PRWI_242861_Camp_5_Access_Drawings_FINAL_APPROVED_25_1218.pdf
PDF 32 MB Posted
- Attached to
- NCR PRWI: C5 BATHHOUSE & VISITOR ACCESS Federal contract opportunity
- Solicitation number
- 140P2126R0003
About this file
This is a set of detailed civil engineering drawings and specifications for access improvements at Cabin Camp 5 in Prince William Forest Park, located in Triangle, Virginia. The project, titled "PRWI Camp 5 and Carter Pond Access Improvements," was prepared by Alpha Corporation and includes comprehensive site plans, grading plans, demolition plans, erosion and sediment control measures, and stormwater management (SWM) details. The project encompasses approximately 1.5 acres of disturbance across Units A and B of the cabin camp and involves construction of new five-foot-wide accessible pathways connecting both units, a six-foot-wide accessible path between units along an existing sanitary sewer alignment, reconstruction of the existing wooden pathway to the dining hall, and new handicap-accessible parking adjacent to an existing pavilion.
The drawings detail multiple construction options (Options 1-4) with specific phase-in dates, including options deleted as of September 3, 2025, and options to be reconsidered as of December 18, 2025. Key construction elements include flexible porous paving walkways with concrete curbs, stamped and dyed concrete sidewalks, retaining walls (1-3 feet high), split rail fencing, and tree plantings. Stormwater management features encompass five concentrated outfalls with underground storage pipe detention systems, outlet control structures, and erosion control measures including silt fence, tree protection, temporary and permanent seeding, and inlet protection. Survey control benchmarks and hydrologic soil group data are provided, with detailed specifications for permanent vegetation restoration, dust control, and maintenance requirements following Virginia Erosion and Sediment Control Handbook standards. The project also includes specifications for soil preparation, grading, concrete work, and utility coordination, with all work subject to Virginia Stormwater Management Program (VSMP) permitting and approval requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PRWI_242861_Camp_5_Access_DWGS_FINAL_24_1101_pg_35_39_0002.pdf | ||
| Sol_140P2126R0003_Amd_0002.pdf | ||
| questions_(1)_0001.docx | DOCX document | |
| B09_PRWI_Sign_in_sheet_3-5-2026_Camp_5_bathrooms_and_visitor_access_0001.pdf | ||
| Sol_140P2126R0003_Amd_0001.pdf | ||
| Sol_140P2126R0003.pdf | ||
| PRWI_343092_Bathhouse_5B_DWGS_FINAL_25_0903.pdf | ||
| B03_Wage_Determination_.pdf | ||
| PRWI_233645_Bathhouse_5A_Spec_FINAL_25_0903.pdf | ||
| PRWI_242861_Camp_5_Access_Spec_FINAL_25_1218.pdf | ||
| PRWI_343092_Bathhouse_5B_Spec_FINAL_25_0903.pdf | ||
| PRWI_233645_Bathhouse_5A_DWGS_FINAL_25_0903.pdf | ||
| E15_Deliverables_LmtOnSubconRpt_REQD.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPROVE VISITOR ACCESS TO UNITS A & B
ALPHA
CORPORATION
CS-1[COVER].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
CABIN CAMP 5 IN PRINCE WILLIAM FOREST PARK
PRINCE WILLIAM FOREST PARK
8/27/249/16/2410/4/2411/1/24 gfr23783 Standard gfr23783 Text Box November 12, 2024 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
Δ4 C7, C9A, C10 REINCORPORATE OPTION 12/18/25 JPB
LOD LOD
G
CO
ALPHA
CORPORATION
C1[NOTES -LEGEND-ABBREVIATIONS].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SECTION
SCALE:CG-001
A
CG-002
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
MAWAVI ROAD
G
G
G
X
X
ALPHA
CORPORATION
C2 [KEY PLAN].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
AREA A
SHEETS :
C3, C5, C7, C10
AREA B
SHEETS :
C4, C6, C8, C11
CONTRACTOR STAGING
& PARKING AREA
(SEE NOTE 4)
SITE ACCESS ROUTE
MAWAVI ROAD
(GRAVEL SURFACE)
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
G
G
G
G
G
G
X
X
X
X
X
BENCHMARK 2
BENCHMARK
BENCHMARK
BENCHMARK
ALPHA
CORPORATION
C3_C4 [EX COND].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SE
E
SH
EE
T C4
DENUDED POOR CONDITION BARREN LAND
COVER
(SEE SHEET C18) SURVEY CONTROL DATA
(US FT)
NORTHING
6,893,923.17
6,894,250.86
6,895,055.02
6,894,486.81
6,894,622.02
6,894,979.44
EASTING
11,793,840.42
11,793,649.85
11,793,699.59
11,793,652.10
11,793,638.77
11,793,635.19
NAME
BM6
BM5
BM4
BM3
BM2
BM1
DESCRIPTION
MAGNETIC HEAD NAIL
MAGNETIC HEAD NAIL
MAGNETIC HEAD NAIL
MAGNETIC HEAD NAIL
MAGNETIC HEAD NAIL
MAGNETIC HEAD NAIL
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
BENCHMARK
BENCHMARK
ALPHA
CORPORATION
C3_C4 [EX COND].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SE
E
SH
EE
T C3
DENUDED POOR CONDITION BARREN LAND
COVER
(SEE SHEET C18)
SURVEY CONTROL DATA
(US FT)
NORTHING
6,893,923.17
6,894,250.86
6,895,055.02
6,894,486.81
6,894,622.02
6,894,979.44
EASTING
11,793,840.42
11,793,649.85
11,793,699.59
11,793,652.10
11,793,638.77
11,793,635.19
NAME
BM6
BM5
BM4
BM3
BM2
BM1
DESCRIPTION
MAGNETIC HEAD NAIL
MAGNETIC HEAD NAIL
MAGNETIC HEAD NAIL
MAGNETIC HEAD NAIL
MAGNETIC HEAD NAIL
MAGNETIC HEAD NAIL
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
G
G
G
G
G
G
X
X
X
X
X
ALPHA
CORPORATION
C5_C6 [DEMO].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SE
E
SH
EE
T C6
DEMOLITION KEY NOTES
REMOVE EX WOOD COMPOSITE WALKWAY
REMOVE EX TREE
PROTECT EX CONCRETE STOOP
PROTECT EX COVERED PORCH AND CONCRETE SLAB
UNDER COVERED PORCH
REMOVE EX GRAVEL AS REQUIRED FOR NEW CONSTRUCTION
PROTECT EX EQUIPMENT PAD
PROTECT EX FLAGPOLE
PROTECT EX WATER FOUNTAIN
NOTES
1) SEE EROSION & SEDIMENT CONTROL PLANS FOR TREE
PROTECTION DETAILS AND TREE PROTECTION ALONG THE
LIMITS OF DISTURBANCE (LOD)
PROTECT EX RAMP
REMOVE EX GATE /GATE POSTS
PROTECT EX STEPS
PROTECT EX UTILITY
NOT USED THIS SHEET
RELOCATE EX WAYSIDE AS REQUIRED
TO ACCOMMODATE NEW WALKWAY.
SEE SHEET C7 FOR NEW LOCATION
OF RELOCATED WAYSIDE.
