This document is Attachment (F) to a solicitation for a Firm Fixed Price contract for Pump Transportation Services to be performed for the Naval Sea Systems Command (NAVSEA) at the Norfolk Naval Shipyard (NNSY). The attachment provides a summary of the key events and timeline for the transportation services, including the requirement for the contractor to secure all necessary permits, provide documentation to NNSY, arrive at NNSY for inspections and equipment setup, load the transport, depart for Westinghouse, and arrive at Westinghouse. The contract period of performance is anticipated to begin on June 3, 2024 and end on August 1, 2024. The solicitation is being issued as full and open competition, with a NAICS code of 484230 and a small business size standard of $34.0M.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Technical Capability Statement.docx | DOCX document | |
| NNSY OPSEC CONTRACT REQUIREMENT -ATTACHMENTG.pdf | ||
| ATTACHMENT E TRANS VEH REQUEST FORM.pdf | ||
| ATTACHMENT B.pdf | ||
| 4037-V100 ATTACHMENT A REVISED-.docx | DOCX document | |
| N4215824QE047.pdf | ||
| 4037V100-Attachment (D) Vehicle Assessment Checklist.docx | DOCX document | |
| ATTACHMENT C.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document No. 4037V100 Attachment (F)
ATTACHMENT (F)
PUMP TRANSPORT SERVICE SUMMARY OF KEY EVENTS
KEY EVENT
TIMELINE
CORRESPONDING
DATE/TIME
LOCATION
Contract Award N/A When awarded N/A
Contract Begins N/A JUNE 1, 2024 Attachment (A)
Section 1.A The Contractor shall apply for and secure all required State and Local Permits and Escorts
6 weeks from notification of the initial planned shipping date
TBD
Attachment (A) Section 2.E
The Contractor shall provide documents showing (1) the expected axle spacing and weight loadings as well as the method and calculations used to determine them and (2) the axle load limit values that will be on the permits
At least 3 weeks prior to the planned shipping date (preferably sooner, if possible)
Section 2.E.1
The Contractor shall provide all required personnel information to NNSY to obtain security accesses
At least 1 week prior to the initial arrival at NNSY (preferably sooner, if possible)
Section 1.B.2
The Contractor shall provide documentation to NNSY of citizenship and other information on company letter head
At least 1 week prior to arrival at NNSY
(preferably sooner, if possible)
Section 2.P
The Contractor shall provide trailer tie-down information to
NNSY
At least 1 week prior to arrival at NNSY
(preferably sooner, if possible)
Attachment (B)
Section 1.B
The Contractor shall provide off-yard routes to NNSY
Any time prior to arrival at NNSY (preferably as soon as possible)
Any time prior to arrival at NNSY
(preferably as soon as possible)
Section 2.L.1
The Contractor shall provide permits to NNSY
Any time prior to release of shipment.
Any time prior to release of shipment.
Attachment (A) Sections 1.G and 2.Q
Attachment (E) Middle of Page
Document No. 4037V100 Attachment (F)
ATTACHMENT (F)
PUMP TRANSPORT SERVICE SUMMARY OF KEY EVENTS
KEY EVENT
TIMELINE
CORRESPONDING
DATE/TIME
LOCATION
The Contractor shall arrive at
NNSY
N/A
Within 6 weeks after being notified by NNSY, at 6:00 AM or as permits allow
Attachment (A) Sections 1.B.1 and 2.J
Attachment (E) Top of Page 1
The Contractor shall arrive at NNSY for inspections and equipment setup of the Transport Vehicle(s)
2 days prior to loading
TBD, at 6:00 AM or as permits allow
Attachment (A) Sections 2.I and 2.J
Load Transport N/A TBD N/A The Contractor shall depart for
Westinghouse (Planned Shipping Date)
Attachment (E) Top of Page 1
The Contractor shall submit problem notifications (should any occur) to NNSY
Section 2.F
The Contractor shall submit DOT discrepancy or detected radioactivity notifications (should any occur) to NNSY
Section 2.O
Daily Driver check-ins (for loads in-transit greater than 1 day) with NNSY
Sections 1.G and 2.F.1
Attachment (E)
Bottom of
The Contractor shall arrive at
Westinghouse
TBD, between 7:00
AM and 12:00 PM or as permits allow
Section 1.E.1
Attachment (E) Top of Page 1
Contract Ends N/A AUGUST 1, 2024 Attachment (A)
Section 1.A Notes:
1. Transport Vehicle inspections (i.e., FMCSA, State, CVSA) are not included as they are expected to be performed outside of this Contract.
2. Attachment (F) does not replace the need to observe the remaining documentation of this Contract.