This is a Project Manual for a Riverfront Land Development Project comprising Phases 1A, 1B, and 2A, prepared by Fuss & O'Neill for Riverfront Recapture, Inc., a non-profit organization based in Hartford, Connecticut. The project involves landscaping, sitework, and remediation of impacted soil across multiple parcels located at 228 Leibert Road in Hartford and 100 Meadow Road in Windsor, Connecticut. The work includes disposal of soil stockpiles (1,400 tons), excavation and stockpiling of impacted soil from remedial areas (1,600 cubic yards), excavation and stockpiling from cove excavation areas (11,300 cubic yards), excavation from cove dredge areas (1,030 cubic yards), excavation of Phase 2A cove area (130,000 cubic yards), backfilling with reusable soil (105,000 cubic yards), and offsite disposal of surplus subsoil (25,000 cubic yards). A mandatory prebid conference and site walk are scheduled for November 5, 2025 at 1:00 PM. Bid requests for information are due 14 days prior to bid submission, with the final addendum due 7 days prior. Bids are due November 25, 2025 before 3:00 PM via email, with opening at 4:00 PM the same day. The contract duration is 250 calendar days from the date of executed agreement. Offers must remain open and irrevocable for 60 days following the bid closing date, with the selected contractor required to execute the agreement and furnish bonds within 7 days of acceptance.

The bid must include a 5 percent bid bond, performance bond, and labor and material payment bond, with all costs included in the bid amount. The project is subject to Connecticut prevailing wage requirements under Connecticut General Statutes Section 31-53c and Davis Bacon Act provisions, with wage rates varying by classification and location (Hartford or Windsor). Funding sources include Connecticut Department of Economic and Community Development (DECD) Brownfields grant funds and Environmental Protection Agency (EPA) Multipurpose, Assessment, RLF, and Cleanup (MARC) grant funds. State contract compliance requirements apply, including a mandatory 25 percent set-aside of the state-funded portion for subcontractors holding current Connecticut Department of Administrative Services (DAS) certification, with an additional 25 percent requirement for minority, women, and disabled-owned businesses. Contractors must submit an approved affirmative action plan to the Commission on Human Rights and Opportunities (CHRO) within 30 days following intent to award notice, with a 2 percent monthly retainage applied until CHRO approval is granted. Commercial General Liability insurance must include $1,000,000 per occurrence, $2,000,000 general aggregate, and $5,000,000 umbrella coverage, with additional insured endorsements naming Riverfront Recapture, Inc., Riverfront Land, Inc., and the State of Connecticut.

View the file

Other files

File Type Posted
RFQ 8626 Addendum 2.pdf PDF
RFQ 8626 Addendum 1.pdf PDF
RFQ 8626 10242025 B.pdf PDF
RFQ 8626- Wtby_Jan_28_26_solicitation_doc.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual for Riverfront Land Development Project: Phases 1A, 1B, & 2A

Riverfront Recapture, Inc.

228 Leibert Rd, Hartford, Connecticut 100 Meadow Road, Windsor, Connecticut

October 20, 2025

FUSS & O'NEILL Riverfront Land Development Project: Phases 1A, 1B, & 2A

Project No. 20170277.S10

PROJECT DIRECTORY 00 01 03 - 1

SECTION 00 01 03 - PROJECT DIRECTORY

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Identification of project team members and their contact information.

1.2 OWNER:

A. Name: Riverfront Recapture, Inc.

Address Line 1: 50 Columbus Blvd.

City: Hartford.

State: CT.

Zip Code: 06106 .

B. Primary Contact: All correspondence from the Contractor to the Engineer will be through this party, unless alternate arrangements are mutually agreed upon at preconstruction meeting.

Name: Marc A. Nicol, Director of Park Planning & Development.

Email: MNicol@Riverfront.org.

Telephone: (860) 713-3131 Ext. 334

1.3 CONSULTANTS:

A. Engineer: Design Professional of Record. All correspondence from the Contractor regarding construction documents authored by Engineer's consultants will be through this party, unless alternate arrangements are mutually agreed upon at preconstruction meeting.

1. Company Name: Fuss & O'Neill, Inc..

Address Line 1: One Financial Plaza, 15th Floor.

City: Hartford.

State: CT.

Zip Code: 06103 .

2. Primary Contact:

Name: Nicholas Roy, PE, Senior Civil Engineer.

Project No. 20170277.S10

PROJECT DIRECTORY 00 01 03 - 2

Email: nicholas.roy@fando.com.

Telephone: (860) 783-4762

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION 00 01 03

Project No. 20170277.S10

TABLE OF CONTENTS 00 01 10 - 1

SECTION 00 01 10 - TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

A. 00 01 01 - Project Title Page

B. 00 01 03 - Project Directory

C. 00 01 10 - Table of Contents

D. 00 01 15 - List of Drawing Sheets

E. 00 21 13 - Instructions to Bidders

F. 00 31 00 - Available Project Information

G. 00 41 00 - Bid Form

H. 00 43 36 - Proposed Subcontractors Form

I. 00 72 00 - General Conditions

J. 00 73 00 - Supplementary Conditions

K. 00 73 44 - Prevailing Wage Rates/Contractor’s Wage Certification/Payroll Certification

SPECIFICATIONS

2.1 DIVISION 01 -- GENERAL REQUIREMENTS

A. 01 20 00 - Price and Payment Procedures

B. 01 22 00 - Unit Prices

C. 01 30 00 - Administrative Requirements

D. 01 40 00 - Quality Requirements

E. 01 42 16 - Definitions

F. 01 50 00 - Temporary Facilities and Controls

G. 01 57 13 - Temporary Erosion and Sediment Control

H. 01 70 00 - Execution and Closeout Requirements

2.2 DIVISION 02 -- EXISTING CONDITIONS

A. 02 61 16 - Impacted Material Management

Project No. 20170277.S10

TABLE OF CONTENTS 00 01 10 - 2

2.3 DIVISION 03 -- CONCRETE (NOT USED)

2.4 DIVISION 04 -- MASONRY (NOT USED)

2.5 DIVISION 05 -- METALS (NOT USED)

2.6 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES (NOT USED)

2.7 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION (NOT USED)

2.8 DIVISION 08 -- OPENINGS (NOT USED)

2.9 DIVISION 09 -- FINISHES (NOT USED)

2.10 DIVISION 10 -- SPECIALTIES (NOT USED)

2.11 DIVISION 11 -- EQUIPMENT (NOT USED)

2.12 DIVISION 12 -- FURNISHINGS (NOT USED)

2.13 DIVISION 13 -- SPECIAL CONSTRUCTION (NOT USED)

2.14 DIVISION 14 -- CONVEYING EQUIPMENT (NOT USED)

2.15 DIVISION 21 -- FIRE SUPPRESSION (NOT USED)

2.16 DIVISION 22 -- PLUMBING (NOT USED)

2.17 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) (NOT

USED)

2.18 DIVISION 25 -- INTEGRATED AUTOMATION (NOT USED)

2.19 DIVISION 26 -- ELECTRICAL (NOT USED)

2.20 DIVISION 27 -- COMMUNICATIONS (NOT USED)

2.21 DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY (NOT USED)

2.22 DIVISION 31 -- EARTHWORK

A. 31 10 00 - Site Clearing

B. 31 23 00 - Earthwork

Project No. 20170277.S10

TABLE OF CONTENTS 00 01 10 - 3

2.23 DIVISION 32 -- EXTERIOR IMPROVEMENTS (NOT USED)

2.24 DIVISION 33 -- UTILITIES (NOT USED)

2.25 DIVISION 34 -- TRANSPORTATION (NOT USED)

2.26 DIVISION 40 -- PROCESS INTEGRATION (NOT USED)

2.27 DIVISION 46 -- WATER AND WASTEWATER EQUIPMENT (NOT USED)

Project No. 20170277.S10

LIST OF DRAWING SHEETS 00 01 15 - 1

SECTION 00 01 15 - LIST OF DRAWING SHEETS

SHEET NO. TITLE

GI-001 COVER SHEET

C-001 CIVIL GENERAL NOTES

C-101 CIVIL EXISTING CONDITIONS

CP-101 SITE PREPARATION PLAN - PHASES 1A, 1B, & 2A

CP-401 SITE PREPARATION ENLARGEMENTS - PHASE 1A

CP-402 SITE PREPARATION ENLARGEMENTS - PHASE 1B

CE-101 SITE EROSION & SEDIMENT CONTROL PLAN - PHASES 1A, 1B, & 2A

CG-101 SITE GRADING AND DRAINAGE PLAN - PHASES 1A, 1B, & 2A

CD-501 CONSTRUCTION DETAILS

END OF SECTION 00 01 15

Project No. 20170277.S10

INSTRUCTIONS TO BIDDERS 00 21 13 - 1

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

SUMMARY

1.1 DOCUMENT INCLUDES

A. Invitation

1. Procurement Timetable

2. Bid Requests for Information

3. Bid Submission

4. Intent

5. Work Identified in Contract Documents

6. Contract Time

B. Bid Documents and Contract Documents

1. Definitions

2. Availability

3. Examination

4. Inquiries/Addenda

C. Site Assessment

1. Prebid Conference

D. Qualifications

1. Prequalification

2. Subcontractors/Suppliers/Others

E. Bid Submission

1. Submission Procedure

2. Bid Ineligibility

F. Bid Enclosures/Requirements

1. Bid Bond

2. Performance Bond

Project No. 20170277.S10

INSTRUCTIONS TO BIDDERS 00 21 13 - 2

3. Labor & Material Payment Bond

4. Bid Form Requirements

5. Fees for Changes in the Work

6. Bid Form Signature

7. Additional Bid Information

G. Offer Acceptance/Rejection

1. Duration of Offer

2. Acceptance of Offer

1.2 RELATED DOCUMENTS

A. Document 00 43 36 - Proposed Subcontractors Form.

B. Document 00 73 00 - Supplementary Conditions:

INVITATION

2.1 PROCUREMENT TIMETABLE

A. Mandatory Prebid Conference: November 5, 2025 at 1:00 PM.

B. Mandatory Prebid Site Walk: Following the Prebid Conference.

C. Last Bid Requests for Information Due: 14 days prior to due date of bids.

D. Last Bid Addendum: 7 days prior to due date of bids.

E. Bid Due Date: November 25, 2020, before 3 PM local time.

F. Bid Opening: Same day, 4 PM local time.

G. The Owner reserves the right to change the schedule or terminate the entire procurement process at any time.

2.2 BID REQUESTS FOR INFORMATION

A. All Bid questions should be addressed to the Owner, Marc Nicol, Director of Park Planning & Development electroniclly via email to parkprojects@riverfront.org with a copy to the Engineer, Nicholas Roy, PE, Senior Civil Engineer electroniclly via email to nicholas.roy@fando.com.

Project No. 20170277.S10

INSTRUCTIONS TO BIDDERS 00 21 13 - 3

2.3 BID SUBMISSION

A. Bids signed, executed, and dated will be received by the Owner electronically. Submit bids via email to Marc Nicol, Director of Park Planning & Development, parkprojects@riverfront.org before 3 PM local time on November 25, 2025.

B. Offers submitted after the above time will be returned to the bidder unopened.

C. Offers will be opened at 4 p.m. on November 25, 2025, at the office of the Owner.

2.4 INTENT

A. The central vision for the project is transforming this land into a public park that embodies Riverfront Recapture’s mission to connect people with the Connecticut River. The remediation of the land and construction of the cove is a vital step in that process. Riverfront Recapture values employment opportunities being provided for Hartford and Windsor residents so local communities benefit from and take part in the work we are doing to connect the region with the river.

B. The intent of this Bid request is to obtain an offer to perform work to complete the Riverfront Land Development Project: Phases 1A, 1B, & 2A for a Unit Price contract, in accordance with Contract Documents.

2.5 FUNDING

A. The work performed will be partially funded through the Connecticut Department of Economic and Community Development (DECD) OBRD Brownfields grant funds.

B. The work performed will be partially funded through a Multipurpose, Assessment, RLF, and Cleanup (MARC) Grant from the Environmental Protection Agency (EPA).

2.6 WORK IDENTIFIED IN THE CONTRACT DOCUMENTS

A. Work of this proposed Contract comprises of the following classifications:

1. Landscaping

2. Sitework

3. Remediation of Impacted Soil by a Contractor or Subcontractor registered under the anticipated CT DEEP 454 Contractor General Permit.

2.7 CONTRACT TIME

A. Perform the Work in 250 calendar days.

Project No. 20170277.S10

INSTRUCTIONS TO BIDDERS 00 21 13 - 4

B. The project site is impacted by flooding from the Connecticut River. Refer to Drawing C-001 – General Notes, Work Restrictions Notes 3, 3.1, and 3.2 and Drawing C-001 – General Notes, Flood Contingency Plan.

C. When flooding from the Connecticut River occurs and when no other work can be scheduled a weather day will be tracked, weather days will not be counted towards contract days, and no additional payment will be made.

BID DOCUMENTS AND CONTRACT DOCUMENTS

3.1 DEFINITIONS

A. Contract Documents: Defined in AIA A201 Article 1 including issued Addenda.

B. Bid, Offer, or Bidding: Act of submitting an offer.

C. Bid Amount: Monetary sum identified by the Bidder in the Bid Form.

3.2 AVAILABILITY

A. Bid documents may be obtained on the CT DAS Contracting Portal.

3.3 EXAMINATION

A. Upon receipt of Bid Documents verify that documents are complete. Notify Engineer should the documents be incomplete.

B. Immediately notify Engineer upon finding discrepancies or omissions in the Bid Documents.

3.4 INQUIRIES/ADDENDA

A. Addenda may be issued during the bidding period. All Addenda become part of Contract Documents. Include resultant costs in the Bid Amount.

