PUBMID008352 VDPS - Lincoln MIddle School BidPermit Set.pdf

PDF 5 MB Posted

Attached to
Interior Door Upgrades High School and Middle School
Solicitation number
RFP-VDPS-250000002363-2
Issued by
Macomb County, Westland City, Michigan

About this file

This document is a bid set for the Lincoln Middle School Roofing and Interior Door Improvements project for Van Dyke Public Schools, located at 22500 Federal Ave, Warren, MI 48089. The project involves renovation of two floors of an existing educational building, specifically focusing on replacing select doors on the first and second floors and replacing the roof. The scope does not include other building envelope improvements or structural updates. The project is designed as an Alteration Level 2 renovation, following the 2021 Michigan Rehabilitation Code, and will involve asbestos abatement to be performed by certified professionals.

The bid set includes detailed architectural plans, demolition plans, floor plans, and roofing details, with a project number VDP25 and dated for bidding on 04/09/2025. The building is classified as an E (Education) use group with Construction Type IIB, and has a total building area of 115,920 square feet. The project will involve replacing doors with new hollow metal doors and frames, with specific hardware requirements, and a comprehensive roof replacement using a two-ply modified bitumen membrane system. The drawings indicate careful consideration of existing conditions, with notes emphasizing the need to coordinate with district representatives and maintain existing building functionality during the renovation process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site

Building Code:

Mechanical Code:

Electrical Code:

Plumbing Code:

Energy Code:

Life Safety Code:

Use Group:

Construction Type:

Height, Building:

1 Story Area (T.O.M.)

2 Story Area (T.O.M.)

Area, Building:

Net Area:

Net Area Per Floor:

Work Area:

1st Floor:

2nd Floor:

2021 Michigan Rehabilitation Code Alteration Level 2

2021 Michigan Mechanical Code 2023 National Electrical Code (NEC) 2021 Michigan Plumbing Code 2015 Michigan Uniform Energy Code

2012 NFPA 101

E, Education

IIB

12'-0" 24'-0"

115,920 SF

12,333 SF

32,870 SF

12,225 SF

A. Asbestos abatement performed and inspected by certified entities will be required.

Project Number

ISSUE FOR BID:

NOT TO SCALE

OWNER

ARCHITECT

CITY, STATE, ZIP:

STREET:

COMPANY:

PHONE:

AOR:

CONTACT:

EMAIL:

COMPANY:

SITE MAP

SHEET INDEXPROJECT SCOPE NARRATIVEPROJECT TEAM

NAME:

Date:

Exp. Date:

Lic. No.

Ann Arbor, MI, 48103

2373 Oak Valley Drive

O|X Studio, Inc.

(734) 929-9000

Robb Burroughs

Matt Biglin mattb@oxstudioinc.com

Van Dyke Public Schools

ROBERT BURROUGHS

04-09-2025 04-22-2025

1301043972

SHEET

1 2 3 4 5 6

A

B

C

D

E a rc h it ec tu re co n st ru ct io o b je ct s

P

) 9

-9

F:

(7

) 9

-9 w w w

.o xs tu d io in c.

m

STREET:

CONTACT:

PHONE:

EMAIL:

11387 East Nine Mile Road

Jeffrey VanConant, Director of Facilities and Operations

Office: (586) 759-9439 Cell: (586) 634-3589 vanconant.jeff@vdps.net

Warren, MI 48089CITY, STATE, ZIP:

PROJECT MANAGER

CITY, STATE, ZIP:

STREET:

COMPANY:

PHONE:

PM:

CONTACT:

EMAIL:

Minneapolis, MN, 55402

80 South 8th Street, Suite 1850

Site LogiQ Design, LLC

(612) 770-4704

Tim Stevenson

Tim Stevenson tim.stevenson@sitelogiq.com

APPLICABLE CODES & LIFE SAFETY SUMMARY SPECIAL INSPECTIONS & TESTS

/9

/2

:3

:4

P M

VDP25

04/09/25

G-100

L in c o ln

M id d le

S c h o o l

R o o fi n g a n d

In te ri o r D o o r Im p ro v e m e n ts

Title Sheet

22500 Federal Ave, Warren, MI 48089

Lincoln Middle School - 2025 Roofing and Interior Door Improvements

F e d e ra l A v e

W a rr e n

M I

Sheet Number Sheet Name Current Revision Description

Current Revision Date

General

G-100 Title Sheet 100% CD 04/09/2025

G-101 General Information & Accessible Clearances 100% CD 04/09/2025

Demolition

AD-101 First Floor Demolition Plan - North 100% CD 04/09/2025

AD-102 First Floor Demolition Plan - South 100% CD 04/09/2025

AD-103 Second Floor Demolition Plan 100% CD 04/09/2025

Architectural

A-101 Floor Plans 100% CD 04/09/2025

A-401 Enlarged First Floor Plan - North 100% CD 04/09/2025

A-402 Enlarged First Floor Plan - South 100% CD 04/09/2025

A-403 Enlarged Second Floor Plan 100% CD 04/09/2025

A-701 Door & Frame Legend & Details 100% CD 04/09/2025

Roofing

R1.00 Overall Roof Area Plan 100% CD 04/09/2025

R1.01 Enlarged Roof Area Plans 100% CD 04/09/2025

R3.00 Roof Details 100% CD 04/09/2025

R5.00 Roof Details 100% CD 04/09/2025

22500 Federal Ave, Warren, MI

Renovation of 2 floors of existing Educational building. Select doors to be replaced on First and Second floor, and roof to be replaced. Other building envelope improvements and structural updates are not included as part of this scope.

# REVISION DATE

1 75% CD 03/21/2025

2 95% CD 04/03/2025

3 100% CD 04/09/2025

PT-1

A-101

SIM

101.1

XX

XX

1i

1t

A-101

SIM

Reference Text

Top #: Detail Number (Location on sheet)

Bottom #: Sheet on which detail is located

Typical Detail Bubble (applies to all detail types):

Detail plan view:

Dashed outline indicates area being detailed

Detail section view:

Tail indicates direction of section cut

Door number. See door and hardware schedule.

Window Type number.

See window schedule.

Accent paint location and paint identification. Accent paint color to be continuous for entire length of wall.

Electrical fixture tag

Lighting fixture tag

Plumbing fixture tag

Equipment tag

Extent of finish material replacement if not continuous for entire length of wall.

