PW_26-05B_Animal_Shelter_Phase_I_Furnace_tech_specs_bid_set.pdf

PDF 3 MB Posted

Attached to
Napa County Animal Shelter Phase I Furnace Replacement
Solicitation number
PW 26-05B
Issued by
Napa County, California

About this file

This is a technical specifications document for the Napa County Animal Shelter Phase I Furnace Replacement project (PW 26-05B), prepared by YEI Engineers, Inc. for the County of Napa, California. The project involves replacing existing furnaces at the facility located at 942 Hartle Court and installing associated mechanical, plumbing, and electrical systems. The technical specifications document, filed July 16, 2026, under Napa County Agreement No. 260111B, encompasses detailed requirements for multiple building systems including ball valves for plumbing piping, hangers and supports for plumbing and HVAC equipment, duct insulation, metal ducts, gas-fired furnaces, electrical systems, facility natural-gas piping, and identification labeling for all piping and equipment. The specifications reference standards from organizations including ASME, NSF, MSS, AWS, and ASHRAE, and establish requirements for product selection, installation methods, testing, adjusting, and balancing procedures, and quality assurance measures.

The document establishes comprehensive technical requirements for materials, including specifications for brass and bronze ball valves with cold working pressure ratings of 600 psig, metal pipe hangers and supports meeting MSS SP-58 and MSS SP-69 standards with hot-dipped galvanized coatings, and equipment labeling systems with stainless steel or plastic materials from approved manufacturers such as Brady Corporation and NIBCO Inc. All valves must be lead-free with dezincification-resistant materials. Testing, adjusting, and balancing work must be performed by qualified TAB specialists certified by the Associated Air Balance Council (AABC), with comprehensive documentation including instrument calibration reports and certified TAB reports required for system commissioning. Installation requirements include compliance with structural steel welding qualifications per AWS D1.1/D1.1M, proper pipe support design to prevent system shutdown during maintenance, and detailed identification scheduling for all equipment and valve systems to be included in operation and maintenance documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

Napa County Animal Shelter Phase I Furnace Replacement, PW 26-05B

Provided by: YEI Engineers, Inc.

TABLE OF CONTENTS

Plumbing

22 05 23.12 Ball Valves for Plumbing Piping

22 05 29 Hangers and Supports for Plumbing Piping and Equipment

22 05 53 Identification for Plumbing Piping and Equipment

22 05 93 Testing, Adjusting, and Balancing for Plumbing

231123 FL - Facility Natural-Gas Piping

Mechanical

23 01 30.52 Existing HVAC Air Distribution System Cleaning

23 05 29 Hangers and Supports for HVAC Piping and Equipment

23 05 48 Vibration and Seismic Controls for HVAC

23 05 53 Identification for HVAC Piping and Equipment

23 05 93 Testing, Adjusting, and Balancing for HVAC

23 07 13 Duct Insulation

23 11 23 Facility Natural-Gas Piping

23 31 13 Metal Ducts

23 33 00 Air Duct Accessories

23 54 16.13 Gas-Fired Furnaces

Electrical

26 05 19 Low-Voltage Electrical Power Conductors and Cables

26 05 26 Grounding and Bonding for Electrical Systems

26 05 29 Hangers and Supports for Electrical Systems

26 05 33 Raceways and Boxes for Electrical Systems

26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling

26 05 53 Identification for Electrical Systems

26 27 26 Wiring Devices

26 28 16 Enclosed Switches and Circuit Breakers

E

NR

E

ETATS

R

FO C

EL C T

OFLA I

AI C L

RET

GER

IS

D

No. E18384

RP O SEF NIS O AL

I A

N

RE

ENI

GE

BR

ANDON M . YEE

County of Napa, Napa County Animal Shelter 942 Hartle Court

Design for Phase I Furnace Replacement Project

NAPA COUNTY AGREEMENT NO. 260111B

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 23.12 - 1

SECTION 22 05 23.12

BALL VALVES FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Brass ball valves.

2. Bronze ball valves.

1.3 DEFINITIONS

A. CWP: Cold working pressure.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of valve.

1. Certification that products comply with NSF 61.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Prepare valves for shipping as follows:

1. Protect internal parts against rust and corrosion.

2. Protect threads, flange faces, and soldered ends.

3. Set ball valves open to minimize exposure of functional surfaces.

B. Use the following precautions during storage:

1. Maintain valve end protection.

2. Store valves indoors and maintain at higher-than-ambient-dew-point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 23.12 - 2

C. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use operating handles or stems as lifting or rigging points.

1.6 MEASUREMENT AND PAYMENT

A. Full compensation for all work under this Section must be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS FOR VALVES

A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.

B. ASME Compliance:

1. ASME B1.20.1 for threads for threaded end valves.

2. ASME B16.1 for flanges on iron valves.

3. ASME B16.5 for flanges on steel valves.

4. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.

5. ASME B16.18 for solder-joint connections.

6. ASME B31.9 for building services piping valves.

C. NSF Compliance: NSF 61 for valve materials for potable-water service.

D. All valves must be Lead Free material.

E. Bronze valves must be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.

F. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

G. Valve Sizes: Same as upstream piping unless otherwise indicated.

H. Valve Actuator Types:

1. Handlever: For quarter-turn valves smaller than NPS 4.

2.2 BRASS BALL VALVES

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 23.12 - 3

a. NIBCO Inc.

b. KITZ Corporation.

c. Milwaukee Valve Company.

d. Red-White Valve Corp.

B. Two-Piece, Brass Ball Valves with Full Port and Brass Trim:

1. Description:

a. Standard: MSS SP-110.

b. CWP Rating: 600 psig.

c. Body Design: Two piece.

d. Body Material: Forged brass.

e. Ends: Threaded and soldered.

f. Seats: PTFEStem: Brass.

g. Ball: Chrome-plated brass.

h. Port: Full.

2.3 BRONZE BALL VALVES

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Milwaukee Valve Company.

b. NIBCO INC.

c. Red-White Valve Corp.

d. WATTS.

B. Two-Piece, Bronze Ball Valves with Full Port, and Bronze or Brass Trim:

1. Description:

a. Standard: MSS SP-110.

b. CWP Rating: 600 psig.

c. Body Design: Two piece.

d. Body Material: Bronze.

e. Ends: Threaded and soldered.

f. Seats: PTFE.

g. Stem: Bronze or brass.

h. Ball: Chrome-plated brass.

i. Port: Full.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 23.12 - 4

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.

B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.

C. Examine threads on valve and mating pipe for form and cleanliness.

D. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.

E. Do not attempt to repair defective valves; replace with new valves.

3.2 VALVE INSTALLATION

A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

B. Locate valves for easy access and provide separate support where necessary.

C. Install valves in horizontal piping with stem at or above center of pipe.

D. Install valves in position to allow full stem movement.

E. Install valve tags. Comply with requirements in Section 220553 "Identification for Plumbing

Piping and Equipment" for valve tags and schedules.

3.3 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.

B. Select valves with the following end connections:

1. For Copper Tubing, NPS 2 and Smaller: Threaded ends except where solder-joint valve-end option is indicated in valve schedules below.

END OF SECTION

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 29 - 1

SECTION 22 05 29

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Metal pipe hangers and supports.

2. Trapeze pipe hangers.

3. Metal framing systems.

4. Fastener systems.

5. Equipment supports.

B. Related Sections:

1. Section 220548 "Vibration and Seismic Controls for Plumbing Piping and Equipment" for vibration isolation devices.

1.3 DEFINITIONS

A. MSS: Manufacturers Standardization Society of The Valve and Fittings Industry Inc.

1.4 PERFORMANCE REQUIREMENTS

A. Delegated Design: Design trapeze pipe hangers and equipment supports, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.

B. Structural Performance: Hangers and supports for plumbing piping and equipment must withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI 7.

1. Design supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 29 - 2

2. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.

3. Design seismic-restraint hangers and supports for piping and equipment.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: Signed and sealed by a qualified professional engineer. Show fabrication and installation details and include calculations for the following; include Product Data for components:

1. Trapeze pipe hangers.

2. Metal framing systems.

3. Pipe stands.

4. Equipment supports.

C. Delegated-Design Submittal: For trapeze hangers indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1. Detail fabrication and assembly of trapeze hangers.

2. Design Calculations: Calculate requirements for designing trapeze hangers.

1.6 INFORMATIONAL SUBMITTALS

A. Welding certificates.

1.7 QUALITY ASSURANCE

A. Structural Steel Welding Qualifications: Qualify procedures and personnel according to

AWS D1.1/D1.1M, "Structural Welding Code - Steel."

B. Pipe Welding Qualifications: Qualify procedures and operators according to ASME Boiler and

Pressure Vessel Code.

C. Where there is presence of train induced vibration and air pressure, or support of vibratory equipment, undercut anchor or anchors with documented fatigue test report must be used.

1.8 MEASUREMENT AND PAYMENT

A. Full compensation for all work under this Section must be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 29 - 3

PART 2 - PRODUCTS

2.1 METAL PIPE HANGERS AND SUPPORTS

A. Carbon-Steel Pipe Hangers and Supports:

1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.

2. Galvanized Metallic Coatings: Hot dipped galvanized.

3. Nonmetallic Coatings: Plastic coating, jacket, or liner.

4. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.

5. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.

2.2 TRAPEZE PIPE HANGERS

A. Description: MSS SP-69, Type 59, shop- or field-fabricated pipe-support assembly made from structural carbon-steel shapes with MSS SP-58 carbon-steel hanger rods, nuts, saddles, and U-bolts. Entire assembly must be hot-dipped galvanized.

2.3 METAL FRAMING SYSTEMS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. B-line; Eaton, Electrical Sector.

2. Flex-Strut Inc.

3. G-Strut.

4. Unistrut; Atkore International.

B. MFMA Manufacturer Metal Framing Systems:

1. Description: Shop- or field-fabricated pipe-support assembly for supporting multiple parallel pipes.

2. Standard: MFMA-4.

3. Channels: Continuous slotted steel channel with inturned lips.

4. Channel Nuts: Formed or stamped steel nuts or other devices designed to fit into channel slot and, when tightened, prevent slipping along channel.

5. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.

6. Metallic Coating: Hot-dipped galvanized.

2.4 FASTENER SYSTEMS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 29 - 4

1. Hilti, Inc.

2. Powers Fasteners.

3. Simpson Strong-Tie Co., Inc.

B. Mechanical-Expansion Anchors: Insert-wedge-type, stainless- steel anchors, for use in hardened portland cement concrete; with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.

2.5 PIPE POSITIONING SYSTEMS

A. Description: IAPMO PS 42, positioning system of metal brackets, clips, and straps for positioning piping in pipe spaces; for plumbing fixtures in commercial applications.

2.6 EQUIPMENT SUPPORTS

A. Description: Welded, shop- or field-fabricated equipment support made from structural carbon-steel shapes.

2.7 MISCELLANEOUS MATERIALS

A. Structural Steel: ASTM A 36/A 36M, carbon-steel plates, shapes, and bars; black and galvanized.

B. Grout: ASTM C 1107, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications.

1. Properties: Nonstaining, noncorrosive, and nongaseous.

2. Design Mix: 5000-psi, 28-day compressive strength.

PART 3 - EXECUTION

3.1 HANGER AND SUPPORT INSTALLATION

A. Metal Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.

B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated trapeze pipe hangers.

1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified for individual pipe hangers.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 29 - 5

2. Field fabricate from ASTM A 36/A 36M, carbon-steel shapes selected for loads being supported. Weld steel according to AWS D1.1/D1.1M.

C. Metal Framing System Installation: Arrange for grouping of parallel runs of piping, and support together on field-assembled metal framing systems.

D. Fastener System Installation:

1. Install mechanical-expansion anchors in concrete after concrete is placed and completely cured. Install fasteners according to manufacturer's written instructions.

E. Pipe Positioning-System Installation: Install support devices to make rigid supply and waste piping connections to each plumbing fixture.

F. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.

G. Equipment Support Installation: Fabricate from welded-structural-steel shapes.

H. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.

I. Install lateral bracing with pipe hangers and supports to prevent swaying.

J. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through openings at top of inserts.

K. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.

L. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.

3.2 EQUIPMENT SUPPORTS

A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.

B. Grouting: Place grout under supports for equipment and make bearing surface smooth.

C. Provide lateral bracing, to prevent swaying, for equipment supports.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 29 - 6

3.3 METAL FABRICATIONS

A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers and equipment supports.

B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations.

C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding;

appearance and quality of welds; and methods used in correcting welding work; and with the following:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove welding flux immediately.

4. Finish welds at exposed connections so no roughness shows after finishing and so contours of welded surfaces match adjacent contours.

3.4 ADJUSTING

A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.

B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches.

3.5 PAINTING

A. Touchup: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately after erecting hangers and supports. Use same materials as used for shop painting. Comply with

SSPC-PA 1 requirements for touching up field-painted surfaces.

1. Apply paint by brush or spray to provide a minimum dry film thickness of 2.0 mils.

B. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A 780.

3.6 HANGER AND SUPPORT SCHEDULE

A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.

B. Comply with MSS SP-69 for pipe-hanger selections and applications that are not specified in piping system Sections.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 29 - 7

C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.

D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.

E. Use carbon-steel pipe hangers and supports and metal framing systems and attachments for general service applications.

F. Use stainless-steel pipe hangers and stainless-steel attachments for hostile environment applications.

G. Use copper-plated pipe hangers and copper attachments for copper piping and tubing.

H. Use padded hangers for piping that is subject to scratching.

I. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated, stationary pipes NPS 1/2 to NPS 30.

2. Steel Pipe Clamps (MSS Type 4): For suspension of cold and hot pipes NPS 1/2 to

NPS 24 if little or no insulation is required.

3. U-Bolts (MSS Type 24): For support of heavy pipes NPS 1/2 to NPS 30.

4. Clips (MSS Type 26): For support of insulated pipes not subject to expansion or contraction.

J. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system

Sections, install the following types:

1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to

NPS 24.

2. Carbon- or Alloy-Steel Riser Clamps (MSS Type 42): For support of pipe risers NPS 3/4 to NPS 24 if longer ends are required for riser clamps.

K. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system

Sections, install the following types:

1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches for heavy loads.

2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations.

L. Saddles and Shields: Unless otherwise indicated and except as specified in piping system

Sections, install the following types:

1. Steel-Pipe-Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation that matches adjoining insulation.

2. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 29 - 8

3. Thermal-Hanger Shield Inserts: For supporting insulated pipe.

M. Comply with MSS SP-69 for trapeze pipe-hanger selections and applications that are not specified in piping system Sections.

N. Comply with MFMA-103 for metal framing system selections and applications that are not specified in piping system Sections.

O. Use mechanical-expansion anchors instead of building attachments where required in concrete construction.

P. Use pipe positioning systems in pipe spaces behind plumbing fixtures to support supply and waste piping for plumbing fixtures.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 53 - 1

SECTION 22 05 53

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Equipment labels.

2. Warning signs and labels.

3. Pipe labels.

4. Stencils.

5. Valve tags.

6. Warning tags.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

C. Equipment Label Schedule: Include a listing of all equipment to be labeled with the proposed content for each label.

D. Valve numbering scheme.

E. Valve Schedules: For each piping system to include in maintenance manuals.

1.4 MEASUREMENT AND PAYMENT

A. Full compensation for all work under this Section must be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 53 - 2

2.1 EQUIPMENT LABELS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Brady Corporation.

2. Brimar Industries, Inc.

3. Marking Services, Inc.

4. Seton Identification Products; a Brady Corporation company.

B. Metal Labels for Equipment:

1. Material and Thickness: stainless steel, 0.025-inch minimum thickness, and having predrilled or stamped holes for attachment hardware.

2. Letter Color: Black.

3. Background Color: White.

4. Minimum Label Size: Length and width vary for required label content, but not less than

2-1/2 by 3/4 inch.

5. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-quarters the size of principal lettering.

6. Fasteners: Stainless-steel rivets.

7. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

C. Label Content: Include equipment's Drawing designation or unique equipment number, Drawing numbers where equipment is indicated (plans, details, and schedules), and the

Specification Section number and title where equipment is specified.

D. Equipment Label Schedule: For each item of equipment to be labeled, on 8-1/2-by-11-inch (A4) bond paper. Tabulate equipment identification number, and identify Drawing numbers where equipment is indicated (plans, details, and schedules) and the Specification Section number and title where equipment is specified. Equipment schedule must be included in operation and maintenance data.

2.2 WARNING SIGNS AND LABELS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Brady Corporation.

2. Brimar Industries, Inc.

3. Marking Services Inc.

4. Seton Identification Products; a Brady Corporation company.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 53 - 3

B. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/8 inch thick, and having predrilled holes for attachment hardware.

C. Letter Color: Red.

D. Background Color: Yellow.

E. Maximum Temperature: Able to withstand temperatures up to 160 deg F.

F. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.

G. Minimum Letter Size: 1/2 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-quarters the size of principal lettering.

H. Fasteners: Stainless-steel rivets.

I. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

J. Label Content: Include caution and warning information plus emergency notification instructions.

2.3 PIPE LABELS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Brady Corporation.

2. Brimar Industries, Inc.

3. Craftmark Pipe Markers.

4. Marking Services Inc.

5. Seton Identification Products; a Brady Corporation company.

B. General Requirements for Manufactured Pipe Labels: Preprinted, color-coded, with lettering indicating service, and showing flow direction.

C. Pretensioned Pipe Labels: Precoiled, semirigid plastic formed to cover full circumference of pipe and to attach to pipe without fasteners or adhesive.

D. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.

E. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings; also include pipe size and an arrow indicating flow direction.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 53 - 4

1. Flow-Direction Arrows: Integral with piping-system service lettering to accommodate both directions or as separate unit on each pipe label to indicate flow direction.

2. Lettering Size: At least 1/2 inch for viewing distances up to 72 inches and proportionately larger lettering for greater viewing distances.

2.4 VALVE TAGS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Brady Corporation.

2. Brimar Industries, Inc.

3. Marking Services Inc.

4. Seton Identification Products; a Brady Corporation company.

B. Valve Tags: Stamped or engraved with 1/4-inch letters for piping system abbreviation and 1/2-inch numbers.

1. Tag Material: stainless steel, 0.025-inch minimum thickness, and having predrilled or stamped holes for attachment hardware.

2. Fasteners: Brass wire-link chain.

C. Valve Schedules: For each piping system, on 8-1/2-by-11-inch (A4) bond paper. Tabulate valve number, piping system, system abbreviation (as shown on valve tag), location of valve (room or space), normal-operating position (open, closed, or modulating), and variations for identification. Mark valves for emergency shutoff and similar special uses.

1. Valve-tag schedule must be included in operation and maintenance data.

2.5 WARNING TAGS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Brady Corporation.

2. Brimar Industries, Inc.

3. Craftmark Pipe Markers.

4. Marking Services Inc.

5. Seton Identification Products; a Brady Corporation company.

B. Description: Preprinted or partially preprinted accident-prevention tags of plasticized card stock with matte finish suitable for writing.

1. Size: Approximately 4 by 7 inches.

2. Fasteners: Brass grommet and wire.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 53 - 5

3. Nomenclature: Large-size primary caption such as "DANGER," "CAUTION," or "DO

NOT OPERATE."