B. Verbal answers are not binding on any party.

SITE ASSESSMENT

4.1 PREBID CONFERENCE

A. A mandatory prebid conference has been scheduled for 1 p.m. on November 5, 2025 at the location of Project.

B. All general contract bidders are invited.

C. Representatives of Engineer will be in attendance.

D. Summarized minutes of this meeting will be circulated to attendees. These minutes will not form part of Contract Documents.

Project No. 20170277.S10

INSTRUCTIONS TO BIDDERS 00 21 13 - 5

E. Information relevant to the Bid Documents will be recorded in an Addendum, issued to Bid Document recipients.

QUALIFICATIONS

5.1 PREQUALIFICATION

A. Contract shall comply with Connecticut General Statutes (CGS) Section 4b-91. As a prerequisite for selecting the Lowest Responsible and Qualified Bidder, the Bidder must also be pre-qualified with the State of Connecticut Department of Administrative Services (DAS). Bidder shall provide a Contractor’s Qualification Statement, certifying compliance with CGS Sec. 4b-91.

5.2 SUBCONTRACTORS/SUPPLIERS/OTHERS

A. Owner reserves the right to reject a proposed subcontractor for reasonable cause.

BID SUBMISSION

6.1 SUBMISSION PROCEDURE

A. Bidders shall be solely responsible for the delivery of their bids in the manner and time prescribed.

B. Bids signed, executed, and dated will be received by the Owner electronically. Submit bids via email to Marc Nicol, Director of Park Planning & Development, parkprojects@riverfront.org before 3 PM local time on November 25, 2025.

6.2 BID INELIGIBILITY

A. Bids that are unsigned, improperly signed or sealed, conditional, illegible, obscure, contain arithmetical errors, erasures, alterations, or irregularities of any kind, may at the discretion of the Owner, be declared unacceptable.

B. Bid Forms, Appendices, and enclosures that are improperly prepared may, at the discretion of Owner, be declared unacceptable.

C. Failure to provide security deposit, bonding or insurance requirements may, at the discretion of Owner, be waived.

BID ENCLOSURES/REQUIREMENTS

7.1 BID BOND

A. Bids shall be accompanied by a security deposit as follows:

1. Bid Bond of a sum no less than 5 percent of the Bid Amount on AIA A310 Bid Bond Form.

Project No. 20170277.S10

INSTRUCTIONS TO BIDDERS 00 21 13 - 6

B. Endorse the Bid Bond in the name of the Owner as obligee, signed and sealed by the principal (Contractor) and surety.

C. Include the cost of bid security in the Bid Amount.

D. If no contract is awarded, all security deposits will be returned.

7.2 PERFORMANCE BOND

A. Accepted Bidder: Provide a Performance bond as described in 00 73 00 - Supplementary Conditions.

B. Include the cost of Performance Bond in the Bid Amount.

7.3 LABOR & MATERIAL PAYMENT BOND

A. Accepted Bidder: Provide a Labor & Material Payment Bond as described in 00 73 00 - Supplementary Conditions.

B. Include the cost of Labor & Material Payment Bond in the Bid Amount.

7.4 BID FORM REQUIREMENTS

A. Complete all requested information in the Bid Form and Appendices.

B. Taxes: Refer to Document 00 73 00 - Supplementary Conditions for inclusion of taxes and products that are tax exempt.

7.5 COMMISSION ON HUMAN RIGHTS AND OPPORTUNITIES CONTRACT COMPLIANCE

REGULATIONS

A. All bidders must complete, sign, and return the “Commission on Human Rights and Opportunities Contract Compliance Regulations Notification to Bidders” form to the grantee at the time of bid opening. Bids not including this form should be considered incomplete and rejected. This form is attached and can also be found at: https://portal.ct.gov/-/media/chro/cc-documents/notificationtobidderspdf

B. This contract is subject to state contract compliance requirements, including non-discrimination statutes and set-aside requirements. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract be set aside for award to subcontractors holding current certification from the Connecticut Department of Administrative Services. The contractor must demonstrate good faith effort to meet the 25% set-aside goals.

C. The contractor who is selected to perform this State project must comply with CONN. GEN.

STAT. §§ 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f, inclusive, as amended by June 2015 Special Session Public Act 15-5.

Project No. 20170277.S10

INSTRUCTIONS TO BIDDERS 00 21 13 - 7

D. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. § 4a-60g. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals.

E. Submit an affirmative action plan to CHRO within 30 days following the intent to award notice and must be approved by the CHRO prior to the award of the construction contract.

F. A retainage of 2% per month of the total contract value will be applied until the contractor has submitted an approved affirmative action plan to CHRO and CHRO has granted approval.

7.6 FEES FOR CHANGES IN THE WORK

A. Include the fees for overhead and profit on own Work and Work by subcontractors, identified in Document 00 73 00 - Supplementary Conditions.

7.7 BID FORM SIGNATURE

A. The Bid Form shall be signed by the bidder, as follows:

1. Sole Proprietorship: Signature of sole proprietor in the presence of a witness who will also sign. Insert the words "Sole Proprietor" under the signature. Affix seal.

2. Partnership: Signature of all partners in the presence of a witness who will also sign. Insert the word "Partner" under each signature. Affix seal to each signature.

3. Corporation: Signature of a duly authorized signing officer(s) in their normal signatures.

Insert the officer's capacity in which the signing officer acts, under each signature. Affix the corporate seal. If the bid is signed by officials other than the president and secretary of the company, or the president/secretary/treasurer of the company, a copy of the by-law resolution of their board of directors authorizing them to do so, must also be submitted with the Bid Form in the bid envelope.

4. Joint Venture: Each party of the joint venture shall execute the Bid Form under their respective seals in a manner appropriate to such party as described above, similar to the requirements of a Partnership.

7.8 ADDITIONAL BID INFORMATION

A. Submit the following Supplements concurrent with bid submission:

1. Contractor’s Qualification Statement, certifying compliance with CGS Sec. 4b-91

2. CHRO Contract Compliance Regulations Notification to Bidders

Project No. 20170277.S10

INSTRUCTIONS TO BIDDERS 00 21 13 - 8

3. Document 00 43 36 - Proposed Subcontractors Form: Include the names of all Subcontractors and the portions of the Work they will perform.

OFFER ACCEPTANCE/REJECTION

8.1 DURATION OF OFFER

A. Bids shall remain open to acceptance and shall be irrevocable for a period of sixty (60) days after the bid closing date.

8.2 ACCEPTANCE OF OFFER

A. Owner reserves the right to accept or reject any or all offers.

B. After acceptance by Owner, Engineer on behalf of Owner, will issue to the successful bidder, a written Bid Acceptance.

AN AFFIRMATIVE ACTION/EQUAL OPPORTUNITY EMPLOYER. MINORITY/WOMEN'S

BUSINESS ENTERPRISES ARE ENCOURAGED TO APPLY. THIS CONTRACT IS SUBJECT TO STATE

SET-ASIDE AND CONTRACT COMPLIANCE REQUIREMENTS.

