This is a Statement of Work (SOW) for Protective Coating Maintenance services at Grand Forks Air Force Base (GFAFB) in North Dakota, dated 14 January 2026.

The Contractor shall provide all labor, materials, tools, equipment, uniforms, and supervision to perform protective coatings maintenance for GFAFB industrial facilities (excluding Military Family Housing). Services include interior and exterior painting of walls, ceilings, concrete floors, building surfaces, pavements, parking lot striping, airfield striping, parking ramp markings, and fire hydrants; installation and repair of wall coverings; and taping, bedding, and texturing of walls. Work shall be performed according to Objective Quality Standards in Technical Exhibit 1 and conform to UFC 3-190-06 Protective Coatings and Paints standards. Normal work hours are 7:45 a.m. to 4:30 p.m. Central Time, Monday through Friday, except federal holidays. A no-work/winter exclusion period extends from 1 November through 15 April annually. The Contractor must provide an on-site Project Manager physically present during normal hours and designated alternates with full supervisory authority. All personnel require contractor-furnished identification badges, distinctive uniforms (company shirt and white painter pants), and security clearances for restricted area access obtained through National Agency Checks per DODM 5200.02. The Government provides a 2,000 SF facility at 543 Contractor Row (Building 491) connected to utilities; the Contractor is responsible for utilities costs established through a utility sales agreement and minor facility maintenance. The Contractor furnishes all materials and supplies meeting Objective Quality Standards, maintains paint storage preventing freezing, and provides portable structures for flammable material storage meeting OSHA requirements. Extensive environmental compliance obligations include waste disposal management plans, hazardous materials listings with Safety Data Sheets, spill control and dust control plans, air quality management (Low-VOC or Zero-VOC paints only), and participation in base recycling programs. Work is controlled through government-issued work orders specifying square footage, facility numbers, completion dates, and Contract Line Item Numbers with unit prices; the Contractor receives work orders from the project inspector and maintains weekly scheduling meetings as needed. The Contractor shall pre-inspect facilities, report repair requirements, schedule work with building occupants at least two business days in advance, and complete work per timelines in work orders, with one day added for each day environmental conditions do not meet specifications. Quality assurance provisions require contractor-submitted quality control programs, qualified supervisors, and 72-hour notice prior to final inspections; work must be accepted by the Government project inspector and Contractor before payment. Additional responsibilities include pavement markings complying with ETL 04-2 or UFC 3-260-04 standards, fire system painting per NFPA 13, compliance with fire regulations, environmental protection against spills and fugitive emissions, security protocols for controlled/secure areas with pre-announcement requirements, coordination with other contractors, and 24-hour key return upon employee termination with reimbursement for lock/re-keying costs resulting from contractor negligence. The Government retains the right to perform any tasks in-house.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14 January 2026

STATEMENT OF WORK

PROTECTIVE COATING MAINTENANCE

GRAND FORKS AFB, ND

TABLE OF CONTENTS

SECTION l—GENERAL

1. Scope of Work

1.2 Personnel

1.3 Hours of Operation

1.4 Contingencies

1.5 Environmental Compliance and Clean-up

1.6 Fire Regulations

1.7 Damages

1.8 Employee Conduct

1.9 Military Exercises

1.10 Work Schedule

1.11 Conservation of Utilities

1.12 Key Control

1.13 Government Observations

1.14 Documentation and Records

1.15 Coordination with Other Contractors

1.16 Government Work

SECTION 2—DEFINITIONS AND ACRONYMS

2.1 Standard Definitions

2.2 Acronyms

SECTION 3-GOVERNMENT FACILTIES

3.1 Facilities

3.2 Utilities

SECTION 4--CONTRACTOR-FURNISHED ITEMS

4.1 General

4.2 Facilities

4.3 Materials and Supplies

4.4 Samples

4.5 Vehicles

SECTION 5--SPECIFIC TASKS

5.1 Work Control

5.2 Exterior Paint Requirements

5.3 Interior Paint Requirements

5.4 Administrative Reports and Data

5.5 Moving Assigned Job Orders

5.6 Work Priorities

5.7 Work at Hospital

5.8. Work Orders

5.9. Signage Program

5.10. Pavement Markings

5.11. Fire Systems

5.12. Quality Assurance Provisions

TECHNICAL EXHIBITS TO STATEMENT OF WORK

TE-1 Objective Quality Standards

TE-2 Vinyl-coated Wall coverings

TE-3 GFAFB Recycled Items

SECTION 1

GENERAL

1. Scope of Work. Except as provided in Section 3, the Contractor shall furnish all labor, transportation, tools, equipment, uniforms/protective clothing, materials, supplies, supervision, and administration to provide protective coatings for various Grand Forks Air Force Base (GFAFB) facilities in accordance with (IAW) the terms of this contract.

1.1. For base industrial facilities (no work to be performed in Military Family Housing), the Contractor shall perform both exterior and interior painting. The Contractor shall paint walls, ceilings, concrete floors, exterior building surfaces, pavements, parking lot striping, airfield striping, parking ramp markings (arrows), and fire hydrants; install and repair wall coverings;

tape, bed, and texture walls. Performance shall be according to the standards contained in Technical Exhibit 1 (TE-1). The main functions include but are not limited to:

1.1.1. Maintenance Management and Inspection of Facilities (see Section 5 and TE-1).

1.1.2. Exterior Paint Requirements. (Surface Preparation, Priming, Painting, Taping (if applicable), Caulking, and Glazing Putty).

1.1.3. Taping, Interior Facilities Maintenance (Surface Preparation, Painting, Taping, and Bedding of Gypsum Board Cracks and Repair of Holes in Gypsum Board as required including all necessary wood blocking).

1.1.4. Crosswalk Maintenance and striping of streets/parking areas: Streets, airfield, and parking lots shall be painted per Contracting Officer’s or project inspector directions. Crosswalk tape shall not be used.

The above general outline of main functions does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, and materials required by this contract. In addition to other safety codes and manuals referenced in the contract documents, all work must be performed IAW applicable Occupational Safety and Health Administration (OSHA) regulations and industry accepted safe practices.

1.2. Personnel.

1.2.1. Project Manager. The Contractor shall provide a fully qualified on-site project manager or designated representative(s), physically present between the hours of 7:45 a.m. – 4:30 p.m.

Central Time, Monday through Friday, except on Federal holidays IAW paragraph 1.3.2.

Designated representatives for the project manager shall provide phone numbers for himself/herself and one alternate representative. The designated representative shall have full supervisory authority during the absence of the project manager. The project manager or alternates shall be responsible for management and coordination of the contract and shall be the point of contact with Government representatives. The Contractor shall notify the Contracting Officer in writing, prior to contract start date, of the names of the project manager and the designated representatives.

1.2.1.1. The project manager and designated representative(s) shall be able to read, write, and understand English fluently.

1.2.1.2. The project manager and designated representative(s) shall be able to read and correctly interpret all regulations, manuals, and specifications.

1.2.2. Other Personnel. The Contractor shall furnish qualified supervisory, administrative, and other personnel to accomplish all work required. The Contractor is prohibited from hiring off-duty government Civil Engineer Squadron (CES) employees from Grand Forks AFB.

1.2.2.1. The Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a personal conflict of interest nor shall the Contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval IAW DOD 5500.7-R, Joint Ethics Regulation.

1.2.2.2. The Contractor is cautioned that off duty active military personnel hired under this contract may be subject to permanent change of station (PCS), change in duty hours or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the Contractor's ability to perform. Their absence at any time shall not constitute an excuse for nonperformance under this contract.

1.2.3. Contractor Identification. Each Contractor employee shall wear a visible contractor-furnished identifying badge, which shall include, at a minimum, the person's name and the name of the Contractor. All Contractor employees shall wear similar distinctive uniforms. These uniforms shall, at a minimum, consist of a company shirt and white painter pants. To ensure a professional image is projected at all times, no clothing (tank tops, etc.) shall be worn that will detract from the uniform’s appearance.

1.2.4. Security Requirements. Personnel requiring more than periodic access to restricted areas must have a favorable National Agency Check IAW DODM 5200.02, Procedures for DOD Personnel Security Program (PSP). The CES Security Manager will provide assistance in the preparation of the required security forms. After the National Agency Checks are completed, employees will be issued a United States Air Force (USAF) Restricted Area Badge. All Government property badges (identification cards, restricted area badges) must be returned within 24 hours after employment is terminated. The Contractor shall retrieve such items and report any loss or misuse to the appropriate authorities. The Government will conduct and bear all costs for background investigations for required clearances. The number of personnel obtaining security clearances/badges will be kept to a minimum. The following publications must be adhered to:

AFI 31-101 Integrated Defense

DODM 5200.02 Procedures for the DoD Personnel Security Program (PSP) Personnel Security Program

AFI 31-501: Personnel Security Program Management

1.2.4.1. Work in Controlled/Secure Areas. The Contractor shall be responsible for pre-announcing workers into controlled/secure areas. Pre-announcement is handled through the controlled area monitor of the owning/using unit. The Security Forces may search all vehicles and all personnel. Each person must present two forms of identification, at least one of which must have a current photograph. After the Contractor personnel are cleared/searched, and when directed by the Security Forces, they will proceed through the entry control point. The time required for this entry procedure should be anticipated at 30 minutes, and is not reimbursable by the Government.

1.2.4.1.1. Workers painting red security lines in secured areas shall have restricted area badges, security clearances, pre-announcement, and/or Security Forces escorts. Failure to comply could result in security violations. The Government will not be responsible for any expenses resulting from security violations.

1.2.4.1.2. Delays caused by Contractor personnel requiring escorted movement from one secure area to another or delays are not considered reimbursable by the government. Such delays shall be anticipated by the Contractor.

1.2.4.1.3. At irregular and unscheduled times, mission exercises, such as an alert/exercise, will prevent the Contractor from entering or exiting through the security gate at the entry control point. Such exercises occur on an average of once a month and last approximately 30 minutes.

The Government as indicated on the price schedule will reimburse delays in excess of 45 minutes. Delays will be reimbursed by 15 minute intervals; the contract line item for delays shall be by flat hourly rate, not a man-hour rate. The Contractor shall notify the project inspector or the Contracting Officer of all delays within one (1) working day after each occurrence.

1.2.5. Control of Contractor Employees. Assignment, transfer, and reassignment of Contractor personnel will be the prerogative of the Contractor. The Contractor shall be responsible for selection, certification, assignment, supervision, management, and control of employees in performance of the Protective Coating Maintenance contract and shall comply with the general intent and specific policies set forth in regulations of Grand Forks Air Force Base (GFAFB) concerning conduct of employees as referenced herein.

1.3. Hours of Operation.

1.3.1. Normal Hours. All required inspections and maintenance and repair actions shall normally be 7:45 a.m. to 4:30 p.m. Central Time, Monday through Friday. Work hours outside of “normal” must be requested in writing to the Contracting Officer and approved, extended hours are at no cost to the government. Extended hours will not commence until approved. Request for extended hours shall be submitted to Contracting Officer 2 business days prior to work commencement.

1.3.2. Recognized Holidays. The Contractor is not required to work on federally recognized holidays: New Year’s Day, Martin Luther King Jr. Day, Presidents Day, Memorial Day, Juneteenth, July Fourth, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day.

1.4. Contingencies. In the event contractor work is necessary because of natural disaster, civil disturbance, military contingency operations, fire, the Contracting Officer may direct emergency work be accomplished outside of established work hours. Such work shall be subject to negotiation for reimbursement. It shall not include major rehabilitation or major repairs.

1.5. Environmental Compliance and Clean-up. The Contractor shall leave the work area free of all debris generated by its own work at the end of each workday as well as job site cleanup each day and upon completion. Facilities serviced by the Contractor shall be returned to the Government in the same condition of cleanliness as existed when received by the Contractor.

All plumbing fixtures used to clean paint equipment shall be cleaned immediately after use.

Mineral spirits and flammable liquids must be disposed of properly and shall not be poured into plumbing fixtures, on grass, plants, or asphalt. Flammable paints, liquids, and materials shall not be stored overnight at facilities other than Contractor storage lockers. The Contractor shall follow all applicable environmental rules and regulations, including the base stormwater permit and Stormwater Pollution Prevention Plan. For all contractor required environmental plan submittals (Waste, Spill, Dust, and Hazardous Materials), it is suggested to use government provided examples. They are available from 319 CES/CEIE ( 319CES.CEIE.EnvironmentalQC@us.af.mil ). Activities that may create water pollution problems are:

- Media Blasting - No “grit” may be left where it can enter the storm water collection system and increase sedimentation

- Pressure washing - No “process water” is allowed to enter the storm water collection system.

Cleaning agents must be approved for discharge or if not, collected for discharge to the sanitary system.

1.5.1. Disposal of Materials and Hazardous Waste. The Contractor shall not dispose of any refuse, debris, or hazardous waste in any Government-contracted dumpster. The Contractor shall make arrangement to provide a dumpster at the Contractor facility at Contractor’s expense.

Dumpsters may be secured to prevent unauthorized usage. Material disposed of will conform to all local, state, and federal guidelines, criteria, and regulations at no additional cost to the mailto:319CES.CEIE.EnvironmentalQC@us.af.mil

Government. The Contractor shall participate in the base-recycling program. See TE-3 for a list of items recycled on GFAFB.

1.5.1.1. The Contractor shall submit a waste disposal management plan for approval to CO and to the 319 CES/CEIE workflow email ( 319CES.CEIE.EnvironmentalQC@us.af.mil ) prior to beginning any work on the installation. The plan shall include, but is not limited to, how the Contractor plans on managing discarded paints and paint byproducts, joint compounds, spent acids and solvents, blast media and sweepings. All hazardous waste generated on GFAFB must be managed IAW hazardous generator standards as specified in 40 CFR 262. The Contractor shall coordinate with 319 CES/CEIE prior to generating, accumulating, or storing, any known hazardous wastes or spent hazardous materials.

1.5.1.2. Hazardous waste are hazardous substances as defined in 40 CFR 261, or as defined by applicable State and local regulations. Examples of waste commonly generated in construction activities include, but are not limited to, spent solvents, paints, adhesives, lead-based paint abatement wastes, and glues. All contaminated cleaning supplies, filters, personal protective equipment used in the handling of hazardous wastes are also hazardous waste. Other waste may also be hazardous, and if in doubt, obtain guidance from 319 CES/CEIE.

1.5.1.3. All hazardous waste will be properly packaged, labeled, and transported in UN-DOT approved containers. Storage of waste containers during accumulation and pre-transport must be properly marked and stored within the Contractors facility. Containers used to accumulate, store, or transport hazardous waste will be new/unused, performance-oriented tested containers that are marked with appropriate information showing they conform to 40 CFR 262. The Contractor shall label containers used to accumulate hazardous waste with the contents of the container. Contractor will coordinate HW storage requirements with the CO and 319 CES/CEIE prior to any accumulation.

1.5.1.4. All hazardous waste will be property of contractor. Waste disposal documentation will include all EPA and state required manifest forms. North Dakota requires a Uniform Hazardous Waste Manifest. Contractor will use GFAFB EPA ID number. The contractor must handle, store, manifest, and transport hazardous wastes in accordance with 40 CFR, 49 CFR and NDAC 33-24. The contractor assumes all financial obligation to accomplish this. Uniform HW manifest copies include on-site generator copy and completed original upon completion. The contractor must secure 319 CES/CEIE signature on the Hazardous Waste Manifest. The contractor shall provide a 10-day notice and will email the workflow or call to schedule review of all hazardous waste shipments and required signature of manifests.

1.5.1.5. Used fluorescent tubes are universal waste. The Contractor shall turn used fluorescent tubes into the Bldg 408 Hazardous Waste Office for recycling. The Contractor shall individually double-bag broken bulbs in plastic bags and tape shut. The Contractor shall contact the Hazardous Waste Office at (701) 747-5995 to acquire the proper container for storage and further guidance on storage requirements for light tubes only.

1.5.2 Hazardous Material Authorization. IAW DAFMAN32-7002, Chapter 3, Hazardous Material Management, contractors using hazardous materials on GFAFB must comply with the authorization procedures contained in chapter 3 of the instruction and this technical specification. IAW FAR Clause 52.223-3, each offeror must provide the Contracting Office with a list of proposed and planned Hazardous Materials for use on the installation during the performance of the contract. The contractor shall at all times use non-hazardous alternatives to accomplish work under this contract. Coatings containing asbestos, lead, mercury, cadmium or chromate are not authorized. At the start of the contract, the Contractor shall submit a listing of all equipment utilized for painting, stripping, and cleaning.

1.5.2.1 To implement the AF authorization and tracking process, Contractors must submit their Hazardous Materials listing to the CO and to the 319 CES/CEIE workflow email ( 319CES.CEIE.EnvironmentalQC@us.af.mil ) prior to beginning any work on the installation.

The hazardous materials listing must include the following information and supporting documentation necessary for approval:

• a listing of the anticipated hazardous materials to be used on the installation

• all material SDSs (formerly referred to as MSDSs) in individual pdf format from the manufacturer

• all container sizes for each material (16 oz., 5 gallon, 1 pint, etc.)

• all container types for each material, (plastic bottle, plastic pail, metal can, etc.), and

• a listing of all industrial sized batteries such as those included with cranes or other large heavy equipment to be used, if applicable, including their size, type, serial number and

SDS

1.5.2.2 If the contractor needs to bring hazardous material on the installation that was not included in the original Hazardous Material listing, the contractor must first notify the Contracting Office and then obtain prior authorization.

1.5.3 Air Quality Management. The contractor shall abide by the base Air Permit-Operate issued to Grand Forks Air Force base, as well as all state, federal, local and AF air quality rules.

1.5.3.1 Air Emissions. The Contractor shall limit emissions of Volatile Organic Compounds (VOC) into the atmosphere. Only paints, primers, and solvents labeled as Low-VOC (containing less than 50 g/L of VOCs) or Zero-VOC (containing less than 5 g/L of VOCs) may be used.

1.5.3.2. Dust Control. During surface preparation (sanding, scraping), the Contractor must use dust collection systems and seal off work areas with plastic sheeting to prevent particulate matter (PM) from contaminating the HVAC system or other areas of a building or project area.

1.5.3.3. Blast Media (Abrasive Blasting). For areas requiring abrasive blasting or sandblasting, the Contractor shall erect containment shrouds around the blasting area IAW SSPC Guide 6 (Class 2A or Class 3A). Only clean, non-hazardous blast media may be used. The use of crystalline silica sand is prohibited. Low-dust, recyclable, or eco-friendly media must be approved by the CO and 319 CES/CEIE prior to use. Any large, stationary diesel compressors or other stationary combustion engines that are often used for abrasive blasting shall be coordinated with 319 CES/CEIE.

1.5.3.4. Lead-Based Paint (LBP). If a structure was built before 1978, or if lead-based paint is suspected, or encountered during surface preparation, the Contractor must immediately stop working in that area and notify the CO. Work can resume once testing is completed. If lead-based paint is present, all work shall be performed by an EPA Lead-Safe Certified Contractor IAW the EPA’s Renovation, Repair, and Painting (RRP) Rule. Dry sanding, dry scraping, and uncontained blasting of lead-based paint are strictly prohibited. Wet scraping, wet sanding, or HEPA-shrouded tools must be used.

1.5.3.5. Recovery and Disposal: Spent blast media and blasted paint debris shall be vacuumed or swept up and secured in sealed drums. Unless known, all media spent shall be tested for heavy metals (including lead) before disposal and managed IAW Section 1.5.14.

1.5.3.6. Restriction of Fugitive Emissions and Dust Control Plan: The Contractor shall comply with NDAC 33-15-17-03, Reasonable Precautions for Abating and Preventing Fugitive Particulate Emissions; and shall take reasonable precautions to prevent and abate fugitive emissions from causing air pollution. The Contractor shall be responsible for performing all dust control work in accordance with EPA 832-R-92-005, Chapter 3; and shall prepare a Dust Control Plan that identifies possible sources of dust, outlines preventive measures and control strategies to minimize dust and other fugitive emissions from their activities. At a minimum, the plan shall identify the Contractor’s equipment to be utilized for preventing and mitigating dust, dirt and debris. The Contractor shall submit a dust control plan for approval to the CO and 319 CES/CEIE workflow email ( 319CES.CEIE.EnvironmentalQC@us.af.mil ) prior to beginning work on the installation.

1.5.4 Spill Prevention and Response: The Contractor is responsible for preventing spills and managing any accidental releases of paint, thinners, cleaning agents or other materials.

1.5.4.1. Spill Prevention: Paint mixing and pouring shall be done in designated areas and within a secondary containment system (i.e. spill trays) or other equivalent protection method.

Materials stored on-site shall be in compatible containers in good condition. Secondary containment or an equivalent method is required for all oil/petroleum-based products stored in containers equal to or greater than 55 gallons and is strongly recommended for all other hazardous materials.

1.5.4.2. Spill Response. All hazardous material/waste spills must be reported to the Contracting Officer. Any release of a hazardous material/waste which is beyond the capability of the contractor must be reported to 911 immediately. The contractor will notify and provide complete documentation of all spills to the CO and 319 CES/CEIE. Documentation will include the date and time of spill, location, quantity, and an SDS of the spilled material.

1.5.4.3. Restoration and Disposal. It is the contractor’s responsibility to restore the spill area to pre-spill conditions. Spent spill kit materials as well as contaminated soil or other media must be properly disposed of, off-base, IAW federal, state, and local regulations and guidelines. 319 CES/CEIE will file any required reports with appropriate federal, state, and local agencies.

1.5.4.4. Spill Control Plan. The Contractor shall prepare a Spill Control Plan and provide strategies to prevent accidental releases and clear procedures for containing, cleaning up and mitigating any spills that do occur. The Contractor shall identify potential spill sources and submit a list of materials and their Safety Data Sheets (SDS) prior to bringing any hazardous materials onto GFAFB. The Contractor shall submit a spill control plan for approval to the CO and to the 319 CES/CEIE workflow email ( 319CES.CEIE.EnvironmentalQC@us.af.mil ) prior to beginning work on the installation. The plan should include measures to prevent spills from entering the stormwater system or other waterways.

1.6 Base Fire Regulations. The Contractor shall comply with the base fire regulations as set forth in Civil Engineering Fire Protection and Contractor Fire Prevention Brochure (available for review at Fire Department (701) 747-6304). The Contractor shall immediately cease work and correct violations upon notification by the project inspector. The cost for delays and corrective measures shall be at the Contractor’s expense.

1.6. Damages. The Contractor shall be responsible for protecting Government and private property at all times. When painting, the Contractor shall take proper precautions to prevent paint or other damage to private or Government property. Also, the Contractor shall be responsible for wind blown paint damage to Privately Owned Vehicles (POV), Government Owned Vehicles (GOV), and Government property and will be required to pay for any damages due to his/her negligence. Contractor shall protect flowers, shrubs, plants, etc. around buildings to prevent damage to plantings. The Contractor shall be required to clean, repair, or replace at Contractor’s expense for any damages.

1.7. Employee Conduct. All Contractor employees will conduct themselves in a courteous and customer oriented matter. Consumption, use, or possession of controlled substances, illegal drugs, or alcohol is prohibited. In addition to prosecution, violators may be barred entry to

GFAFB.

1.8. Military Exercises. Occasionally, Security forces will conduct various disaster or contingency exercises. In an area subject to control, the Contractor shall immediately comply with the directions of Security Forces personnel. This may include cessation of work and immediate departure from the area. The Contractor shall immediately inform the Contracting Officer or project inspector and await a clearance to return to the area under work. Disruption of work schedules shall be at no additional cost to the Government.

1.9. Work Schedule. The Government will provide job orders to the Contractor, and from that, the Contractor will provide a weekly work schedule upon request.

1.10. Conservation of Utilities. The Contractor shall be directly responsible for instructing employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which shall include:

1.10.1. The Contractor shall only use lights in areas where work is actually being performed.

1.10.2. The Contractor shall not set thermostats for heating, ventilation, and air conditioning systems higher than 68 degrees Fahrenheit for heating and lower than 78 degrees Fahrenheit for cooling.

1.10.3. The Contractor shall turn off water faucets and valves after each use.

1.10.4. The Contractor shall not use Government telephones for personal reasons, any toll, or long distance calls.

1.11. Key Control. The Contractor shall establish and implement methods of ensuring that all keys issued to the Contractor by the Government are not lost and misplaced, and are not used by unauthorized persons. The Contractor shall not duplicate any keys issued by the Government.

1.11.1. The Contractor shall reimburse the Government for replacement of locks and re-keying as a result of the Contractor lost or duplicated keys. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government at the Contractor’s expense.

1.11.2. The Contractor shall report the occurrences of lost or missing keys immediately to the Contracting Officer / Government Inspector.

1.11.3. The Contractor shall prohibit the use of keys issued by the Government by any person(s) other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by the Contractor’s employees to permit entrance of persons other than Contractor’s employees engaged in the performance of assigned work in those areas.

1.12. Government Observations. Government personnel, other than Contracting Officer and Government inspectors, may from time-to-time observe Contractor operations. The Contractor shall not perform work as directed by these individuals without Contracting Officer approval.

The Contractor shall not perform work directed by anyone except the Contracting Officer.

1.13. Documentation and Records. All documentation, records schedules, etc. as described in this Statement of Work (SOW) that are the responsibility of the Contractor, are property of the Government and shall remain so even upon termination of this contract. The Contractor shall be responsible for keeping these items current at all times. Requested documentation and records shall be turned over to the Government when requested by Contracting Officer or inspector.

1.14. Coordination with other Contractors. The Government may undertake or award other contracts for work not specified in this SOW, and the Contractor shall fully cooperate with other such Contractors and Government employees and carefully fit the work to accommodate completion of other work as may be directed by the Contracting Officer. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or Government employees.

1.15. Government Work. The Government retains the right to perform any of the tasks defined within this SOW in-house.

SECTION 2

DEFINITIONS AND ACRONYMS

2.1. Standard Definitions.

2.1.1. Contingency Operations. Unanticipated increases or decreases of the level of service required.

2.1.2. Exterior Surfaces. Those surfaces to include wood, metal, concrete, concrete block, stucco, special sidings including fiberglass and glass.

2.1.3. Facility. A facility is an integral structure, such as a building and all of its attachments.

Included with the building area all of its components that belong to the structure unless otherwise specified hereinafter. The facility does not include (unless attached and previously painted) sidewalks, driveways, yard sprinkler systems, fencing, and landscaping.

2.1.4. High-use Facility. A building that generates enough recurring work to justify frequent visits to the building by maintenance personnel. Buildings that normally meet this need are dormitories, clubs, visiting quarters, and large administrative buildings.

2.1.5. In-house Work. Work accomplished IAW this SOW by Government personnel.

2.1.6. Interior Surfaces. Those surfaces to include plaster, gypsum, floors, plastic, wallboard, wood, metal, block, glass, and wall coverings.

2.1.7. Paint and/or Protective Coatings. Includes enamels, paints, stains, varnishes, sealers, and other coatings; whether used as prime, intermediate, or finish coats.

2.1.8. Pavement Markings. Areas of Contractor work include striping, marking, and lettering of aircraft parking ramps and pavements, industrial pavements, and parking lots. Markings must conform to the specifications outlined in Engineering Technical Letter (ETL) 04-2: Standard Airfield Pavement Marking Schemes, or UFC 3-260-04, Airfield and Heliport Marking, as identified by the Government Project Inspector, using TT-P-1952, Paint, Traffic and Airfield Marking, Waterborne. Base streets must be marked to conform to the U.S. Department of Transportation/Federal Highway Administration Manual on Uniform Traffic Control Devices for Streets and Highways.

2.1.9. Repair Painting. (Multi-Shop Job) Includes remodeling, minor construction, and maintenance such as painting, varnishing, staining, sanding, taping, priming new walls and doors, etc. Also includes maintenance or repair on existing structures such as patching, painting, varnishing, sanding, taping, and priming.

2.1.10. Surface Preparation. The technique(s) required to prepare a given surface, whether interior or exterior, to receive paint or wallpaper. Techniques include, but are not limited to:

sandblasting, water-blasting, scraping, perfa-taping and sanding new gypsum surfaces and sizing finished surface for wallpaper. Use of heat gun to remove paint is not authorized.

2.1.11. Wallpaper. Decorative paper or other material, such as vinyl, used to cover a given interior surface.

2.1.12. Weekly Progress/Scheduling Meeting. The Contractor shall schedule meetings with contract administrator, inspector and project inspector as needed. The Contractor may request a meeting at any time; once requested the meeting must take place as scheduled.

2.1.13. Fiberglass Repair and Painting. The Contractor shall make damage repairs for pits, holes, gouges, tears, and cracks in fiberglass surfaces. The Contractor shall paint fiberglass surfaces IAW specifications of the paint schedule at TE-1 and only after all repairs have been properly accomplished and cured.

2.2. Acronyms.

2.2.1. BCE. Base Civil Engineer.

2.2.2. GFAFB. Grand Forks Air Force Base.

2.2.3. GOV. Government owned Vehicles.

2.2.4. IAW. In Accordance With.

2.2.5. MFH. Military Family Housing.

2.2.6. NLT. No Later Then.

2.2.7. OSHA. Occupational Safety and Health Administration.

2.2.8. POV. Privately Owned Vehicle.

2.2.9. SOW. Statement of Work.

2.2.10. TE. Technical Exhibit.

SECTION 3

GOVERNMENT FACILITIES

3.1. Facilities. The Government will provide a facility approximately 2,000 SF which includes an office area approximately 100 SF, break room and a handicap accessible unisex bathroom.

The facility address is 543 Contractor Row (Bldg. 491). The approximate size of the lot is 10,000 SF. The facility is connected to natural gas, water, electricity, telephone and sanitary sewer. The facility is heated with a commercial grade overhead natural gas furnace. Facility will be clean, free of debris and, 100% operational. The Government reserves the right to refuse the condition of facility at contract end and direct re-performance.

3.1.1. The Government will provide facility manager training to the contractor appointed facility manager IAW AFI 32-1001, Civil Engineer Operations. The inspector will schedule facility manager training within 120 days of award.

3.2. Utilities. The Contractor shall be responsible for securing commercial telephone service if necessary. The Contractor shall contact 319 CES and establish a utility sales agreement no later than fourteen (14) calendar days of contract award. The Contractor shall be responsible for all wastewater discharge to include any blockages caused by improper dumping or draining into wastewater system.

3.2.1. The Government will maintain electrical, gas, sewer, and water connections to the government furnished contractor's facility. If connection freezes or breaks occur due to the Contractor's negligence, he/she shall be responsible for repairing the damage at no additional cost to the Government. The Contractor and Contracting Officer’s designated representative will inspect the facility at contract start and annually thereafter.

3.2.1.1. The Contractor will be billed monthly for utilities and make required payment monthly.

Failure to make payment will result in invoice deduction the month following the payment month.

SECTION 4

CONTRACTOR-FURNISHED ITEMS

4.1. General. The Contractor shall furnish all necessary supplies, materials, protective clothing, tools, support equipment, labor, and vehicles required to perform all operations required by this

SOW.

4.2. Facilities. The Contractor shall be responsible for physical security and minor maintenance of the facility. All maintenance and repair must be documented and turned over to the Government at termination of this contract or contract completion. For other than minor maintenance (i.e. light bulbs, cleaning) the Contractor shall contact CES/Customer service (701) 747-5210 to initiate an AF103 Work Clearance Request. The Contractor shall not modify/alter the facility without an approved AF103. All manufacturer warranties on materials and equipment used in maintenance of the facility must be turned over to the government at termination of this contract. Contractor facilities shall be neat in appearance. The Contractor shall provide a portable structure subject to approval by the government for storage space for flammable supplies. This portable structure shall be equipped with an adequate locking device to protect materials and shall meet all OSHA requirements. The Contractor shall provide and maintain a means to prevent latex paint from freezing. The Contractor shall store all paints out of the weather.

4.3. Materials and Supplies. The Contractor shall acquire the materials and supplies required for the performance of this contract. The Contractor shall bear the cost of all materials and supplies and meet the Objective Quality Standards specified in TE-1.

4.3.1. The Contractor shall purchase materials and supplies of a quality which shall adequately and economically serve the purpose for which they are required and at a minimum, be equal to the items to be replaced in quality. The Contractor shall supply items that are standard products of manufacturers regularly engaged in the production of such supplies and materials. The Contractor shall remove any and all outdated materials (e.g. paint that has exceeded the manufacturer’s shelf life), or materials determined by the Government to be defective, from the base within eight hours of notification to the Contractor.

4.4. Samples. The Contractor shall provide paint supplies (when requested) in sealed one-quart containers IAW the requirements of Objective Quality Standards, TE-1, and paragraph 2.8.3. All Contractor-furnished paint is subject to testing by the Government at Government expense at a frequency and time option of the Government. The Contractor shall remove any paint which does not satisfy the criteria from GFAFB within eight (8) hours of notification. The Contractor shall supply the Government color chip fans with full range of color options and SAE-AMS- STANDARD-595 “colors Used in Government Procurement,” within fifteen (15) business days of award.

4.5. Vehicles. Each Contractor-supplied vehicle shall have the name of the Contractor and the words “Protective Coating Maintenance” neatly exhibited on each side with letters at least 3” high. The vehicle shall be in satisfactory mechanical condition and present a neat and clean appearance. The Contractor shall operate vehicles to comply with all base/state traffic regulations/laws.

4.5.1. Flightline Operation Licensing. Each day, before driving on GFAFB Flightline, each Contractor vehicle operator shall report to the Airfield Operations desk in Building 528 to receive airfield driving instructions and vehicle passes if required. Radios will be provided as required.

SECTION 5

SPECIFIC TASKS

5. Maintenance Management. The Contractor shall provide the services of maintenance management described below.

5.1. Work Control.

5.1.1. Interior and Exterior Facility Painting. The Government will, by work order, provide the Contractor with total square foot (SF) area paint requirements. These estimated requirements, as reflected in the bid schedule, include multiple paint coats. Prime or multiple paint coats, when required, will each be reimbursed at the full square foot/lineal foot bid item price for each coat.

5.1.2. Receipt of Work Orders. The Contractor shall have a central point of contact for receiving all requests for service during hours stated in Section 1, paragraph 1.3. The Contractor shall furnish a point of contact and telephone number.

5.1.2.1. The Contractor Project Manager or representative shall be available during normal duty hours (7:45 a.m. – 4:30 p.m. Central Time) Monday - Friday (except on federal holidays) within 30 minutes of verbal notification from the Government project inspector to meet at GFAFB with Government personnel designated by the Contracting Officer, at a place specified by the Government to discuss and resolve problem issues. The Contractor shall provide phone numbers where he/she and other contract representatives may be reached after non-duty hours.

5.1.2.2. The Contractor shall contact project inspector or designated representative as needed at

(701) 747-6644.

5.1.3. Job Order/Work Order System. The Government will create work orders to control all work. Work orders (computer generated) will be provided to the Contractor. Handwritten generated work orders may also be employed.

5.1.3.1. The work order shall indicate type of work, date, and time of request, facility number, and description of work to include required completion date of work. It will also contain a list of Contract Line Item Numbers (CLINs) with the required quantities to perform the work, the awarded unit prices and the total cost of the work. A copy of each completed work order, with time of completion and square footage painted and colors or color scheme used shall be provided to inspector upon request. The Contractor shall provide information on the status of any job/work order when requested by the Contracting Officer, inspector, or designated representative(s).

5.2. Exterior Paint Requirements.

5.2.1. The Contractor shall accomplish complete exterior painting of facilities IAW paragraph 5.1.1., above, and TE-1. The Contractor shall accomplish partial exterior painting requirements as identified on work order.

5.2.2. The Contractor shall schedule exterior painting such that each facility is completed within a time period stated on work order. For delays caused by environmental conditions, one day will be added for each day conditions do not meet requirements of TE-1.

5.2.3. The Contractor shall pre-inspect facilities scheduled for painting to identify any deteriorated and damaged work requiring repair prior to application of new paint finish. The Contractor shall immediately report repair requirements to the Government inspector for resolution prior to painting. Once repairs have been accomplished, the Contractor shall apply appropriate prime and finish coats at the unit price reflected in the bid schedule. Pre-inspection trip costs are included in bid schedule unit costs. No additional payment will be made for trips resulting from facility pre-inspection requirements of this paragraph.

5.3. Interior Paint Requirements. The Contractor shall accomplish all interior painting as identified. The Government has the option to order as listed on the bid schedule. All such work shall be accomplished IAW TE-1.

5.4. Administrative Reports and Data. The Contractor shall provide the reports and data as specified in this SOW and technical exhibits.

5.4.1. The Contractor shall re-accomplish or repair project inspector-identified discrepancies within three (3) working days. The Contractor shall provide, to the inspector, one copy of written documentation outlining the procedures used to resolve discrepancies.

5.5. Moving Assigned Job Orders. The Contractor shall cooperate without additional expense with the Government in reassigning work from a specific work order. Additional time to work order will be added to the original complete by date.

5.6. Work Priorities. Work performance will be established for each individual work order prior to the beginning of the work. The Contractor shall provide Government representative the reasons why work performance will not be completed on time. Notification to the project inspector shall be prior to the original completion date assigned. There is a no exterior work/ winter exclusion period of 1 November through 15 April of each year. The no-work/winter exclusions period does not count against the number of days negotiated for individual work orders.

5.7. Work Orders. The Contractor shall schedule all jobs with occupants of buildings or offices, as required at least two (2) business days prior to the anticipated work day, so that their regular schedule is not unduly disrupted.

5.8. Pavement Markings. The Contractor shall accomplish all pavement/concrete markings, to include lettering and symbols, as outlined in TE-1. The Contractor shall furnish and place traffic cones/barriers when marking pavements. At no time shall the cones/barriers at any one work site block more than 1/2 of one street block. The Contractor shall remove the cones/barriers upon completion of the work, but not before the pavement paint is completely dry. The Contractor shall accomplish pavement markings on the flight line IAW Section 1, paragraph 1.2.4.1.and Section 4, paragraph 4.5.1.

5.9. Fire Systems. The Contractor shall prepare and paint all fire hydrants, exterior fire alarm boxes and bells, reflective barrier posts, and post indicator valves for building sprinkler systems, and outside bell/fire alarm systems, as required, IAW the National Fire Protection Association (NFPA), 13, or as local directive dictates. Requirements will be written into work order the specific requirement for each fire system to be painted.

5.10. Quality Assurance Provisions. Materials shall be approved based on manufacturer's test reports.

5.10.1. The Contractor shall submit, for approval by the Contracting Officer, a quality control program for inspection of the Contractor’s work.

5.10.2. The Contractor shall employ a qualified, competent, and reliable supervisor to maintain quality control evaluations as specified in this SOW and to the highest standards of the industry.

5.10.3. Entry into restricted areas will require the Contractor’s employees to possess a restricted area badge. The Contractor shall be required to execute the necessary forms to enter these areas through the Contracting Officer. Contractor receipt of approved security clearances from the Government takes approximately nine (9) to twelve (12) months. At a minimum, the supervisor shall be required to obtain a restricted area badge. In the interim, the Contractor will be escorted by Air Force personnel into restricted areas. During this time, the Contractor will be provided a time and place when the escort will be available to provide entrance into the secured areas requiring a restricted area badge. Entrance into these restricted areas, either by escort or Contractor’s restricted area badge, the Contractor may have up to a 1/2 hour delay at no cost to the Government for processing through the Entry Control Point.

5.10.4. Inspection. Each phase of work on work orders may be randomly inspected for compliance with the specifications and completeness before the next phase of work begins. The Contractor shall provide the Government project inspector seventy-two (72) hours’ notice prior to the desired final inspection date. An inspection of all completed work orders by the Government project inspector and Contractor must be completed and accepted prior to payment.

TECHNICAL EXHIBIT 1

OBJECTIVE QUALITY STANDARDS

1. General.

1.1. Quality Standards. These technical specifications define the quality of maintenance and repair work to be accomplished under this contract.

1.2. Scope. The Contractor shall paint, maintain, and repair all interior and exterior components of designated base facilities, when applicable, at a serviceable standard. The Contractor shall complete work as assigned for each work order. The Contractor shall adhere to standards in UFC 3-190-06, Protective Coatings and Paints. https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-190-06

1.2.1. Transition from Existing to New Work. The Contractor shall make a smooth and workmanlike transition when new work abuts or finishes flush with existing work. The Contractor shall match patched work with existing adjacent work in texture, color, and appearance so that the patch or transition is invisible at a distance of five (5) feet. The Contractor shall terminate existing surfaces in a neat manner along a straight line at a neutral line of division, and provide trim appropriate to the finished surface when finished surfaces are cut in such a way that a smooth transition with new work is not possible.

1.3. Surface Area Determination.

1.3.1. All surface areas to be painted will be represented on assigned work orders from the project inspector. Individual CLINs will have quantities.

2. Painting.

2.1. Description of Work.

2.1.1. Interior. The work to be performed includes painting of interiors of Government-selected facilities to be accomplished IAW this SOW. The painting includes spot prime, prime, complete pre-painting, preparation, and finish painting of all surfaces assigned.

2.1.2. Exterior. The work to be performed includes painting of exterior facilities. The Contractor shall provide surface preparation and spot priming where required to produce complete hiding of the substrate by the finish coat.

2.2. Materials. Contractor-furnished paints shall be in sealed containers that plainly show the designated name, formula or specification number, batch number, color, date of manufacture, manufacturer’s directions and manufacturer name. Materials shall conform to the specifications shown in the painting schedule that follows at paragraph 2.18.

https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-190-06 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-190-06

2.3. Quality Assurance Provisions. Materials shall be approved based on test reports furnished except where samples are tested. Then, approval will be based on tests of samples. If materials are approved based on test reports furnished, samples will be retained by the Government for testing should the materials appear defective during or after application. The actual cost of re-testing materials found to be defective will be deducted from payments due to the Contractor.

2.4. Removal of Furnishings, Equipment, Furniture, Venetian Blinds, Drapery, Movable Partitions, Pictures, and Wall Hangings. The Contractor shall disconnect and move all items, both private and Government-owned, away from painting areas and relocate them after the painting is completed. However, occupants are responsible for computers, copiers, personal equipment and emptying closets and cabinets when these areas are to be painted. The Contractor shall remove all venetian blinds, light shades, drapes, drapery rods, roller shades, wall hangings, and pictures prior to painting and shall replace them after painting. The Contractor shall be fully responsible for covering and otherwise protecting all items from paint, thinner, and dust during painting operations.

2.4.1. Removal of Security Screens/Security Bars/Window Screens. The Contractor shall remove and replace all security screens, security bars, and window screens. The Contractor shall remove all items whether bolted, screwed, or similarly fastened and replace them using the same method of attachment. The Contractor shall replace security devices the same day as they are removed.

The Contractor shall accomplish surface preparation, spot priming, and application of finished coat to all assigned surfaces to receive protective coating. The Contractor shall coordinate with the 319 Security Forces Squadron ((701) 747-5351) prior to, and after completion of, all work, that involves temporary security alterations.

2.4.2. Removal and Protection of Bushes, Limbs, and Vegetation. When painting exterior facilities, the Contractor shall be fully…