4. Color: Safety yellow background with black lettering.

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean piping and equipment surfaces of substances that could impair bond of identification devices, including dirt, oil, grease, release agents, and incompatible primers, paints, and encapsulants.

3.2 GENERAL INSTALLATION REQUIREMENTS

A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.

B. Coordinate installation of identifying devices with locations of access panels and doors.

C. Install identifying devices before installing acoustical ceilings and similar concealment.

3.3 EQUIPMENT LABEL INSTALLATION

A. Install or permanently fasten labels on each major item of mechanical equipment.

B. Locate equipment labels where accessible and visible.

3.4 PIPE LABEL INSTALLATION

A. Piping Color Coding: Painting of piping is specified in Section 099123 "Interior Painting."

B. Pipe Label Locations: Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:

1. Near each valve and control device.

2. Near each branch connection, excluding short takeoffs for fixtures and terminal units.

Where flow pattern is not obvious, mark each pipe at branch.

3. Near penetrations through walls, floors, ceilings, and inaccessible enclosures.

4. At access doors, manholes, and similar access points that permit view of concealed piping.

5. Near major equipment items and other points of origination and termination.

6. Spaced at maximum intervals of 25 feet along each run. Reduce intervals to 10 feet in areas of congested piping and equipment.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 53 - 6

7. On piping above removable acoustical ceilings. Omit intermediately spaced labels.

C. Directional Flow Arrows: Arrows must be used to indicate direction of flow in pipes, including pipes where flow is allowed in both directions.

D. Pipe Label Color Schedule:

1. Domestic Water Piping

a. Background: Safety green.

b. Letter Colors: White.

2. Sanitary Waste and Storm Drainage Piping:

a. Background Color: Safety black.

b. Letter Color: White.

3.5 VALVE-TAG INSTALLATION

A. Install tags on valves and control devices in piping systems, except check valves, valves within factory-fabricated equipment units, shutoff valves, faucets, convenience and lawn-watering hose connections, and similar roughing-in connections of end-use fixtures and units. List tagged valves in a valve schedule.

B. Valve-Tag Application Schedule: Tag valves according to size, shape, and color scheme and with captions similar to those indicated in the following subparagraphs:

1. Valve-Tag Size and Shape:

a. Cold Water: 2 inches, round.

b. Hot Water: 2 inches, round.

2. Valve-Tag Colors:

a. Cold Water: Safety green.

b. Hot Water: Safety green.

3. Letter Colors:

a. Cold Water: White.

b. Hot Water: White.

3.6 WARNING-TAG INSTALLATION

A. Write required message on, and attach warning tags to, equipment and other items where required.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 53 - 7

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 1

SECTION 22 05 93

TESTING, ADJUSTING, AND BALANCING FOR PLUMBING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. TAB of domestic water system.

2. TAB of plumbing equipment:

a. Domestic hot-water in-line circulation pumps.

b. Existing General-duty air compressors.

3. Pipe-leakage test verification.

4. Testing, adjusting, and balancing of existing plumbing systems and equipment.

1.2 DEFINITIONS

A. AABC: Associated Air Balance Council.

B. NEBB: National Environmental Balancing Bureau.

C. TAB: Testing, adjusting, and balancing.

D. TABB: Testing, Adjusting, and Balancing Bureau.

E. TAB Specialist: An independent entity meeting qualifications to perform TAB work.

F. TDH: Total dynamic head.

1.3 PREINSTALLATION MEETINGS

A. TAB Conference: Conduct a TAB conference at Project site after approval of the TAB strategies and procedures plan, to develop a mutual understanding of the details. Provide a minimum of 14 days' advance notice of scheduled meeting time and location.

1. Minimum Agenda Items:

a. The Contract Documents examination report.

b. The TAB plan.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 2

c. Needs for coordination and cooperation of trades and subcontractors.

d. Proposed procedures for documentation and communication flow.

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: Within 30 60 90 days of Contractor's Notice to Proceed, submit documentation that the TAB specialist and this Project's TAB team members meet the qualifications specified in "Quality Assurance" Article.

B. Contract Documents Examination Report: Within 30 60 90 days of Contractor's Notice to

Proceed, submit the Contract Documents review report, as specified in Part 3.

C. Strategies and Procedures Plan: Within 30 60 90 days of Contractor's Notice to Proceed, submit

TAB strategies and step-by-step procedures, as specified in "Preparation" Article.

D. System Readiness Checklists: Within 30 60 90 days of Contractor's Notice to Proceed, submit system readiness checklists, as specified in "Preparation" Article.

E. Examination Report: Submit a summary report of the examination review required in

"Examination" Article.

F. Certified TAB reports.

G. Sample report forms.

H. Instrument calibration reports, to include the following:

1. Instrument type and make.

2. Serial number.

3. Application.

4. Dates of use.

5. Dates of calibration.

1.5 QUALITY ASSURANCE

A. TAB Specialists Qualifications, Certified by AABC:

1. TAB Field Supervisor: Employee of the TAB specialist and certified by AABC.

2. TAB Technician: Employee of the TAB specialist and certified by AABC.

B. Instrumentation Type, Quantity, Accuracy, and Calibration: Comply with requirements in

ASHRAE 111, Section 4, "Instrumentation."

