Project_summary.docx

DOCX document 16 KB Posted

Attached to
Melrose Dock Repairs State and local contract opportunity
Solicitation number
100325
Issued by
Beaufort County, South Carolina

About this file

This project summary document pertains to the Melrose Dock Rehabilitation Project administered by Beaufort County, South Carolina. The project addresses deteriorated conditions at the Melrose Dock facility on Daufuskie Island through comprehensive repairs to ensure public safety and maintain ferry landing operations. The scope of work includes removing gangways 1 through 4, restricting access to triangular decking areas, replacing seven specified piles in kind (32A, 33A, 33B, 34B, 46B, 44A, 36B), replacing deck timbers on both the dock and barge that present tripping or splintering hazards, repairing or replacing damaged handrails, restoring bearing conditions at Pile 8B, and replacing all cleats, bumpers, and hardware on the barge. A pre-bid meeting is scheduled, though attendance is not mandatory. The contract is structured as a lump sum agreement with a 120-day performance period and liquidated damages of $1,000 per calendar day for non-compliance.

The project is funded through state, federal, and Beaufort County appropriations, with funding subject to allocation contingencies. Contractors must provide performance and payment bonds equal to 100% of the contract price and maintain specified insurance coverages. The solicitation process requires contractors to demonstrate good faith efforts for Small and Minority Business (S/MBE) participation and submit comprehensive documentation of such efforts for evaluation. Contractors must also comply with Title VI of the Civil Rights Act. The structural inspection report classified the facility in poor condition (Code 3), noting critical deficiencies including marine borer infestation, advanced cross-bracing deterioration, and severe steel beam corrosion, underscoring the urgency and significance of this rehabilitation initiative.

View the file

Other files for this state and local contract opportunity

Other files attached to Melrose Dock Repairs, newest first.
File Type Posted
Melrose_Dock_Repairs_(Addendum_#6_Revision).pdf PDF
Melrose_Dock_Repairs_(Addendum_#3_Revision).pdf PDF
2025_Melrose_Dock_Structural_Inspection_Report_Rev1_(003).pdf PDF
2025_Melrose_Dock_Structural_Inspection_Report_Rev1_(003).pdf PDF
Project_summary.docx DOCX document
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Schedule_of_Values.docx DOCX document
Schedule_of_Values.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SUMMARY

Project Title: Melrose Dock Rehabilitation Project Description: The conditions at the Melrose Dock facility on Daufuskie Island has deteriorated over years of neglect. For the safety of the public and users of the dock, several floating docks have been closed to public use. McSweeney Engineers has prepared a report on the conditions and needed repairs to keep the ferry landing dock operational. That report is included in the supporting documents.

Scope of Work:

1) Remove gangways 1 through 4

2) Restrict access to triangular decking areas.

3) Replace piles 32A, 33A, 33B, 34B, 46B, 44A, 36B – in kind.

4) Replace deck timbers, both on the dock and barge, with deterioration that poses a tripping/splintering hazard to dock users.

5) Replace/repair all damaged handrails.

6) Restore bearing condition between pile and pile cap at Pile 8B.

7) Replace all cleats, bumpers and hardware on the barge.

Project Administration: Beaufort County Contract Type: Lump Sum Contract Time: 120 days Liquidated Damages: $1000/day Pre Bid Meeting: Yes Mandatory: No See attached engineer’s report and schedule of values.