The document is a bid set for interior door improvements at Lincoln High School for Van Dyke Public Schools, located in Warren, Michigan. The project involves renovating existing educational building spaces, specifically targeting door replacements in the Music Suite and Auditorium. The scope excludes broader building envelope and structural updates, focusing instead on selective door replacements. The project is designed for 100% Construction Documents (CD) as of 04/09/2025, with previous revisions at 75% and 95% CD stages.
The project documents detail precise specifications for door replacements, including door types D1, D2, and D3, with specific hardware requirements and fire rating considerations. The renovation covers multiple rooms in the Music Suite and Auditorium, including practice rooms, storage areas, and offices. Notable technical specifications include using 2021 Michigan Rehabilitation Code, Alteration Level 2, and adherence to various state and national building codes. The total building area is substantial, with 225,994 square feet of total area, and the specific work area for this project is 7,012 square feet. An important preparatory requirement is asbestos abatement, which must be performed and inspected by certified entities prior to construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PUBMID008352 VDPS - Lincoln MIddle School BidPermit Set.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site
Building Code:
Mechanical Code:
Electrical Code:
Plumbing Code:
Energy Code:
Life Safety Code:
Use Group:
Construction Type:
Area, Building:
Existing Basement:
Existing 1st Floor:
Existing 2nd Floor:
Total Area:
Work Area:
Music Suite (1st Floor):
Auditorium (1st Floor):
2021 Michigan Rehabilitation Code Alteration Level 2
2021 Michigan Mechanical Code 2023 National Electrical Code (NEC) 2021 Michigan Plumbing Code 2015 Michigan Uniform Energy Code
2012 NFPA 101
E, Education
IIB
7,035 SF
135,785 SF
49,786 SF
225,994 SF
7,012 SF
9,298 SF
A. Asbestos abatement performed and inspected by certified entities will be required.
Project Number
ISSUE FOR BID:
NOT TO SCALE
OWNER
ARCHITECT
CITY, STATE, ZIP:
STREET:
COMPANY:
PHONE:
AOR:
CONTACT:
EMAIL:
COMPANY:
SITE MAP
SHEET INDEXPROJECT SCOPE NARRATIVEPROJECT TEAM
NAME:
Date:
Exp. Date:
Lic. No.
Ann Arbor, MI, 48103
2373 Oak Valley Drive
O|X Studio, Inc.
(734) 929-9000
Robb Burroughs
Matt Biglin mattb@oxstudioinc.com
Van Dyke Public Schools
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec tu re co n st ru ct io o b je ct s
P
) 9
-9
F:
(7
) 9
-9 w w w
.o xs tu d io in c.
m
STREET:
CONTACT:
PHONE:
EMAIL:
11387 East Nine Mile Road
Jeffrey VanConant, Director of Facilities and Operations
Office: (586) 759-9439 Cell: (586) 634-3589 vanconant.jeff@vdps.net
Warren, MI 48089CITY, STATE, ZIP:
PROJECT MANAGER
CITY, STATE, ZIP:
STREET:
COMPANY:
PHONE:
PM:
CONTACT:
EMAIL:
Minneapolis, MN, 55402
80 South 8th Street, Suite 1850
Site LogiQ Design, LLC
(612) 770-4704
Tim Stevenson
Tim Stevenson tim.stevenson@sitelogiq.com
APPLICABLE CODES & LIFE SAFETY SUMMARY SPECIAL INSPECTIONS & TESTS
/9
/2
:4
:3
P M
VDP25
04/09/25
G-100
L in c o ln
H ig h S c h o o l
I n te ri o r D o o r Im p ro v e m e n ts
Title Sheet
22900 Federal Ave, Warren, MI 48089
Lincoln High School - 2025 Interior Door Improvements
F e d e ra l A v e
W a rr e n
M I
Sheet Number Sheet Name Current Revision Description
Current Revision Date
General
G-100 Title Sheet 100% CD 04/09/2025
G-101 General Information & Accessible Clearances 100% CD 04/09/2025
Demolition
AD-101 Demolition Plans 100% CD 04/09/2025
Architectural
A-101 Floor Plan 100% CD 04/09/2025
A-401 Enlarged Floor Plans 100% CD 04/09/2025
A-701 Door & Frame Legend & Details 100% CD 04/09/2025
22900 Federal Ave, Warren, MI
Renovation of existing Educational building. Select doors to be replaced in Music Suite and Auditorium. Other building envelope improvements and structural updates are not included as part of this scope.