REMOVE EX WOOD WALL & WOOD STEP
REMOVE EX WOODEN STEPS.
PROTECT EX STONE WALL
NOT USED THIS SHEET
NOT USED THIS SHEET
NOT USED THIS SHEET
PROTECT EX PRIVACY WALL
REMOVE EX CONCRETE EQUIPMENT PADS. EX
EQUIPMENT ON PADS TO BE REMOVED BY OTHERS
UNDER SEPARATE CONTRACT
NOT USED THIS SHEET
REMOVE SECTION OF PIPE AS REQUIRED TO CONSTRUCT OUTLET
CONTROL STRUCTURE OCS 2.
RELOCATION REQUIRED AS PART OF OPTION 1
REMOVE EX GRAVEL AS REQUIRED FOR EXCAVATION & INSTALLATION
OF UNDERGROUND STORAGE PIPE SYSTEM DA3.
NOT USED THIS SHEET
ALL EX TREES LOCATED INSIDE THE LOD AND EX TREES
LOCATED ADJACENT THE OUTER PERIMETER OF THE LOD TO
REMAIN AND BE PROTECTED UNLESS OTHERWISE INDICATED
BY KEY NOTE 2 (TYPICAL).
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
CORPORATION
C5_C6 [DEMO].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SE
E
SH
EE
T C-
DEMOLITION KEY NOTES
NOT USED THS SHEET
REMOVE EXISTING TREE
PROTECT EX CONCRETE STOOP
NOT USED THIS SHEET
PROTECT EX EQUIPMENT
NOT USED THIS SHEET
PROTECT EX WATER FOUNTAIN
NOTES
PROTECT EX UTILITY
REMOVE EX CONC SIDEWALK SURROUNDING BLDG.
SOUTH EAST CORNER OF SIDEWALK TO REMAIN.
NOT USED THIS SHEET
PROTECT EX PROPANE TANKS AND SUPPORTING
SECTION OF CONCRETE. SEE KEY NOTE 25
NOT USED THIS SHEET
NOT USED THIS SHEET
NOT USED THIS SHEET
NOT USED THIS SHEET
NOT USED THIS SHEET
NOT USED THIS SHEET
NOT USED THIS SHEET
NOT USED THIS SHEET
PROTECT EX GATE /GATE POSTS
NOT USED THIS SHEET
PROTECT EX PRIVACY WALL
NOT USED ON THIS SHEET
APPROX LIMITS OF CONCRETE TO REMAIN TO SUPPORT
PROPANE TANKS. REMOVE CONCRETE BEYOND TANKS
AT THE NEAREST JOINT.
1) SEE EROSION & SEDIMENT CONTROL PLANS FOR TREE
PROTECTION DETAILS AND TREE PROTECTION ALONG THE
LIMITS OF DISTURBANCE (LOD)
ALL EX TREES LOCATED INSIDE THE LOD AND EX TREES
LOCATED ADJACENT THE OUTER PERIMETER OF THE LOD
TO REMAIN AND BE PROTECTED UNLESS OTHERWISE
INDICATED BY KEY NOTE 2 (TYPICAL).
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
G
G
G
G
G
G
X
X
X X
X
10+00
11+00
12+00
13+00 14+00
+0
20+63
+0
+5
50+00
51+00
51+20
+0
61+00
+6
+0
+6
100+00
101+00
101+64
+0
31+00 31+30
ALPHA
CORPORATION
C7 [SITE&GRADE]_NEW.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SE
E
SH
EE
T C8
SEE ENLARGED GRADING PLAN SHEET C9
KEY NOTES
WALKWAY - FLEXIBLE POROUS PAVEMENT WITH CURB.
CONCRETE SIDEWALK SURROUNDING BUILDING
RESTORE ALL PERVIOUS AREAS WITHIN LOD WITH SEED/TURF. TYPICAL
EDGE OF GRAVEL. PROVIDE FINE GRADING AS REQUIRED TO PROVIDE
SMOOTH TRANSITION TO ASPHALT PARKING AND ALONG EDGE OF ROADWAY.
PROVIDE ASPHALT PAVEMENT AT NEW PARKING
1' - 3' HIGH RETAINING WALL. SEE STRUCTURAL FOR DETAIL.
GRADING NOTES
1) REVISE GRADING AT DORMS AS SHOWN TO DIRECT
RUNOFF AWAY FROM BUILDING
1' - 2' HIGH RETAINING WALL - SEE STRUCTURAL FOR DETAIL.
SPLIT RAIL FENCE
LEGEND
OPTION 1 (BLDG A-60 ACCESSIBLE PATH & PARKING)
OPTION 2 (BLDG A-16 TO A-60 ACCESSIBLE PATH)
“STRIP TOPSOIL TO A DEPTH OF 6”, PERFORM
SOILS TESTING AND ANALYSIS AND PROVIDE
SOILS AMENDMENTS IN ACCORDANCE WITH
SPECIFICATION SECTION 329115 FL “SOIL
PREPARATION”, AND PERMANENTLY SEED IN
ACCORDANCE WITH SPECIFICATION SECTION
329200 TURFS AND GRASSES.
STAMPED & DYED CONCRETE WITH CURB.
DELETE CURB ACROSS
WALKWAY AT START OF
OPTION IF OPTION SELECTED
RESTORE EX GRAVEL
ROADWAY SURFACE AFTER
INSTALLATION OF
UNDERGROUND SWM
FACILITY. SEE SWM
UNDERGROUND STORAGE
NOTE 1 ON SHEET C23.
CONNECT NEW STORM PIPING
TO EXISTING DOWNSPOUTS
OPTION 3 (BLDG A-17 ACCESSIBLE PATH)
END OF OPTION
START OF OPTION
RELOCATED WAYSIDE. SEE TYPICAL POST INSTALLATION DETAIL 3 ON C26.
CONCRETE SIDEWALK WITH CROSSWALK STRIPING
PLANT NEW TREE. SEE TREE PLANTING DETAIL 5 ON SHEET C26 AND TREE PLANTING SCHEDULE, THIS SHEET.
NOT USED THIS SHEET
RELOCATE WAYSIDE AS PART OF OPTION 1. SEE TYPICAL POST INSTALLATION DETAIL 3 ON C26.
NOT USED THIS SHEET
PROVIDE CLEANOUT
NOT USED THIS SHEET
TREE PLANTING SCHEDULE
TREE
NO.
BOTANICAL /
COMMON NAME
DBH (IN) LATITUDE LONGITUDE
T1 KALMIA LATFOLIA
"MOUNTAIN LAUREL"
T2 HAMAMELIS VIRGINIANA
"WITCH HAZEL"
T3 QUERCUS ALBA
"WHITE OAK"
T4 QUERCUS ALBA
"WHITE OAK"
3 8/27/249/16/2410/4/2411/1/24 jbello Line jbello Polygon jbello Callout
THIS OPTION IS NOT IN CONTRACT
9/3/2025 jbello Callout
THIS OPTION IS NOT IN CONTRACT
9/3/2025 jbello Polygon jbello Callout
THIS OPTION WILL BE CONSIDERED
12/18/2025 jbello Line jbello Line jbello Line jbello Line jbello Line jbello Line jbello Line jbello Polygon jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
jbello Highlight
13+00 14+00
15+00
16+00
+0
18+00
+7
+0
20+63
70+00
70+90
+0
+3
ALPHA
CORPORATION
C7 [SITE&GRADE]_NEW.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SE
E
SH
EE
T C7
KEY NOTES
WALKWAY - FLEXIBLE POROUS PAVING WITH CURB
CONCRETE SIDEWALK SURROUNDING BUILDING
RESTORE ALL PERVIOUS AREAS WITHIN LOD WITH SEED/TURF. TYPICAL
GRADING NOTES
1) REVISE GRADING AT DORMS AS SHOWN TO DIRECT RUNOFF
AWAY FROM BUILDING
NOT USED THIS SHEET
SEE ENLARGED GRADING PLAN SHEET C9
PROVIDE ASPHALT PAVEMENT AT NEW PARKING
1' - 3' HIGH RETAINING WALL. SEE STRUCTURAL FOR DETAIL.
1' - 2' HIGH RETAINING WALL. SEE STRUCTURAL FOR DETAIL.
SPLIT RAIL FENCE
LEGEND
NOT USED THIS SHEET
NOT USED THIS SHEET
“STRIP TOPSOIL TO A DEPTH OF 6”, PERFORM
SOILS TESTING AND ANALYSIS AND PROVIDE
SOILS AMENDMENTS IN ACCORDANCE WITH
SPECIFICATION SECTION 329115 FL “SOIL
PREPARATION”, AND PERMANENTLY SEED IN
ACCORDANCE WITH SPECIFICATION SECTION
329200 TURFS AND GRASSES.
END OF OPTION
START OF OPTION
DELETE CURB ACROSS WALKWAY AT START OF OPTION IF OPTION SELECTED
CONNECT NEW STORM PIPING TO EXISTING DOWNSPOUTS
NOT USED THIS SHEET
NOT USED THIS SHEET
NOT USED THIS SHEET
APPROX LIMITS OF CONCRETE TO REMAIN TO
SUPPORT PROPANE TANKS. REMOVE CONCRETE
BEYOND TANKS AT THE NEAREST JOINT.
OPTION 4 (B-15 ACCESSIBLE PATH)
NOT USED THIS SHEET
PLANT NEW TREE. SEE TREE PLANTING DETAIL 5
ON SHEET C26 AND TREE PLANTING SCHEDULE,
THIS SHEET.
PROVIDE CLEANOUT
NOT USED THIS SHEET
NOT USED THIS SHEET
TREE PLANTING SCHEDULE
TREE
NO.
BOTANICAL /
COMMON NAME
DBH (IN) LATITUDE LONGITUDE
T5 KALMIA LATIFOLIA
"MOUNTAIN LAUREL"
T6 HAMAMELIS VIRGINIANA
"WITCH HAZEL"
T7 QUERCUS ALBA
"WHITE OAK"
T8 QUERCUS ALBA
"WHITE OAK"
T9 QUERCUS ALBA
"WHITE OAK"
EDGE OF GRAVEL. PROVIDE FINE GRADING AS REQUIRED TO PROVIDE
SMOOTH TRANSITION TO ASPHALT PARKING AND ALONG EDGE OF ROADWAY.
8/27/249/16/2410/4/2411/1/24 jbello Polygon jbello Line jbello Line jbello Line jbello Line jbello Callout
THIS OPTION IS NOT IN CONTRACT
9/3/2025 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
12+00
13+00 14+00
15+00
+0
20+63
ALPHA
CORPORATION
C7 [SITE&GRADE]_NEW.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
KEY NOTES
NEW WALKWAY - FLEXIBLE POROUS PAVING WITH CURB.
NOT USED THIS SHEET
CONCRETE SIDEWALK WITH CROSSWALK STRIPING
RESTORE ALL PERVIOUS AREAS WITHIN LOD WITH SEED/TURF. TYPICAL
PROVIDE ASPHALT PAVEMENT AT NEW PARKING
1' - 3' HIGH RETAINING WALL. SEE STRUCTURAL FOR DETAIL.
1' - 2' HIGH RETAINING WALL. SEE STRUCTURAL FOR DETAIL.
SPLIT RAIL FENCE
PLANT NEW TREE. SEE TREE PLANTING DETAIL 5 ON
SHEEET C26 AND TREE PLANTING SCHEDULE ON SHEET C7.
KEY NOTES 10 TO 15 NOT USED THIS SHEET
KEY NOTES 16 TO 21 NOT USED THIS SHEET
NOT USED THIS SHEET
RELOCATE ELECTRICAL CONDUIT AS NECESSARY
TO FACILITATE SPLIT RAIL FENCE INSTALLATION.
NOT USED THIS SHEET
EDGE OF GRAVEL. PROVIDE FINE GRADING AS REQUIRED TO PROVIDE
SMOOTH TRANSITION TO ASPHALT PARKING AND ALONG EDGE OF ROADWAY.
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
X
X
X X
X
10+00
11+00
12+00
13+00 14+00
+0
20+63
+0
+5
50+00
51+00
51+20
+0
61+00
+6
+0
+6
100+00
101+00
101+64
+0
31+00 31+30
ALPHA
CORPORATION
C7 [SITE&GRADE]_NEW.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SE
E
SH
EE
T C9
B
LAYOUT KEY NOTES
MAIN A-60 TO B-15. STA. 10+00 TO STA. 18+77. SEE SHEET C9C
A-60 TO A-10. STA. 30+00 TO STA. 31+31. SEE SHEET C9C
OPTION 3 INTERSECTION TO A-10. STAT 50+00 TO STA. 51+20. SEE SHEET C9C
INTERSECTION TO MAIN. STA. 60+00 TO STA. 61+63. SEE SHEET C9D
A-10 TO A-16. STA. 40+00 TO STA. 40+58. SEE SHEET C9C
MAIN TO A-40. STA 20+00 TO STA. 20+62. SEE SHEET C9C
OPTION 1 STA 90+00 TO STA. 90+64. SEE SHEET C9C
OPTION 2 STA. 100+00 TO STA. 101+64. SEE SHEET C9C
8/27/249/16/2410/4/2411/1/24 jbello Polygon jbello Polygon jbello Polygon jbello Callout
THIS OPTION IS NOT IN CONTRACT
9/3/2025 jbello Callout
THIS OPTION IS NOT IN CONTRACT
9/3/2025 jbello Callout
THIS OPTION WILL BE CONSIDERED
12/18/2025 jbello Line jbello Line jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
jbello Highlight
13+00 14+00
15+00
16+00
+0
18+00
+7
+0
20+63
70+00
70+90
+0
+3
ALPHA
CORPORATION
C7 [SITE&GRADE]_NEW.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SE
E
SH
EE
T C9
A
LAYOUT KEY NOTES
MAIN A-60 TO B-15. STA. 10+00 TO STA. 18+77. SEE SHEET C9C
NOT USED THIS SHEET
NOT USED THIS SHEET
MAIN TO A-40. STA 20+00 TO STA. 20+62. SEE SHEET C9C
B-14 TO B-10. STA. 70+00 TO STA. 70+90. SEE SHEET C9D
MAIN TO B-10. STA. 80+00 TO STA. 80+33. SEE SHEET C9D
NOT USED THIS SHEET
NOT USED THIS SHEET
NOT USED THIS SHEET
NOT USED THIS SHEET
11 OPTION 4. STA. 80+00 TO B-15. SEE SHEET C9D
8/27/249/16/2410/4/2411/1/24 jbello Polygon jbello Callout
THIS OPTION IS NOT IN CONTRACT
9/3/2025 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
A-60 TO B-15
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50
BL
D
G . A
-6
ST
A.
