits normally accruing to Agency employees unless required by applicable law. Furthermore, Contractor is free to contract with other parties for the duration of the Contract.
13. Governing Law and Venue.
Any dispute between the Agency and the Contractor that arises from or relates to this Contract and that is not resolved under the provisions of Section 00199 of the General Conditions shall be brought and conducted solely and exclusively within the Circuit Court of Marion County; provided, however, if a dispute must be brought in a federal forum, then it shall be brought and conducted solely and exclusively within the United States District Court for the District of Oregon. In no event shall this be construed as a waiver by Agency on any form of defense or immunity, whether sovereign immunity, governmental immunity, immunity based on the Eleventh Amendment to the Constitution of the United States or otherwise, from any claim or from the jurisdiction of any court. CONTRACTOR BY EXECUTION OF THE
CONTRACT HEREBY CONSENTS TO THE IN PERSONAM JURISDICTION OF THE COURTS
REFERENCED IN THIS SECTION.
IN WITNESS WHEREOF, the parties hereto have subscribed their names and affixed their respective official seals below.
MARION COUNTY SIGNATURE
BOARD OF COMMISSIONERS:
Chair Date
Commissioner Date
Commissioner Date
Authorized Signature:
Department Director or designee Date
Chief Administrative Officer Date
Reviewed by Signature:
Marion County Legal Counsel Date
Reviewed by Signature:
Marion County Contracts & Procurement Date
[CONTRACTOR] SIGNATURE
Date
Title:
PROJECT WAGE RATES
Minimum Wage Requirements - This Project is subject to State prevailing wage rate requirements. Not less than the existing State prevailing wage rates shall be paid to workers according to 00170.65(b) and 00170.65(e).
Applicable Wages - Prevailing wage rates published in the wage determinations and any applicable modifications or amendments apply to this Project and are incorporated by reference:
(1) Oregon Bureau of Labor and Industries (BOLI), "Prevailing Wage Rates For Public Works Contracts in Oregon".
The applicable State prevailing wage rates last published prior to the time of Bid Opening, which is stated on the Invitation to Bid, apply to this Project.
Wage Rates are Internet-Accessible - The BOLI wage rates can be found on the Oregon Bureau of Labor and Industries website at: https://www.oregon.gov/boli/WHD/PWR/Pages/index.aspx.
Wage Rates are Subject to Change - Modifications or amendments to BOLI wage rates applicable to this Project may occur at any time before Bid Opening. Bidders are responsible to monitor the respective web page for modifications and amendments up until Bid Opening.
https://www.oregon.gov/boli/WHD/PWR/Pages/index.aspx
SPECIAL PROVISIONS
PART 00100 - GENERAL CONDITIONS
Replace ”PART 00100 – GENERAL CONDITIONS” of the 2024 Oregon Standard Specifications for Construction with the following:
General Conditions for Construction for Marion County, v2024, a Supplemental Specification published by Marion County on the Marion County Public Works Engineering Division website at http://www.co.marion.or.us/PW/Engineering and included in these Special Provisions by reference.
SECTION 00110 - ORGANIZATION, CONVENTIONS, ABBREVIATIONS, AND DEFINITIONS
Comply with Section 00110 of the General Conditions modified as follows.
00110.05(e) Reference to Websites - Add the following bullet list to the end of this subsection:
• ATSSA - American Traffic Safety Services Association www.atssa.com
• NTMAG - Nonfield-Tested Materials Acceptance Guide https://www.oregon.gov/odot/Construction/Documents/NTMAG_202401.pdf
• QPL - Qualified Products List www.oregon.gov/ODOT/Construction/Pages/Qualified-Products.aspx
SECTION 00120 – BIDDING REQUIREMENTS AND PROCEDURES
Comply with Section 00120 of the General Conditions modified as follows:
00120.15 Examination of Work Site and Solicitation Documents; Consideration of Conditions to be Encountered - Add the following to the end of this subsection:
Certain Specifications included in the Project require additional experience or personnel qualifications. Refer to the subsection requirements that may affect bidding considerations, including but not limited to the following:
Subsection Title
00736.30 Personnel Qualifications
SECTION 00130 – AWARD AND EXECUTION OF CONTRACT
Comply with Section 00130 of the General Conditions.
SECTION 00140 - SCOPE OF WORK
Comply with Section 00140 of the General Conditions.
http://www.co.marion.or.us/PW/Engineering https://www.oregon.gov/odot/Construction/Documents/NTMAG_202401.pdf http://www.oregon.gov/ODOT/Construction/Pages/Qualified-Products.aspx
SECTION 00150 - CONTROL OF WORK
Comply with Section 00150 of the General Conditions modified as follows:
00150.50(c) Contractor Responsibilities – Replace the bullet that begins "Determine the exact location before excavating within …" with the following bullet:
• Determine the exact location before excavating within the tolerance…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .