PUBMID008352 VDPS - Lincoln MIddle School BidPermit Set.pdf
PDF 5 MB Posted
- Solicitation number
- RFP-VDPS-250000002363-2
- Issued by
- Macomb County, Westland City, Michigan
About this file
This document is a bid set for the Lincoln Middle School Roofing and Interior Door Improvements project for Van Dyke Public Schools, located at 22500 Federal Ave, Warren, MI 48089. The project involves renovation of two floors of an existing educational building, specifically focusing on replacing select doors on the first and second floors and replacing the roof. The scope does not include other building envelope improvements or structural updates. The project is designed as an Alteration Level 2 renovation, following the 2021 Michigan Rehabilitation Code, and will involve asbestos abatement to be performed by certified professionals.
The bid set includes detailed architectural plans, demolition plans, floor plans, and roofing details, with a project number VDP25 and dated for bidding on 04/09/2025. The building is classified as an E (Education) use group with Construction Type IIB, and has a total building area of 115,920 square feet. The project will involve replacing doors with new hollow metal doors and frames, with specific hardware requirements, and a comprehensive roof replacement using a two-ply modified bitumen membrane system. The drawings indicate careful consideration of existing conditions, with notes emphasizing the need to coordinate with district representatives and maintain existing building functionality during the renovation process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PUBMID008352 VDPS - Lincoln High School BidPermit Set.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site
Building Code:
Mechanical Code:
Electrical Code:
Plumbing Code:
Energy Code:
Life Safety Code:
Use Group:
Construction Type:
Height, Building:
1 Story Area (T.O.M.)
2 Story Area (T.O.M.)
Area, Building:
Net Area:
Net Area Per Floor:
Work Area:
1st Floor:
2nd Floor:
2021 Michigan Rehabilitation Code Alteration Level 2
2021 Michigan Mechanical Code 2023 National Electrical Code (NEC) 2021 Michigan Plumbing Code 2015 Michigan Uniform Energy Code
2012 NFPA 101
E, Education
IIB
12'-0" 24'-0"
115,920 SF
12,333 SF
32,870 SF
12,225 SF
A. Asbestos abatement performed and inspected by certified entities will be required.
Project Number
ISSUE FOR BID:
NOT TO SCALE
OWNER
ARCHITECT
CITY, STATE, ZIP:
STREET:
COMPANY:
PHONE:
AOR:
CONTACT:
EMAIL:
COMPANY:
SITE MAP
SHEET INDEXPROJECT SCOPE NARRATIVEPROJECT TEAM
NAME:
Date:
Exp. Date:
Lic. No.
Ann Arbor, MI, 48103
2373 Oak Valley Drive
O|X Studio, Inc.
(734) 929-9000
Robb Burroughs
Matt Biglin mattb@oxstudioinc.com
Van Dyke Public Schools
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec tu re co n st ru ct io o b je ct s
P
) 9
-9
F:
(7
) 9
-9 w w w
.o xs tu d io in c.
m
STREET:
CONTACT:
PHONE:
EMAIL:
11387 East Nine Mile Road
Jeffrey VanConant, Director of Facilities and Operations
Office: (586) 759-9439 Cell: (586) 634-3589 vanconant.jeff@vdps.net
Warren, MI 48089CITY, STATE, ZIP:
PROJECT MANAGER
CITY, STATE, ZIP:
STREET:
COMPANY:
PHONE:
PM:
CONTACT:
EMAIL:
Minneapolis, MN, 55402
80 South 8th Street, Suite 1850
Site LogiQ Design, LLC
(612) 770-4704
Tim Stevenson
Tim Stevenson tim.stevenson@sitelogiq.com
APPLICABLE CODES & LIFE SAFETY SUMMARY SPECIAL INSPECTIONS & TESTS
/9
/2
:3
:4
P M
VDP25
04/09/25
G-100
L in c o ln
M id d le
S c h o o l
R o o fi n g a n d
In te ri o r D o o r Im p ro v e m e n ts
Title Sheet
22500 Federal Ave, Warren, MI 48089
Lincoln Middle School - 2025 Roofing and Interior Door Improvements
F e d e ra l A v e
W a rr e n
M I
Sheet Number Sheet Name Current Revision Description
Current Revision Date
General
G-100 Title Sheet 100% CD 04/09/2025
G-101 General Information & Accessible Clearances 100% CD 04/09/2025
Demolition
AD-101 First Floor Demolition Plan - North 100% CD 04/09/2025
AD-102 First Floor Demolition Plan - South 100% CD 04/09/2025
AD-103 Second Floor Demolition Plan 100% CD 04/09/2025
Architectural
A-101 Floor Plans 100% CD 04/09/2025
A-401 Enlarged First Floor Plan - North 100% CD 04/09/2025
A-402 Enlarged First Floor Plan - South 100% CD 04/09/2025
A-403 Enlarged Second Floor Plan 100% CD 04/09/2025
A-701 Door & Frame Legend & Details 100% CD 04/09/2025
Roofing
R1.00 Overall Roof Area Plan 100% CD 04/09/2025
R1.01 Enlarged Roof Area Plans 100% CD 04/09/2025
R3.00 Roof Details 100% CD 04/09/2025
R5.00 Roof Details 100% CD 04/09/2025
22500 Federal Ave, Warren, MI
Renovation of 2 floors of existing Educational building. Select doors to be replaced on First and Second floor, and roof to be replaced. Other building envelope improvements and structural updates are not included as part of this scope.
# REVISION DATE
1 75% CD 03/21/2025
2 95% CD 04/03/2025
3 100% CD 04/09/2025
PT-1
A-101
SIM
101.1
XX
XX
1i
1t
A-101
SIM
Reference Text
Top #: Detail Number (Location on sheet)
Bottom #: Sheet on which detail is located
Typical Detail Bubble (applies to all detail types):
Detail plan view:
Dashed outline indicates area being detailed
Detail section view:
Tail indicates direction of section cut
Door number. See door and hardware schedule.
Window Type number.
See window schedule.
Accent paint location and paint identification. Accent paint color to be continuous for entire length of wall.
Electrical fixture tag
Lighting fixture tag
Plumbing fixture tag
Equipment tag
Extent of finish material replacement if not continuous for entire length of wall.
Indicates face of new construction to be aligned with face of existing construction to remain.
A
A-202
A-242
1 Ref
R ef
1 Ref
R ef
1000T
150 SF
Room name
Building section:
Arrow indicates direction of building section
Exterior elevation:
Arrow indicates face of structure being represented
Top #: Detail Number (Location on sheet)
Bottom #: Sheet on which detail is located
Reference Text
Detail Number (Location on sheet)
Sheet on which detail is located
Interior elevation:
Level Mark
New column grid
Keynotes:
See sheet notes, same sheet as symbol
Indicates room number Indicates room area
Room Tag:
Wall section:
Tail indicates direction of section cut
Target Elevation
A Existing column grid
+ 5'-0"
New construction / New door and frame shown open 90º.
Indicates change in flooring material.
A-101
SIM
A-202
SIM
A-202
SIM
A-101
Name
Elevation
Wall partition type tag0 S A.
1t
## ## ##.A Reference Keynotes
Sheet Keynotes
Existing construction to remain. Existing doors shown open 45º.
Wall Floor Base
North Wall Accent finish location and finish identification. Accent finish to be continuous for entire length of wall.
Wall finish
Floor finish
Wall base type
N
1 View Name A101 1/8" = 1'-0"
View title with Graphic Scale & North Arrow:
Detail number
Graphic scale of drawing
Sheet number
North Arrow (Direction varies per project)
Determine where 1' lies on the graphic scale
Reading the Graphic Scale:
4' 8' Measure to 1' on the sheet to determine the scale
4' - 8" (min) w cl os er
(m in
) o r
(m in
(m in closer & latch 12" (min) w/ w cl os er
(m in
) o r d o r
= Direction of Travel Approach
ADA Door and Maneuvering Clearances m in m in w cl o se r
(m in
) o r
(min)
2' - 0"
42" @ d=54"
36" @ d=60"
2' - 0"
(min)
1' - 6"
Door maneuvering clearances Clearances for doors in series
22" min.
m in m in . 24" min.
m in m in . 24" min.
32" min.
Opaque Assemblies:
Roofs Insulation Entirely above Deck R-30.0 c.i. (U-0.032) Metal Building R-19 + R-11 Ls (U-0.037) or R-25 + R-8 Ls Attic and Other: R-49.0 (U-0.021)
Walls, Above-Grade Mass Walls (Concrete, CMU) R-11.4 c.i. (U-0.090) Metal Building R-0 + R-19 c.i. (U-0.050) Steel-Framed R-13.0 + R-10 c.i. (U-0.055) Wood-Framed and Other R-13.0 + R-7.5 c.i. (U-0.051) or R-19 + R-5 c.i.
Walls, Below-Grade Below-Grade Walls (all) R-7.5 c.i. (C-0.119)
Floors (Exposed Beneath) Mass R-14.6 c.i. (U-0.057) Steel-Joist R-30.0 (U-0.038) Wood-Framed and Other R-30.0 (U-0.033)
Slab-On-Grade Floors Unheated R-15 for 24 in. (F-0.520) Heated R-20 for 48 in. (F-0.688)
Opaque Doors Swinging (U-0.500) Nonswinging (U-0.500)
Fenestration (Including glazed doors):
Vertical Glazing, 0% - 40% of wall Nonmetal framing (all) U-0.32 SHGC-0.40 VT/SHGC = 1.10 Metal framing
Fixed U-0.42 SHGC-0.40 VT/SHGC = 1.10 Operable U-0.50 SHGC-0.40 VT/SHGC = 1.10 Entrance Door U-0.77 SHGC-0.40 VT/SHGC = 1.10
Skylight, All Types 0% - 3% of Roof Uall-0.50 SHGCall-0.40 (No VT/SHGC req't.)
Values based on ASHRAE 90.1 - 2013, Climate Zone 5A, Non-Residential.
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:3
:4
P M
VDP25
04/09/25
G-101
L in c o ln
M id d le
S c h o o l
R o o fi n g a n d
In te ri o r D o o r Im p ro v e m e n ts
General Information & Accessible Clearances
F e d e ra l A v e
W a rr e n
M I
General Symbol Legend Graphic Scale LegendMinimum Insulation Values
# REVISION DATE
1 75% CD 03/21/2025
D1 D1
D1
D1
D1
D1
D2 D2 D2 D2
D2
D2
D2
D2
D1
D2
D3
D3
Existing construction to remain.
Demolition Floor Plan Legend
Existing construction to be demolished.
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:3
:5
P M
VDP25
04/09/25
AD-101
L in c o ln
M id d le
S c h o o l
R o o fi n g a n d
In te ri o r D o o r Im p ro v e m e n ts
First Floor Demolition Plan - North
F e d e ra l A v e
W a rr e n
M I
N
AD-101 1/8" = 1'-0"
8'4' 16'
1 Demo - First Floor North
General Sheet Notes:
A. Demolish existing interior construction as indicated.
B. All dimensions to be verified in field prior to construction. Notify
Architect of all discrepancies in layout prior to starting framing.
C. All existing materials to remain, U.N.O. Those damaged or otherwise disturbed by the contractor's operations shall be patched and repaired to match existing adjacent materials so that repair is imperceptible.
D. Contractor shall maintain all required exits unobstructed, illuminated, and protected from construction activities.
E. Contractor to clean areas adjacent to demolition area of dust, dirt and debris caused by demolition operations.
F. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate onsite. Transport demolished materials and legally dispose of them.
G. Contractor shall notify Architect of any conflicts between existing conditions and construction documents.
H. Area of demolition will require assessment for asbestos and potential abatement, by VDPS. Abatement must be conducted by a certified professional. Construction to coordinate with abatement as it occurs.
I. Salvage removed (mortise lock) hardware to Director of Building and Grounds. Coordinate with SIQ PM and District Representative.
Sheet Keynotes D1 Demolish existing door, frame, casing and hardware.
Coordinate removal with district asbestos consultant.
D2 Prep opening to receive new door and door frame.
D3 Prep door to receive new panic hardware. Existing door and hardware to remain.
Key Plan N
Courtyard
Wood Lab
Main Entry
Classroom
Metal Lab
Computer Lab
Media Center
Crafts Art
Gym
Cafeteria
Biology
Lab
Life Science
Classrooms
Classrooms
Instrumental Music
Special Ed.
Vocal Music FACSClassrooms
Reception
# REVISION DATE
1 75% CD 03/21/2025
D1
D1D1D1
D1 D1D1
D1
D1
D1
D1
D1
D1
D2
D2
D2
D2
D2 D2 D2
D2
D2D2D2
D2
D2 D2 D2
D1
D2
D1
D1
D2
D1
D2
D1
D2
D2
Existing construction to remain.
Demolition Floor Plan Legend
Existing construction to be demolished.
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:3
:5
P M
VDP25
04/09/25
AD-102
L in c o ln
M id d le
S c h o o l
R o o fi n g a n d
In te ri o r D o o r Im p ro v e m e n ts
First Floor Demolition Plan - South
F e d e ra l A v e
W a rr e n
M I
General Sheet Notes:
N
AD-102 1/8" = 1'-0"
8'4' 16'
1 Demo - First Floor South
Sheet Keynotes D1 Demolish existing door, frame, casing and hardware.
Coordinate removal with district asbestos consultant.
D2 Prep opening to receive new door and door frame.
A. Demolish existing interior construction as indicated.
B. All dimensions to be verified in field prior to construction. Notify
Architect of all discrepancies in layout prior to starting framing.
C. All existing materials to remain, U.N.O. Those damaged or otherwise disturbed by the contractor's operations shall be patched and repaired to match existing adjacent materials so that repair is imperceptible.
D. Contractor shall maintain all required exits unobstructed, illuminated, and protected from construction activities.
E. Contractor to clean areas adjacent to demolition area of dust, dirt and debris caused by demolition operations.
F. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate onsite. Transport demolished materials and legally dispose of them.
G. Contractor shall notify Architect of any conflicts between existing conditions and construction documents.
H. Area of demolition will require assessment for asbestos and potential abatement, by VDPS. Abatement must be conducted by a certified professional. Construction to coordinate with abatement as it occurs.
I. Salvage removed (mortise lock) hardware to Director of Building and Grounds. Coordinate with SIQ PM and District Representative. Key Plan N
Courtyard
Wood Lab
Main Entry
Classroom
Metal Lab
Computer Lab
Media Center
Crafts Art
Gym
Cafeteria
Biology
Lab
Life Science
Classrooms
Classrooms
Instrumental Music
Special Ed.
Vocal Music FACSClassrooms
Reception
# REVISION DATE
1 75% CD 03/21/2025
D2
D2
D2
D2
D2
D2
D2
D2
D2
D1
D1
D1
D1
D1
D1
D1
D1
D1
D3
D3
Existing construction to remain.
Demolition Floor Plan Legend
Existing construction to be demolished.
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:3
:5
P M
VDP25
04/09/25
AD-103
L in c o ln
M id d le
S c h o o l
R o o fi n g a n d
In te ri o r D o o r Im p ro v e m e n ts
Second Floor Demolition Plan
F e d e ra l A v e
W a rr e n
M I
General Sheet Notes:
Sheet Keynotes D1 Demolish existing door, frame, casing and hardware.
Coordinate removal with district asbestos consultant.
D2 Prep opening to receive new door and door frame.
D3 Prep door to receive new panic hardware. Existing door and hardware to remain.
N
AD-103 1/8" = 1'-0"
8'4' 16'
1 Demo - Second Floor
A. Demolish existing interior construction as indicated.
B. All dimensions to be verified in field prior to construction. Notify
Architect of all discrepancies in layout prior to starting framing.
C. All existing materials to remain, U.N.O. Those damaged or otherwise disturbed by the contractor's operations shall be patched and repaired to match existing adjacent materials so that repair is imperceptible.
D. Contractor shall maintain all required exits unobstructed, illuminated, and protected from construction activities.
E. Contractor to clean areas adjacent to demolition area of dust, dirt and debris caused by demolition operations.
F. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate onsite. Transport demolished materials and legally dispose of them.
G. Contractor shall notify Architect of any conflicts between existing conditions and construction documents.
H. Area of demolition will require assessment for asbestos and potential abatement, by VDPS. Abatement must be conducted by a certified professional. Construction to coordinate with abatement as it occurs.
I. Salvage removed (mortise lock) hardware to Director of Building and Grounds. Coordinate with SIQ PM and District Representative.
# REVISION DATE
1 75% CD 03/21/2025
2 95% CD 04/03/2025
3 100% CD 04/09/2025
Key Plan N
C la ss ro o m s
C la ss ro o m s
Faculty Lounge
C la ss ro o m
C la ss ro o m
C la ss ro
Media Center
Computer Lab
Classroom
Wood Lab
Metal Lab
Crafts
Art
Classroom
Classroom
Classroom
Classroom
Vocal Music
Classroom
Classroom
112.1 Life Science Lab
Classroom
Classroom
Classroom
Classroom
Instrumental Music
Special Ed. Classroom
FACS
Classroom
Classroom
Classroom
Classroom
Classroom
Classroom
CafeteriaKitchen
Gym
Stage
Classroom
Courtyard
Reception
A-401
Sim
Lab
Biology
Classroom
A-402
Sim
B Stair
A Stair
Architectural Floor Plan Legend
New Construction
Area Not in Scope
Align Symbol
Existing Construction to Remain
A. All dimensions to be verified in field prior to construction. Notify architect of all discrepancies prior to starting work.
B. All dimensions on plans are to face of finish face or column centerlines, Unless Noted Otherwise (U.N.O.)
C. Refer to sheet A-701 for Door Schedule.
D. Refer to sheets A-401 and A-402 for room occupancy loads.
Classroom
Classroom
Classroom
Classroom
Classroom
Classroom
Classroom
Classroom
Classroom
Classroom
Faculty Lounge
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:3
:5
P M
VDP25
04/09/25
A-101
L in c o ln
M id d le
S c h o o l
R o o fi n g a n d
In te ri o r D o o r Im p ro v e m e n ts
Floor Plans
F e d e ra l A v e
W a rr e n
M I
N A-101 1/32" = 1'-0"
32'16' 64'
2 Overall First Floor Plan
General Sheet Notes:
N A-101 1/32" = 1'-0"
32'16' 64'
1 Overall Second Floor Plan
# REVISION DATE
1 75% CD 03/21/2025
UP
UP
4782 SF
Media Center
Computer Lab
Classroom
Wood Lab
Metal Lab
754 SF
Crafts
888 SF
Art
729 SF
Classroom
Courtyard
754 SF
Classroom
101 103 104
105B
106B
105A
106A
1121 SF
Lab
738 SF
Biology
763 SF
Classroom
1096 SF
Lab
37 Occ. 37 Occ. 44 Occ. 36 Occ.
22 Occ.
36 Occ. 21 Occ.
38 Occ.
47 Occ.
B Stair
A Stair128
A. All dimensions to be verified in field prior to construction. Notify architect of all discrepancies prior to starting work.
B. All dimensions on plans are to face of finish face or column centerlines, Unless Noted Otherwise (U.N.O.)
C. Refer to sheet A-701 for Door Schedule.
D. Refer to sheets A-401 and A-402 for room occupancy loads.
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:3
:5
P M
VDP25
04/09/25
A-401
L in c o ln
M id d le
S c h o o l
R o o fi n g a n d
In te ri o r D o o r Im p ro v e m e n ts
Enlarged First Floor Plan - North
F e d e ra l A v e
W a rr e n
M I
General Sheet Notes:
N A-401 1/8" = 1'-0"
8'4' 16'
1 Enlarged First Floor Plan - North
Key Plan N
Courtyard
Wood Lab
Main Entry
Classroom
Metal Lab
Computer Lab
Media Center
Crafts Art
Gym
Cafeteria
Biology
Lab
Life Science
Classrooms
Classrooms
Instrumental Music
Special Ed.
Vocal Music FACSClassrooms
Reception
# REVISION DATE
1 75% CD 03/21/2025
2048 SF
Instrumental Music
779 SF
Classroom
764 SF
Classroom
766 SF
Classroom
760 SF
Classroom
374 SF
Classroom
773 SF
Classroom
1425 SF
Special Ed. Classroom
1863 SF
Vocal Music
1719 SF
FACS
957 SF
Classroom
944 SF
Classroom
1272 SF
112.1
Life Science Lab
766 SF
Classroom
760 SF
Classroom
110A 114
110B
111A
111B
112A
112B 113
126B126A 127A
127B
123A124B124A
117 118 119 120 121 122
123C
108 109
737 SF
Classroom
775 SF
Classroom
36 Occ.
38 Occ.
25 Occ.
38 Occ.
47 Occ.
47 Occ.
47 Occ.
37 Occ.
34 Occ.
40 Occ. 62 Occ.
38 Occ. 18 Occ. 38 Occ. 38 Occ. 38 Occ. 38 Occ.
123B
763 SF
Classroom
38 Occ.
1121 SF
Lab
991 SF
Classroom
1096 SF
Lab
738 SF
Biology
763 SF
Classroom
105A
986 SF
Classroom
Student Drop Zone
A. All dimensions to be verified in field prior to construction. Notify architect of all discrepancies prior to starting work.
B. All dimensions on plans are to face of finish face or column centerlines, Unless Noted Otherwise (U.N.O.)
C. Refer to sheet A-701 for Door Schedule.
D. Refer to sheets A-401 and A-402 for room occupancy loads.
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:3
:5
P M
VDP25
04/09/25
A-402
L in c o ln
M id d le
S c h o o l
R o o fi n g a n d
In te ri o r D o o r Im p ro v e m e n ts
Enlarged First Floor Plan - South
F e d e ra l A v e
W a rr e n
M I
N A-402 1/8" = 1'-0"
8'4' 16'
1 Enlarged First Floor Plan - South
General Sheet Notes:
Key Plan N
Courtyard
Wood Lab
Main Entry
Classroom
Metal Lab
Computer Lab
Media Center
Crafts Art
Gym
Cafeteria
Biology
Lab
Life Science
Classrooms
Classrooms
Instrumental Music
Special Ed.
Vocal Music FACSClassrooms
Reception
# REVISION DATE
1 75% CD 03/21/2025
DN
859 SF
Classroom
835 SF
Classroom
841 SF
Classroom
Restroom
812 SF
Classroom
801 SF
Classroom
854 SF
Classroom
Stor.
825 SF
Classroom
834 SF
Classroom
B Stair
Restroom
801 SF
Classroom
848 SF
Classroom
654 SF
Faculty Lounge
Corridor
Storage Storage
A Stair
73 74
75 76 77 78
209B
209A
42 Occ.
41 Occ.
40 Occ.
40 Occ. 42 Occ.
42 Occ.
41 Occ.
41 Occ.
6 Occ.
40 Occ.
42 Occ.
Architectural Floor Plan Legend
New Construction
Area Not in Scope
Align Symbol
Existing Construction to Remain
A. All dimensions to be verified in field prior to construction. Notify architect of all discrepancies prior to starting work.
B. All dimensions on plans are to face of finish face or column centerlines, Unless Noted Otherwise (U.N.O.)
C. Refer to sheet A-701 for Door Schedule.
D. Refer to sheets A-401 and A-402 for room occupancy loads.
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:3
:5
P M
VDP25
04/09/25
A-403
L in c o ln
M id d le
S c h o o l
R o o fi n g a n d
In te ri o r D o o r Im p ro v e m e n ts
Enlarged Second Floor Plan
F e d e ra l A v e
W a rr e n
M I
N A-403 1/8" = 1'-0"
8'4' 16'
1 Enlarged Second Floor Plan
General Sheet Notes:
Sheet Keynotes
# REVISION DATE
1 75% CD 03/21/2025
2 95% CD 04/03/2025
3 100% CD 04/09/2025
Key Plan N
C la ss ro o m s
C la ss ro o m s
Faculty Lounge
C la ss ro o m
C la ss ro o m
C la ss ro
Door Opening 6" at Corner (UON)
D o o r
O p en in g
Door Type D1
Per schedule
P er s ch ed u le
6"
Door Type D2
Per schedule
P er s ch ed u le
6" 6"
Frame Type F1
2" Per schedule 2"
P er s ch ed u le
Door Hardware (Measured floor to center of hardware)
(K n ob an d
P an ic E xi t
P u ll H an dl e
P u sh P la te
Hollow Metal Door
Frame Anchor
Hollow Metal Door Frame
Backer Rod and Sealant 1/2" Min.
1/
U .O
.N
/8
1"
Door, refer to plan and schedule for type
Precast Concrete Lintel
Masonry Embedded Flashing System
Backer Road and Sealant
Hollow Metal Door Frame, Grouted
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:3
:5
P M
VDP25
04/09/25
A-701
L in c o ln
M id d le
S c h o o l
R o o fi n g a n d
In te ri o r D o o r Im p ro v e m e n ts
Door & Frame Legend & Details
F e d e ra l A v e
W a rr e n
M I
Door Type Legend
Door Schedule
Mark Room Name
Door Frame Door Hardware
Set Fire Rating**Width* Height* Thickness* Type Material Finish Type Material Finish
100 Media Center 6' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT M.04 20 min.
101 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
102 Crafts 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
103 Art 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
104 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
105A Lab 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
105B Lab 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
106A Biology 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
106B Biology 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
107 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
108 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
109 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
110A Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
110B Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
111A Lab 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
111B Lab 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
112A Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
112B Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
113 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
114 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
115 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
116 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
117 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
118 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
119 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
120 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
121 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
122 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
123A Special Ed. Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
123B Special Ed. Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
123C Instrumental Music 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.03 20 min.
124A Instrumental Music 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.03 20 min.
124B Instrumental Music 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.03 20 min.
125 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
126A Vocal Music 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.03 20 min.
126B Vocal Music 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.03 20 min.
127A FACS 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
127B FACS 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
128 Stair 6' - 0" 7' - 0" 0' - 1 3/4" Existing Existing Existing Existing Existing Existing M.06 ---
129 Stair 6' - 0" 7' - 0" 0' - 1 3/4" Existing Existing Existing Existing Existing Existing M.06 ---
200 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
201 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
202 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
203 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
204 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
205 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
206 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
207 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.05 20 min.
208 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
209A Faculty Lounge 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
209B Faculty Lounge 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.02 20 min.
210 Classroom 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM/GL By Manuf. F1 HM PT M.01 20 min.
228 Stair 6' - 0" 7' - 0" 0' - 1 3/4" Existing Existing Existing Existing Existing Existing M.06 ---
229 Stair 6' - 0" 7' - 0" 0' - 1 3/4" Existing Existing Existing Existing Existing Existing M.06 ---
Door Frame Legend
Door Hardware Heights Diagram
General Sheet Notes:
A-701 3" = 1'-0" 4"2" 8"
2 HM Door Jamb Detail @ CMU A-701 3" = 1'-0"
4"2" 8"
1 HM Door Head Detail @ CMU
A. Refer to specifications for additional door hardware requirements, including submittal requirements.
Note:
* Verify all door sizes in field. Dimensions of new doors and frames to match existing.
** Verify existing fire rating for the doors being replaced, and replace in-kind for any doors with existing ratings greater than newly noted ratings.
# REVISION DATE
1 75% CD 03/21/2025
COURTYARD
3/
/2
9:
:1
AM
VDP25
03/20/25
Li nc ol n
M id dl e
Sc ho ol
R oo fin g an d In te rio r D oo r I m pr ov em en ts
ROOF AREA PLANS -
OVERALL ROOF PLAN
AND ROOF AREAS
1,2,4,5,6,8,9
Fe de ra l A ve
, W ar re n, M I 4
R1.00
Project Number
ISSUE FOR BID:
SHEET
1 2 3 4 5 6
A
B
C
D
E
1 03/21/202575% CD
2 04/09/2025100% CD
# REVISION DATE
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R3.00
R3.00
SIM 4
R3.00
R5.00
R5.00
R3.00
R5.00
R5.00
R5.00
REMOVE EXISTING
PENETRATIONS IN THIS
LOCATION; COVER
OPENINGS IN THE DECK
WITH NEW METAL
DECKING IN MATCHING
PROFILE.
R5.00
R5.00
R3.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
AR
EA
N O
T
IN
C O
N
TR
AC
T
AR
EA
N O
T
IN
C O
N
TR
AC
T
AR
EA
N O
T
IN
C O
N
TR
AC
T
AREA NOT IN CONTRACT AREA NOT IN CONTRACT
R5.00
R3.00
R5.00
REMOVE EXISTING
CURB IN THIS
LOCATION; COVER
OPENINGS IN THE DECK
WITH NEW METAL
DECKING IN MATCHING
PROFILE.
REMOVE EXISTING CURB IN THIS LOCATION;
COVER OPENINGS IN THE DECK WITH NEW
METAL DECKING IN MATCHING PROFILE.
REMOVE EXISTING
CURB IN THIS
LOCATION; COVER
OPENINGS IN THE DECK
WITH NEW METAL
DECKING IN MATCHING
PROFILE.
R3.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R5.00
R3.00
R5.00
ROOF AREA 2
0 8' 16'4'SCALE:R1.00 3/32" = 1'-0"
1 ROOF AREA PLAN - ROOF AREAS 1 & 2
0 8' 16'4'SCALE:R1.00 3/32" = 1'-0"
2 ROOF AREA PLAN - ROOF AREAS 4, 5, & 6
0 8' 16'4'SCALE:R1.00 3/32" = 1'-0"
3 ROOF AREA PLAN - ROOF AREAS 7 & 8
RO
O
F
AR
EA
ROOF AREA 4ROOF AREA 4
ROOF AREA 5
ROOF AREA 6
ROOF AREA 8
ROOF AREA 9
R5.00
R5.00
157'
10' 33'
165'
183'-6"
76'
55'
29'
153'
75'
28'63'
96'
NORTH NORTH
NORTH ARROW
ANNOTATIONS
AREA NOT
IN CONTRACT
NORTH POINT
DETAIL NO.
DETAIL REFERENCE
SHEET NO.
CONDITION IS SIMILAR
TO DETAIL NO.
SIM
R5.00
ROOF AREA TAG
ROOF NO.
ROOF AREA
NORTH
LEGEND
CURB
ROOF DRAIN & SUMP
ROOF HATCH
HEAT STACK
POURABLE SEALER POCKET
PIPE PENETRATION
ROOF PARAPET/
SEPARATION JOINT
ROOF EDGE
CURB, SCHEDULED
FOR REMOVAL
FAN CURB
UNIT ON SLEEPER CURB
NORTH
11'
70'
0 32' 64' 128'SCALE:R1.00 1/64" = 1'-0"
A OVERALL ROOF AREA PLAN
ROOF AREA 1
ROOF AREA 2
ROOF AREA 4
ROOF AREA 5 ROOF AREA 8
ROOF AREA 6 ROOF AREA 9
AREA NOT IN CONTRACT
AREA NOT IN CONTRACT
AREA NOT IN CONTRACT
AREA NOT IN CONTRACT
2' 2'
TYP NEW ROOF SYSTEM, REFER
TO NEW ROOF SECTION FOR
ASSEMBLY COMPONENTSFLAT INSULATION
BOARD
0" TO 1" X 24" WOODFIBER
TAPERED EDGE STRIP
CAST IRON STRAINER AND
DRAIN BOWL ASSEMBLY 30" x 30" FOUR-POUND
LEAD STIFFENING PLATE
STRIPPING PLIES
6" MIN
NEW AND EXISTING WOOD BLOCKING - TYPICAL;
AS NECESSARY TO ACHIEVE INSULATION &
FLASHING HEIGHT
℄ OF DRAIN AND SUMP
TYP NEW ROOF SYSTEM, REFER
TO NEW ROOF SECTION FOR
ASSEMBLY COMPONENTS
6" MINIMUM; STAGGER NEW AND
EXISTING INSULATION BOARDS
1. REMOVE EXISTING WET INSULATION BOARDS UNTIL DRY DECK CAN BE
OBSERVED AROUND FULL PERIMETER OF IDENTIFIED WET INSULATION.
2. NEW INSULATION BOARDS, MECHANICALLY ATTACHED, TO MATCH HEIGHT
OF NEW INSULATION SYSTEM OVER EXISTING ROOF ASSEMBLY. FINISHED
HEIGHT WILL BE A CONSISTENT SURFACE WITHOUT DEPRESSION.
PROVIDE FASTENERS AS NECESSARY TO
PROPERLY SECURE INSULATION BOARDS AND
MEET SECUREMENT REQUIREMENTS
3/
/2
9:
:1
AM
VDP25
03/20/25
Li nc ol n
M id dl e
Sc ho ol
R oo fin g an d In te rio r D oo r I m pr ov em en ts
EXSITING AND NEW
TYPICAL ROOF SECTIONS
Fe de ra l A ve
, W ar re n, M I 4
R3.00
Project Number
ISSUE FOR BID:
SHEET
1 2 3 4 5 6
A
B
C
D
E
1 03/21/202575% CD
2 04/09/2025100% CD
# REVISION DATE
ROOF AREA: 1, 2, 4, 5, 6, 8, 9
NOTE: ALL COMPONENTS ARE EXISTING AND ARE TO BE REMOVED UNLESS DESIGNATED TO REMAIN
TYPE B STEEL ROOF DECK TO REMAIN
2" POLYISOCYANURATE
INSULATION BOARD TO REMAIN
1/2" FIBERGLASS INSULATION BOARD TO REMAIN
MULTI-PLY COAL TAR PITCH MEMBRANE
TO REMAIN
GRAVEL SURFACING; LOOSE GRAVEL SURFACING
TO BE REMOVED. GRAVEL ADHERED IN COAL-TAR
PITCH MEMBRANE TO REMAIN
ROOF AREA: 1, 2, 4, 5, 6, 8, 9
NOTE: ALL COMPONENTS NEW UNLESS DESIGNATED AS EXISTING
SECUREMENT PLATE AND FASTENER
(NOT SHOWN IN DETAILS FOR CLARITY)
EXISTING POLYISOCYANURATE INSULATION
EXISTING TYPE B STEEL ROOF DECK
(EXISTING DECK)
EX
IS
TI
N
G
IN
SU
LA
TI
O
N B
O
AR
D (S
O M
E
LA
YE
RS
N O
T
SH
O W
N
IN
D
ET
AI
LS
F O
R
CL
AR
IT
Y)
1/2" HIGH DENSITY POLYISOCYANURATE COVERBOARD;
MECHANICALLY ATTACHED THROUGH EXISTING ROOF SYSTEM
(INSULATION BOARD)
EXISTING FIBERGLASS INSULATION BOARD
EXISTING GRAVEL SURFACED MULTI-PLY
COAL-TAR PITCH MEMBRANE
1/4" GYPSUM COVERBOARD; SET IN LOW-RISE ADHESIVE OVER
NEW HIGH DENSITY POLYISOCYANURATE COVERBOARD
(COVERBOARD)
2-PLY MODIFIED BITUMEN BASE SHEET AND GRANULAR
CAP SHEET; SET IN COLD APPLIED ADHESIVE
(MEMBRANE)
R3.00
SUMP PERIMETER TO HAVE CONSTANT
INSULATION THICKNESS AROUND PERIMETER
0 2" 4" 8"SCALE:R3.00 3" = 1'-0"
6 WALL SECTION - ROOF AREA 1 TO ROOF AREA 2
R5.00
R5.00
0 2" 4" 8"SCALE:R3.00 3" = 1'-0"
1 EXISTING ROOF SECTIONS
0 2" 4" 8"SCALE:R3.00 3" = 1'-0"
2 NEW ROOF SECTIONS
SCALE: 0 2' 4'1'R3.00 3/8" = 1'-0"
3 TYPICAL INSULATION DRAIN SUMP
0 2" 4" 8"SCALE:R3.00 3" = 1'-0"
4 TYPICAL DRAIN SECTION
0 2" 4" 8"SCALE:R3.00 3" = 1'-0"
5 TYPICAL WET INSULATION REPLACEMENT SECTION
SELF ADHERING
MEMBRANE
METAL EDGE
NEOPRENE GASKETED FASTENER; 4"O.C.
CONTINUOUS
CLEAT
4"6"
NAIL WOOD CANT TO BLOCKING; 2 ROWS OF
FASTENERS STAGGERED, EACH ROW 12" O.C.
BASE FLASHING
TYP NEW ROOF SYSTEM, REFER TO
NEW ROOF SECTION FOR
ASSEMBLY COMPONENTS
1-0" TO 0-0" x 12" TAPERED EDGE STRIP
AT EXISTING WOOD BLOCKING EDGE
FOR POSITIVE DRAINAGE. ADJUST AS
NECESSARY TO FIELD CONDITIONS.
EXISTING WOOD BLOCKING; ADD NEW WOOD
BLOCKING AS NECESSARY TO ACCOMMODATE
NEW INSULATION HEIGHT AND MAINTAIN
POSITIVE DRAINAGE AWAY FROM THE EDGE
EXISTING MASONRY
WALL ASSEMBLY
4"6"
TYP NEW ROOF
SYSTEM, REFER TO
NEW ROOF SECTION
FOR ASSEMBLY
COMPONENTS
SELF-ADHERING MEMBRANE
BASE FLASHING
FLAT SEAM METAL PANEL
CANT STRIP
METAL DIVIDER CAP
FASTENER WITH
NEOPRENE
GASKET; 24" O.C.
NEW AND EXISTING WOOD BLOCKING - TYPICAL;
AS NECESSARY TO ACHIEVE INSULATION &
FLASHING HEIGHT
4"6"
WOOD CANT
TYP NEW ROOF
SYSTEM, REFER TO
NEW ROOF SECTION
FOR ASSEMBLY
COMPONENTS
SELF-ADHERING MEMBRANE
BASE FLASHING
FLAT SEAM METAL PANEL
METAL DIVIDER CAP
FASTENER WITH NEOPRENE GASKET; 24" O.C.
NEW AND EXISTING WOOD BLOCKING - TYPICAL;
AS NECESSARY TO ACHIEVE INSULATION &
FLASHING HEIGHT
IF EXISTING ROOF SYSTEM IS DISTURBED
BY NEW WOOD BLOCKING PROVIDE
NEW BASE FLASHING MEMBRANE
COMPATIBLE WITH EXISTING ROOF SYSTEM;
INSTALLED IN ACCORDANCE WITH
MANUFACTURE'S REQUIREMENTS
AND RECOMMENDATIONS
EXISTING ROOF SYSTEM AND
COMPONENTS TO REMAIN
4"6"
TYP NEW ROOF
SYSTEM, REFER TO
NEW ROOF SECTION
FOR ASSEMBLY
COMPONENTS
BASE FLASHING
FLAT SEAM METAL PANEL
CANT STRIP
NEW AND EXISTING WOOD BLOCKING - TYPICAL;
AS NECESSARY TO ACHIEVE INSULATION &
FLASHING HEIGHT
PREFAB. INSULATED METAL CURB
EXISTING PREFAB. COUNTERFLASHING
EXISTING MECHANICAL/SKYLIGHT ASSEMBLY
TF TAPE
4"6"
TYP NEW ROOF
SYSTEM, REFER TO
NEW ROOF SECTION
FOR ASSEMBLY
COMPONENTS
BASE FLASHING
FLAT SEAM METAL PANEL
CANT STRIP
NEW AND EXISTING WOOD BLOCKING - TYPICAL;
AS NECESSARY TO ACHIEVE INSULATION &
FLASHING HEIGHT
PREFAB. COUNTERFLASHING
TF TAPE
PREFAB. METAL CURB ASSEMBLY
HATCH ASSEMBLY
4"
TYP NEW ROOF SYSTEM, REFER TO
NEW ROOF SECTION FOR ASSEMBLY
COMPONENTS
LEAD PIPE FLASHING
TOP OF FLANGE ROLLED INTO PIPE ±1"
EXISTING PIPE PENETRATION
SEALANT
6" FLANGE SET IN MASTIC OVER FIELD PLIES
STRIPPING PLIES
M
IN
IM
UM
4"
NEW AND EXISTING WOOD BLOCKING - TYPICAL;
AS NECESSARY TO ACHIEVE INSULATION &
FLASHING HEIGHT
RAIN HOOD
HIGH TEMPERATURE SEALANT
STAINLESS STEEL CLAMP
STAINLESS STEEL CLAMP
EXISTING HIGH TEMPERATURE STACK PIPE
22 GA. GALV. PAN
SEALANT
6" FLANGE SET IN MASTIC OVER FIELD PLIES
STRIPPING PLIES
TYP NEW ROOF SYSTEM, REFER TO
NEW ROOF SECTION FOR ASSEMBLY
COMPONENTS
HIGH TEMPERATUER INSULATION
4"
NEW AND EXISTING WOOD BLOCKING - TYPICAL;
AS NECESSARY TO ACHIEVE INSULATION &
FLASHING HEIGHT
TYP NEW ROOF SYSTEM, REFER
TO NEW ROOF SECTION FOR
ASSEMBLY COMPONENTS
NON-SHRINK GROUT
POURABLE SEALER
RAIN HOOD
SEALANT
STAINLESS STEEL CLAMP
EXISTING PIPE PENETRATION
22 GA. GALV. PAN
SEALANT
6" FLANGE SET IN MASTIC OVER FIELD PLIES
STRIPPING PLIES
INSULATION
IN-FILL
BASE FLASHING
FLAT SEAM METAL PANEL
CANT STRIP
EXISTING COTTON ROPE WICK AT 16" O.C. CLEAN ROPE
WEEPS FREE OF SEALANT AND REPLACE AS NECESSARY.
FACE-FASTENED METAL COUNTERFLASHING
EXISTING THROUGH WALL FLASHING; REMOVE EXISTING
SEALANT BLOCKING THROUGH WALL WEEPS.
4"6"
TYP NEW ROOF SYSTEM,
REFER TO NEW ROOF
SECTION FOR ASSEMBLY
COMPONENTS
BA
SE
F
LA
SH
IN
G
TO
E
XT
EN
D
TO
UN
DE
RS
ID
E
O F
EX
IS
TI
N
G
TH
RO
UG
H W
AL
L F
LA
SH
IN
G.
HE
IG
HT
V
AR
IE
S 6-
1/ 2"
NEOPRENE GASKETED FASTENER
EXISTING MASONRY WALL ASSEMBLY
4"6"
SHEET METAL COUNTER FLASHING
BASE FLASHING
FLAT SEAM METAL PANEL
CANT STRIP TYP NEW ROOF SYSTEM, REFER
TO NEW ROOF SECTION FOR
ASSEMBLY COMPONENTS
EXISTING CURTAIN WALL WINDOW ASSEMBLY
SEALANT
4" 6"
8" M
IN
IM
UM
BASE FLASHING
FLAT SEAM METAL PANEL
CANT STRIP
TYP NEW ROOF SYSTEM, REFER TO NEW
ROOF SECTION FOR ASSEMBLY
COMPONENTS
EXISTING THROUGH-WALL FLASHING DRIP EDGE,
TRIMMED FLUSH WITH EXISTING MASONRY WALL
NEOPRENE GASKETED FASTENER
SHEET METAL PANEL CLOSURE AND
COUNTERFLASHING RECEIVER
SELF ADHERING MEMBRANE
TERMINATION BAR WITH FASTENERS
METAL WALL PANEL ASSEMBLY
SELF ADHERING
MEMBRANE
METAL EDGE
NEOPRENE GASKETED FASTENER; 4"O.C.
CONTINUOUS
CLEAT
4"6"
NAIL WOOD CANT TO BLOCKING; 2 ROWS OF
FASTENERS STAGGERED, EACH ROW 12" O.C.
BASE FLASHING
TYP NEW ROOF SYSTEM, REFER TO
NEW ROOF SECTION FOR
ASSEMBLY COMPONENTS
1-0" TO 0-0" x 12" TAPERED EDGE STRIP
AT EXISTING WOOD BLOCKING EDGE
FOR POSITIVE DRAINAGE. ADJUST AS
NECESSARY TO FIELD CONDITIONS.
EXISTING WOOD BLOCKING; ADD NEW WOOD
BLOCKING AS NECESSARY TO ACCOMMODATE
NEW INSULATION HEIGHT AND MAINTAIN
POSITIVE DRAINAGE AWAY FROM THE EDGE
3/
/2
9:
:1
AM
VDP25
03/20/25
Li nc ol n
M id dl e
Sc ho ol
R oo fin g an d In te rio r D oo r I m pr ov em en ts
NEW CONSTRUCTION
ROOF DETAILS
Fe de ra l A ve
, W ar re n, M I 4
R5.00
Project Number
ISSUE FOR BID:
SHEET
1 2 3 4 5 6
A
B
C
D
E
1 03/21/202575% CD
2 04/09/2025100% CD
# REVISION DATE
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
3 RISING WALL - TYPE 1
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
1 ROOF EDGE - TYPE 1
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
4 RISING WALL - TYPE 2
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
5 RISING WALL - TYPE 3
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
2 ROOF EDGE - TYPE 2
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
6 ROOF DIVIDER - TYPE 1
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
7 ROOF DIVIDER - TYPE 2
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
8 MECHANICAL CURB
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
9 ROOF HATCH CURB
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
10 PIPE PENETRATION
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
11 HIGH TEMPERATURE PIPE FLASHING
0 2" 4" 8"SCALE:R5.00 3" = 1'-0"
12 POURABLE SEALER POCKET
| ARCH_VDP25_Lincoln MS_2025 Roofing & Interior Door Improvements_100 Percent CD_SEALED |
| G-100 - Title Sheet |
| G-101 - General Information & Accessible Clearances |
| AD-101 - First Floor Demolition Plan - North |
| AD-102 - First Floor Demolition Plan - South |
| AD-103 - Second Floor Demolition Plan |
| A-101 - Floor Plans |
| A-401 - Enlarged First Floor Plan - North |
| A-402 - Enlarged First Floor Plan - South |
| A-403 - Enlarged Second Floor Plan |
| A-701 - Door & Frame Legend & Details |
VDPS_LINCOLN_MS_TREMCO_100%
File details come from the government source that posted it. Updated .