0+
BL
D
G . B
-1
ST
A.
8+
PROP. GRADE
EX. GRADE
MAIN TO A-40
20+00 20+50 21+00 21+50
A-60 TO A-10
30+00 30+50 31+00 31+50 32+00
BL
D
G A
-4
ST
A.
0+
BL
D
G A
-6
ST
A.
0+
BL
D
G A
-1
ST
A.
1+
PROP. GRADE
EX. GRADE
PROP. GRADE
EX. GRADE
INTERSECTION TO A-10
50+00 50+50 51+00 51+50 52+00
A-10 TO A-16
40+00 40+50 41+00 41+50
BL
D
G A
-1
ST
A.
0+
BL
D
G A
-1
ST
A.
0+
IN
TE
R
SE
C
TI
O N
W
IT
H M
AI
N
P
AT
H
ST
A.
0+
BL
D
G A
-1
ST
A.
1+
PROP. GRADE
EX. GRADE
PROP. GRADE
EX. GRADE
ALPHA
CORPORATION
C7 [SITE&GRADE]_NEW.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
H:V:
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
INTERSECTION TO MAIN
60+00 60+50 61+00 61+50 62+00 62+50
B-14 TO B-10
70+00 70+50 71+00 71+50
MAIN TO B-10
80+00 80+50 81+00
5- W
AY
IN
TE
R
SE
C
TI
O
N
ST
A.
0+
IN
TE
R
SE
C
TI
O N
W
IT
H M
AI
N
P
AT
H
ST
A.
1+
BL
D
G . B
-1
ST
A.
0+
BL
D
G . B
-1
ST
A.
0+
IN
TE
R
SE
C
TI
O N
W
IT
H M
AI
N
P
AT
H
ST
A.
0+
BL
D
G . B
-1
ST
A.
0+
PROP. GRADE
EX. GRADE
PROP. GRADE
EX. GRADE
PROP. GRADE
EX. GRADE
OPTION 2
100+00 100+50 101+00 101+50 102+00 102+50
OPTION 1
90+00 90+50 91+00 91+50
IN
TE
R
SE
C
TI
O N
W
IT
H M
AI
N
P
AT
H
ST
A.
0+
AC
C
ES
SI
BL
E
PA
R
KI
N
G
ST
A.
0+
5- W
AY
IN
TE
R
SE
C
TI
O
N
ST
A.
+0
A-
T O
A -1
PA
TH
ST
A.
+6
EX. GRADE
PROP. GRADE
EX. GRADE
PROP. GRADE
ALPHA
CORPORATION
C7 [SITE&GRADE]_NEW.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
H:V:
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
G
G
G
G
G
G
X
X
X
X
X
SFSFSF
SF
SF
SF
SFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF
SF
SF
SF
SF
SF
SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
TP
PS
TP
TP
TP
TP
TP
TP
TP
TP TP TP
TP
TP
TP
TP TP
TP
TP TP
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
SF
SF
SF
OP
SF
CONTRACTOR
STAGING
AREA
TP
SF
SF
SFTP
SF
SF
EROSION & SEDIMENT CONTROL LEGEND
SFSILT FENCE
TITLEVESCH NO. KEY SYMBOL
3.05
OUTLET PROTECTION3.18
TREE PROTECTION3.38
SF
TP
PERMANENT
SEEDING3.32 PS PS
OP
TEMP CONSTRUCTION
ENTRANCE3.02 CE
CONCRETE WASHOUT
STRUCTURE CWS
ALPHA
CORPORATION
C10_C11_C12_C13[E&S].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SE
E
SH
EE
T C-
LEGEND
8/27/249/16/2410/4/2411/1/24 jbello Polygon jbello Polygon jbello Polygon jbello Callout
THIS OPTION IS NOT IN CONTRACT
9/3/2025 jbello Callout
THIS OPTION IS NOT IN CONTRACT
9/3/2025 jbello Callout
THIS OPTION WILL BE CONSIDERED
12/18/2025 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
SF SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TP TP
TP
TP TP TP
TP
TP
TP
TP
TP
TP
TP
TP
TP TP
TP
TP
TP
TP
TPTPTP
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
SF
OP
CWS
CONTRACTOR
STAGING AREA
SFSILT FENCE
TITLEVESCH NO. KEY SYMBOL
3.05
OUTLET PROTECTION3.18
TREE PROTECTION3.38
SF
TP
PERMANENT
SEEDING3.32 PS PS
OP
TEMP CONSTRUCTION
ENTRANCE3.02 CE
CONCRETE WASHOUT
STRUCTURE CWS
SF
ALPHA
CORPORATION
C10_C11_C12_C13[E&S].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SE
E
SH
EE
T C-
LEGEND
8/27/249/16/2410/4/2411/1/24 jbello Polygon jbello Callout
THIS OPTION IS NOT IN CONTRACT
9/3/2025 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
CORPORATION
C10_C11_C12_C13[E&S].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
GENERAL EROSION CONTROL NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ANY AND ALL EROSION
CONTROL (EC) AND STORMWATER MANAGEMENT (SWM) REQUIREMENTS FOR ANY
LAND DISTURBING ACTIVITIES, INCLUDING BUT NOT LIMITED TO, ON-SITE OR OFFSITE
BORROW, ON-SITE OR OFFSITE STOCKPILING OR DISPOSAL OF WASTE MATERIALS.
BEFORE UNDERTAKING ANY LAND DISTURBING ACTIVITY FOR WHICH THE PLANS DO
NOT SPECIFICALLY ADDRESS EROSION CONTROL AND STORMWATER MANAGEMENT,
THE CONTRACTOR SHALL CONTACT THE REGIONAL OFFICE OF THE DIVISION OF SOIL
AND WATER CONSERVATION TO DETERMINE WHAT EC AND SWM MEASURES ARE
NECESSARY. THE CONTRACTOR SHALL COMPLETELY SATISFY ALL REQUIREMENTS OF
THE CONTRACTING OFFICER INCLUDING PROVIDING A DESIGNATED, CERTIFIED,
"RESPONSIBLE LAND DISTURBER" AS DEFINED IN 9VAC25-850-10 BEFORE
CONTINUING WITH THE CONCERNED ACTIVITY.
2. DEVICES SHOWN ON SHEETS C10 AND C11 ARE TO BE CONSIDERED MINIMUM
EROSION AND SEDIMENT CONTROLS. ADDITIONAL CONTROLS MAY BE NECESSARY
DUE TO CONTRACTOR PHASING OR OTHER UNANTICIPATED CONDITIONS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADDITIONAL DEVICES TO THOSE
SHOWN IN ORDER TO CONTROL EROSION AND SEDIMENTATION. THIS IS INCLUDING,
BUT NOT LIMITED TO, THE REVISION, RELOCATION OR ADDITIONS OF SILT FENCE,
INLET PROTECTION, AND TEMPORARY SEEDING.
3. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND
MAINTAINED ACCORDING TO THE STANDARDS AND SPECIFICATIONS OF THE LATEST
EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.
4. THE CONTRACTOR IS TO PROVIDE ADEQUATE MEANS OF ALLAYING DUST AS
NECESSARY BY APPLYING EITHER MOISTURE, CALCIUM CHLORIDE OR BOTH
MATERIALS ALONG THOSE SECTIONS OF THE PROJECT ADJACENT TO PUBLIC ACCESS.
5. APPLY PERMANENT VEGETATION (SEEDING) WITH SOIL PREPARATION.
AMENDMENTS AND SEED MIXTURE SHALL BE APPROPRIATE TO THE TIME OF YEAR.
SEE SEEDING MIX ON SHEET C13 FOR FURTHER DETAIL.
6. NO UNPROTECTED, DISTURBED AREA SHALL DRAIN TO ROADWAY PAVEMENTS SUCH
THAT THE SUBBASE, BASE OR WEARING SURFACE ARE CONTAMINATED BY SILT
TRAPPED AT LOW POINTS OR INLETS.
7. WATER SOURCE FOR TEMPORARY CONSTRUCTION ENTRANCES TO BE PROVIDED BY
EITHER A WATER TANK TRUCK OR AN EXISTING FIRE HYDRANT.
8. THE GRADING/EXCAVATION CONTRACTOR FOR THE SUBJECT SITE IS REQUIRED TO
NOTIFY, IN WRITING, THE ASSIGNED SITE INSPECTOR REGARDING ANY EXCESS
MATERIAL PROPOSED TO BE HAULED OFFSITE PRIOR TO HAULING. THE NOTIFICATION
MUST INDICATE THE QUANTITY OF MATERIAL TO BE MOVED OFFSITE,
IDENTIFICATION OF THE RECEIVING SITE WHERE THE EXCESS WILL BE TAKEN, AND
ALL INFORMATION NECESSARY TO SHOW THAT SUCH RECEIVING SITE HAS BEEN
PROPERLY PERMITTED AND HAS E&S CONTROLS INSTALLED.
ADDITIONAL EROSION CONTROL NOTES:
ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND
SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING
TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND
SEDIMENT CONTROL HANDBOOK, LATEST EDITION AND THE VIRGINIA EROSION AND
SEDIMENT CONTROL REGULATIONS.
ES-2: THE ADMINISTRATOR MUST BE NOTIFIED ONE WEEK PRIOR TO THE
PRE-CONSTRUCTION CONFERENCE, TWO WEEKS PRIOR TO THE COMMENCEMENT OF
LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. THE
NAME OF THE RESPONSIBLE LAND DISTURBER MUST BE PROVIDED TO THE
ADMINISTRATOR TWO WEEKS PRIOR TO ACTUAL ENGAGEMENT IN THE
LAND-DISTURBING ACTIVITY SHOWN ON THE APPROVED PLAN. IF THE NAME IS NOT
PROVIDED PRIOR TO ENGAGING IN THE LAND-DISTURBING ACTIVITY, THE PLAN'S
APPROVAL WILL BE REVOKED.
ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES TO BE PLACED PRIOR TO OR AS
THE FIRST STEP IN CLEARING.
ES-4: A COPY OF THE APPROVED E&SC PLAN SHALL BE MAINTAINED ON THE SITE AT ALL
TIMES.
ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN
INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OFF-SITE BORROW OR
WASTE AREAS) THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY E&SC PLAN TO THE
ADMINISTRATOR FOR REVIEW AND APPROVAL.
ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL
EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION
AS DETERMINED BY THE INSPECTOR.
ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL
MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE
DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED, AFTER WHICH UPON
APPROVAL BY THE INSPECTOR, THE CONTROLS SHALL BE REMOVED. TRAPPED
SEDIMENT AND DISTURBED SOIL AREAS RESULTING FROM THE REMOVAL OF
TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER
EROSION AND SEDIMENTATION.
ES-8: DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN
APPROVED FILTERING DEVICE.
ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT LEAST
ONCE EVERY FOUR (4) BUSINESS DAYS OR AT LEAST ONCE EVERY (5) BUSINESS DAYS
AND NO LATER THAN 48 HOURS FOLLOWING A MEASURABLE STORM EVENT. ANY
NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION
CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
ES-10: THE CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT
HAS BEEN TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE.
ES-11: SEEDING OPERATIONS SHALL BE INITIATED WITHIN 7 DAYS AFTER REACHING
FINAL GRADE OR UPON SUSPENSION OF GRADING OPERATIONS FOR ANTICIPATED
DURATION OF GRATER THAN 14 DAYS UPON COMPLETION OF GRADING OPERATIONS
FOR A SPECIFIC AREA.
ES-12: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR
MOVEMENT OF DUST FROM EXPOSED SOILS WHICH MAY PRESENT HEALTH HAZARDS,
TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE.
ES-13: A VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) PERMIT FOR THE
DISCHARGE OF STORMWATER FROM CONSTRUCTION ACTIVITIES IS REQUIRED FOR
PROJECTS DISTURBING 1 ACRE OR GREATER.
PERMANENT VEGETATIVE COVER NOTE:
ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT
SEEDING IMMEDIATELY FOLLOWING FINISH GRADING. SEEDING SHALL BE SELECTED
ACCORDING TO THE DETAIL ON SHEET C13. THE PLANTING SOIL MUST HAVE ENOUGH
FINE GRADED SOIL, FAVORABLE pH, SUFFICIENT PORE SPACE, SUFFICIENT DEPTH AND
FREE FROM TOXIC AMOUNTS OF HARMFUL MATERIALS OR EXCESSIVE QUANTITIES OF
ROOTS/STONES AND SHALL BE APPLIED WITH STD & SPEC 3.30. AFTER SEED IS IN PLACE,
IT MUST BE PROTECTED WITH A MULCH TO HOLD MOISTURE AND MODIFY
TEMPERATURE EXTREMES, AND TO PREVENT EROSION WHILE SEEDLINGS ARE
GROWING.
GENERAL LAND CONSERVATION NOTES
1. NO DISTURBED AREA WHICH IS NOT ACTIVELY BEING WORKED SHALL REMAIN
DENUDED FOR MORE THAN 7 CALENDAR DAYS.
2. ALL E&S CONTROL MEASURES APPROVED WITH THE E&S PLAN SHALL BE PLACED AS
THE FIRST STEP IN GRADING.
3. ALL STORM AND SANITARY SEWER LINES NOT IN STREETS SHALL BE SEEDED AND
MULCHED WITHIN 5 DAYS AFTER BACKFILL.
4. ELECTRIC POWER, TELEPHONE AND GAS SUPPLY TRENCHES SHALL BE COMPACTED,
SEEDED AND MULCHED WITHIN 7 DAYS AFTER BACKFILL.
6. DURING CONSTRUCTION ALL STORM SEWER INLETS SHALL BE PROTECTED BY INLET
PROTECTION, MAINTAINED AND MODIFIED DURING CONSTRUCTION PROGRESS AS
REQUIRED.
8. AT THE COMPLETION OF ANY PROJECT CONSTRUCTION AND PRIOR TO BOND
RELEASE, ALL TEMPORARY SEDIMENT CONTROLS SHALL BE REMOVED AND ALL
DENUDED AREAS SHALL BE STABILIZED.
9. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS
SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES.
10.ALL SOIL THAT IS BROUGHT TO THE SITE SHALL BE FROM AN APPROVED (i.e.
PERMITTED) LOCATION. ALL SOIL REMOVED FROM THE SITE WILL BE TAKEN TO AN
APPROVED (i.e. PERMITTED) LOCATION.
SOILS
THE SITE CONSISTS OF BUCKHALL LOAM(10C), MEADOWVILLE LOAM(38B), OCCOQUAN
SANDY LOAM(44D), AND OCCOQUAN SANDY LOAM(44E). FOR MORE SOILS
INFORMATION SEE SOIL MAP ON SHEET C13.
ANTICIPATED PHASING OF CONSTRUCTION
1. INSTALL SAFETY AND PROTECTION MEASURES PRIOR TO LAND DISTURBING
ACTIVITIES, INCLUDING TREE PROTECTION. INSTALL EROSION & SEDIMENT
CONTROLS & ENSURE THEY ARE PROPERLY FUNCTIONING PRIOR TO BEGINNING THE
WORK AND DISTURBANCE
2. NOTIFY THE PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE
PRE-CONSTRUCTION CONFERENCE AND ONE WEEK PRIOR TO THE COMMENCEMENT
OF LAND-DISTURBING ACTIVITY AS REQUIRED BY GENERAL EROSION & SEDIMENT
CONTROL NOTES SHOWN THIS SHEET
3. PERFORM DEMOLITION OF EXISTING TREES, CONCRETE, GRAVEL, AND WOODEN
WALKWAY.
4. TEMPORARILY STABILIZE THE SITE DAILY AS WORK PROGRESSES.
5. INSTALL PROPOSED WALK AND OTHER APPURTENANCES AS PER THE PLAN.
6. PERMANENTLY SEED ALL DENUDED AREAS IMMEDIATELY FOLLOWING FINISHED
GRADING. FOR ALL STAGING AREAS AND UTILITY MAINTENANCE WAIVER WORK,
SOILS SHALL BE DECOMPACTED AND RESTORED TO PRE-DEVELOPMENT CONDITIONS.
7. NOTIFY THE PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE FINAL
INSPECTION. UPON COMPLETION OF CONSTRUCTION, ADEQUATE STABILIZATION,
AND AUTHORITY APPROVAL, REMOVE ALL EROSION AND SEDIMENT CONTROL
MEASURES.
SEDIMENT AND EROSION CONTROL NARRATIVE
PROJECT DESCRIPTION
THE PROPOSED PROJECT IS LOCATED AT CABIN CAMP 5 IN PRINCE WILLIAM FOREST
PARK IN TRIANGLE, VIRGINIA. THE PROJECT PURPOSES TO CONSTRUCT NEW 5-FEET
WIDE ACCESSIBLE PATHWAYS WITHIN BOTH UNITS A & B OF CABIN CAMP 5. A NEW 6
FEET WIDE ACCESSIBLE PATH BETWEEN THE UNITS IS PROPOSED TO BE CONSTRUCTED
ALONG AN EXISTING SANITARY SEWER ALIGNMENT AND ADJACENT TO THE EXISTING
GRAVEL MAWAVI ROAD. THE EXISTING WOODEN PATHWAY LEADING TO THE DINING
HALL LOCATED IN CAMP A WILL BE RECONSTRUCTED. NEW HANDICAP ACCESSIBLE
PARKING IS PROPOSED TO BE INSTALLED NEXT TO THE EXISTING PAVILION.
EXISTING SITE CONDITIONS
THE SITE IS LOCATED AT THE PRINCE WILLIAM FOREST CABIN 5 CAMPGROUND IN
TRIANGLE, VIRGINIA. THE CAMPGROUND IS MAINLY WOODED. THE SIT CONTAINS
SEVERAL DORM STRUCTURES, BATH HOUSE BUILDINGS, AND OTHER CAMPGROUND
SUPPORT STRUCTURES. ELECTRIC, STORM WATER SEWER, SANITARY SEWER, AND
WATER LINES RUN THROUGHOUT THE CAMPGROUND TO SERVE THE EXISTING
CAMPGROUND STRUCTURES
ADJACENT PROPERTY
THE PROJECT SITE IS A PART OF THE OVERALL PRINCE WILLIAM FOREST PARK AND IS
BORDERED BY WOODS IN ALL DIRECTIONS.
OFFSITE AREAS
AS APPROVED BY THE CO.
CRITICAL EROSION AREAS
THE PROJECT SITE CONSISTS OF MODERATE SLOPES AND IS NEAR AREAS OF
STORMWATER RUNOFF CULMINATION.
SEDIMENT CONTROL PROGRAM
THE EROSION AND SEDIMENT CONTROL PROGRAM HAS BEEN PROPOSED TO BE
INSTALLED BEFORE OTHER CLEARING, GRADING AND CONSTRUCTION STARTS.
CONTROLS INSTALLED ARE INTENDED TO REMAIN FOR THE DURATION OF THE PROJECT.
DUST CONTROL NARRATIVE
THE CONTRACTOR SHALL UTILIZE DUST CONTROL MEASURES AS DEFINED IN THE
VIRGINIA STATE EROSION AND SEDIMENT CONTROL HANDBOOK TO PREVENT
SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE
THE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY PRESENT HEALTH HAZARDS,
TRAFFIC SAFETY PROBLEMS, OR HARM ANIMAL OR PLANT LIFE.
EROSION AND SEDIMENT CONTROL MEASURES
1. SILT FENCE - 3.05 A TEMPORARY SEDIMENT BARRIER CONSTRUCTED OF POSTS AND
FILTER FABRIC AND PLACED AT THE TOE OF A SLOPE TO INTERCEPT AND DETAIN
SEDIMENT AND DECREASE FLOW VELOCITIES FROM DRAINAGE AREAS OF LIMITED
SIZE.
PERMANENT STABILIZATION/VEGETATIVE MEASURES WILL INCLUDE:
1. TEMPORARY SEEDING (3.31) - TEMPORARY SOIL STABILIZATION SHALL BE APPLIED
WITHIN 7 DAYS TO DENUDED AREAS NOT AT FINAL GRADE BUT WILL REMAIN
DORMANT FOR LONGER THAN 14 DAYS. TEMPORARY SEEDING MAY BE USED
DURING SEASONS WHEN PERMANENT SEEDING IS PROHIBITED. SEEDING SHALL BE
PER TABLE 3.31.B.
2. PERMANENT SEEDING (3.32) - ALL AREAS DENUDED BY THIS CONSTRUCTION
SHALL BE STABILIZED SEEDING. PERMANENT SEEDING SHALL BE PER TABLE ON
C13.