# REVISION DATE
1 75% CD 03/21/2025
2 95% CD 04/03/2025
3 100% CD 04/09/2025
PT-1
A-101
SIM
101.1
XX
XX
1i
1t
A-101
SIM
Reference Text
Top #: Detail Number (Location on sheet)
Bottom #: Sheet on which detail is located
Typical Detail Bubble (applies to all detail types):
Detail plan view:
Dashed outline indicates area being detailed
Detail section view:
Tail indicates direction of section cut
Door number. See door and hardware schedule.
Window Type number.
See window schedule.
Accent paint location and paint identification. Accent paint color to be continuous for entire length of wall.
Electrical fixture tag
Lighting fixture tag
Plumbing fixture tag
Equipment tag
Extent of finish material replacement if not continuous for entire length of wall.
Indicates face of new construction to be aligned with face of existing construction to remain.
A
A-202
A-242
1 Ref
R ef
1 Ref
R ef
1000T
150 SF
Room name
Building section:
Arrow indicates direction of building section
Exterior elevation:
Arrow indicates face of structure being represented
Top #: Detail Number (Location on sheet)
Bottom #: Sheet on which detail is located
Reference Text
Detail Number (Location on sheet)
Sheet on which detail is located
Interior elevation:
Level Mark
New column grid
Keynotes:
See sheet notes, same sheet as symbol
Indicates room number Indicates room area
Room Tag:
Wall section:
Tail indicates direction of section cut
Target Elevation
A Existing column grid
+ 5'-0"
New construction / New door and frame shown open 90º.
Indicates change in flooring material.
A-101
SIM
A-202
SIM
A-202
SIM
A-101
Name
Elevation
Wall partition type tag0 S A.
1t
## ## ##.A Reference Keynotes
Sheet Keynotes
Existing construction to remain. Existing doors shown open 45º.
Wall Floor Base
North Wall Accent finish location and finish identification. Accent finish to be continuous for entire length of wall.
Wall finish
Floor finish
Wall base type
N
1 View Name A101 1/8" = 1'-0"
View title with Graphic Scale & North Arrow:
Detail number
Graphic scale of drawing
Sheet number
North Arrow (Direction varies per project)
Determine where 1' lies on the graphic scale
Reading the Graphic Scale:
4' 8' Measure to 1' on the sheet to determine the scale
4' - 8" (min) w cl os er
(m in
) o r
(m in
(m in closer & latch 12" (min) w/ w cl os er
(m in
) o r d o r
= Direction of Travel Approach
ADA Door and Maneuvering Clearances m in m in w cl o se r
(m in
) o r
(min)
2' - 0"
42" @ d=54"
36" @ d=60"
2' - 0"
(min)
1' - 6"
Door maneuvering clearances Clearances for doors in series
22" min.
m in m in . 24" min.
m in m in . 24" min.
32" min.
Opaque Assemblies:
Roofs Insulation Entirely above Deck R-30.0 c.i. (U-0.032) Metal Building R-19 + R-11 Ls (U-0.037) or R-25 + R-8 Ls Attic and Other: R-49.0 (U-0.021)
Walls, Above-Grade Mass Walls (Concrete, CMU) R-11.4 c.i. (U-0.090) Metal Building R-0 + R-19 c.i. (U-0.050) Steel-Framed R-13.0 + R-10 c.i. (U-0.055) Wood-Framed and Other R-13.0 + R-7.5 c.i. (U-0.051) or R-19 + R-5 c.i.
Walls, Below-Grade Below-Grade Walls (all) R-7.5 c.i. (C-0.119)
Floors (Exposed Beneath) Mass R-14.6 c.i. (U-0.057) Steel-Joist R-30.0 (U-0.038) Wood-Framed and Other R-30.0 (U-0.033)
Slab-On-Grade Floors Unheated R-15 for 24 in. (F-0.520) Heated R-20 for 48 in. (F-0.688)
Opaque Doors Swinging (U-0.500) Nonswinging (U-0.500)
Fenestration (Including glazed doors):
Vertical Glazing, 0% - 40% of wall Nonmetal framing (all) U-0.32 SHGC-0.40 VT/SHGC = 1.10 Metal framing
Fixed U-0.42 SHGC-0.40 VT/SHGC = 1.10 Operable U-0.50 SHGC-0.40 VT/SHGC = 1.10 Entrance Door U-0.77 SHGC-0.40 VT/SHGC = 1.10
Skylight, All Types 0% - 3% of Roof Uall-0.50 SHGCall-0.40 (No VT/SHGC req't.)
Values based on ASHRAE 90.1 - 2013, Climate Zone 5A, Non-Residential.
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:4
:3
P M
VDP25
04/09/25
G-101
L in c o ln
H ig h S c h o o l
I n te ri o r D o o r Im p ro v e m e n ts
General Information & Accessible Clearances
F e d e ra l A v e
W a rr e n
M I
General Symbol Legend Graphic Scale LegendMinimum Insulation Values
# REVISION DATE
1 75% CD 03/21/2025
D1
D1D1 D1
D1
D1
D1
D1
D1
D1
D1 D1
D2
D2
D2
D2 D2 D2
D2
D2
D2
D2
D2
D2
D1D1 D1 D1
D1
D1
D2 D2 D2 D2
D2
D2
Existing construction to remain.
Demolition Floor Plan Legend
Existing construction to be demolished.
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:4
:3
P M
VDP25
04/09/25
AD-101
L in c o ln
H ig h S c h o o l
I n te ri o r D o o r Im p ro v e m e n ts
Demolition Plans
F e d e ra l A v e
W a rr e n
M I
General Sheet Notes:
A. Demolish existing interior construction as indicated.
B. All dimensions to be verified in field prior to construction. Notify
Architect of all discrepancies in layout prior to starting framing.
C. All existing materials to remain, U.N.O. Those damaged or otherwise disturbed by the contractor's operations shall be patched and repaired to match existing adjacent materials so that repair is imperceptible.
D. Contractor shall maintain all required exits unobstructed, illuminated, and protected from construction activities.
E. Contractor to clean areas adjacent to demolition area of dust, dirt and debris caused by demolition operations.
F. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate onsite. Transport demolished materials and legally dispose of them.
G. Contractor shall notify Architect of any conflicts between existing conditions and construction documents.
H. Area of demolition will require assessment for asbestos and potential abatement, by VDPS. Abatement must be conducted by a certified professional. Construction to coordinate with abatement as it occurs.
I. Salvage removed (mortise lock) hardware to Director of Building and Grounds. Coordinate with SIQ PM and District Representative.
Sheet Keynotes D1 Demolish existing door, frame, casing and hardware.
Coordinate removal with district asbestos consultant.
D2 Prep opening to receive new door and door frame.
N
AD-101 1/8" = 1'-0"
8'4' 16'
2 Demo - Music Suite
N
AD-101 1/8" = 1'-0"
8'4' 16'
1 Demo - Auditorium
# REVISION DATE
1 75% CD 03/21/2025
E X
IS
T
G A
S
M E
T E
R
S N
A P
C O
L E
R
E X
IS
T
IN
G
R E
F R
IG
EXISTING ICE
CREAM COLER
C O
K E
C O
L E
R
Architectural Floor Plan Legend
New Construction
Area Not in Scope
Align Symbol
Existing Construction to Remain
A. All dimensions to be verified in field prior to construction. Notify architect of all discrepancies prior to starting work.
B. All dimensions on plans are to face of finish face or column centerlines, Unless Noted Otherwise (U.N.O.)
C. All interior door frames shall be located a distance of six inches from the throat return to the closest adjacent perpendicular partition, U.N.O.
D. Refer to sheet A-701 for Door Schedule.
E. Refer to sheet A-401 for room occupancy loads.
Music Suite
Auditorium
A-401
Sim
A-401
Sim
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:4
:3
P M
VDP25
04/09/25
A-101
L in c o ln
H ig h S c h o o l
I n te ri o r D o o r Im p ro v e m e n ts
Floor Plan
F e d e ra l A v e
W a rr e n
M I
General Sheet Notes:
N A-101 1/32" = 1'-0"
32'16' 64'
1 Overall Floor Plan
# REVISION DATE
1 75% CD 03/21/2025
UP
UP
UP
UP
Architectural Floor Plan Legend
New Construction
Area Not in Scope
Align Symbol
Existing Construction to Remain
6759 SF
G105
Auditorium
1519 SF
G100
Lobby
G105B
G105A
G105J G105C
G105D G105E G105HG105F
G101
900 Occ.
A1 A1
A1
2619 SF
F113 Band
1751 SF
F119
Vocal
145 SF
F115
Practice
153 SF
F117
Storage
79 SF
F118
Practice
125 SF
F121
Office
126 SF
F122
Storage
321 SF
F120
Instrument Storage
142 SF
F116
Storage
135 SF
F114
Storage
144 SF
F100
Office
142 SF
F101
Storage
67 SF
F102
Practice Room
70 SF
F103
Practice Room
70 SF
F104
Practice Room
106 SF
F105
Practice Room
74 SF
F106
Practice Room
70 SF
F107
Practice Room
66 SF
F108
Practice Room F120A
F122A
F120B
F106A
F114A
F116B
F115A
F118A
F121A
F116A F117A
F107A
F108A
F105A
F100A F101A
F102A
F103A
F104A
52 Occ.
1 Occ.
1 Occ.
1 Occ. 7 Occ.
1 Occ. 1 Occ.
3 Occ.
1 Occ. 3 Occ.
1 Occ.
35 Occ.
5 Occ.
3 Occ.
3 Occ.
3 Occ.
3 Occ.
3 Occ.
3 Occ.
A. All dimensions to be verified in field prior to construction. Notify architect of all discrepancies prior to starting work.
B. All dimensions on plans are to face of finish face or column centerlines, Unless Noted Otherwise (U.N.O.)
C. Refer to sheet A-701 for Door Schedule.
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:4
:3
P M
VDP25
04/09/25
A-401
L in c o ln
H ig h S c h o o l
I n te ri o r D o o r Im p ro v e m e n ts
Enlarged Floor Plans
F e d e ra l A v e
W a rr e n
M I
General Sheet Notes:
Sheet Keynotes A1 Crash bars required on new exit doors for spaces with an occupancy over 50.
N A-401 1/8" = 1'-0"
8'4' 16'
1 New - Auditorium
N A-401 1/8" = 1'-0"
4'2' 8'
2 New - Music Suite
# REVISION DATE
1 75% CD 03/21/2025
Door Type D1 Door Type D2
1/4" Fully tempered safety glazing
Per schedule
P er s ch ed u le
"P er s ch ed u le
Per schedule
6"
Door Type D3
P er s ch ed u le
Per schedule
Frame Type F1
2" Per schedule 2"
P er s ch ed u le
Door Hardware (Measured floor to center of hardware)
(K n ob an d
P an ic E xi t
P u ll H an dl e
P u sh P la te
Project Number
ISSUE FOR BID:
NAME:
Date:
Exp. Date:
Lic. No.
ROBERT BURROUGHS
04-09-2025 04-22-2025
1301043972
SHEET
1 2 3 4 5 6
A
B
C
D
E a rc h it ec st ru ct je ct
) 9
-9
) 9
-9 w w w
.o xs tu d io in c.
/9
/2
:4
:3
P M
VDP25
04/09/25
A-701
L in c o ln
H ig h S c h o o l
I n te ri o r D o o r Im p ro v e m e n ts
Door & Frame Legend & Details
F e d e ra l A v e
W a rr e n
M I
Door Type Legend
Door Schedule
Mark Room Name
Door Frame Door Hardware
Set Fire
Rating**Width* Height* Thickness* Type Material Finish Type Material Finish
F100A Office 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.01 ---
F101A Storage 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.02 ---
F102A Practice Room 3' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT H.03 ---
F103A Practice Room 3' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT H.03 ---
F104A Practice Room 3' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT H.03 ---
F105A Practice Room 3' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT H.03 ---
F106A Practice Room 3' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT H.03 ---
F107A Practice Room 3' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT H.03 ---
F108A Practice Room 3' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT H.03 ---
F114A Storage 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.02 ---
F115A Practice 3' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT H.03 ---
F116A Storage 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.04 ---
F116B Storage 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.05 ---
F117A Storage 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.04 ---
F118A Practice 3' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT H.03 ---
F120A Instrument Storage 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.06 20 min.
F120B Instrument Storage 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.07 ---
F121A Office 3' - 0" 7' - 0" 0' - 1 3/4" D2 HM/GL By Manuf. F1 HM PT H.01 ---
F122A Storage 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.04 ---
G101 Lobby 6' - 0" 7' - 0" 0' - 1 3/4" D3 HM By Manuf. F1 HM PT H.08
G105A Auditorium 3' - 6" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.09 20 min.
G105B Auditorium 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.09 20 min.
G105C Auditorium 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.09 20 min.
G105D Auditorium 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.09 20 min.
G105E Auditorium 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.09 20 min.
G105F Auditorium 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.09 20 min.
G105H Auditorium 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.09 20 min.
G105J Auditorium 3' - 0" 7' - 0" 0' - 1 3/4" D1 HM By Manuf. F1 HM PT H.09 20 min.
Door Frame Legend
Door Hardware Heights Diagram
General Sheet Notes:
A. Refer to specifications for additional door hardware requirements, including submittal requirements.
Note:
* Verify all door sizes in field. Dimensions of new doors and frames to match existing.
** Verify existing fire rating for the doors being replaced, and replace in-kind for any doors with existing ratings greater than newly noted ratings.
# REVISION DATE
1 75% CD 03/21/2025
| Sheets |
| A-101 - Floor Plan |
| A-401 - Enlarged Floor Plans |
| A-701 - Door & Frame Legend & Details |
| AD-101 - Demolition Plans |
| G-100 - Title Sheet |
| G-101 - General Information & Accessible Clearances |
File details come from the government source that posted it. Updated .