Proposal Evaluation.docx

DOCX document 34 KB Posted

Attached to
NDSU - ASTM Type I and Type III Pure Water System Replacement
Solicitation number
SRC000467
Issued by
Cass County, North Dakota

About this file

Proposal Evaluation Scoring Document - NDSU Pure Water System Replacement

This document is a proposal evaluation scoresheet for North Dakota State University's (NDSU) request for proposals to replace its existing pure-water treatment system with a complete, integrated ASTM Type I and Type III pure-water generation and distribution support system (RFP SRC000467). The evaluation is structured as a technical assessment separate from cost evaluation, with proposals due by November 3, 2026, at 2:00 p.m. Central Time for questions. The procurement officer is Casie Ewalt (casie.ewalt@ndsu.edu), and all communications must be directed exclusively to this contact. Suppliers must be registered in the NDBuys portal to participate in the solicitation and submit electronic bid responses. The evaluation process requires reviewers to assess mandatory minimum requirements independently, including a mandatory minimum of ten years of applicable experience, prior to scoring technical proposals.

The technical evaluation allocates 80 points across seven factors: Technical Compliance & Minimum Requirements (20 points), Experience & Qualifications (10 points), Proposed System & Technical Approach (15 points), Implementation Timeline & Water-Service Downtime (15 points), Installation, Startup & Commissioning (5 points), Service & Support (10 points), and Warranty, Training & Documentation (5 points). Cost proposals are evaluated separately using NDSU's established cost-scoring formula and are worth 20 points, for a combined total of 100 points. Evaluators are instructed to assign whole-number scores within defined performance bands (Excellent, Good, Adequate, Limited, Deficient) based on documented proposal evidence, completeness, quality, substantiation, risk, and relevance. Failure to meet mandatory minimum requirements must be handled according to RFP procedures and applicable procurement regulations, and technical points do not waive mandatory requirements.

View the file

Other files

File Type Posted
Cost Proposal Document.docx DOCX document
Technical Proposal Document.docx DOCX document
NDSU CSA - Business_DRAFT.pdf PDF
RFP - Scope of Work.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL EVALUATION SCORING

ASTM Type I and Type III Pure Water System Replacement — RFP SRC000467 Evaluator: __________________________________ Offeror: __________________________________ Date: __________________________ Evaluation stage: Technical (separate from cost) Evaluation Overview Review mandatory minimum requirements before scoring. Evaluate the Technical Proposal without cost information. Award points based on documented proposal evidence and the factor-specific rubric below. Cost proposals are evaluated separately using NDSU’s established cost-scoring formula. Do not include pricing in technical evaluator materials.

Component
Maximum Points
Score
Technical Proposal
80
Cost Proposal (separate evaluation)
20
Combined Total
100

Technical Evaluation — 80 Points General scoring method: Select the performance level best supported by the proposal. Within each band, assign a whole-number score reflecting completeness, quality, substantiation, risk and relevance. Record the rationale for each score. Do not award points for merely promising to meet a mandatory minimum.

1. Technical Compliance & Minimum Requirements — 20 Points Demonstrated compliance with required ASTM Type I/III water quality, production, storage, flow/pressure, controls and all mandatory requirements.

Performance level
Point range
Factor-specific scoring anchor
Excellent
17–20
Fully demonstrated, well supported and exceeds key performance needs
Good
13–16
Meets requirements with complete and convincing evidence
Adequate
9–12
Meets most requirements but evidence/clarity has minor gaps
Limited
1–8
Significant gaps or unsupported compliance claims
Deficient
0–0
Fails to demonstrate core requirements or has material deficiencies

Points awarded: ______ / 20 Evaluator comments/evidence: __________________________________________

2. Experience & Qualifications — 10 Points Comparable high-purity water projects; qualifications of firm and assigned personnel; documented references and relevant experience. Ten years of applicable experience is a mandatory minimum.

Performance level
Point range
Factor-specific scoring anchor
Excellent
8–10
Extensive directly comparable experience and strong documented team/references
Good
6–7
Solid relevant experience and qualified team
Adequate
4–5
Adequate experience with minor weaknesses
Limited
1–3
Limited comparable evidence or notable concerns
Deficient
0–0
Unsubstantiated qualifications or significant deficiencies

Points awarded: ______ / 10 Evaluator comments/evidence: __________________________________________

3. Proposed System & Technical Approach — 15 Points System design, treatment strategy, reliability, redundancy, maintainability, controls, monitoring and compatibility with NDSU facilities.

Performance level
Point range
Factor-specific scoring anchor
Excellent
13–15
Excellent integrated approach, low technical risk, strong supporting documentation
Good
10–12
Sound, well-supported design meeting operational needs
Adequate
7–9
Generally suitable with minor design or documentation gaps
Limited
1–6
Notable weaknesses or implementation risks
Deficient
0–0
Inadequate or unsupported proposed approach

Points awarded: ______ / 15 Evaluator comments/evidence: __________________________________________

4. Implementation Timeline & Water-Service Downtime — 15 Points Evaluate proposed total calendar days from award to final acceptance, anticipated outage/changeover duration, milestone realism, critical-path dependencies, and strategies to minimize disruption. Consider NDSU-contractor coordination and schedule credibility.

Performance level
Point range
Factor-specific scoring anchor
Excellent
13–15
Shortest credible schedule and minimal downtime, with detailed achievable milestones and strong mitigation
Good
10–12
Competitive realistic schedule and low downtime, well substantiated
Adequate
7–9
Acceptable schedule/downtime with some uncertainties
Limited
1–6
Long or weakly supported schedule, or material disruption concerns
Deficient
0–0
No usable timeline or unrealistic/unsubstantiated schedule

Points awarded: ______ / 15 Evaluator comments/evidence: __________________________________________

5. Installation, Startup & Commissioning — 5 Points Vendor installation supervision, coordination with Owner contractors, factory testing, startup, commissioning, performance verification and acceptance.

Performance level
Point range
Factor-specific scoring anchor
Excellent
4–5
Detailed, coordinated, low-risk execution plan
Good
3–3
Clear and feasible plan with appropriate responsibilities
Adequate
2–2
Adequate plan with minor omissions
Limited
1–1
Incomplete plan or notable coordination gaps
Deficient
0–0
Material deficiencies in execution approach

Points awarded: ______ / 5 Evaluator comments/evidence: __________________________________________

6. Service & Support — 10 Points Qualified local/regional service resources, response times, critical parts availability, remote support and maintenance approach.

Performance level
Point range
Factor-specific scoring anchor
Excellent
8–10
Excellent demonstrated service coverage, responsiveness and parts support
Good
6–7
Strong documented support capability
Adequate
4–5
Adequate support with some limitations
Limited
1–3
Limited resources or uncertain response/parts availability
Deficient
0–0
Insufficient or unsubstantiated service support

Points awarded: ______ / 10 Evaluator comments/evidence: __________________________________________

7. Warranty, Training & Documentation — 5 Points Warranty coverage, training plan, O&M manuals, as-built documentation and turnover materials.

Performance level
Point range
Factor-specific scoring anchor
Excellent
4–5
Comprehensive coverage, training and deliverables beyond minimum
Good
3–3
Complete and clearly documented provisions
Adequate
2–2
Adequate provisions with minor gaps
Limited
1–1
Weak or unclear provisions
Deficient
0–0
Material omissions or inadequate provisions

Points awarded: ______ / 5 Evaluator comments/evidence: __________________________________________ Technical Score Summary

Evaluation factor
Maximum
Score
1. Technical Compliance & Minimum Requirements
20
2. Experience & Qualifications
10
3. Proposed System & Technical Approach
15
4. Implementation Timeline & Water-Service Downtime
15
5. Installation, Startup & Commissioning
5
6. Service & Support
10
7. Warranty, Training & Documentation
5
TOTAL TECHNICAL SCORE
80

Minimum Requirements / Compliance Review Mandatory RFP requirements, including the minimum ten (10) years of applicable experience, must be reviewed separately from point scoring. A failure to meet a mandatory minimum must be handled according to the RFP and applicable procurement procedures; technical points do not waive mandatory requirements.

Mandatory compliance review: ☐ Meets minimums ☐ Requires clarification/review ☐ Does not meet minimums Notes / exceptions: ___________________________________________________________________________