C. ASHRAE 111 Compliance: Requirements in ASHRAE 111 applicable to analogous domestic water system and plumbing equipment balancing.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 3

D. ASHRAE 188 Compliance: Comply with balancing and report requirements, Section 8.3

"Balancing."

E. Code and Authorities Having Jurisdiction Compliance: TAB is required to comply with governing codes and requirements of authorities having jurisdiction.

1.6 FIELD CONDITIONS

A. Full Owner Occupancy: Owner will occupy the site and existing building during entire TAB period. Cooperate with Owner during TAB operations to minimize conflicts with Owner's operations.

B. Partial Owner Occupancy: Owner may occupy completed areas of building before Substantial

Completion. Cooperate with Owner during TAB operations to minimize conflicts with Owner's operations.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 TAB SPECIALISTS

A. Subject to compliance with requirements, engage one of the following available TAB specialists that may be engaged include, but are not limited to, the following:

1. <Insert TAB specialist's name>.

3.2 EXAMINATION

A. Examine the Contract Documents to become familiar with Project requirements and to discover conditions in systems designs that may preclude proper TAB of systems and equipment.

B. Examine installed systems for balancing devices, such as test ports, gauge cocks, thermometer wells, flow-control devices, and balancing valves and fittings. Verify that locations of these balancing devices are applicable for intended purpose and are accessible.

C. Examine approved submittals for plumbing systems and equipment.

D. Examine design data, including plumbing system descriptions, statements of design assumptions for environmental conditions and systems output, and statements of philosophies and assumptions about plumbing system and equipment controls.

E. Examine equipment performance data, including pump curves.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 4

1. Relate performance data to Project conditions and requirements, including pump system effects that can create undesired or unpredicted conditions that cause reduced capacities in all or part of a system.

2. Calculate pump system-effect factors to reduce performance ratings of plumbing equipment when installed under conditions different from the conditions used to rate equipment performance. Compare results with the design data and installed conditions.

F. Examine system and equipment installations, and verify that field quality-control testing, cleaning, and adjusting specified in individual Sections have been performed.

G. Examine test reports specified in individual system and equipment Sections.

H. Examine plumbing equipment and verify that bearings are greased, belts are aligned and tight, filters are clean, and equipment with functioning controls is ready for operation.

I. Examine temporary and permanent strainers. Verify that temporary strainer screens used during system cleaning and flushing have been removed and permanent strainers are installed and clean.

J. Examine control valves for proper installation for their intended function of isolating, throttling, diverting, or mixing fluid flows.

K. Examine system pumps to ensure absence of entrained air in the suction piping.

L. Examine operating safety interlocks and controls on plumbing equipment.

M. Report deficiencies discovered before and during performance of TAB procedures. Observe and record system reactions to changes in conditions. Record default set points if different from indicated values.

3.3 PREPARATION

A. Prepare a TAB plan that includes the following:

1. Equipment and systems to be tested.

2. Strategies and step-by-step procedures for balancing the systems.

3. Instrumentation to be used.

4. Sample forms with specific identification for all equipment.

B. Perform system-readiness checks of plumbing systems and equipment to verify system readiness for TAB work. Include, at a minimum, the following:

1. Domestic Water System:

a. Verify leakage and pressure tests on water distribution systems have been satisfactorily completed in accordance with applicable code and authority having jurisdiction.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 5

b. Water heaters are installed and functioning.

c. Piping is complete and all points of outlet are installed.

d. Water treatment is complete.

e. Systems are flushed, filled, and air purged.

f. Strainers are clean.

g. Control valves are functioning in accordance with the sequence of operation.

h. Shutoff and balance valves are 100 percent open.

i. Booster- and hot-water circulating pumps are operational and proper rotation is verified.

j. Pump gauge connections are installed directly at pump inlet and outlet flanges or in discharge and suction pipe prior to valves or strainers.

k. Variable-frequency controllers' startup is complete and safeties are verified.

l. Suitable access to balancing devices and equipment is provided.

2. Sanitary Sewage/Drainage System:

a. Leakage and pressure tests on sanitary sewage/drainage systems have been completed in accordance with applicable code and authority having jurisdiction requirements.

b. Piping is complete.

c. Sanitary sewage pumps/drainage pumps are operational.

d. Control valves are functioning in accordance with the sequence of operation.

e. Shutoff valves are 100 percent open.

f. Suitable access to equipment is provided.