END OF SECTION 00 21 13

Project No. 20170277.S10

AVAILABLE PROJECT INFORMATION 00 31 00 - 1

SECTION 00 31 00 - AVAILABLE PROJECT INFORMATION

PART 1 GENERAL

1.1 EXISTING CONDITIONS

A. Certain information relating to existing surface and subsurface conditions and structures is available to bidders but will not be part of Contract Documents, as follows:

1. The plan entitled "Sheet 1 of 1, Property Survey, Land to be Aquired by Riverfront Recapture, Inc, Russo Lower Farm, 228,590H,600H610 Libert Road, Hartford, Connecticut, 100 Meadow Road, Windsor, Connecticut" Dated 09/27/19, Scale 1" = 100', Prepared by Close, Jensen & Miller, P.C., 1137 Silas Deane Highway, Wethersfield, CT 06109.

2. Preliminary Geotechnical Engineering Report, RLI Project, Hartford/Windsor, CT, prepared for Riverfront Recapture Inc. prepared by Fuss & O'Neill, Inc. dated October 2020.

3. Phase II/III Environmental Site Assessment, Portion of Windsor Meadows State Park, DEEP Remediation No.: TBD, prepared for Riverfront Recapture Inc., prepared by Fuss & O'Neill, Inc. dated April 2021, Updated November 2021.

4. Phase II/III Environmental Site Assessment, Riverfront Land Inc. Properties, 228, 690, 600, & 610 Leibert Road, Hartford, CT & 100 & 120 Meadow Road, Windsor, CT, DEEP Remediation No.: 14420 prepared for Riverfront Recapture Inc., prepared by Fuss & O'Neill, Inc. dated November 2018, Revised January 2022.

5. Phoenix Environmental Laboratories, Inc. Lab Report GCT22559: Waste characterization samples collected by the Engineer on May 8, 2025, from stockpiles H/I, K, and W.

6. Phoenix Environmental Laboratories, Inc. Lab Report GCT36739: Waste characterization samples collected by the Engineer on May 28, 2025, from stockpiles H/I, K, and W.

7. Remedial Action Plan, RLI Project, Hartford/Windsor, CT, prepared for Riverfront Recapture Inc., prepared by Fuss & O'Neill, Inc. dated July 2025.

8. RLI Project / Connecticut River Hydraulic & Floodway Report, State Project No. 63-721, prepared for Riverfront Recapture Inc., prepared by Fuss & O'Neill, Inc. dated June 2025 (Last Revised July 2025).

9. Stormwater Pollution Control Plan, Riverfront Land Incorporated, Parcel 1: 228 Leibert Road, Hartford/ 100 Meadow Road, Windsor, Parcel 2: 590 Leibert Road, Hartford, Parcel 3: 600 Leibert Road, Hartford/ 120 Meadow Road, Windsor, Parcel 4: 610 Leibert Road, Hartford, Parcel 5: Windsor Meadows State Park, prepared for Riverfront Recapture Inc., 50 Columbus Blvd, Hartford, CT, 06106, prepared by Fuss & O'Neill, Inc. dated July 2025.

Project No. 20170277.S10

AVAILABLE PROJECT INFORMATION 00 31 00 - 2

1.2 PERMITS

A. Owner has obtained the following permits and/or approvals, that are required to be secured prior to commencement of construction work on this project:

1. General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities.

2. Flood Management Certification.

PART 2 PRODUCTS - NOT USED

END OF SECTION 00 31 00

Project No. 20170277.S10

BID FORM 00 41 00 - 1

SECTION 00 41 00 - BID FORM

THE PROJECT AND THE PARTIES

1.1 TO:

A. Riverfront Recapture, Inc. (Owner)

50 Columbus Blvd

Hartford, CT 06106

1.2 FOR:

A. Riverfront Land Development Project: Phases 1A, 1B, & 2A

228 Leibert Rd, Hartford, Connecticut

100 Meadow Road, Windsor, Connecticut

1.3 DATE: ______________ (BIDDER TO ENTER DATE)

1.4 SUBMITTED BY: (BIDDER TO ENTER NAME AND ADDRESS)

A. Bidder's Full Name _________________________

1. Address _________________________

2. City, State, Zip_________________________

1.5 OFFER

A. Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and the Bid Documents prepared by the Engineer for the above mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform the Work for the Unit Prices listed in this bid form of:

B. _________________________________________________________ _________________________________________________________ dollars ($______________________), in lawful money of the United States of America.

C. We have included the required Bid Bond as required by the Instruction to Bidders.

D. All applicable federal taxes are included and State of Connecticut taxes are included in the Bid Sum.

1.6 ACCEPTANCE

A. This offer shall be open to acceptance and is irrevocable for sixty days from the bid closing date.

Project No. 20170277.S10

BID FORM 00 41 00 - 2

B. If this bid is accepted by Owner within the time period stated above, we will:

1. Execute the Agreement within seven days of receipt of acceptance of this bid.

2. Furnish the required bonds within seven days of receipt of acceptance of this bid.

C. If this bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required Bond(s), the security deposit shall be forfeited as damages to Owner by reason of our failure, limited in amount to the lesser of the face value of the security deposit or the difference between this bid and the bid upon which a Contract is signed.

1.7 CONTRACT TIME

A. If this Bid is accepted, we will:

1. Complete the Work in 250 calendar days from date of executed agreement.

1.8 UNIT PRICES

The following are Unit Prices for specific portions of the Work as listed. The following is the list of Unit Prices:

Item No.

Item Name No. of Units

Unit of Measure

Unit Price Bid Price in Words

Unit Price Computed

Total Bid Price in Figures

1 Mobilization, Demobilization and Miscellaneous Construction

1 Lump Sum

The Lump Sum price of:

Dollars and cents [in words]

[in figures]

2 Prepare Health and Safety Plan

1 Lump Sum

The Lump Sum price of:

Dollars and cents [in words]

[in figures]

3 Disposal of Soil Stockpiles H/I K and W and Soil at Borings SB-15R and SB-15

1,400 Tons The per Ton price of:

Dollars and cents [in words]

[in figures]

Project No. 20170277.S10

BID FORM 00 41 00 - 3

4 Excavation and Stockpiling of Impacted Soil from Remedial Areas

1,600 Yards The per Cubic Yard price of:

Dollars and cents [in words]

[in figures]

5 Excavation and Stockpiling of Impacted Soil from Cove Excavation Area

11,300 Yards The per Cubic Yard price of:

Dollars and cents [in words]

[in figures]

6 Excavation and Stockpiling Impacted Soil from Cove Dredge Area

1,030 Yards The per Cubic Yard price of:

Dollars and cents [in words]

[in figures]

7 Excavation of Phase 2A Cove Excavation Area

130,000 Yards The per Cubic Yard price of:

Dollars and cents [in words]

[in figures]

8 Backfilling with Reuseable Soil in Designated Areas

105,000 Yards The per Cubic Yard price of:

Dollars and cents [in words]

[in figures]

9 Offsite Disposal of Surplus Subsoil

25,000

Yards The per Cubic Yard price of:

Dollars and cents [in words]

[in figures]

10 Site Stabilization 1 Lump Sum

The Lump Sum price of:

Dollars and cents [in words]

[in figures]

Project No. 20170277.S10

BID FORM 00 41 00 - 4

1.9 ADDENDA

A. The following Addenda have been received. The modifications to the Bid Documents noted below have been considered and all costs are included in the Bid Sum.

1. Addendum # _______ Dated ________________.

2. Addendum # _______ Dated ________________.

3. Addendum # _______ Dated ________________.

4. Addendum # _______ Dated ________________.

1.10 BID FORM SUPPLEMENTS

A. The following Supplements are attached to this Bid Form and are considered an integral part of this Bid Form:

1. Contractor’s Qualification Statement, certifying compliance with CGS Sec. 4b-91

2. CHRO Contract Compliance Regulations Notification to Bidders

3. Document 00 43 36 - Proposed Subcontractors Form: Include the names of Subcontractors and the portions of the Work they will perform.

1.11 BID FORM SIGNATURE(S)

A. The Corporate Seal of

(Bidder - print the full name of your firm)

B. was hereunto affixed in the presence of:

(Authorized signing officer, Title)

C. (Seal)

(Authorized signing officer, Title)

END OF SECTION 00 41 00

Project No. 20170277.S10

PROPOSED SUBCONTRACTORS FORM 00 43 36 - 1

SECTION 00 43 36 - PROPOSED SUBCONTRACTORS FORM

PARTICULARS

1.1 HEREWITH IS THE LIST OF SUBCONTRACTORS REFERENCED IN THE BID SUBMITTED BY:

1.2 (BIDDER) ____________________________________

1.3 DATED ___________________ AND WHICH IS AN INTEGRAL PART OF THE BID FORM.

1.4 THE FOLLOWING WORK WILL BE PERFORMED (OR PROVIDED) BY SUBCONTRACTORS

AND COORDINATED BY US:

LIST OF SUBCONTRACTORS:

END OF SECTION 00 43 36

Project No. 20170277.S10

GENERAL CONDITIONS 00 72 00 - 1

SECTION 00 72 00 - GENERAL CONDITIONS

FORM OF GENERAL CONDITIONS

1.1 THE GENERAL CONDITIONS APPLICABLE TO THIS CONTRACT IS ATTACHED

FOLLOWING THIS PAGE.

RELATED REQUIREMENTS

2.1 SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS.

2.2 SECTION 01 42 16 - DEFINITIONS.

SUPPLEMENTARY CONDITIONS

3.1 REFER TO DOCUMENT 00 73 00 - SUPPLEMENTARY CONDITIONS FOR AMENDMENTS TO

THESE GENERAL CONDITIONS.

END OF SECTION 00 72 00

Senior Civil Engineer

10/10/2025

Project No. 20170277.S10

SUPPLEMENTARY CONDITIONS 00 73 00 - 1

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

PART 1 GENERAL

1.1 SUMMARY

A. These Supplementary Conditions amend and supplement the General Conditions defined in Document 00 72 00 - General Conditions and other provisions of Contract Documents as indicated below. Provisions that are not so amended or supplemented remain in full force and effect.

B. The terms used in these Supplementary Conditions that are defined in the General Conditions have the meanings assigned to them in the General Conditions.

1.2 MODIFICATIONS TO GENERAL CONDITIONS

Delete Section 2.3.6 and substitute the following:

§ 2.3.6 The Owner shall furnish the Contractor zero (0) paper copies of the Contract Documents. An electronic copy in Adobe™ PDF format will be provided.

§ 3.2.5 The Owner is entitled to reimbursement from the Contractor for amounts paid to the Engineer for evaluating and responding to the Contractor’s requests for information that are not prepared in accordance with the Contract Documents or where the requested information is available to the Contractor from a careful study and comparison of the Contract Documents, field conditions, other Owner-provided information, Contractor-prepared coordination drawings, or prior Project correspondence or documentation.

§ 3.6.1 Tax Exempt Status: Riverfront Recapture, Inc. is an Exempt Entity from sales and use taxes. The Owner will provide a Tax Exempt Certificate to the awarded Contractor for their records.

§ 3.12.11 The Engineer’s review of Contractor’s submittals will be limited to examination of an initial submittal and one (1) resubmittals. The Owner is entitled to obtain reimbursement from the Contractor for amounts paid to the Architect for evaluation of additional resubmittals.

§ 3.12.12 The Owner is entitled to obtain reimbursement from the Contractor for the Engineer’s review of Contractor’s alternate means, methods, design, delegated design purview, material substitution, etc., proposed by Contractor, deviating from that specified on Subcontract documents.

§ 4.2.2.1 The Owner is entitled to reimbursement from the Contractor for amounts paid to the Architect for site visits made necessary by the fault of the Contractor or by defects and deficiencies in the Work.

§ 7.1.4 The combined overhead and profit included in the total cost to the Owner for a change in the Work shall be based on the following schedule:

Project No. 20170277.S10

SUPPLEMENTARY CONDITIONS 00 73 00 - 2

1. For the Contractor, for Work performed by the Contractor’s own forces, 10 percent of the cost.

2. For the Contractor, for Work performed by the Contractor’s Subcontractors, 5 percent of the amount due the Subcontractors.

3. For each Subcontractor involved, for Work performed by that Subcontractor’s own forces, 10 percent of the cost.

4. For each Subcontractor involved, for Work performed by the Subcontractor’s Sub-subcontractors, 5 percent of the amount due the Sub-subcontractor.

5. Cost to which overhead and profit is to be applied shall be determined in accordance with Section 7.3.7.

§ 7.1.5 In order to facilitate checking of quotations for extras or credits, all proposals, except those so minor that their propriety can be seen by inspection, shall be accompanied by a complete itemization of costs including labor, materials and Subcontracts. Labor and materials shall be itemized in the manner prescribed above. Where major cost items are Subcontracts, they shall be itemized also. In no case will a change involving over $1,000 be approved without such itemization.

§ 9.3.1.3 In making such Application For Payment for the Work, there shall be deducted five percent (5%) of the amount of each Application for Payment to be retained by the Owner as Retainage until Final Completion. If the contractor has provided Contractor’s Affidavit of Release of Liens (AIA form G706A) and lien waivers from major subcontractors and suppliers, a contractor may request the balance of retainage. If these documents are not provided, retainage cannot be paid until 91 days after the date on the Certificate of Substantial Completion.

§ 9.8.3.1 The Engineer will perform no more than one (1) inspection to determine whether the Work or a designated portion thereof has attained Substantial Completion in accordance with the Contract Documents. The Owner is entitled to reimbursement from the Contractor for amounts paid to the Architect for any additional inspections.

§ 9.10.1.1 The Engineer will perform no more than one (1) inspection to determine whether the Work or a designated portion thereof has attained Final Completion in accordance with the Contract Documents. The Owner is entitled to reimbursement from the Contractor for amounts paid to the Architect for any additional inspections.

§ 11.1.1.1 Listed the following as additionally insured on insurance certificates:

1. Riverfront Recapture, Inc.

2. Riverfront Land, Inc.

3. State of Connecticut

Project No. 20170277.S10

SUPPLEMENTARY CONDITIONS 00 73 00 - 3

§ 11.1.1.1.1 The “Hold Harmless” Indemnification endorsement of the insurance shall include the interest of the Owner and the State of Connecticut. The Contractor and Subcontractors and other interests shall be so named.

§ 11.1.1.2 The limits for Commercial General Liability insurance including coverage for Premises-Operations, Independent Contractors’ Protective, Products-Completed Operations, Contractual Liability, Personal Injury and Broad Form Property Damage (including coverage for Explosion, Collapse and Underground hazards) shall be as follows:

1. $1,000,000 Each Occurrence

2. $2,000,000 General Aggregate

3. $5,000,000 Umbrella Coverage

4. The policy shall be endorsed to have the General Aggregate apply to this Project only.

5. The Contractual Liability insurance shall include coverage sufficient to meet the obligations in AIA Document A201™–2007 under Section 3.18.

§ 11.1.1.3 Automobile Liability insurance (owned, non-owned and hired vehicles) for bodily injury and property damage: $1,000,000 Each Accident.

§ 11.1.1.5 If this insurance is written on a Commercial General Liability policy form, the certificates shall be ACORD form 25-S, completed and supplemented in accordance with AIA Document G715™–1991, Instruction Sheet and Supplemental Attachment for ACORD Certificate of Insurance 25-S.

PART 2 PRODUCTS - NOT USED

END OF SECTION 00 73 00

Project No. 20170277.S10

PREVAILING WAGE RATES/CONTRACTOR’S

WAGE CERTIFICATION/PAYROLL

CERTIFICATION

00 73 44 - 1

SECTION 00 73 44 - PREVAILING WAGE RATES/CONTRACTOR’S WAGE

CERTIFICATION/PAYROLL CERTIFICATION

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Minimum Rates and Classifications for Heavy/Highway Construction.

1.2 DAVIS BACON ACT/PREVAILING WAGE

A. As the Project has received a Multipurpose, Assessment, and Cleanup (MARC) Grant from the Environmental Protection Agency (EPA) and shall pay prevailing wages rates for any cleanup, remediation, and associated construction work.

B. As per CGS Section 31-53c, any business organization that receives DECD financial assistance totaling one million dollars or more, shall pay prevailing wages rates for any construction, remodeling, refinishing, refurbishing, rehabilitation, alteration or repair contracts entered into.

C. As the grantee has received more than one million dollars in DECD financial assistance, the requirements set forth in CGS Section 31-53c do apply and prevailing wage is required for Project bidding or contracts.

D. Submit monthly certified payroll records to the Owner that contain among other items, a signed statement from the employer that (a) the records are correct, (b) the employer met the prevailing wage law's requirements, and (c) the employer understands the penalties for knowingly filing false payroll records. The Owner shall keep records satisfactory to DECD and hold DECD harmless in any disputes regarding Conn. Gen. Stat. Sec. 31-53c.

E. The wages paid on an hourly basis to any person performing the work of any mechanic, laborer, or worker on the work herein contracted to be done and the amount of the payment or contribution paid or payable on behalf of each person to any employee, welfare fund, as defined in subsection (i) of the section 31-53, shall be at a rate equal to the rate customary or prevailing for the same work in the same trade or occupation in the town in which such construction, remodeling, refinishing, refurbishing, rehabilitation, alteration or repair project is being undertaken. Any contractor who is not obligated by agreement to make payment or contribution on behalf of such persons to any such employee welfare fund shall pay to each mechanic, laborer, or worker as part of such person’s wages the amount of payment or contribution for such person’s classification on each pay day.

F. The U. S. Secretary of Labor's latest decision and the State of Connecticut Wage Schedule are all incorporated in the documents. The higher rate (Federal or State) for any given occupation shall prevail. At the time of bidding, the bidder agrees to accept the current prevailing wage scale, as well as the annual adjustment to the prevailing wage scale, as provided by the Connecticut Department of Labor.

Project No. 20170277.S10

PREVAILING WAGE RATES/CONTRACTOR’S

WAGE CERTIFICATION/PAYROLL

CERTIFICATION

00 73 44 - 2

G. Project:

1. Riverfront Land Development Project: Phases 1A, 1B, & 2A

228 Leibert Rd, Hartford, Connecticut

100 Meadow Road, Windsor, Connecticut

H. The following pages contain:

1. Contractors Wage Certification Form: 1 page

2. Notice to all Mason Contractors reference Section 31-53 of C.GS. (Prevailing Wages): 1 page

3. Prevailing Wage Rates (Hartford) - English: 10 pages

4. Prevailing Wage Rates (Windsor) - English: 10 pages

5. Federal Wage Rates – English: 10 pages

6. Informational Bulletin - Occupational Classifications: 6 pages

7. Informational Bulletin – The 10-Hour OSHA Construction Safety and Health Course: 2 pages

8. Footnotes: 2 pages

9. Special Notice re Wage Rate Adjustments: 1 page

10. Weekly Payroll Certification Form (WWS-CP1): 1 page

11. Fringe Benefits Explanation (P): 1 page

12. Weekly Payroll Certification Form (WWS-CP2): 1 page

13. Prevailing Wage Law Poster: 1 page

CONNECTICUT DEPARTMENT OF LABOR

WAGE AND WORKPLACE STANDARDS DIVISION

CONTRACTORS WAGE CERTIFICATION FORM

I, of Officer, Owner, Authorized Rep. Company Name do hereby certify that the Company Name

Street

City and all of its subcontractors will pay all workers on the

Project Name and Number

Street and City the wages as listed in the schedule of prevailing rates required for such project (a copy of which is attached hereto).

Signed

Subscribed and sworn to before me this day of , .

Return to:

Notary Public

Connecticut Department of Labor Wage & Workplace Standards Division 200 Folly Brook Blvd.

Wethersfield, CT 06109

Rate Schedule Issued (Date):

November 29, 2006

Notice To All Mason Contractors and Interested Parties

Regarding Construction Pursuant to Section 31-53 of the Connecticut General Statutes (Prevailing Wage)

The Connecticut Labor Department Wage and Workplace Standards Division is empowered to enforce the prevailing wage rates on projects covered by the above referenced statute.

Over the past few years the Division has withheld enforcement of the rate in effect for workers who operate a forklift on a prevailing wage rate project due to a potential jurisdictional dispute.

The rate listed in the schedules and in our Occupational Bulletin (see enclosed) has been as follows:

Forklift Operator:

- Laborers (Group 4) Mason Tenders - operates forklift solely to assist a mason to a maximum height of nine feet only.

- Power Equipment Operator (Group 9) - operates forklift to assist any trade and to assist a mason to a height over nine feet.

The U.S. Labor Department conducted a survey of rates in Connecticut but it has not been published and the rate in effect remains as outlined in the above Occupational Bulletin.

Since this is a classification matter and not one of jurisdiction, effective January 1, 2007 the Connecticut Labor Department will enforce the rate on each schedule in accordance with our statutory authority.

Your cooperation in filing appropriate and accurate certified payrolls is appreciated.

CLASSIFICATION Hourly Rate Benefits

Riverfront Land Development, Phase 1A, 1B, & 2AProject:

Minimum Rates and Classifications for Heavy/Highway Construction

ID#:

By virtue of the authority vested in the Labor Commissioner under provisions of Section 31-53 of the General Statutes of Connecticut, as amended, the following are declared to be the prevailing rates and welfare payments and will apply only where the contract is advertised for bid within 20 days of the date on which the rates are established. Any contractor or subcontractor not obligated by agreement to pay to the welfare and pension fund shall pay this amount to each employee as part of his/her hourly wages.

Project Number:

State#:

Project:

FAP#:

Project Town:

Riverfront Land Development, Phase 1A, 1B, & 2A

Hartford

Connecticut Department of Labor Wage and Workplace Standards Division

25-10651

1) Boilermaker 48.21 30.01

1a) Bricklayer, Cement Masons, Cement Finishers, Plasterers, Stone Masons 43.14 34.74

2) Carpenters, Piledrivermen 42.03 29.19

2a) Diver Tenders 42.03 29.19

2b) Divers Effluent 67.52 29.19

3) Divers 50.49 29.19

03a) Millwrights 43.25 29.13

03b) Carpenter-Welder 42.53 29.19

03c) Carpenter: Working with creosote lumber or acid 43.03 29.19

As of: October 17, 2025

4) Painters: (Bridge Construction) Brush, Roller, Blasting (Sand, Water, etc.), Spray

59.7 26.65

4a) Painters: Brush and Roller 39.57 26.50

4b) Painters: Spray 42.57 26.50

4bc) Painters: Spray Helper 40.57 26.50

4c) Painters: Steel Only 41.57 26.50

4d) Painters: Blast 44.57 26.50

4de) Painter: Blast Helper 40.57 26.50

4e) Painters: Tanks, Tower and Swingstage etc. 41.57 26.50

4f) Elevated Tanks (60 feet and above) 48.57 26.50

5) Electrician (Trade License required: E-1,2 L-5,6 C-5,6 T-1,2 L-1,2 V- 1,2,7,8,9)

48.25 35.22+3% of gross wage

6) Ironworkers: Ornamental, Reinforcing, Structural, and Precast Concrete Erection

45.25 43.62 + a

7) Plumbers (Trade License required: (P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2) and Pipefitters (Including HVAC Work) (Trade License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4 G-1, G-2, G-8, G-9)

50.58 36.30

----LABORERS---- -

8) Group 1: General Laborers and concrete specialist 35.7 28.85

8) Group 1a: Acetylene Burners (Hours worked with a torch) 36.7 28.85

9) Group 2: Chain saw operators, fence and guard rail erectors, pneumatic tool operators, powdermen

35.95 28.85

10) Group 3: Pipelayers 36.2 28.85

11) Group 4: Jackhammer/Pavement breaker (handheld); mason tenders (cement/concrete), catch basin builders, asphalt rakers, air track operators, block paver, curb setter and forklift operators

36.2 28.85

12) Group 5: Toxic waste removal (non-mechanical systems) 37.7 28.85

13) Group 6: Blasters 37.45 28.85

Group 7: Asbestos/lead removal, non-mechanical systems (does not include leaded joint pipe)

38.7 28.85

Group 8: Traffic control signalmen 21.42 28.85

Group 9: Hydraulic Drills 36.45 28.85

Group 10: Toxic Waste Removers A or B With PPE 38.7 28.85

----LABORERS (TUNNEL CONSTRUCTION, FREE AIR). Shield Drive and Liner Plate Tunnels in Free Air.----

13a) Miners, Motormen, Mucking Machine Operators, Nozzle Men, Grout Men, Shaft & Tunnel Steel & Rodmen, Shield & Erector, Arm Operator, Cable Tenders

37.93 28.85 + a

13b) Brakemen, Trackmen, Miners' Helpers and all other men 36.96 28.85 + a

14) Concrete Workers, Form Movers, and Strippers 36.96 28.85 + a

15) Form Erectors 37.29 28.85 + a

----ROCK SHAFT LINING, CONCRETE, LINING OF SAME AND TUNNEL IN

FREE AIR:----

16) Brakemen, Trackmen, Tunnel Laborers, Shaft Laborers, Miners Helpers 36.96 28.85 + a

17) Laborers Topside, Cage Tenders, Bellman 36.85 28.85 + a

18) Miners 37.93 28.85 + a

----TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: ---

18a) Blaster 44.42 28.85 + a

19) Brakemen, Trackmen, Groutman, Laborers, Outside Lock Tender, Gauge Tenders

44.22 28.85 + a

20) Change House Attendants, Powder Watchmen, Top on Iron Bolts 42.24 28.85 + a

21) Mucking Machine Operator, Grout Boss, Track Boss 45.01 28.85 + a

----TRUCK DRIVERS----(*see note below)

Block Truck 37.48 32.68 + a

2 Axle 36.16 32.68 + a

Helpers 34.66 32.68 + a

Three Axle Trucks; Two Axle Mixer 36.27 32.68 + a

Three Axle Mixer 36.33 32.68 + a

Four Axle Trucks 36.39 32.68 + a

Four Axle Mixer 37.19 32.68 + a

5 Axle 36.39 32.68 + a

5 Axle Mixer 37.19 32.68 + a

Heavy Duty Trailer (40 tons and over) 38.66 32.68 + a

Heavy Duty Trailer (up to 40 tons) 37.39 32.68 + a

Snorkle Truck 36.54 32.68 + a

Swivel Dump and Tack Truck 36.39 32.68 + a

Euclids and Semi Trailer 36.44 32.68 + a

----POWER EQUIPMENT OPERATORS----

Group 1: Crane Handling or Erecting Structural Steel or Stone, Hoisting Engineer (2 drums or over). (Trade License Required)

58.19 29.80 + a

Group 1a: Front End Loader (7 cubic yards or over); Work Boat 26 ft. and over.

53.33 29.80 + a

Group 2: Cranes (100 ton rate capacity and over); Bauer Drill/Caisson.

(Trade License Required)

57.78 29.80 + a

Group 2a: Cranes (under 100 ton rated capacity). 56.79 29.80 + a

Group 2b: Excavator over 2 cubic yards; Pile Driver ($3.00 premium when operator controls hammer).

52.92 29.80 + a

Group 3: Excavator; Gradall; Master Mechanic; Hoisting Engineer (all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power of operation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade (slopes, shaping, laser or GPS, etc.). (Trade License Required)

51.92 29.80 + a

Group 4: Trenching Machines; Lighter Derrick; CMI Machine or Similar;

Koehring Loader (Skooper).

51.42 29.80 + a

Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt Spreader;

Asphalt Reclaiming Machine; Line Grinder; Concrete Pumps; Drills with Self Contained Power Units; Boring Machine; Post Hole Digger; Auger; Pounder;

Well Digger; Milling Machine (over 24" mandrel)

50.63 29.80 + a

Group 5 continued: Side Boom; Combination Hoe and Loader; Directional Driller.

50.63 29.80 + a

Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough grade dozer).

50.22 29.80 + a

Group 7: Asphalt Roller; Concrete Saws and Cutters (ride on types);

Vermeer Concrete Cutter; Stump Grinder; Scraper; Snooper; Skidder; Milling Machine (24" and under Mandrel)

49.77 29.80 + a

Group 8: Mechanic, Grease Truck Operator, Hydroblaster, Barrier Mover, Power Stone Spreader; Welder; Work Boat under 26 ft.; Transfer Machine.

49.25 29.80 + a

Group 9: Front End Loader (under 3 cubic yards), Skid Steer Loader regardless of attachments (Bobcat or Similar); Fork Lift, Power Chipper;

Landscape Equipment (including hydroseeder), Vacuum Excavation Truck and Hydrovac Excavation Truck (27 HG pressure or greater).

48.67 29.80 + a

Group 10: Vibratory Hammer, Ice Machine, Diesel and Air Hammer, etc. 45.96 29.80 + a

Group 11: Conveyor, Earth Roller; Power Pavement Breaker (whiphammer), Robot Demolition Equipment.

45.96 29.80 + a

Group 12: Wellpoint Operator. 45.87 29.80 + a

Group 13: Compressor Battery Operator. 45.12 29.80 + a

Group 14: Elevator Operator; Tow Motor Operator (Solid Tire No Rough Terrain).

43.6 29.80 + a

Group 15: Generator Operator; Compressor Operator; Pump Operator;

Welding Machine Operator; Heater Operator.

43.06 29.80 + a

Group 16: Maintenance Engineer. 42.2 29.80 + a

Group 17: Portable Asphalt Plant Operator; Portable Crusher Plant Operator;

Portable Concrete Plant Operator., Portable Grout Plant Operator, Portable Water Filtration Plant Operator.

47.91 29.80 + a

Group 18: Power Safety Boat; Vacuum Truck; Zim Mixer; Sweeper;

(minimum for any job requiring CDL license).

44.7 29.80 + a

Surveyor: Chief of Party 48.16 29.80 + a

Surveyor: Assistant Chief of Party 44.41 29.80 + a

Surveyor: Instrument Man 42.73 29.80 + a

Surveyor: Rodman or Chairman 36.78 29.80 + a

**NOTE: SEE BELOW

----LINE CONSTRUCTION----(Railroad Construction and Maintenance)----

20) Lineman, Cable Splicer, Technician 59.91 33.94

21) Heavy Equipment Operator 51.84 29.95

22) Equipment Operator, Tractor Trailer Driver, Material Men 50.92 30.78

23) Driver Groundmen 44.93 28.41

23a) Groundman Experienced 32.95 13.95

----OUTSIDE LINE CONSTRUCTION----

24) Driver Groundmen 43.78 28.41

25) Groundmen 32.1 13.95

26) Heavy Equipment Operators 50.51 29.95

27) Linemen, Cable Splicers, Dynamite Men 58.37 33.94

28) Material Men, Tractor Trailer Drivers, Equipment Operators 49.61 30.78

29) Technician 56.12 32.85

----COMMUNICATION----

Sales & Service Technician: To include but not limited to: Installation, Repair, Splicing and Maintenance

48.84 18.07

----DREDGING----

Class A1: Mechanical Dredge Operator 48.48 17.32+a+b

Class B1: Maintenance Engineer 41.93 16.87+a+b

Class C1: Mate/Welder 38.38 16.62+a+b

Class D: Deckhand 30.86 16.09+a+b

Welders: Rate for craft to which welding is incidental.

Surveyors: Hazardous material removal: $3.00 per hour premium.

*Note: Hazardous waste removal work receives additional $1.25 per hour for truck drivers.

**Note: Hazardous waste premium $3.00 per hour over classified rate.

Truck Drivers: Trainers Premium: $3.00 over wage rate.

Truck Drivers: Night Premium - Mixer Drivers: $2.00 over wage rate.

Crane with 150 ft. boom (including jib) - $1.50 extra

Crane with 200 ft. boom (including jib) - $2.50 extra

Crane with 250 ft. boom (including jib) - $5.00 extra

Crane with 300 ft. boom (including jib) - $7.00 extra

Crane with 400 ft. boom (including jib) - $10.00 extra

All classifications that indicate a percentage of the fringe benefits must be calculated at the percentage rate times the "base hourly rate".

Apprentices duly registered under the Commissioner of Labor's regulations on "Work Training Standards for Apprenticeship and Training Programs" Section 31-51-d-1 to 12, are allowed to be paid the appropriate percentage of the prevailing journeymen hourly base and the full fringe benefit rate, providing the work site ratio shall not be less than one full-time journeyperson instructing and supervising the work of each apprentice in a specific trade.

~~Connecticut General Statute Section 31-55a: Annual Adjustments to wage rates by contractors doing state work

The Prevailing wage rates applicable to this project are subject to annual adjustments each July 1st for the duration of the project.

Each contractor shall pay the annual adjusted prevailing wage rate that is in effect each July 1st, as posted by the Department of Labor.

It is the contractor's responsibility to obtain the annual adjusted prevailing wage rate increases directly from the Department of Labor's website.

The annual adjustments will be posted on the Department of Labor's Web page:

www.ct.gov/dol. For those without internet access, please contact the division listed below.

The Department of Labor will continue to issue the initial prevailing wage rate schedule to the Contracting Agency for the project.

All subsequent annual adjustments will be posted on our Web Site for contractor access.

Contracting Agencies are under no obligation pursuant to State labor law to pay any increase due to the annual adjustment provision.

Effective October 1, 2005 - Public Act 05-50: any person performing the work of any mechanic, laborer, or worker shall be paid prevailing wage

All Person who perform work ON SITE must be paid prevailing wage for the appropriate mechanic, laborer, or worker classification.

All certified payrolls must list the hours worked and wages paid to All Persons who perform work ON SITE regardless of their ownership i.e.: (Owners, Corporate Officers, LLC Members, Independent Contractors, et.

al)

Reporting and payment of wages is required regardless of any contractual relationship alleged to exist between the contractor and such person.

~~Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clause (29 CFR 5.5 (a) (1) (ii)).

Please direct any questions which you may have pertaining to classification of work and payment of prevailing wages to the Wage and Workplace Standards Division, telephone (860)263-6790.

CLASSIFICATION Hourly Rate Benefits

Riverfront Land Development, Phase 1A, 1B, & 2AProject:

Minimum Rates and Classifications for Heavy/Highway Construction

ID#:

By virtue of the authority vested in the Labor Commissioner under provisions of Section 31-53 of the General Statutes of Connecticut, as amended, the following are declared to be the prevailing rates and welfare payments and will apply only where the contract is advertised for bid within 20 days of the date on which the rates are established.