MAINTENANCE
1. ALL MEASURES ARE TO BE INSPECTED DAILY BY THE SITE SUPERINTENDENT OR
THEIR REPRESENTATIVE. ANY DAMAGED STRUCTURAL MEASURES ARE TO BE
REPAIRED BY THE END OF THE DAY.
2. TRAPPED SEDIMENT IS TO BE REMOVED AS REQUIRED TO MAINTAIN EFFICIENCY
AND TO BE DISPOSED OF BY SPREADING ON-SITE.
3. CONTROLS MAY BE REMOVED AFTER AREAS ABOVE THEM HAVE BEEN
STABILIZED AND WITH APPROVAL OF THE SITE INSPECTOR.
GUIDANCE MEMO NO. 15-2003
THE CONSTRUCTION OF ABOVEGROUND OR UNDERGROUND LINEAR UTILITIES MAY
BE CONDUCTED WITHOUT REQUIRING COVERAGE UNDER THE GENERAL VPDES
PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES
(CONSTRUCTION GENERAL PERMIT) PROVIDED THAT:
· THE PROJECT DOES NOT SIGNIFICANTLY ALTER THE PREDEVELOPMENT RUNOFF
CHARACTERISTICS OF THE LAND SURFACE AFTER THE COMPLETION OF
CONSTRUCTION AND FINAL STABILIZATION;
· THE PROJECT IS MANAGED SO THAT LESS THAN ONE (1) ACRE OF LAND
DISTURBANCE OCCURS ON A DAILY BASIS;
· THE DISTURBED LAND WHERE WORK HAS BEEN COMPLETED IS ADEQUATELY
STABILIZED ON A DAILY BASIS;
· THE ENVIRONMENT IS PROTECTED FROM EROSION AND SEDIMENTATION
DAMAGE ASSOCIATED WITH THE LAND-DISTURBING ACTIVITY;
· THE OWNER AND/OR CONSTRUCTION ACTIVITY OPERATOR DESIGNS, INSTALLS,
IMPLEMENTS, AND MAINTAINS POLLUTION PREVENTION MEASURES TO:
o MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE
WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS;
o MINIMIZE THE EXPOSURE OF BUILDING MATERIALS, BUILDING PRODUCTS, CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE, AND OTHER
MATERIALS PRESENT ON-SITE TO PRECIPITATION AND TO STORMWATER;
o MINIMIZE THE DISCHARGE OF POLLUTANTS FROM SPILLS AND LEAKS AND
IMPLEMENT CHEMICAL SPILL AND LEAK PREVENTION AND RESPONSE
PROCEDURES;
o PROHIBIT THE DISCHARGE OF WASTEWATER FROM THE WASHOUT OF
CONCRETE;
o PROHIBIT THE DISCHARGE OF WASTEWATER FROM THE WASHOUT AND
CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS,
AND OTHER CONSTRUCTION MATERIALS; AND
o PROHIBIT THE DISCHARGE OF FUELS, OILS, OR OTHER POLLUTANTS USED IN
VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE.
· THE OWNER AND/OR CONSTRUCTION ACTIVITY OPERATOR PROVIDES
REASONABLE ASSURANCE TO DEQ OR THE LOCAL VSMP AUTHORITY THAT ALL OF
THE ABOVE CONDITIONS WILL BE SATISFIED. THIS MAY BE ACCOMPLISHED BY
INCORPORATING THESE CONDITIONS INTO AN EROSION AND SEDIMENT
CONTROL PLAN DEVELOPED FOR THE PROJECT.
MINIMUM STANDARDS (9VAC25-840-40):
1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED
AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF
THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS
TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN
DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE
APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS
SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE
APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT
STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND
SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS
NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL
NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS
UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND
OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A
FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL
BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS
DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED
BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC
YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL
DRAINAGE AREAS LESS THAN THREE ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW
FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE
CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A
SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE
OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY
OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF
COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE
EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE
SEDIMENT BASIN IS UTILIZED.
7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER
THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING
EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE
PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM
IS CORRECTED.
8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS
CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL,
FLUME OR SLOPE DRAIN STRUCTURE.
9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER
PROTECTION SHALL BE PROVIDED.
10.ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION
SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE
CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED
TO REMOVE SEDIMENT.
11.BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES
ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED
TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE
CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
12.WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE
TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND
STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING
CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE
CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED
FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS.
13.WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES
MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR
STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE
PROVIDED.
14.ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO
WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET.
15.THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY
AFTER WORK IN THE WATERCOURSE IS COMPLETED.
16.UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE
FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED
THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND
DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING
STREAMS OR OFF-SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED
IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS
CHAPTER.
F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.
17.WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC
ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT
BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS
TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE
SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE
REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED
TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED
ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL
APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER
LAND-DISTURBING ACTIVITIES.
18.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE
TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE
AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED
SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL
BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND
SEDIMENTATION.
19.PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL
BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO
INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER
RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN
ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM
RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL
CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE
EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR
NATURAL OR MAN-MADE CHANNELS:
A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL
BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE
RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE
RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY
ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED.
B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING
MANNER:
(1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO
THE POINT OF ANALYSIS WITHIN THE CHANNEL IS 100 TIMES GREATER THAN THE
CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR
(2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR
STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR
CAUSE EROSION OF CHANNEL BED OR BANKS;
(B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED
BY THE USE OF A 10-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT
OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE
THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND
(C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A
10-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE
PIPE OR SYSTEM.
C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED
MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL:
(1) IMPROVE THE CHANNELS TO A CONDITION WHERE A 10-YEAR STORM WILL
NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION
TO THE CHANNEL, THE BED, OR THE BANKS;
(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE 10-YEAR
STORM IS CONTAINED WITHIN THE APPURTENANCES;
(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK
RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS
INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK
RUNOFF RATE FROM A 10-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS
INTO A MAN-MADE CHANNEL; OR
(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER
DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP
AUTHORITY TO PREVENT DOWNSTREAM EROSION.
D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE
IMPROVEMENTS.
E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED
CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE
SUBJECT PROJECT.
F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER
DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR
MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE
MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE
FOR PERFORMING THE MAINTENANCE.
G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING
CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL
DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION
FROM THE FACILITY TO THE RECEIVING CHANNEL.
H. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR
SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE
OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION
FACILITY.
J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS
OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT
SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD,
THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE
DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE
ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING
CALCULATIONS.
K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE
EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL,
CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS
OF THE STATE.
L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR
STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND
VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL
SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL
OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I) DETAIN THE
WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND
RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE
ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE
RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS
LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS
IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE
FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE
RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED
CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED
CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND
VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED
IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR
62.1-44.15:65 OF THE ACT.
M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY
AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS
SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY
REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET
SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH
LAND-DISTURBING ACTIVITIES (I) ARE IN ACCORDANCE WITH PROVISIONS FOR
TIME LIMITS ON APPLICABILITY OF APPROVED DESIGN CRITERIA IN 9VAC25-870-47
OR GRANDFATHERING IN 9VAC25-870-48 OF THE VIRGINIA STORMWATER
MANAGEMENT PROGRAM (VSMP) REGULATION, IN WHICH CASE THE FLOW RATE
CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT SHALL
APPLY, OR (II) ARE EXEMPT PURSUANT TO § 62.1-44.15:34 C 7 OF THE ACT.