Indicates face of new construction to be aligned with face of existing construction to remain.

A

A-202

A-242

1 Ref

R ef

1 Ref

R ef

1000T

150 SF

Room name

Building section:

Arrow indicates direction of building section

Exterior elevation:

Arrow indicates face of structure being represented

Top #: Detail Number (Location on sheet)

Bottom #: Sheet on which detail is located

Reference Text

Detail Number (Location on sheet)

Sheet on which detail is located

Interior elevation:

Level Mark

New column grid

Keynotes:

See sheet notes, same sheet as symbol

Indicates room number Indicates room area

Room Tag:

Wall section:

Tail indicates direction of section cut

Target Elevation

A Existing column grid

+ 5'-0"

New construction / New door and frame shown open 90º.

Indicates change in flooring material.

A-101

SIM

A-202

SIM

A-202

SIM

A-101

Name

Elevation

Wall partition type tag0 S A.

1t

## ## ##.A Reference Keynotes

Sheet Keynotes

Existing construction to remain. Existing doors shown open 45º.

Wall Floor Base

North Wall Accent finish location and finish identification. Accent finish to be continuous for entire length of wall.

Wall finish

Floor finish

Wall base type

N

1 View Name A101 1/8" = 1'-0"

View title with Graphic Scale & North Arrow:

Detail number

Graphic scale of drawing

Sheet number

North Arrow (Direction varies per project)

Determine where 1' lies on the graphic scale

Reading the Graphic Scale:

4' 8' Measure to 1' on the sheet to determine the scale

4' - 8" (min) w cl os er

(m in

) o r

(m in

(m in closer & latch 12" (min) w/ w cl os er

(m in

) o r d o r

= Direction of Travel Approach

ADA Door and Maneuvering Clearances m in m in w cl o se r

(m in

) o r

(min)

2' - 0"

42" @ d=54"

36" @ d=60"

2' - 0"

(min)

1' - 6"

Door maneuvering clearances Clearances for doors in series

22" min.

m in m in . 24" min.

m in m in . 24" min.

32" min.

Opaque Assemblies:

Roofs Insulation Entirely above Deck R-30.0 c.i. (U-0.032) Metal Building R-19 + R-11 Ls (U-0.037) or R-25 + R-8 Ls Attic and Other: R-49.0 (U-0.021)

Walls, Above-Grade Mass Walls (Concrete, CMU) R-11.4 c.i. (U-0.090) Metal Building R-0 + R-19 c.i. (U-0.050) Steel-Framed R-13.0 + R-10 c.i. (U-0.055) Wood-Framed and Other R-13.0 + R-7.5 c.i. (U-0.051) or R-19 + R-5 c.i.

Walls, Below-Grade Below-Grade Walls (all) R-7.5 c.i. (C-0.119)

Floors (Exposed Beneath) Mass R-14.6 c.i. (U-0.057) Steel-Joist R-30.0 (U-0.038) Wood-Framed and Other R-30.0 (U-0.033)

Slab-On-Grade Floors Unheated R-15 for 24 in. (F-0.520) Heated R-20 for 48 in. (F-0.688)

Opaque Doors Swinging (U-0.500) Nonswinging (U-0.500)

Fenestration (Including glazed doors):

Vertical Glazing, 0% - 40% of wall Nonmetal framing (all) U-0.32 SHGC-0.40 VT/SHGC = 1.10 Metal framing

Fixed U-0.42 SHGC-0.40 VT/SHGC = 1.10 Operable U-0.50 SHGC-0.40 VT/SHGC = 1.10 Entrance Door U-0.77 SHGC-0.40 VT/SHGC = 1.10

Skylight, All Types 0% - 3% of Roof Uall-0.50 SHGCall-0.40 (No VT/SHGC req't.)

Values based on ASHRAE 90.1 - 2013, Climate Zone 5A, Non-Residential.

Project Number

ISSUE FOR BID:

NAME:

Date:

Exp. Date:

Lic. No.

ROBERT BURROUGHS

04-09-2025 04-22-2025

1301043972

SHEET

1 2 3 4 5 6

A

B

C

D

E a rc h it ec st ru ct je ct

) 9

-9

) 9

-9 w w w

.o xs tu d io in c.

/9

/2

:3

:4

P M

VDP25

04/09/25

G-101

L in c o ln

M id d le

S c h o o l

R o o fi n g a n d

In te ri o r D o o r Im p ro v e m e n ts

General Information & Accessible Clearances

F e d e ra l A v e

W a rr e n

M I

General Symbol Legend Graphic Scale LegendMinimum Insulation Values

# REVISION DATE

1 75% CD 03/21/2025

D1 D1

D1

D1

D1

D1

D2 D2 D2 D2

D2

D2

D2

D2

D1

D2

D3

D3

Existing construction to remain.

Demolition Floor Plan Legend

Existing construction to be demolished.

Project Number

ISSUE FOR BID:

NAME:

Date:

Exp. Date:

Lic. No.

ROBERT BURROUGHS

04-09-2025 04-22-2025

1301043972

SHEET

1 2 3 4 5 6

A

B

C

D

E a rc h it ec st ru ct je ct

) 9

-9

) 9

-9 w w w

.o xs tu d io in c.

/9

/2

:3

:5

P M

VDP25

04/09/25

AD-101

L in c o ln

M id d le

S c h o o l

R o o fi n g a n d

In te ri o r D o o r Im p ro v e m e n ts

First Floor Demolition Plan - North

F e d e ra l A v e

W a rr e n

M I

N

AD-101 1/8" = 1'-0"

8'4' 16'

1 Demo - First Floor North

General Sheet Notes:

A. Demolish existing interior construction as indicated.

B. All dimensions to be verified in field prior to construction. Notify

Architect of all discrepancies in layout prior to starting framing.

C. All existing materials to remain, U.N.O. Those damaged or otherwise disturbed by the contractor's operations shall be patched and repaired to match existing adjacent materials so that repair is imperceptible.

D. Contractor shall maintain all required exits unobstructed, illuminated, and protected from construction activities.

E. Contractor to clean areas adjacent to demolition area of dust, dirt and debris caused by demolition operations.

F. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate onsite. Transport demolished materials and legally dispose of them.

