About this file

The document is a Schedule of Values for the Melrose Dock Rehabilitation project in South Carolina, involving a comprehensive dock and barge repair initiative. The project scope includes removing gangways 1-4, restricting access to triangular decking areas, replacing multiple piles (32A, 33A, 33B, 34B, 46B, 44A, 36B), replacing deteriorated deck timbers on both dock and barge, repairing handrails, restoring pile and pile cap connections, and replacing barge cleats, bumpers, and hardware.

The Schedule of Values outlines 12 line items for the project, with allocations for performance bond, general conditions, permitting and fees, mobilization/demobilization, demolition, new piles, decking, handrails, pile bearing repairs, and barge-related components. While specific dollar amounts are not detailed in the provided document, the comprehensive line items suggest a structured approach to budgeting and project management for the dock rehabilitation effort, which appears to be focused on safety improvements and infrastructure maintenance for the marine facility.

View the file

Other files for this state and local contract opportunity

Other files attached to Melrose Dock Repairs, newest first.
File Type Posted
Melrose_Dock_Repairs_(Addendum_#6_Revision).pdf PDF
Melrose_Dock_Repairs_(Addendum_#3_Revision).pdf PDF
2025_Melrose_Dock_Structural_Inspection_Report_Rev1_(003).pdf PDF
2025_Melrose_Dock_Structural_Inspection_Report_Rev1_(003).pdf PDF
Project_summary.docx DOCX document
Project_summary.docx DOCX document
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Schedule_of_Values.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Values: Melrose Dock Rehabilitation

IFB#:

Item No.Description of WorkScheduled Value
1P $ P Bond$
2General Conditions$
3Permitting and Fees$
4Mobilization/ Demobilization$
5Demolition and Removal$
6New Piles$
7New Decking on Dock$
8New decking on barge$
9New Handrail (as needed)$
10Pile Bearing r\Repairs at Pile 8B$
11New Barge Bumper$
12New Barge Cleats and Hardware$