3. Compressed-Air System:

a. Leakage and pressure tests on compressed air distribution system have been satisfactorily completed in accordance with Division 22 requirements.

b. Piping is complete and all points of outlet are installed.

c. Systems are flushed, filled, and air purged.

d. Strainers are clean.

e. Control valves are functioning in accordance with the sequence of operation.

f. Shutoff and balance valves are 100 percent open.

g. Compressors are operational and of proper rotation.

h. Gauge connections are installed directly at compressor inlet and outlet flanges prior to valves or strainers.

i. Variable-frequency controllers' startup is complete and safeties are verified.

j. Suitable access to balancing devices and equipment is provided,

3.4 GENERAL PROCEDURES FOR TESTING AND BALANCING

A. Perform testing and balancing procedures on each system in accordance with the procedures contained in AABC's "National Standards for Total System Balance" ASHRAE 111 NEBB's

"Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems" and in this Section.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 6

B. Cut insulation, pipes, and equipment casings for installation of test probes to the minimum extent necessary for TAB procedures.

1. Where holes for probes are required in piping or equipment, install pressure and temperature test plugs to seal systems.

2. Install and join new insulation that matches removed materials. Restore insulation, coverings, vapor barrier, and finish in accordance with Section 220716 "Plumbing

Equipment Insulation" and Section 220719 "Plumbing Piping Insulation."

C. Mark equipment and balancing devices, including valve position indicators and similar controls and devices, with paint or other suitable, permanent identification material to show final settings.

D. Take and report testing and balancing measurements in inch-pound (IP) and units.

3.5 GENERAL PROCEDURES FOR PLUMBING EQUIPMENT

A. Test, adjust, and balance plumbing equipment indicated on Drawings, including, but not limited to, the following:

1. Motors.

2. Domestic water booster pumps.

3. Domestic water in-line pumps.

4. Domestic water heaters.

5. Sanitary sewage pumps.

6. Drainage pumps.

7. Air compressors.

8. Vacuum pumps.

3.6 PROCEDURES FOR DOMESTIC WATER SYSTEMS

A. Prepare test reports for pumps and other equipment. Obtain approved submittals and manufacturer-recommended testing procedures. Crosscheck the summation of required equipment flow rates with system design flow rates.

B. Prepare schematic diagrams of systems' Record drawings piping layouts.

C. In addition to requirements in "Preparation" Article, prepare domestic water systems for testing and balancing as follows:

1. Check expansion tank for proper setting.

2. Check water heater for proper discharge temperature setting.

3. Check remotest point of outlet for adequate pressure.

4. Check flow-control valves for proper position.

5. Locate start-stop and disconnect switches, electrical interlocks, and motor controllers.

6. Verify that motor controllers are equipped with properly sized thermal protection.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 7

7. Check that air has been purged from the system.

D. Measure and record upstream and downstream pressure of each piece of equipment.

E. Measure and record upstream and downstream pressure of pressure-reducing valves.

F. Check settings and operation of automatic temperature-control valves, self-contained control valves, and pressure-reducing valves. Record final settings.

G. Check settings and operation of each safety valve. Record settings.

3.7 PROCEDURES FOR COMPRESSED-AIR SYSTEMS

A. Prepare test reports for air compressors, and other equipment. Obtain approved submittals and manufacturer-recommended testing procedures. Crosscheck the summation of required equipment flow rates with system design flow rates.

B. Prepare schematic diagrams of systems' Record drawings piping layouts.

C. In addition to requirements in "Preparation" Article, prepare compressed-air systems for testing and balancing as follows:

1. Check remotest point of outlet for adequate pressure.

2. Check pressure-control valves for proper position.

3. Locate start-stop and disconnect switches, electrical interlocks, and motor controllers.

4. Verify that motor controllers are equipped with properly sized thermal protection.

D. Measure and record upstream and downstream pressure of pressure-reducing valves.

E. Check settings and operation of pressure-reducing valves. Record final settings.

F. Check settings and operation of each safety valve. Record settings.

3.8 PROCEDURES FOR DOMESTIC HOT-WATER CIRCULATING INLINE PUMP

A. Balance system with manual or automatic balancing valves by setting at design flow.

1. Measure flow in main and branch pipes.

2. Adjust main and branch balance valves for design flow.

3. Re-measure each main and branch after all have been adjusted.

B. Adjust pump to deliver total design flow.

1. Measure pump TDH as follows:

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 8

a. Measure discharge pressure directly at the pump outlet flange or in discharge pipe prior to any valves.

b. Measure inlet pressure directly at the pump inlet flange or in suction pipe prior to any valves or strainers.

c. Convert pressure to head and correct for differences in gauge heights.

d. Verify pump impeller size by measuring the TDH with the discharge valve closed.

Note the point on manufacturer's pump curve at zero flow, and verify that the pump has the intended impeller size.

2. Monitor motor performance during procedures, and do not operate motor in an overloaded condition.

3. Mark final settings and verify that all memory stops have been set.

4. Verify final system conditions as follows:

a. Re-measure and confirm that total flow is within design.

b. Re-measure final pumps' operating data, TDH, volts, amps, speed, and static profile.

c. Mark final settings.

3.9 PROCEDURES FOR MOTORS

A. Motors 1/2 HP and Larger: Test at final balanced conditions and record the following data:

1. Manufacturer's name, model number, and serial number.

2. Motor horsepower rating.

3. Motor rpm.

4. Phase and hertz.

5. Nameplate and measured voltage, each phase.

6. Nameplate and measured amperage, each phase.

7. Starter size and thermal-protection-element rating.

8. Service factor and frame size.

B. Motors Driven by Variable-Frequency Controllers: Test manual bypass of controller to prove proper operation.

3.10 PROCEDURES FOR WATER HEATERS

A. Electric Water Heaters:

1. Measure and record entering- and leaving-water temperatures.

2. Measure and record water flow.

3. Measure and record pressure drop.

4. Measure and Record relief valve(s) pressure setting.

5. Capacity: Calculate in Btu/h of heating output.

6. Efficiency: Calculate operating efficiency for comparison to submitted equipment.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 9

B. Gas- and Oil-Fired Water Heaters:

1. Measure and record entering- and leaving-water temperatures.

2. Measure and record water flow.

3. Measure and record pressure drop.

4. Measure and Record relief valve(s) pressure setting.

5. Capacity: Calculate in Btu/h of heating output.

6. Fuel Consumption: If fuel supply is equipped with flow meter, measure and record consumption.

7. Efficiency: Calculate operating efficiency for comparison to submitted equipment.

8. Fan, motor, and motor controller operating data.

3.11 PROCEDURES FOR TESTING, ADJUSTING, AND BALANCING EXISTING

SYSTEMS

A. Perform a preconstruction inspection of existing equipment that is to remain and be reused.

1. Measure and record flows, temperatures, and pressures of each piece of equipment.

Compare the values to design or nameplate information, where information is available.

2. Measure motor voltage and amperage. Compare the values to motor nameplate information.

3. Check the condition of filters.

4. Check bearings and other lubricated parts for proper lubrication.

5. Report on the operating condition of the equipment and the results of the measurements taken. Report deficiencies.

B. TAB After Construction: Before performing testing and balancing of renovated existing systems, inspect existing equipment that is to remain and be reused to verify that existing equipment has been cleaned and refurbished in accordance with renovation scope indicated by

Contract Documents. Verify the following:

1. New filters are installed.

2. Bearings and other parts are properly lubricated.

3. Deficiencies noted in the preconstruction report are corrected.

C. Perform testing and balancing of existing systems to the extent that existing systems are affected by the renovation work.

1. Compare the indicated system flows of the renovated work to the measured flows, and determine the new pump speed.

2. Verify that the indicated system flows of the renovated work result in velocities and pump speeds that are within the acceptable limits defined by equipment manufacturer.

3. If calculations increase or decrease the system flow rates by more than 5 percent, make equipment adjustments to achieve the calculated rates. If increase or decrease is 5 percent or less, equipment adjustments are not required.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 10

3.12 TOLERANCES

A. Set plumbing system's flow rates within the following tolerances:

1. Domestic Water Flow Rate: Plus or minus 5 percent Plus or minus 10 percent Plus 10 percent or minus 5 percent. If design value is less than 10 gpm, within 10 percent.

2. Compressed-Air Flow Rate: Plus or minus 5 percent Plus or minus 10 percent Plus 10 percent or minus 5 percent. If design value is less than 10 gpm, within 10 percent.

3. Vacuum Flow Rate: Plus or minus 5 percent Plus or minus 10 percent Plus 10 percent or minus 5 percent.

3.13 PROGRESS REPORTING

A. Initial Construction-Phase Report: Based on examination of the Contract Documents as specified in "Examination" Article, prepare a report on the adequacy of design for system-balancing devices. Recommend changes and additions to system-balancing devices, to facilitate proper performance measuring and balancing. Recommend changes and additions to plumbing systems and general construction to allow access for performance-measuring and -balancing devices.

B. Status Reports: Prepare weekly biweekly monthly progress reports to describe completed procedures, procedures in progress, and scheduled procedures. Include a list of deficiencies and problems found in systems being tested and balanced. Prepare a separate report for each system and each building floor for systems serving multiple floors.

3.14 FINAL REPORT

A. General: Prepare a certified written report; tabulate and divide the report into separate sections for tested systems and balanced systems.

1. Include a certification sheet at the front of the report's binder, signed and sealed by the certified testing and balancing engineer.

2. Include a list of instruments used for procedures, along with proof of calibration.

3. Certify validity and accuracy of field data.

B. Final Report Contents: In addition to certified field-report data, include the following:

1. Pump curves.

2. Manufacturers' test data.

3. Field test reports prepared by system and equipment installers.

4. Other information relative to equipment performance; do not include Shop Drawings and

Product Data.

C. General Report Data: In addition to form titles and entries, include the following data:

1. Title page.

File Date: JULY 16, 2026 TECHNICAL SPECIFICATIONS Page 22 05 93 - 11

2. Name and address of the TAB specialist.

3. Project name.

4. Project location.

5. Architect's name and address.

6.…