G. Contractor shall notify Architect of any conflicts between existing conditions and construction documents.

H. Area of demolition will require assessment for asbestos and potential abatement, by VDPS. Abatement must be conducted by a certified professional. Construction to coordinate with abatement as it occurs.

I. Salvage removed (mortise lock) hardware to Director of Building and Grounds. Coordinate with SIQ PM and District Representative.

Sheet Keynotes D1 Demolish existing door, frame, casing and hardware.

Coordinate removal with district asbestos consultant.

D2 Prep opening to receive new door and door frame.

D3 Prep door to receive new panic hardware. Existing door and hardware to remain.

Key Plan N

Courtyard

Wood Lab

Main Entry

Classroom

Metal Lab

Computer Lab

Media Center

Crafts Art

Gym

Cafeteria

Biology

Lab

Life Science

Classrooms

Classrooms

Instrumental Music

Special Ed.

Vocal Music FACSClassrooms

Reception

# REVISION DATE

1 75% CD 03/21/2025

D1

D1D1D1

D1 D1D1

D1

D1

D1

D1

D1

D1

D2

D2

D2

D2

D2 D2 D2

D2

D2D2D2

D2

D2 D2 D2

D1

D2

D1

D1

D2

D1

D2

D1

D2

D2

Existing construction to remain.

Demolition Floor Plan Legend

Existing construction to be demolished.

Project Number

ISSUE FOR BID:

NAME:

Date:

Exp. Date:

Lic. No.

ROBERT BURROUGHS

04-09-2025 04-22-2025

1301043972

SHEET

1 2 3 4 5 6

A

B

C

D

E a rc h it ec st ru ct je ct

) 9

-9

) 9

-9 w w w

.o xs tu d io in c.

/9

/2

:3

:5

P M

VDP25

04/09/25

AD-102

L in c o ln

M id d le

S c h o o l

R o o fi n g a n d

In te ri o r D o o r Im p ro v e m e n ts

First Floor Demolition Plan - South

F e d e ra l A v e

W a rr e n

M I

General Sheet Notes:

N

AD-102 1/8" = 1'-0"

8'4' 16'

1 Demo - First Floor South

Sheet Keynotes D1 Demolish existing door, frame, casing and hardware.

Coordinate removal with district asbestos consultant.

D2 Prep opening to receive new door and door frame.

A. Demolish existing interior construction as indicated.

B. All dimensions to be verified in field prior to construction. Notify

Architect of all discrepancies in layout prior to starting framing.

C. All existing materials to remain, U.N.O. Those damaged or otherwise disturbed by the contractor's operations shall be patched and repaired to match existing adjacent materials so that repair is imperceptible.

D. Contractor shall maintain all required exits unobstructed, illuminated, and protected from construction activities.

E. Contractor to clean areas adjacent to demolition area of dust, dirt and debris caused by demolition operations.

F. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate onsite. Transport demolished materials and legally dispose of them.

G. Contractor shall notify Architect of any conflicts between existing conditions and construction documents.

H. Area of demolition will require assessment for asbestos and potential abatement, by VDPS. Abatement must be conducted by a certified professional. Construction to coordinate with abatement as it occurs.

I. Salvage removed (mortise lock) hardware to Director of Building and Grounds. Coordinate with SIQ PM and District Representative. Key Plan N

Courtyard

Wood Lab

Main Entry

Classroom

Metal Lab

Computer Lab

Media Center

Crafts Art

Gym

Cafeteria

Biology

Lab

Life Science

Classrooms

Classrooms

Instrumental Music

Special Ed.

Vocal Music FACSClassrooms

Reception

# REVISION DATE

1 75% CD 03/21/2025

D2

D2

D2

D2

D2

D2

D2

D2

D2

D1

D1

D1

D1

D1

D1

D1

D1

D1

D3

D3

Existing construction to remain.

Demolition Floor Plan Legend

Existing construction to be demolished.

Project Number

ISSUE FOR BID:

NAME:

Date:

Exp. Date:

Lic. No.

ROBERT BURROUGHS

04-09-2025 04-22-2025

1301043972

SHEET

1 2 3 4 5 6

A

B

C

D

E a rc h it ec st ru ct je ct

) 9

-9

) 9

-9 w w w

.o xs tu d io in c.

/9

/2

:3

:5

P M

VDP25

04/09/25

AD-103

L in c o ln

M id d le

S c h o o l

R o o fi n g a n d

In te ri o r D o o r Im p ro v e m e n ts

Second Floor Demolition Plan

F e d e ra l A v e

W a rr e n

M I

General Sheet Notes:

Sheet Keynotes D1 Demolish existing door, frame, casing and hardware.

Coordinate removal with district asbestos consultant.

D2 Prep opening to receive new door and door frame.

D3 Prep door to receive new panic hardware. Existing door and hardware to remain.

N

AD-103 1/8" = 1'-0"

8'4' 16'

1 Demo - Second Floor

A. Demolish existing interior construction as indicated.

B. All dimensions to be verified in field prior to construction. Notify

Architect of all discrepancies in layout prior to starting framing.

C. All existing materials to remain, U.N.O. Those damaged or otherwise disturbed by the contractor's operations shall be patched and repaired to match existing adjacent materials so that repair is imperceptible.

D. Contractor shall maintain all required exits unobstructed, illuminated, and protected from construction activities.

E. Contractor to clean areas adjacent to demolition area of dust, dirt and debris caused by demolition operations.

F. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate onsite. Transport demolished materials and legally dispose of them.

G. Contractor shall notify Architect of any conflicts between existing conditions and construction documents.

H. Area of demolition will require assessment for asbestos and potential abatement, by VDPS. Abatement must be conducted by a certified professional. Construction to coordinate with abatement as it occurs.

I. Salvage removed (mortise lock) hardware to Director of Building and Grounds. Coordinate with SIQ PM and District Representative.

# REVISION DATE

1 75% CD 03/21/2025

2 95% CD 04/03/2025

3 100% CD 04/09/2025

Key Plan N

C la ss ro o m s

C la ss ro o m s

Faculty Lounge

C la ss ro o m

C la ss ro o m

C la ss ro

Media Center

Computer Lab

Classroom

Wood Lab

Metal Lab

Crafts

Art

Classroom

Classroom

Classroom

Classroom

Vocal Music

Classroom

Classroom

112.1 Life Science Lab

Classroom

Classroom

Classroom

Classroom

Instrumental Music

Special Ed. Classroom

FACS

Classroom

Classroom

Classroom

Classroom

Classroom

Classroom

CafeteriaKitchen

Gym

Stage

Classroom

Courtyard

Reception

A-401

Sim

Lab

Biology

Classroom

A-402

Sim

B Stair

A Stair

Architectural Floor Plan Legend

New Construction

Area Not in Scope

Align Symbol

Existing Construction to Remain

A. All dimensions to be verified in field prior to construction. Notify architect of all discrepancies prior to starting work.

