Proposal form.doc
DOC document 28 KB Posted
- Solicitation number
- 2024065
- Issued by
- Arenac County, Michigan
About this file
This document is a proposal form for Delta College, located in Michigan, specifically for the M-Wing 3D Printer Room HVAC System Upgrade project. The project scope involves performing all work as outlined in the 2024-2307 documents prepared by Macmillan Associates Consulting Engineers. The work is time-sensitive and cannot occur during active class sessions, with recommended performance times being either during spring break (March 2-7) or after the winter semester ends (May 4). Bidders are required to specify their proposed completion date and note any addendums.
The proposal form requires potential contractors to provide comprehensive contact information, including company name, address, phone, fax, and email. While a specific base bid amount is to be filled in by the bidder, no predetermined budget or funding source is explicitly stated in the document. The project appears to be a targeted HVAC system upgrade for a specific room within the college's M-Wing, with a focus on minimizing disruption to academic operations by scheduling work during non-class periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| General .pdf | ||
| Insurance Requirements.pdf | ||
| Addendum-Q_A (1).docx | DOCX document | |
| Certifications.docx | DOCX document | |
| Delta College M-Wing 3D Printer Room IFB-10.28.2025.pdf | ||
| Introduction Page.docx | DOCX document | |
| Pricing Sheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DELTA COLLEGE
PROPOSAL FORM
PROJECT:
Delta College
M-Wing 3D Printer Room HVAC System Upgrade
SCOPE:
Perform all work as delineated in 2024-2307 documents prepared by Macmillan Associates Consulting Engineers.
BASE BID:
COMPLETION:
Work cannot occur while classes are in session. Plan on performing the work during spring break, March 2-7, or after the end of winter semester, May 4. All work shall be complete by ___________________. (Enter your proposed completion date)
ADDENDUMS NOTED:
ADDITIONAL MATERIALS ENCLOSED: (check here)
CONTACT:
COMPANY NAME:
ADDRESS:
PHONE:
FAX: _________________
E-MAIL:
SIGNATURE:
_____________________________ DATE: ____________
L:/template_bid_form_item.doc
File details come from the government source that posted it. Updated .