NORTH DAKOTA STATE UNIVERSITY
COST PROPOSAL FORM
ASTM Type I and Type III Pure-Water System Replacement Instructions:
Complete all applicable cost fields and provide firm, itemized pricing in U.S. dollars. Include all required costs for the Vendor-furnished scope described in the RFP and Scope of Work; identify optional and recurring costs separately where requested. Do not include cost information in the Technical Proposal. NDBuys submission: Log in to NDBuys, open solicitation SRC000467, and upload this completed Cost Proposal under Info > Financial Envelope > Supplier Financial Documents. Upload the Technical Proposal and its supporting documents separately under Technical Envelope > Supplier Technical Documents. Complete any required questionnaire tabs, save the response, select Validate Submit Proposal, then Submit My Proposal. Verify the History tab shows Submitted. Submit before the solicitation closing date and time specified in the RFP.
1. BASE PROJECT COST
Provide pricing for a complete and operational system meeting the RFP minimum requirements, including the specified Type I and Type III production, storage and distribution performance. Field installation by the Owner’s contractors is excluded unless expressly included in the awarded Vendor scope. Do not double-count installation costs. The base project price shall include all Vendor-furnished equipment, services, coordination, expedited delivery arrangements, and other costs necessary to achieve the implementation timeline proposed in the Technical Proposal. Any costs associated with the proposed schedule must be included in the base price; no additional compensation should be assumed to meet that proposed schedule.
| Required Cost Item |
| Vendor Proposed Cost ($) |
| Complete Type I / Type III treatment system, skids and equipment |
| Click or tap here to enter text |
| Required storage tanks (500-gallon Type III and 250-gallon Type I) |
| Click or tap here to enter text |
| Controls, instrumentation, HMI and required BAS/BMS interface capability |
| Click or tap here to enter text |
| Engineering, design and required submittals |
| Click or tap here to enter text |
| Factory testing and documentation |
| Click or tap here to enter text |
| Freight, delivery and unloading (identify assumptions) |
| Click or tap here to enter text |
| Installation instructions and technical supervision / coordination |
| Click or tap here to enter text |
| Startup, programming, testing and commissioning support |
| Click or tap here to enter text |
| Operator and maintenance training |
| Click or tap here to enter text |
| O&M manuals, as-builts and closeout documentation |
| Click or tap here to enter text |
| Other required Vendor-furnished costs (describe below) |
| Click or tap here to enter text |
| TOTAL BASE PROJECT COST |
| Click or tap here to enter text |
| Other required costs / clarifications / exclusions (reference item) |
| Click or tap here to enter text |
2. INCLUDED SOFTWARE, CONTROLS AND LICENSING
Identify all software, licenses, subscriptions, updates, remote access, and support fees required to operate, monitor, support, or maintain the system. Include initial costs in the base project price when required. State all ongoing fees after Year 1, even if the first year is included at no charge. Identify whether each recurring charge is mandatory or optional.
| Item |
| Included in Base? |
| Initial Cost ($) |
| Annual Cost After Year 1 ($) / Frequency |
| HMI / control software and licenses |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Monitoring / data logging software |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| BAS/BMS interface licenses |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Remote support / access tools |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Other required software or subscriptions |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Licensing terms, update/support arrangements, and any third-party requirements |
| Click or tap here to enter text |
| Contract Year |
| Annual Software / Licensing / Support Cost ($) |
| Mandatory / Optional |
| Year 2 |
| Click or tap here to enter text |
| ☐ Mandatory ☐ Optional |
| Year 3 |
| Click or tap here to enter text |
| ☐ Mandatory ☐ Optional |
| Year 4 |
| Click or tap here to enter text |
| ☐ Mandatory ☐ Optional |
| Year 5 |
| Click or tap here to enter text |
| ☐ Mandatory ☐ Optional |
Software and licensing costs after the first year (enter $0 if none; indicate mandatory or optional fees):
3. WARRANTY AND OPTIONAL EXTENDED COVERAGE
| Standard system warranty included in base price (term and scope) |
| Click or tap here to enter text |
| Optional Coverage |
| Price ($) |
| Term / Description |
| Extended equipment warranty |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Extended controls/software support |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Other optional warranty/service coverage |
| Click or tap here to enter text |
| Click or tap here to enter text |
4. OPTIONAL PREVENTIVE MAINTENANCE PRICING
Provide separately priced optional preventive-maintenance services; do not include in the evaluated base total unless expressly required by the RFP.
| Maintenance Period |
| Annual Price ($) |
| Scope / Frequency / Exclusions |
| Year 1 |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Year 2 |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Year 3 |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Year 4 |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Year 5 |
| Click or tap here to enter text |
| Click or tap here to enter text |
5. SERVICE RATES AND CHARGES
| Service Item |
| Rate / Charge ($) |
| Unit / Notes |
| Regular service labor |
| Click or tap here to enter text |
| Per hour |
| After-hours/emergency service labor |
| Click or tap here to enter text |
| Per hour |
| Travel / trip charge |
| Click or tap here to enter text |
| Per trip; describe |
| Other service charges |
| Click or tap here to enter text |
| Describe |
| Service pricing assumptions / travel radius / exclusions |
| Click or tap here to enter text |
6. OPTIONAL ITEMS AND ALTERNATES
List optional or value-added items separately. Do not include optional items in the base project price unless expressly required by the RFP. Clearly identify any optional item that could affect the proposed implementation timeline.
| Optional Item / Description |
| Price ($) |
| One-time / Recurring / Notes |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
| Click or tap here to enter text |
NDSU Use: Submit this completed Cost Proposal Form with the proposal, separately from the Technical Proposal.