B. All dimensions on plans are to face of finish face or column centerlines, Unless Noted Otherwise (U.N.O.)

C. Refer to sheet A-701 for Door Schedule.

D. Refer to sheets A-401 and A-402 for room occupancy loads.

Classroom

Classroom

Classroom

Classroom

Classroom

Classroom

Classroom

Classroom

Classroom

Classroom

Faculty Lounge

Project Number

ISSUE FOR BID:

NAME:

Date:

Exp. Date:

Lic. No.

ROBERT BURROUGHS

04-09-2025 04-22-2025

1301043972

SHEET

1 2 3 4 5 6

A

B

C

D

E a rc h it ec st ru ct je ct

) 9

-9

) 9

-9 w w w

.o xs tu d io in c.

/9

/2

:3

:5

P M

VDP25

04/09/25

A-101

L in c o ln

M id d le

S c h o o l

R o o fi n g a n d

In te ri o r D o o r Im p ro v e m e n ts

Floor Plans

F e d e ra l A v e

W a rr e n

M I

N A-101 1/32" = 1'-0"

32'16' 64'

2 Overall First Floor Plan

General Sheet Notes:

N A-101 1/32" = 1'-0"

32'16' 64'

1 Overall Second Floor Plan

# REVISION DATE

1 75% CD 03/21/2025

UP

UP

4782 SF

Media Center

Computer Lab

Classroom

Wood Lab

Metal Lab

754 SF

Crafts

888 SF

Art

729 SF

Classroom

Courtyard

754 SF

Classroom

101 103 104

105B

106B

105A

106A

1121 SF

Lab

738 SF

Biology

763 SF

Classroom

1096 SF

Lab

37 Occ. 37 Occ. 44 Occ. 36 Occ.

22 Occ.

36 Occ. 21 Occ.

38 Occ.

47 Occ.

B Stair

A Stair128

A. All dimensions to be verified in field prior to construction. Notify architect of all discrepancies prior to starting work.

B. All dimensions on plans are to face of finish face or column centerlines, Unless Noted Otherwise (U.N.O.)

C. Refer to sheet A-701 for Door Schedule.

D. Refer to sheets A-401 and A-402 for room occupancy loads.

Project Number

ISSUE FOR BID:

NAME:

Date:

Exp. Date:

Lic. No.

ROBERT BURROUGHS

04-09-2025 04-22-2025

1301043972

SHEET

1 2 3 4 5 6

A

B

C

D

E a rc h it ec st ru ct je ct

) 9

-9

) 9

-9 w w w

.o xs tu d io in c.

/9

/2

:3

:5

P M

VDP25

04/09/25

A-401

L in c o ln

M id d le

S c h o o l

R o o fi n g a n d

In te ri o r D o o r Im p ro v e m e n ts

Enlarged First Floor Plan - North

F e d e ra l A v e

W a rr e n

M I

General Sheet Notes:

N A-401 1/8" = 1'-0"

8'4' 16'

1 Enlarged First Floor Plan - North

Key Plan N

Courtyard

Wood Lab

Main Entry

Classroom

Metal Lab

Computer Lab

Media Center

Crafts Art

Gym

Cafeteria

Biology

Lab

Life Science

Classrooms

Classrooms

Instrumental Music

Special Ed.

Vocal Music FACSClassrooms

Reception

# REVISION DATE

1 75% CD 03/21/2025

2048 SF

Instrumental Music

779 SF

Classroom

764 SF

Classroom

766 SF

Classroom

760 SF

Classroom

374 SF

Classroom

773 SF

Classroom

1425 SF

Special Ed. Classroom

1863 SF

Vocal Music

1719 SF

FACS

957 SF

Classroom

944 SF

Classroom

1272 SF

112.1

Life Science Lab

766 SF

Classroom

760 SF

Classroom

110A 114

110B

111A

111B

112A

112B 113

126B126A 127A

127B

123A124B124A

117 118 119 120 121 122

123C

108 109

737 SF

Classroom

775 SF

Classroom

36 Occ.

38 Occ.

25 Occ.

38 Occ.

47 Occ.

47 Occ.

47 Occ.

37 Occ.

34 Occ.

40 Occ. 62 Occ.

38 Occ. 18 Occ. 38 Occ. 38 Occ. 38 Occ. 38 Occ.

123B

763 SF

Classroom

38 Occ.

1121 SF

Lab

991 SF

Classroom

1096 SF

Lab

738 SF

Biology

763 SF

Classroom

105A

986 SF

Classroom

Student Drop Zone

A. All dimensions to be verified in field prior to construction. Notify architect of all discrepancies prior to starting work.

B. All dimensions on plans are to face of finish face or column centerlines, Unless Noted Otherwise (U.N.O.)

C. Refer to sheet A-701 for Door Schedule.

D. Refer to sheets A-401 and A-402 for room occupancy loads.

Project Number

ISSUE FOR BID:

NAME:

Date:

Exp. Date:

Lic. No.

ROBERT BURROUGHS

04-09-2025 04-22-2025

1301043972

SHEET

1 2 3 4 5 6

A

B

C

D

E a rc h it ec st ru ct je ct

) 9

-9

) 9

-9 w w w

.o xs tu d io in c.

/9

/2

:3

:5

P M

VDP25

04/09/25

A-402

L in c o ln

M id d le

S c h o o l

R o o fi n g a n d

In te ri o r D o o r Im p ro v e m e n ts

Enlarged First Floor Plan - South

F e d e ra l A v e

W a rr e n

M I

N A-402 1/8" = 1'-0"

8'4' 16'

1 Enlarged First Floor Plan - South

General Sheet Notes:

Key Plan N

Courtyard

Wood Lab

Main Entry

Classroom

Metal Lab

Computer Lab

Media Center

Crafts Art

Gym

Cafeteria

Biology

Lab

Life Science

Classrooms

Classrooms

Instrumental Music

Special Ed.

Vocal Music FACSClassrooms

Reception

# REVISION DATE

1 75% CD 03/21/2025

DN

859 SF

Classroom

835 SF

Classroom

841 SF

Classroom

Restroom

812 SF

Classroom

801 SF

Classroom

854 SF

Classroom

Stor.

825 SF

Classroom

834 SF

Classroom

B Stair

Restroom

801 SF

Classroom

848 SF

Classroom

654 SF

Faculty Lounge

Corridor

Storage Storage

A Stair

73 74

75 76 77 78

209B

209A

42 Occ.

41 Occ.

40 Occ.

40 Occ. 42 Occ.

42 Occ.

41 Occ.

41 Occ.

6 Occ.

40 Occ.

42 Occ.

Architectural Floor Plan Legend

New Construction

Area Not in Scope

Align Symbol

Existing Construction to Remain

A. All dimensions to be verified in field prior to construction. Notify architect of all discrepancies prior to starting work.

B. All dimensions on plans are to face of finish face or column centerlines, Unless Noted Otherwise (U.N.O.)

C. Refer to sheet A-701 for Door Schedule.

D. Refer to sheets A-401 and A-402 for room occupancy loads.

Project Number

ISSUE FOR BID:

NAME:

Date:

Exp. Date:

Lic. No.

ROBERT BURROUGHS

04-09-2025 04-22-2025

1301043972

SHEET

1 2 3 4 5 6

A

B

C

D

E a rc h it ec st ru ct je ct

) 9

-9

) 9

-9 w w w

.o xs tu d io in c.

/9

/2

:3

:5

P M

VDP25

04/09/25

A-403

L in c o ln

M id d le

S c h o o l

R o o fi n g a n d

In te ri o r D o o r Im p ro v e m e n ts

Enlarged Second Floor Plan

F e d e ra l A v e

W a rr e n

M I

N A-403 1/8" = 1'-0"

8'4' 16'

1 Enlarged Second Floor Plan

General Sheet Notes:

Sheet Keynotes

# REVISION DATE

1 75% CD 03/21/2025

2 95% CD 04/03/2025

3 100% CD 04/09/2025

Key Plan N

C la ss ro o m s

C la ss ro o m s

Faculty Lounge

C la ss ro o m

C la ss ro o m

C la ss ro

Door Opening 6" at Corner (UON)

D o o r

O p en in g

Door Type D1

Per schedule

P er s ch ed u le

6"

Door Type D2

Per schedule

P er s ch ed u le

6" 6"

Frame Type F1

2" Per schedule 2"

P er s ch ed u le

Door Hardware (Measured floor to center of hardware)

(K n ob an d

P an ic E xi t

P u ll H an dl e

P u sh P la te

Hollow Metal Door

Frame Anchor

Hollow Metal Door Frame

Backer Rod and Sealant 1/2" Min.

1/

U .O

.N

/8

1"

Door, refer to plan and schedule for type

Precast Concrete Lintel

Masonry Embedded Flashing System

Backer Road and Sealant

Hollow Metal Door Frame, Grouted

Project Number

ISSUE FOR BID:

NAME:

Date:

Exp. Date:

Lic. No.

ROBERT BURROUGHS

04-09-2025 04-22-2025

1301043972

SHEET

1 2 3 4 5 6

A

B

C

D

E a rc h it ec st ru ct je ct

) 9

-9

) 9

-9 w w w

.o xs tu d io in c.

/9

/2

:3

:5

P M

VDP25

04/09/25

A-701

L in c o ln

M id d le

S c h o o l

R o o fi n g a n d

In te ri o r D o o r Im p ro v e m e n ts

Door & Frame Legend & Details

F e d e ra l A v e

W a rr e n

M I

Door Type Legend

Door Schedule

Mark Room Name

Door Frame Door Hardware

Set Fire Rating**Width* Height* Thickness* Type Material Finish Type Material Finish

100 Media Center 6' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT M.04 20 min.

101 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

102 Crafts 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

103 Art 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

104 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

105A Lab 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

105B Lab 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

106A Biology 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

106B Biology 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

107 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

108 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

109 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

110A Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

110B Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

111A Lab 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

111B Lab 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

112A Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

112B Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

113 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

114 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

115 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

116 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

117 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

118 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

119 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

120 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

121 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

122 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

123A Special Ed. Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

123B Special Ed. Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

123C Instrumental Music 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.03 20 min.

124A Instrumental Music 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.03 20 min.

124B Instrumental Music 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.03 20 min.

125 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

126A Vocal Music 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.03 20 min.

126B Vocal Music 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.03 20 min.

127A FACS 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

127B FACS 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

128 Stair 6' - 0" 7' - 0" 0' - 1 3/4" Existing Existing Existing Existing Existing Existing M.06 ---

129 Stair 6' - 0" 7' - 0" 0' - 1 3/4" Existing Existing Existing Existing Existing Existing M.06 ---

200 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

201 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

202 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

203 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

204 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

205 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

206 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

207 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.

208 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

209A Faculty Lounge 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

209B Faculty Lounge 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.02 20 min.

210 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.

228 Stair 6' - 0" 7' - 0" 0' - 1 3/4" Existing Existing Existing Existing Existing Existing M.06 ---

229 Stair 6' - 0" 7' - 0" 0' - 1 3/4" Existing Existing Existing Existing Existing Existing M.06 ---

Door Frame Legend

Door Hardware Heights Diagram

General Sheet Notes:

A-701 3" = 1'-0" 4"2" 8"

2 HM Door Jamb Detail @ CMU A-701 3" = 1'-0"

4"2" 8"

1 HM Door Head Detail @ CMU

A. Refer to specifications for additional door hardware requirements, including submittal requirements.

Note:

* Verify all door sizes in field. Dimensions of new doors and frames to match existing.

** Verify existing fire rating for the doors being replaced, and replace in-kind for any doors with existing ratings greater than newly noted ratings.

# REVISION DATE

1 75% CD 03/21/2025

COURTYARD

3/

/2

9:

:1

AM

VDP25

03/20/25

Li nc ol n

M id dl e

Sc ho ol

R oo fin g an d In te rio r D oo r I m pr ov em en ts

ROOF AREA PLANS -

OVERALL ROOF PLAN

AND ROOF AREAS

1,2,4,5,6,8,9

Fe de ra l A ve

, W ar re n, M I 4

R1.00

Project Number

ISSUE FOR BID:

SHEET

1 2 3 4 5 6

A

B

C

D

E

1 03/21/202575% CD

2 04/09/2025100% CD

# REVISION DATE

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R3.00

R3.00

SIM 4

R3.00

R5.00

R5.00

R3.00

R5.00

R5.00

R5.00

REMOVE EXISTING

PENETRATIONS IN THIS

LOCATION; COVER

OPENINGS IN THE DECK

WITH NEW METAL

DECKING IN MATCHING

PROFILE.

R5.00

R5.00

R3.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

AR

EA

N O

T

IN

C O

N

TR

AC

T

AR

EA

N O

T

IN

C O

N

TR

AC

T

AR

EA

N O

T

IN

C O

N

TR

AC

T

AREA NOT IN CONTRACT AREA NOT IN CONTRACT

R5.00

R3.00

R5.00

REMOVE EXISTING

CURB IN THIS

LOCATION; COVER

OPENINGS IN THE DECK

WITH NEW METAL

DECKING IN MATCHING

PROFILE.

REMOVE EXISTING CURB IN THIS LOCATION;

COVER OPENINGS IN THE DECK WITH NEW

METAL DECKING IN MATCHING PROFILE.

REMOVE EXISTING

CURB IN THIS

LOCATION; COVER

OPENINGS IN THE DECK

WITH NEW METAL

DECKING IN MATCHING

PROFILE.

R3.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R5.00

R3.00

R5.00

ROOF AREA 2

0 8' 16'4'SCALE:R1.00 3/32" = 1'-0"

1 ROOF AREA PLAN - ROOF AREAS 1 & 2

0 8' 16'4'SCALE:R1.00 3/32" = 1'-0"

2 ROOF AREA PLAN - ROOF AREAS 4, 5, & 6

0 8' 16'4'SCALE:R1.00 3/32" = 1'-0"

3 ROOF AREA PLAN - ROOF AREAS 7 & 8

RO

O

F

AR

EA

ROOF AREA 4ROOF AREA 4

ROOF AREA 5

ROOF AREA 6

ROOF AREA 8

ROOF AREA 9

R5.00

R5.00

157'

10' 33'

165'

183'-6"

76'

55'

29'

153'

75'

28'63'

96'

NORTH NORTH

NORTH ARROW

ANNOTATIONS

AREA NOT

IN CONTRACT

NORTH POINT

DETAIL NO.

DETAIL REFERENCE

SHEET NO.

CONDITION IS SIMILAR

TO DETAIL NO.

SIM

R5.00

ROOF AREA TAG

ROOF NO.

ROOF AREA

NORTH

LEGEND

CURB

ROOF DRAIN & SUMP

ROOF HATCH

HEAT STACK

POURABLE SEALER POCKET

PIPE PENETRATION

ROOF PARAPET/

SEPARATION JOINT

ROOF EDGE

CURB, SCHEDULED

FOR REMOVAL

FAN CURB

UNIT ON SLEEPER CURB

NORTH

11'

70'

0 32' 64' 128'SCALE:R1.00 1/64" = 1'-0"

A OVERALL ROOF AREA PLAN

ROOF AREA 1

ROOF AREA 2

ROOF AREA 4

ROOF AREA 5 ROOF AREA 8

ROOF AREA 6 ROOF AREA 9

AREA NOT IN CONTRACT

AREA NOT IN CONTRACT

AREA NOT IN CONTRACT

AREA NOT IN CONTRACT

2' 2'

TYP NEW ROOF SYSTEM, REFER

TO NEW ROOF SECTION FOR

ASSEMBLY COMPONENTSFLAT INSULATION

BOARD

0" TO 1" X 24" WOODFIBER

TAPERED EDGE STRIP

CAST IRON STRAINER AND

DRAIN BOWL ASSEMBLY 30" x 30" FOUR-POUND

LEAD STIFFENING PLATE

STRIPPING PLIES

6" MIN

NEW AND EXISTING WOOD BLOCKING - TYPICAL;

AS NECESSARY TO ACHIEVE INSULATION &

FLASHING HEIGHT

℄ OF DRAIN AND SUMP

TYP NEW ROOF SYSTEM, REFER

TO NEW ROOF SECTION FOR

ASSEMBLY COMPONENTS

6" MINIMUM; STAGGER NEW AND

EXISTING INSULATION BOARDS

1. REMOVE EXISTING WET INSULATION BOARDS UNTIL DRY DECK CAN BE

OBSERVED AROUND FULL PERIMETER OF IDENTIFIED WET INSULATION.

2. NEW INSULATION BOARDS, MECHANICALLY ATTACHED, TO MATCH HEIGHT

OF NEW INSULATION SYSTEM OVER EXISTING ROOF ASSEMBLY. FINISHED

HEIGHT WILL BE A CONSISTENT SURFACE WITHOUT DEPRESSION.

PROVIDE FASTENERS AS NECESSARY TO

PROPERLY SECURE INSULATION BOARDS AND

MEET SECUREMENT REQUIREMENTS

3/

/2

9:

:1

AM

VDP25

03/20/25

Li nc ol n

M id dl e

Sc ho ol

R oo fin g an d In te rio r D oo r I m pr ov em en ts

EXSITING AND NEW

TYPICAL ROOF SECTIONS

Fe de ra l A ve

, W ar re n, M I 4

R3.00

Project Number

ISSUE FOR BID:

SHEET

1 2 3 4 5 6

A

B

C

D

E

1 03/21/202575% CD

2 04/09/2025100% CD

# REVISION DATE

ROOF AREA: 1, 2, 4, 5, 6, 8, 9

NOTE: ALL COMPONENTS ARE EXISTING AND ARE TO BE REMOVED UNLESS DESIGNATED TO REMAIN

TYPE B STEEL ROOF DECK TO REMAIN

2" POLYISOCYANURATE

INSULATION BOARD TO REMAIN

1/2" FIBERGLASS INSULATION BOARD TO REMAIN

MULTI-PLY COAL TAR PITCH MEMBRANE

TO REMAIN

GRAVEL SURFACING; LOOSE GRAVEL SURFACING

TO BE REMOVED. GRAVEL ADHERED IN COAL-TAR

PITCH MEMBRANE TO REMAIN

ROOF AREA: 1, 2, 4, 5, 6, 8, 9

NOTE: ALL COMPONENTS NEW UNLESS DESIGNATED AS EXISTING

SECUREMENT PLATE AND FASTENER

(NOT SHOWN IN DETAILS FOR CLARITY)

EXISTING POLYISOCYANURATE INSULATION

EXISTING TYPE B STEEL ROOF DECK

(EXISTING DECK)

EX

IS

TI

N

G

IN

SU

LA

TI

O

N B

O

AR

D (S

O M

E

LA

YE

RS

N O

T

SH

O W

N

IN

D

ET

AI

LS

F O

R

CL

AR

IT

Y)

1/2" HIGH DENSITY POLYISOCYANURATE COVERBOARD;

MECHANICALLY ATTACHED THROUGH EXISTING ROOF SYSTEM

(INSULATION BOARD)

EXISTING FIBERGLASS INSULATION BOARD

EXISTING GRAVEL SURFACED MULTI-PLY

COAL-TAR PITCH MEMBRANE

1/4" GYPSUM COVERBOARD; SET IN LOW-RISE ADHESIVE OVER

NEW HIGH DENSITY POLYISOCYANURATE COVERBOARD

(COVERBOARD)

2-PLY MODIFIED BITUMEN BASE SHEET AND GRANULAR

CAP SHEET; SET IN COLD APPLIED ADHESIVE

(MEMBRANE)

R3.00

SUMP PERIMETER TO HAVE CONSTANT

INSULATION THICKNESS AROUND PERIMETER

0 2" 4" 8"SCALE:R3.00 3" = 1'-0"

6 WALL SECTION - ROOF AREA 1 TO ROOF AREA 2

R5.00

R5.00

0 2" 4" 8"SCALE:R3.00 3" = 1'-0"

1 EXISTING ROOF SECTIONS

0 2" 4" 8"SCALE:R3.00 3" = 1'-0"

2 NEW ROOF SECTIONS

SCALE: 0 2' 4'1'R3.00 3/8" = 1'-0"

3 TYPICAL INSULATION DRAIN SUMP

0 2" 4" 8"SCALE:R3.00 3" = 1'-0"

4 TYPICAL DRAIN SECTION

0 2" 4" 8"SCALE:R3.00 3" = 1'-0"

5 TYPICAL WET INSULATION REPLACEMENT SECTION

SELF ADHERING

MEMBRANE

METAL EDGE

NEOPRENE GASKETED FASTENER; 4"O.C.

CONTINUOUS

CLEAT

4"6"

NAIL WOOD CANT TO BLOCKING; 2 ROWS OF

FASTENERS STAGGERED, EACH ROW 12" O.C.

BASE FLASHING

TYP NEW ROOF SYSTEM, REFER TO

NEW ROOF SECTION FOR

ASSEMBLY COMPONENTS

1-0" TO 0-0" x 12" TAPERED EDGE STRIP

AT EXISTING WOOD BLOCKING EDGE

FOR POSITIVE DRAINAGE. ADJUST AS

NECESSARY TO FIELD CONDITIONS.

EXISTING WOOD BLOCKING; ADD NEW WOOD

BLOCKING AS NECESSARY TO ACCOMMODATE

NEW INSULATION HEIGHT AND MAINTAIN

POSITIVE DRAINAGE AWAY FROM THE EDGE

EXISTING MASONRY

WALL ASSEMBLY

4"6"

TYP NEW ROOF

SYSTEM, REFER TO

NEW ROOF SECTION

FOR ASSEMBLY

COMPONENTS

SELF-ADHERING MEMBRANE

BASE FLASHING

FLAT SEAM METAL PANEL

CANT STRIP

METAL DIVIDER CAP

FASTENER WITH

NEOPRENE

GASKET; 24" O.C.

NEW AND EXISTING WOOD BLOCKING - TYPICAL;

AS NECESSARY TO ACHIEVE INSULATION &

FLASHING HEIGHT

4"6"

WOOD CANT

TYP NEW ROOF

SYSTEM, REFER TO

NEW ROOF SECTION

FOR ASSEMBLY

COMPONENTS

SELF-ADHERING MEMBRANE

BASE FLASHING

FLAT SEAM METAL PANEL

METAL DIVIDER CAP

FASTENER WITH NEOPRENE GASKET; 24" O.C.

NEW AND EXISTING WOOD BLOCKING - TYPICAL;

AS NECESSARY TO ACHIEVE INSULATION &

FLASHING HEIGHT

IF EXISTING ROOF SYSTEM IS DISTURBED

BY NEW WOOD BLOCKING PROVIDE

NEW BASE FLASHING MEMBRANE

COMPATIBLE WITH EXISTING ROOF SYSTEM;

INSTALLED IN ACCORDANCE WITH

MANUFACTURE'S REQUIREMENTS

AND RECOMMENDATIONS

EXISTING ROOF SYSTEM AND

COMPONENTS TO REMAIN

4"6"

TYP NEW ROOF

SYSTEM, REFER TO

NEW ROOF SECTION

FOR ASSEMBLY

COMPONENTS

BASE FLASHING

FLAT SEAM METAL PANEL

CANT STRIP

NEW AND EXISTING WOOD BLOCKING - TYPICAL;

AS NECESSARY TO ACHIEVE INSULATION &

FLASHING HEIGHT

PREFAB. INSULATED METAL CURB

EXISTING PREFAB. COUNTERFLASHING

EXISTING MECHANICAL/SKYLIGHT ASSEMBLY

TF TAPE

4"6"

TYP NEW ROOF

SYSTEM, REFER TO

NEW ROOF SECTION

FOR ASSEMBLY

COMPONENTS

BASE FLASHING

FLAT SEAM METAL PANEL

CANT STRIP

NEW AND EXISTING WOOD BLOCKING - TYPICAL;

AS NECESSARY TO ACHIEVE INSULATION &

FLASHING HEIGHT

PREFAB. COUNTERFLASHING

TF TAPE

PREFAB. METAL CURB ASSEMBLY

HATCH ASSEMBLY

4"

TYP NEW ROOF SYSTEM, REFER TO

NEW ROOF SECTION FOR ASSEMBLY

COMPONENTS

LEAD PIPE FLASHING

TOP OF FLANGE ROLLED INTO PIPE ±1"

EXISTING PIPE PENETRATION

SEALANT

6" FLANGE SET IN MASTIC OVER FIELD PLIES

STRIPPING PLIES

M

IN

IM

UM

4"

NEW AND EXISTING WOOD BLOCKING - TYPICAL;

AS NECESSARY TO ACHIEVE INSULATION &

FLASHING HEIGHT

RAIN HOOD

HIGH TEMPERATURE SEALANT

STAINLESS STEEL CLAMP

STAINLESS STEEL CLAMP

EXISTING HIGH TEMPERATURE STACK PIPE

22 GA. GALV. PAN

SEALANT

6" FLANGE SET IN MASTIC OVER FIELD PLIES

STRIPPING PLIES

TYP NEW ROOF SYSTEM, REFER TO

NEW ROOF SECTION FOR ASSEMBLY

COMPONENTS

HIGH TEMPERATUER INSULATION

4"

NEW AND EXISTING WOOD BLOCKING - TYPICAL;

AS NECESSARY TO ACHIEVE INSULATION &

FLASHING HEIGHT

TYP NEW ROOF SYSTEM, REFER

TO NEW ROOF SECTION FOR

ASSEMBLY COMPONENTS

NON-SHRINK GROUT

POURABLE SEALER

RAIN HOOD

SEALANT

STAINLESS STEEL CLAMP

EXISTING PIPE PENETRATION

22 GA. GALV. PAN

SEALANT

6" FLANGE SET IN MASTIC OVER FIELD PLIES

STRIPPING PLIES

INSULATION

IN-FILL

BASE FLASHING

FLAT SEAM METAL PANEL

CANT STRIP

EXISTING COTTON ROPE WICK AT 16" O.C. CLEAN ROPE

WEEPS FREE OF SEALANT AND REPLACE AS NECESSARY.

FACE-FASTENED METAL COUNTERFLASHING

EXISTING THROUGH WALL FLASHING; REMOVE EXISTING

SEALANT BLOCKING THROUGH WALL WEEPS.

4"6"

TYP NEW ROOF SYSTEM,

REFER TO NEW ROOF

SECTION FOR ASSEMBLY

COMPONENTS

BA

SE

F

LA

SH

IN

G

TO

E

XT

EN

D

TO

UN

DE

RS

ID

E

O F

EX

IS

TI

N

G

TH

RO

UG

H W

AL

L F

LA

SH

IN

G.

HE

IG

HT

V

AR

IE

S 6-

1/ 2"

NEOPRENE GASKETED FASTENER

EXISTING MASONRY WALL ASSEMBLY

4"6"

SHEET METAL COUNTER FLASHING

BASE FLASHING

FLAT SEAM METAL PANEL

CANT STRIP TYP NEW ROOF SYSTEM, REFER

TO NEW ROOF SECTION FOR

ASSEMBLY COMPONENTS

EXISTING CURTAIN WALL WINDOW ASSEMBLY

SEALANT

4" 6"

8" M

IN

IM

UM

BASE FLASHING

FLAT SEAM METAL PANEL

CANT STRIP

TYP NEW ROOF SYSTEM, REFER TO NEW

ROOF SECTION FOR ASSEMBLY

COMPONENTS

EXISTING THROUGH-WALL FLASHING DRIP EDGE,

TRIMMED FLUSH WITH EXISTING MASONRY WALL

NEOPRENE GASKETED FASTENER

SHEET METAL PANEL CLOSURE AND

COUNTERFLASHING RECEIVER

SELF ADHERING MEMBRANE

TERMINATION BAR WITH FASTENERS

METAL WALL PANEL ASSEMBLY

SELF ADHERING

MEMBRANE

METAL EDGE

NEOPRENE GASKETED FASTENER; 4"O.C.

CONTINUOUS

CLEAT

4"6"

NAIL WOOD CANT TO BLOCKING; 2 ROWS OF

FASTENERS STAGGERED, EACH ROW 12" O.C.

BASE FLASHING

TYP NEW ROOF SYSTEM, REFER TO

NEW ROOF SECTION FOR

ASSEMBLY COMPONENTS

1-0" TO 0-0" x 12" TAPERED EDGE STRIP

AT EXISTING WOOD BLOCKING EDGE

FOR POSITIVE DRAINAGE. ADJUST AS

NECESSARY TO FIELD CONDITIONS.

EXISTING WOOD BLOCKING; ADD NEW WOOD

BLOCKING AS NECESSARY TO ACCOMMODATE

NEW INSULATION HEIGHT AND MAINTAIN

POSITIVE DRAINAGE AWAY FROM THE EDGE

3/

/2

9:

:1

AM

VDP25

03/20/25

Li nc ol n

M id dl e

Sc ho ol

R oo fin g an d In te rio r D oo r I m pr ov em en ts

NEW CONSTRUCTION

ROOF DETAILS

Fe de ra l A ve

, W ar re n, M I 4

R5.00

Project Number

ISSUE FOR BID:

SHEET

1 2 3 4 5 6

A

B

C

D

E

1 03/21/202575% CD

2 04/09/2025100% CD

# REVISION DATE

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

3 RISING WALL - TYPE 1

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

1 ROOF EDGE - TYPE 1

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

4 RISING WALL - TYPE 2

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

5 RISING WALL - TYPE 3

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

2 ROOF EDGE - TYPE 2

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

6 ROOF DIVIDER - TYPE 1

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

7 ROOF DIVIDER - TYPE 2

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

8 MECHANICAL CURB

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

9 ROOF HATCH CURB

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

10 PIPE PENETRATION

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

11 HIGH TEMPERATURE PIPE FLASHING

0 2" 4" 8"SCALE:R5.00 3" = 1'-0"

12 POURABLE SEALER POCKET

ARCH_VDP25_Lincoln MS_2025 Roofing & Interior Door Improvements_100 Percent CD_SEALED
G-100 - Title Sheet
G-101 - General Information & Accessible Clearances
AD-101 - First Floor Demolition Plan - North
AD-102 - First Floor Demolition Plan - South
AD-103 - Second Floor Demolition Plan
A-101 - Floor Plans
A-401 - Enlarged First Floor Plan - North
A-402 - Enlarged First Floor Plan - South
A-403 - Enlarged Second Floor Plan
A-701 - Door & Frame Legend & Details

VDPS_LINCOLN_MS_TREMCO_100%

File details come from the government source that posted it. Updated .