N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN
9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM
(VSMP) REGULATION SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF THIS
SUBDIVISION 19.
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
C10_C11_C12_C13[E&S].DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
SCALE:
SILT FENCE
NTSA SCALE:
TEMPORARY & PERMANENT SEEDING
NTSB SCALE:
TREE PROTECTION
NTSC
SCALE:
ONSITE CONCRETE WASHOUT STRUCTURE
NTSD
PERMANENT SEEDING (SEE NOTE THIS SHEET)
TEMPORARY SEEDING
PERMANENT SEEDING NOTE
SEED WITH HALF SEEDING RATE
OF AN EQUAL RATIO OF ERNMX -
114 AND ERNMX-129, OR
APPROVED EQUAL SEED MIXES.
OR APPROVED EQUAL
OR APPROVED EQUAL
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
X
X
B
A
B
B
A B
B
A
IMPERVIOUS COVER
DENUDED POOR CONDITION
BARREN LAND COVER
(SEE SHEET C18)
LEGEND
LIMITS OF DISTURBANCE
(FOR STORMWATER COMPUTATION
PURPOSES ONLY)
MANAGED TURF
(NONE SHOWN)
SYMBOL DESCRIPTION
A
B
HYDROLOGIC SOIL GROUP
(PER PRINCE WILLIAM
COUNTY GIS)
SWM APPLICABLE AREA NARRATIVE
THE SITE IS DEFINED BY THE PROPOSED LIMITS OF DISTURBANCE (LOD) OF APPROXIMATELY
1.5 ACRES.
ALPHA
CORPORATION
C-14.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
IMPERVIOUS COVER
LEGEND
LIMITS OF DISTURBANCE
(FOR STORMWATER COMPUTATION
PURPOSES ONLY)
MANAGED TURF
(NONE SHOWN)
SYMBOL DESCRIPTION
A
B
HYDROLOGIC SOIL GROUP
(PER PRINCE WILLIAM
COUNTY GIS)
MAWAVI ROAD
MAWAVI ROAD
X
X
B
A
B
B
A B
B
A
ALPHA
CORPORATION
C-15.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
X
X
B
A
B
B
A B
B
A
2BP
3BP
SF
SF
SF
SF
SF
SF
SCF
SCF
SCF
SCF
IMPERVIOUS COVER
DENUDED POOR CONDITION
BARREN LAND COVER
LEGEND
MANAGED TURF
(NONE SHOWN)
SYMBOL DESCRIPTION
BYPASS AREAS
(NON LOD)
LEGEND
SYMBOL DESCRIPTION
LIMITS OF DISTURBANCE
(FOR STORMWATER COMPUTATION
PURPOSES ONLY)
DRAINAGE AREA
DRAINAGE DIVIDE
D
A
B
HYDROLOGIC SOIL GROUP
(PER PRINCE WILLIAM
COUNTY GIS)
SF
SF = SHEETFLOW
SCF = SHALLOW CONCENTRATED FLOW
CF = CONCENTRATED FLOW
TIME OF CONCENTRATION
ALPHA
CORPORATION
C-16.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
X
X
2D
2BPD2UD
3D
SF
SF
SF
SF
SF
SF
SCF
SCF
SCF
SCF
CF
B
A
B
B
A B
B
AIMPERVIOUS COVER
LEGEND
LIMITS OF DISTURBANCE
(FOR STORMWATER COMPUTATION
PURPOSES ONLY)
MANAGED TURF
(NONE SHOWN)
SYMBOL DESCRIPTION
BYPASS AREAS (NON-LOD)
LEGEND
SYMBOL DESCRIPTION
DRAINAGE AREA
DRAINAGE DIVIDE
D
A
B
HYDROLOGIC SOIL GROUP
(PER PRINCE WILLIAM
COUNTY GIS)
ALPHA
CORPORATION
C-17.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
NOTE: POST-DEVELOPMENT TIMES OF
CONCENTRATION ARE ASSUMED TO
BE 6 MINUTES FOR A CONSERVATIVE
HYDROLOGIC ANALYSIS.
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
2D
2BPD2UD
3D
SF
SF
SF
SF
SF
SF
SF
SCF
SCF
SCF
SCF
CF
B
A
B
B
A B
B
A
ALPHA
CORPORATION
C-17.1.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
LEGEND
LIMITS OF DISTURBANCE
(FOR STORMWATER COMPUTATION
PURPOSES ONLY)
SYMBOL DESCRIPTION
DRAINAGE DIVIDE
8/27/249/16/2410/4/2411/1/24 jbello Text Box
Δ1 C7, C8 DELETE OPTIONS 9/3/25 JPB
Δ2 C9A, C9B DELETE OPTIONS 9/3/25 JPB
Δ3 C10, C11 DELETE OPTIONS 9/3/25 JPB
C-18.DWGN:\JOBS\DULLES\572-100-C PRWI CAMP 5 AND CARTER POND ACCESS IMPROVEMENTS\5000 CIVIL\DWGS CAMP 5\IN PROGRESS\SHEETS NICK.NAVARRO
21000 ATLANTIC BLVD, S. 400
DULLES, VA 20166 (703)450-0800
www.alphacorporation.com
WATER QUALITY COMPUTATIONS
WATER QUALITY NARRATIVE
THE SITE IS DEFINED BY THE PROPOSED LIMITS OF DISTURBANCE (LOD) OF
APPROXIMATELY 1.5 ACRES.
WATER QUALITY REQUIREMENTS
THE SITE IS SUBJECT TO THE REQUIREMENTS OF SECTION 9VAC25-870-63.A.2 OF THE
VSMP REGULATION FOR THE DEVELOPMENT ON PRIOR DEVELOPED LANDS.
WATER QUALITY COMPLIANCE
THE SITE IN ITS PRE-DEVELOPMENT CONDITIONS CONTAINS AREAS OF DENUDED
TURF COVER WHERE THE AREAS HAVE BEEN SUBJECT TO PROLONGED FOOT
TRAFFIC BY SITE USERS. GROUND IS COMPACTED IN THESE AREAS AND IT IS
CONSIDERED IMPERVIOUS COVER PER 9VAC25-870-10, DEFINITION OF IMPERVIOUS
COVER. IN POST-DEVELOPMENT CONDITION, THE WORK PROPOSES TO ESTABLISH
GOOD CONDITION MANAGED TURF LAND COVER IN THESE AREAS VIA AMENDING
ORGANIC MATERIAL, TILLING, AND AERATION OF THE FIRST 6 TO 10 INCHES OF THE
TOPSOIL.
THE OWNER SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE MANAGED TURF
COVER IN GOOD CONDITION, PER SECTION 9VAC25_870-112.A. A MAINTENANCE
AGREEMENT IS NOT REQUIRED TO BE SUBMITTED TO DEQ.
SEE COMPLIANCE COMPUTATIONS ON THIS SHEET.
EXISTING LAND COVER NARRATIVE
PER SECTION 9VAC25-870-66.E AND F, THE APPLICANT REQUESTED TO
CHARACTERIZE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .