About this file
This solicitation package provides the details for a construction project entitled "Fox River Upper & Lower Sluiceway, Spillway and Walkway Repairs project in Appleton, WI." The work involves removing and replacing all sluiceway Tainter gates and trunnion assemblies and anchorage, removing and replacing steel spillway walkways, fully demolishing and replacing all spillway concrete piers, and partially demolishing and replacing all sluiceway concrete piers at two dams. The project also includes repairing bedrock scours downstream of one dam. Bids are due on June 15, 2020. The estimated construction cost is between $5-10 million. The solicitation is available only in PDF format from the provided website. The North American Industry Classification System code is 237990 and the size standard is $39.5 million. The acquisition allows for an HUBZone 10% price evaluation preference. The contracting office is the U.S. Army Corps of Engineers Chicago District.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION COVER SHEET
FOR
APPLETON UPPER AND LOWER SLUICEWAY AND SPILLWAY
REPAIRS
FOX RIVER
APPLETON, WI
50% BCOES AND ATR REVIEW 13 MARCH 2020
95% BCOES AND ATR REVIEW 05 JUNE 2020
95% BCOES AND ATR BACKCHECK 15 JULY 2020
CERTIFIED FINAL – READY TO ADVERTISE 28 JULY 2020
U.S. ARMY CORPS OF ENGINEERS
DETROIT DISTRICT
APPLETON UPPER AND LOWER DAM REPAI RS
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 10 10 REAL ESTATE
01 22 00. 00 10 PRI CE AND PAYMENT PROCEDURES
01 32 01. 00 10 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 35 13 SPECI AL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 45 00. 00 10 QUALI TY CONTROL
01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 PROJECT I DENTI FI CATI ON
01 78 00 CLOSEOUT SUBMI TTALS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 13 90 SI TE PREPARATI ON
02 41 00 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 11 14. 00 10 STRUCTURAL CONCRETE FORMWORK
03 16 00 GROUTED DOWELS
03 20 01. 00 10 CONCRETE REI NFORCEMENT
03 31 01. 00 10 CAST- I N- PLACE STRUCTURAL CONCRETE FOR CI VI L WORKS
03 60 20 EPOXY I NJECTI ON GROUTI NG
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 59 13. 01 04 STRUCTURAL STEEL
05 59 20 FABRI CATI ON OF HYDRAULI C STEEL STRUCTURES
DI VI SI ON 09 - FI NI SHES
09 97 02 PAI NTI NG: HYDRAULI C STRUCTURES
DI VI SI ON 31 - EARTHWORK
31 13 19 SELECTI VE TREE AND SHRUB CLEARI NG, REMOVAL AND GRUBBI NG
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 31 13. 53 HI GH- SECURI TY CHAI N LI NK FENCES AND GATES
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 05 40 SELF- LUBRI CATED MATERI ALS, FABRI CATI ON, HANDLI NG, AND
ASSEMBLY
35 20 14 STEEL STOPLOGS
35 20 15 FRP COMPOSI TES FOR LOW- HEAD WATER CONTROL STRUCTURES
35 20 16. 46 TAI NTER GATES AND ANCHORAGES
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1
30JUL2020
PROJECT TABLE OF CONTENTS Page 2
SECTI ON 01 10 10
REAL ESTATE
03/01
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Addi t i onal Pr oper t y Agr eement s; G- RED.
Copi es of any agr eement s f or Cont r act or - acqui r ed r eal est at e r i ght s f or t hi s pr oj ect shal l be f ur ni shed bef or e ent er i ng t her eon.
Cer t i f i ed Sur vey Resul t s
Fur ni sh a copy of cer t i f i ed r esul t s of sur veys whi ch ver i f y ar eas and l i mi t s of Cont r act or - acqui r ed r eal est at e r i ght s.
1. 2 REGULATORY REQUI REMENTS
1. 2. 1 Real Est at e Ri ght s
Ri ght s f or t he use of t he wor k and st or age ar eas and/ or ot her addi t i onal r eal est at e t hat have been obt ai ned ar e shown on t he t ask or der speci f i c dr awi ngs. Copi es of r eal est at e agr eement s, i f any, obt ai ned pr i or t o adver t i sement ar e i ncl uded i n t he sol i c i t at i on package. Cont r act or s ar e r equi r ed t o compl y wi t h r equi r ement s and condi t i ons f or al l agr eement s i n t he sol i c i t at i on package, and any ot her s obt ai ned af t er , as a condi t i on f or use of t he r eal est at e. No ot her r eal est at e agr eement s have been obt ai ned by t he Gover nment f or t hi s pr oj ect and cont r act or s ar e caut i oned of t he need t o compl et e t he pr oj ect wi t hout dependence on addi t i onal r eal est at e bei ng obt ai ned. Pr oper t y agr eement s and/ or r eal est at e r i ght s pr ovi ded under t hi s cont r act ( i f any) wi l l be at t ached t o Sect i on 01 99 90 " LI STI NG
OF ENCLOSED DOCUMENTS, EXHI BI TS AND OTHER ATTACHMENTS"
1. 2. 2 Addi t i onal Real Est at e Ri ght s
I f addi t i onal pr oper t y agr eement s and/ or r eal est at e r i ght s ar e desi r ed by t he Cont r act or , t hey may obt ai n and ut i l i ze t hem at t hei r own expense. Al l addi t i onal r eal est at e agr eement s shal l c l ear l y r el i eve t he Gover nment of any pot ent i al r esponsi bi l i t y f or damages or l i abi l i t y r esul t i ng f r om t he Cont r act or ' s use of such gr ounds.
Addi t i onal agr eement s obt ai ned by t he Cont r act or must be coor di nat ed and acknowl edged suf f i c i ent by Real Est at e Of f i ce, US Ar my Cor ps of Engi neer s, Det r oi t Di st r i c t , 477 Mi chi gan Avenue, Det r oi t , Mi chi gan pr i or t o
SECTI ON 01 10 10 Page 1 appl i cat i on and execut i on. Thi s acknowl edgment of suf f i c i ency wi l l be dependent upon conf or mance wi t h Feder al Real Est at e and Envi r onment al r equi r ement s and any ot her l aws and r egul at i ons as may be det er mi ned appl i cabl e by t he Gover nment .
1. 2. 3 Addi t i onal Real Est at e Ri ght s Obt ai ned by t he Gover nment
Addi t i onal r eal est at e agr eement s may al so be obt ai ned by t he Gover nment af t er t he sol i c i t at i on. I f ut i l i zed, t he Cont r act or i s r equi r ed t o abi de by al l t er ms and condi t i ons as set f or t h i n t he agr eement s.
1. 3 PROJECT/ SI TE CONDI TI ONS
1. 3. 1 Locat i on and Ver i f i cat i on
I t shal l be t he Cont r act or ' s r esponsi bi l i t y t o accur at el y l ocat e t he l i mi t s of al l l ands ut i l i zed under t he cont r act . The cor ner and angl e poi nt s of each ar ea f or whi ch r i ght s have been obt ai ned shal l be mar ked wi t h semi per manent mar ker s except wher e t her e i s an appr oved exi st i ng pr oper t y mar ker . Tempor ar y mar ker s shal l be pl aced at poi nt s on al i gnment . The poi nt s on al i gnment shal l be mar ked at st at i ons so t hat i nt er val s bet ween poi nt s do not exceed 200 f eet .
1. 3. 2 Sur vey Mar ker s
Al l mar ker s shal l be i nst al l ed i n an ar ea pr i or t o i t s use and t hey shal l be avai l abl e f or r ef er ence dur i ng and upon compl et i on of use of t he ar ea.
Wher e appr oved exi st i ng pr oper t y mar ker s ar e f ound, a wi t ness st ake, as speci f i ed i n Subpar agr aph, " Semi per manent Mar ker s" bel ow, shal l be pr ovi ded. I f t he t ypes of mar ker s speci f i ed her ei naf t er cannot be used, ot her t ypes, as appr oved by t he Cont r act i ng Of f i cer , shal l be pr ovi ded.
1. 3. 2. 1 Semi per manent Mar ker s
The mar ker s shal l be a st eel r od one- hal f i nch i n di amet er and f our ( 4) f eet l ong. The st eel r od shal l be dr i ven ver t i cal l y i nt o t he gr ound so t hat t he t op i s f l ush wi t h t he f i ni shed gr ound sur f ace. Each mar ker shal l be wi t nessed by a 2" x 2" yel l ow st ake ext endi ng t wo ( 2) f eet above t he gr ound sur f ace and dr i ven i nt o t he gr ound unt i l s t abl e, wi t h not l ess t han one ( 1) f oot penet r at i on.
1. 3. 2. 2 Tempor ar y Mar ker s
Mar ker s shal l be 2" x 2" , r ed- col or ed, wood hub st akes dr i ven i nt o t he gr ound unt i l s t abl e ( not l ess t han one ( 1) f oot penet r at i on) wi t h t wo ( 2) f eet pr oj ect i ng above t he gr ound sur f ace. I f t he per i od i n whi ch t empor ar y mar ker s ar e t o be i n pl ace exceeds one ( 1) const r uct i on season, a mor e per manent t ype of mar ker , as appr oved, shal l be pr ovi ded.
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON ( NOT APPLI CABLE)
- - End of Sect i on - -
SECTI ON 01 10 10 Page 2
SECTI ON 01 22 00. 00 10
PRI CE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1. 1 SI NGLE JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i s t ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se provided.
1. 2 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i s t ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
1. 3 BI DDI NG SCHEDULE
BASE CONTRACT
1. 3. 1 0001 Mobi l i zat i on
1. 3. 1. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h Mobi l i zat i on t o Appl et on Upper and Appl et on Lower Dams pr oj ect s i t es.
1. 3. 1. 2 Uni t of Measur e Uni t of measur e: Job.
1. 3. 2 0002 Demobi l i zat i on
1. 3. 2. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h Demobi l i zat i on f r om t he Appl et on Upper and Appl et on Lower Dams pr oj ect s i t es.
1. 3. 2. 2 Uni t of Measur e Uni t of measur e: Job.
SECTI ON 01 22 00. 00 10 Page 1
1. 3. 3 0003 Bl ast and Pai nt Gat es 1- 5 at Appl et on Lower Dam
1. 3. 3. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h bl ast i ng and pai nt i ng gat es 1- 5 at Appl et on Lower Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 3. 2 Uni t of Measur e Uni t of measur e: Job.
1. 3. 4 0004 Repl ace Tai nt er Gat e 6- 9 Removal f or Appl et on Lower Dam
1. 3. 4. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h r epl acement of t ai nt er gat es 6- 9 at Appl et on Lower Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 4. 2 Uni t of Measur e Uni t of measur e: Job.
1. 3. 5 0005 Suppl y and I nst al l Rubber Si de Seal s, Cl amp Pl at es & Bol t s f or Tai nt er Gat es 1- 9 at Appl et on Lower Dam
1. 3. 5. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h suppl y i ng and i nst al l i ng r ubber s i de seal s, c l amp pl at es and bol t s f or t ai nt er gat es 1- 9 at Appl et on Lower Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 5. 2 Uni t of Measur e Uni t of measur e: Job.
1. 3. 6 0006 Embedded Si de Seal Pl at es at Appl et on Lower Gat es 6- 9
1. 3. 6. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h const r uct i ng embedded si de seal pl at es at Appl et on Lower Dam gat es 6- 9 as r equi r ed i n t he pl ans and specifications.
1. 3. 6. 2 Uni t of Measur e Uni t of measur e: Each.
1. 3. 7 0007 Repl ace Spi l l way Wal kways at Appl et on Lower Dam
1. 3. 7. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h r epl aci ng spi l l way wal kways at Appl et on Lower Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 7. 2 Uni t of Measur e Uni t of measur e: Each.
1. 3. 8 0008 Repl ace Spi l l way Pi er s at Appl et on Lower Dam
1. 3. 8. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h r epl aci ng spi l l way pi er s at Appl et on Lower Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
SECTI ON 01 22 00. 00 10 Page 2
1. 3. 8. 2 Uni t of Measur e Uni t of measur e: Each.
1. 3. 9 0009 Si t e Wor k
1. 3. 9. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h var i ous s i t e wor k as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 9. 2 Uni t of Measur e Uni t of measur e: Job.
1. 3. 10 0010 Fabr i cat e and I nst al l St opl ogs and St opl og Gui des at Appl et on Lower Dam Spi l l way
1. 3. 10. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h f abr i cat i on and i nst al l at i on of st opl og and st opl og gui des at Appl et on Lower Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 10. 2 Uni t of Measur e Uni t of measur e: Job.
1. 3. 11 0011 Repl ace Tai nt er Gat e 1- 8 Removal f or Appl et on Upper Dam
1. 3. 11. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h r epl acement of t ai nt er gat es 1- 8 at Appl et on Upper Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 11. 2 Uni t of Measur e Uni t of measur e: Job.
1. 3. 12 0012 I nst al l Gover nment Fur ni shed Rubber Si de Seal s, Cl amp Pl at es and Bol t s f or Tai nt er Gat es 1- 8 at Appl et on Upper Dam
1. 3. 12. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h i nst al l at i on of Gover nment f ur ni shed r ubber s i de seal s, c l amp pl at es and bol t s f or t ai nt er gat es 1- 8 at Appl et on Upper Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 12. 2 Uni t of Measur e Uni t of measur e: Job.
1. 3. 13 0013 Embedded Si de Seal Pl at es at Appl et on Lower Gat es 1- 8
1. 3. 13. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h const r uct i on of embedded si de seal pl at es at Appl et on Lower Dam gat es 1- 8 as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 13. 2 Uni t of Measur e Uni t of measur e: Each.
SECTI ON 01 22 00. 00 10 Page 3
1. 3. 14 0014 Repl ace Spi l l way Wal kways at Appl et on Upper Dam
1. 3. 14. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h r epl acement of spi l l way wal kways at Appl et on Upper Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 14. 2 Uni t of Measur e Uni t of measur e: Each.
1. 3. 15 0015 Repl ace Spi l l way Pi er s at Appl et on Upper Dam
1. 3. 15. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h r epl acement of spi l l wy pi er s at Appl et on Upper Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 15. 2 Uni t of Measur e Uni t of measur e: Each.
1. 3. 16 0016 Per f or mance & Payment Bonds
1. 3. 16. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h per f or mance and payment bonds f or l i ne i t ems 0001 - 0015 per sect i on 00 10 00 of t he sol i c i t at i on.
1. 3. 16. 2 Uni t of Measur e Uni t of measur e: Lot .
1. 3. 17 0017 Opt i on 1: Remove and Repl ace Handr ai l s at Ri ght Abut ment and Pi er s 1- 9 at Appl et on Lower Dam
1. 3. 17. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h r emoval and r epl acement of handr ai l s at r i ght abut ment and pi er s 1- 9 at Appl et on Lower Dam as r equi r ed i n t he pl ans and speci f i cat i ons.
1. 3. 17. 2 Uni t of Measur e Uni t of measur e: Each.
1. 3. 18 0018 Opt i on 1: Per f or mance & Payment Bonds
1. 3. 18. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h per f or mance and payment bonds f or l i ne i t em 0017 per sect i on 00 10 00 of t he sol i c i t at i on.
1. 3. 18. 2 Uni t of Measur e Uni t of measur e: Lot .
1. 3. 19 0019 Opt i on 2: Remove and Repl ace Handr ai l s at Pi er s 1- 9 at Appl et on Upper Dam
1. 3. 19. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h r emoval and r epl acement of
SECTI ON 01 22 00. 00 10 Page 4 handr ai l s at pi er s 1- 9 at Appl et on Upper Dam as r equi r ed i n t he pl ans and specifications.
1. 3. 19. 2 Uni t of Measur e Uni t of measur e: Each.
1. 3. 20 0020 Opt i on 2: Per f or mance & Payment Bonds
1. 3. 20. 1 Payment Payment wi l l be made f or cost s associ at ed wi t h per f or mance and payment bonds f or l i ne i t em 0019 per sect i on 00 10 00 of t he sol i c i t at i on.
1. 3. 20. 2 Uni t of Measur e Uni t of measur e: Lot .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
3. 1 CONTRACT COST BREAKDOWN
The Cont r act or must f ur ni sh wi t hi n 30 cal endar days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i nc l uded i n t he var i ous i t ems. Thi s cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .
- - End of Sect i on - -
SECTI ON 01 22 00. 00 10 Page 5
SECTI ON 01 32 01. 00 10
PROJECT SCHEDULE
02/15
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AACE I NTERNATI ONAL ( AACE)
AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s
AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
ER 1- 1- 11 ( 2017) Admi ni st r at i on Pr oj ect Schedul es
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr oj ect Schedul er Qual i f i cat i ons; G, AOF Pr el i mi nar y Pr oj ect Schedul e; G, AOF I ni t i al Pr oj ect Schedul e; G, AOF Per i odi c Schedul e Updat e; G, AOF
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The aut hor i zed r epr esent at i ve must have a mi ni mum of 2- year s exper i ence schedul i ng const r uct i on pr oj ect s s i mi l ar i n s i ze and nat ur e t o t hi s pr oj ect wi t h schedul i ng sof t war e t hat meet s t he r equi r ement s of t hi s speci f i cat i on. Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nc i pl es and appl i cat i on.
PART 2 PRODUCTS
2. 1 SOFTWARE
The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s specification.
SECTI ON 01 32 01. 00 10 Page 1
2. 1. 1 Gover nment Def aul t Sof t war e
The Gover nment i nt ends t o use Pr i maver a P6.
2. 1. 2 Cont r act or Sof t war e
Schedul i ng sof t war e used by t he cont r act or must be commer ci al l y avai l abl e f r om t he sof t war e vendor f or pur chase wi t h vendor sof t war e suppor t agr eement s avai l abl e. The sof t war e r out i ne used t o cr eat e t he r equi r ed sdef f i l e must be cr eat ed and suppor t ed by t he sof t war e manuf act ur er .
2. 1. 2. 1 Primavera
I f Pr i maver a P6 i s sel ect ed f or use, pr ovi de t he " xer " expor t f i l e i n a ver si on of P6 i mpor t abl e by t he Gover nment syst em.
2. 1. 2. 2 Ot her Than Pr i maver a
I f t he cont r act or chooses sof t war e ot her t han Pr i maver a P6, t hat i s compl i ant wi t h t hi s speci f i cat i on, pr ovi de f or t he Gover nment ' s use t wo l i censes, t wo comput er s, and t r ai ni ng f or t wo Gover nment empl oyees i n t he use of t he sof t war e. These comput er s wi l l be st and- al one and not connect ed t o Gover nment net wor k. Comput er s and l i censes wi l l be r et ur ned at pr oj ect completion.
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n, pur suant t o FAR Cl ause 52. 236- 15, SCHEDULE FOR CONSTRUCTI ON CONTRACTS. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. The schedul i ng of construction i s t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment . Subcont r act or s and suppl i er s wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool . Use t he Cr i t i cal Pat h Met hod ( CPM) of net wor k cal cul at i on t o gener at e al l Pr oj ect Schedul es.
Pr epar e each Pr oj ect Schedul e usi ng t he Pr ecedence Di agr am Met hod ( PDM) .
3. 2 BASI S FOR PAYMENT AND COST LOADI NG
The schedul e i s t he basi s f or det er mi ni ng cont r act ear ni ngs dur i ng each updat e per i od and t her ef or e t he amount of each pr ogr ess payment . The aggr egat e val ue of al l act i v i t i es coded t o a cont r act CLI N must equal t he val ue of t he CLI N.
3. 2. 1 Act i v i t y Cost Loadi ng
Act i v i t y cost l oadi ng must be r easonabl e and wi t hout f r ont - end l oadi ng.
Pr ovi de addi t i onal document at i on t o demonst r at e r easonabl eness i f r equest ed by t he Cont r act i ng Of f i cer .
3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on
Fai l ur e t o meet t he r equi r ement s of t hi s speci f i cat i on may r esul t i n t he di sappr oval of t he pr el i mi nar y, i ni t i al or per i odi c schedul e updat es and
SECTI ON 01 32 01. 00 10 Page 2 subsequent r ej ect i on of payment r equest s unt i l compl i ance i s met .
I n t he event t hat t he Cont r act i ng Of f i cer di r ect s schedul e r evi s i ons and t hose r evi s i ons have not been i nc l uded i n subsequent Pr oj ect Schedul e r evi s i ons or updat es, t he Cont r act i ng Of f i cer may wi t hhol d 10 per cent of pay r equest amount f r om each payment per i od unt i l such r evi s i ons t o t he pr oj ect schedul e have been made.
3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS
3. 3. 1 Level of Det ai l Requi r ed
Devel op t he Pr oj ect Schedul e t o t he appr opr i at e l evel of det ai l t o addr ess maj or mi l est ones and t o al l ow f or sat i sf act or y pr oj ect pl anni ng and execut i on. Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l wi l l r esul t i n i t s di sappr oval . The Cont r act i ng Of f i cer wi l l consi der , but i s not l i mi t ed t o, t he f ol l owi ng char act er i st i cs and r equi r ement s t o det er mi ne appr opr i at e l evel of det ai l :
3. 3. 2 Act i v i t y Dur at i ons
Reasonabl e act i v i t y dur at i ons ar e t hose t hat al l ow t he pr ogr ess of ongoi ng act i v i t i es t o be accur at el y det er mi ned bet ween updat e per i ods.
Less t han 2 per cent of al l non- pr ocur ement act i v i t i es may have Or i gi nal Dur at i ons ( OD) gr eat er t han 20 wor k days or 30 cal endar days.
3. 3. 3 Pr ocur ement Act i v i t i es
I ncl ude act i v i t i es associ at ed wi t h t he cr i t i cal submi t t al s and t hei r appr oval s, pr ocur ement , f abr i cat i on, and del i ver y of l ong l ead mat er i al s, equi pment , f abr i cat ed assembl i es, and suppl i es. Long l ead pr ocur ement act i v i t i es ar e t hose wi t h an ant i c i pat ed pr ocur ement sequence of over 90 cal endar days.
3. 3. 4 Mandat or y Tasks
I ncl ude t he f ol l owi ng act i v i t i es/ t asks i n t he i ni t i al pr oj ect schedul e and al l updat es.
a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each) .
b. Submi ssi on, r evi ew and accept ance of f eat ur es r equi r e desi gn compl et i on
c. Submi ssi on of mechani cal / el ect r i cal / i nf or mat i on syst ems l ayout dr awi ngs.
d. Long pr ocur ement act i v i t i es
e. Submi ssi on and appr oval of O & M manual s.
f . Submi ssi on and appr oval of as- bui l t dr awi ngs.
g. Submi ssi on and appr oval of DD1354 dat a and i nst al l ed equi pment l i s t s.
h. Submi ssi on and appr oval of t est i ng and ai r bal ance ( TAB) .
i . Submi ssi on of TAB speci al i s t desi gn r evi ew r epor t .
j . Submi ssi on and appr oval of f i r e pr ot ect i on speci al i s t .
SECTI ON 01 32 01. 00 10 Page 3
k. Submi ssi on and appr oval of Bui l di ng Commi ssi oni ng Pl an, t est dat a, and r epor t s: Devel op t he schedul e l ogi c associ at ed wi t h t est i ng and commi ssi oni ng of mechani cal syst ems t o a l evel of det ai l consi st ent wi t h t he cont r act commi ssi oni ng r equi r ement s. Al l t asks associ at ed wi t h al l bui l di ng t est i ng and commi ssi oni ng wi l l be compl et ed pr i or t o submi ssi on of bui l di ng commi ssi oni ng r epor t and subsequent cont r act completion.
l . Ai r and wat er bal anci ng.
m. Bui l di ng commi ssi oni ng - Funct i onal Per f or mance Test i ng.
n. Cont r ol s t est i ng pl an submi ssi on.
o. Cont r ol s t est i ng.
p. Per f or mance Ver i f i cat i on t est i ng.
q. Ot her syst ems t est i ng, i f r equi r ed.
r . Cont r act or ' s pr e- f i nal i nspect i on.
s. Cor r ect i on of punch l i s t f r om Cont r act or ' s pr e- f i nal i nspect i on.
t . Gover nment ' s pr e- f i nal i nspect i on.
u. Cor r ect i on of punch l i s t f r om Gover nment ' s pr e- f i nal i nspect i on.
v. Fi nal i nspect i on.
3. 3. 5 Gover nment Act i v i t i es
Show Gover nment and ot her agency act i v i t i es t hat coul d i mpact pr ogr ess.
These act i v i t i es i ncl ude, but ar e not l i mi t ed t o: approvals, envi r onment al per mi t appr oval s by St at e r egul at or s, i nspect i ons, ut i l i t y t i e- i n, Gover nment Fur ni shed Equi pment ( GFE) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.
3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y
Use t he act i v i t y codi ng st r uct ur e def i ned i n t he St andar d Dat a Exchange For mat ( SDEF) i n ER 1- 1- 11. Thi s exact st r uct ur e i s mandat or y. Devel op and assi gn al l Act i v i t y Codes t o act i v i t i es as det ai l ed her ei n. A t empl at e SDEF compat i bl e schedul e backup f i l e i s avai l abl e on t he RMS web si t e:
http://rms.usace.army.mil .
The SDEF f or mat i s as f ol l ows:
Field Act i v i t y Code Length Description
1 WRKP 3 Wor ker s per day
2 RESP 4 Responsi bl e par t y
3 AREA 4 Ar ea of wor k
SECTI ON 01 32 01. 00 10 Page 4
Field Act i v i t y Code Length Description
4 MODF 6 Modi f i cat i on Number
5 BIDI 6 Bi d I t em ( CLI N)
6 PHAS 2 Phase of wor k
7 CATW 1 Cat egor y of wor k
8 FOW 20 Feat ur e of wor k*
* Some syst ems r equi r e t hat FEATURE OF WORK val ues be pl aced i n sever al act i v i t y code f i el ds. The not at i on shown i s f or Pr i maver a P6. Ref er t o t he speci f i c sof t war e gui del i nes wi t h r espect t o t he FEATURE OF WORK f i el d r equi r ement s.
3. 3. 6. 1 Wor ker s Per Day ( WRKP)
Assi gn Wor ker s per Day f or al l f i el d const r uct i on or di r ect wor k act i v i t i es, i f di r ect ed by t he Cont r act i ng Of f i cer . Wor ker s per day i s based on t he aver age number of wor ker s expect ed each day t o per f or m a t ask f or t he dur at i on of t hat act i v i t y .
3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)
Assi gn r esponsi bi l i t y code f or al l act i v i t i es t o t he Pr i me Cont r act or , Subcont r act or ( s) or Gover nment agency( i es) r esponsi bl e f or per f or mi ng t he activity.
a. Act i v i t i es coded wi t h a Gover nment Responsi bi l i t y code i ncl ude, but ar e not l i mi t ed t o: Gover nment appr oval s, Gover nment desi gn r evi ews, envi r onment al per mi t appr oval s by St at e r egul at or s, Gover nment Fur ni shed Pr oper t y/ Equi pment ( GFP) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.
b. Act i v i t i es cannot have mor e t han one Responsi bi l i t y Code. Exampl es of accept abl e act i v i t y code val ues ar e: DOR ( f or t he desi gner of r ecor d) ;
ELEC ( f or t he el ect r i cal subcont r act or ) ; MECH ( f or t he mechani cal subcont r act or ) ; and GOVT ( f or USACE) .
3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)
Assi gn Wor k Ar ea code t o act i v i t i es based upon t he wor k ar ea i n whi ch t he act i v i t y occur s. Def i ne wor k ar eas based on r esour ce const r ai nt s or space const r ai nt s t hat woul d pr ecl ude a r esour ce, such as a par t i cul ar t r ade or cr af t wor k cr ew f r om wor ki ng i n mor e t han one wor k ar ea at a t i me due t o r est r ai nt s on r esour ces or space. Exampl es of Wor k Ar ea Codi ng i nc l ude di f f er ent ar eas wi t hi n a f l oor of a bui l di ng, di f f er ent f l oor s wi t hi n a bui l di ng, and di f f er ent bui l di ngs wi t hi n a compl ex of bui l di ngs.
Act i v i t i es cannot have mor e t han one Wor k Ar ea Code.
Not al l act i v i t i es ar e r equi r ed t o be Wor k Ar ea coded. A l ack of Wor k Ar ea codi ng i ndi cat es t he act i v i t y i s not r esour ce or space const r ai ned.
SECTI ON 01 32 01. 00 10 Page 5
3. 3. 6. 4 Modi f i cat i on Number ( MODF)
Assi gn a Modi f i cat i on Number Code t o any act i v i t y or sequence of act i v i t i es added t o t he schedul e as a r esul t of a Cont r act Modi f i cat i on, when appr oved by Cont r act i ng Of f i cer . Key al l Code val ues t o t he Gover nment ' s modi f i cat i on number i ng syst em. An act i v i t y can have onl y one Modi f i cat i on Number Code.
3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )
Assi gn a Bi d I t em Code t o al l act i v i t i es usi ng t he Cont r act Li ne I t em Schedul e ( CLI N) t o whi ch t he act i v i t y bel ongs, even when an act i v i t y i s not cost l oaded. An act i v i t y can have onl y one BI DI Code.
3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)
Assi gn Phase of Wor k Code t o al l act i v i t i es. Exampl es of phase of wor k ar e pr ocur ement phase and const r uct i on phase. Each act i v i t y can have onl y one Phase of Wor k code.
a. Code pr oposed f ast t r ack desi gn and const r uct i on phases pr oposed t o al l ow f i l t er i ng and or gani z i ng t he schedul e by f ast t r ack desi gn and const r uct i on packages.
b. I f t he cont r act speci f i es phasi ng wi t h separ at el y def i ned per f or mance per i ods, i dent i f y a Phase Code t o al l ow f i l t er i ng and or gani z i ng t he schedul e accor di ngl y.
3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)
Assi gn a Cat egor y of Wor k Code t o al l act i v i t i es. Cat egor y of Wor k Codes i ncl ude, but ar e not l i mi t ed t o const r uct i on submi t t al , pr ocur ement , f abr i cat i on, weat her sensi t i ve i nst al l at i on, non- weat her sensi t i ve i nst al l at i on, st ar t - up, and t est i ng act i v i t i es. Each act i v i t y can have no mor e t han one Cat egor y of Wor k Code.
3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)
Assi gn a Feat ur e of Wor k Code t o appr opr i at e act i v i t i es based on t he Def i nabl e Feat ur e of Wor k t o whi ch t he act i v i t y bel ongs based on t he appr oved QC pl an.
Def i nabl e Feat ur e of Wor k i s def i ned i n Sect i on 01 45 00. 00 10 QUALI TY CONTROL. An act i v i t y can have onl y one Feat ur e of Wor k Code.
3. 3. 7 Cont r act Mi l est ones and Const r ai nt s
Mi l est one act i v i t i es ar e t o be used f or s i gni f i cant pr oj ect event s i ncl udi ng, but not l i mi t ed t o, pr oj ect phasi ng, pr oj ect st ar t and end act i v i t i es, or i nt er i m compl et i on dat es. The use of ar t i f i c i al f l oat const r ai nt s such as " zer o f r ee f l oat " or " zer o t ot al f l oat " ar e pr ohi bi t ed.
Mandat or y const r ai nt s t hat i gnor e or ef f ect net wor k l ogi c ar e pr ohi bi t ed.
No const r ai ned dat es ar e al l owed i n t he schedul e ot her t han t hose speci f i ed her ei n. Submi t addi t i onal const r ai nt s t o t he Cont r act i ng Of f i cer f or appr oval on a case by case basi s.
SECTI ON 01 32 01. 00 10 Page 6
3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt
The f i r st act i v i t y i n t he pr oj ect schedul e must be a st ar t mi l est one t i t l ed " NTP Acknowl edged, " whi ch must have a " St ar t On" const r ai nt dat e equal t o t he dat e t hat t he NTP i s acknowl edged.
3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt
The l ast act i v i t y i n t he schedul e must be a f i ni sh mi l est one t i t l ed " End Project."
Const r ai n t he pr oj ect schedul e t o t he Cont r act Compl et i on Dat e i n such a way t hat i f t he schedul e cal cul at es an ear l y f i ni sh, t hen t he f l oat cal cul at i on f or " End Pr oj ect " mi l est one r ef l ect s posi t i ve f l oat on t he l ongest pat h. I f t he pr oj ect schedul e cal cul at es a l at e f i ni sh, t hen t he " End Pr oj ect " mi l est one f l oat cal cul at i on r ef l ect s negat i ve f l oat on t he l ongest pat h. The Gover nment i s under no obl i gat i on t o accel er at e Gover nment act i v i t i es t o suppor t a Cont r act or ' s ear l y compl et i on.
3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s
Const r ai n cont r act ual l y speci f i ed i nt er i m compl et i on dat es t o show negat i ve f l oat when t he cal cul at ed l at e f i ni sh dat e of t he l ast act i v i t y i n t hat phase i s l at er t han t he speci f i ed i nt er i m compl et i on dat e.
3. 3. 7. 3. 1 St ar t Phase
Use a st ar t mi l est one as t he f i r s t act i v i t y f or a pr oj ect phase. Cal l t he st ar t mi l est one " St ar t Phase X" wher e " X" r ef er s t o t he phase of wor k.
3. 3. 7. 3. 2 End Phase
Use a f i ni sh mi l est one as t he l ast act i v i t y f or a pr oj ect phase. Cal l t he f i ni sh mi l est one " End Phase X" wher e " X" r ef er s t o t he phase of wor k.
3. 3. 8 Calendars
Schedul e act i v i t i es on a Cal endar t o whi ch t he act i v i t y l ogi cal l y bel ongs.
Devel op cal endar s t o accommodat e any cont r act def i ned wor k per i od such as a 7- day cal endar f or Gover nment Accept ance act i v i t i es, concr et e cur e t i mes, et c. Devel op t he def aul t Cal endar t o mat ch t he physi cal wor k pl an wi t h non- wor k per i ods i dent i f i ed i ncl udi ng weekends and hol i days. Devel op Seasonal Cal endar ( s) and assi gn t o seasonal l y af f ect ed act i v i t i es as applicable.
3. 3. 9 Open Ended Logi c
Onl y t wo open ended act i v i t i es ar e al l owed: t he f i r st act i v i t y " NTP Acknowl edged" may have no pr edecessor l ogi c, and t he l ast act i v i t y - " End Pr oj ect " may have no successor l ogi c.
Pr edecessor open ended l ogi c may be al l owed i n a t i me i mpact anal yses upon t he Cont r act i ng Of f i cer ' s appr oval .
3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed
Act ual St ar t and Fi ni sh dat es must not aut omat i cal l y updat e wi t h def aul t mechani sms i ncl uded i n t he schedul i ng sof t war e. Updat i ng of t he per cent compl et e and t he r emai ni ng dur at i on of any act i v i t y must be i ndependent
SECTI ON 01 32 01. 00 10 Page 7 f unct i ons. Di sabl e pr ogr am f eat ur es t hat cal cul at e one of t hese par amet er s f r om t he ot her . Act i v i t y Act ual St ar t ( AS) and Act ual Fi ni sh ( AF) dat es assi gned dur i ng t he updat i ng pr ocess must mat ch t hose dat es pr ovi ded i n t he Cont r act or Qual i t y Cont r ol Repor t s. Fai l ur e t o document t he AS and AF dat es i n t he Dai l y Qual i t y Cont r ol r epor t wi l l r esul t i n di sappr oval of t he Cont r act or ' s schedul e.
3. 3. 11 Out - of - Sequence Pr ogr ess
Act i v i t i es t hat have pr ogr essed bef or e al l pr ecedi ng l ogi c has been sat i sf i ed ( Out - of - Sequence Pr ogr ess) wi l l be al l owed onl y on a case- by- case basi s subj ect t o appr oval by t he Cont r act i ng Of f i cer . Pr opose l ogi c cor r ect i ons t o el i mi nat e out of sequence pr ogr ess or j ust i f y not changi ng t he sequenci ng f or appr oval pr i or t o submi t t i ng an updat ed pr oj ect schedul e. Addr ess out of sequence pr ogr ess or l ogi c changes i n t he Nar r at i ve Repor t .
3. 3. 12 Added and Del et ed Act i v i t i es
Do not del et e act i v i t i es f r om t he pr oj ect schedul e or add new act i v i t i es t o t he schedul e wi t hout appr oval f r om t he Cont r act i ng Of f i cer . Act i v i t y I D and descr i pt i on changes ar e consi der ed new act i v i t i es and cannot be changed wi t hout Cont r act i ng Of f i cer appr oval .
3. 3. 13 Or i gi nal Dur at i ons
Act i v i t y Or i gi nal Dur at i ons ( OD) must be r easonabl e t o per f or m t he wor k i t em. OD changes ar e pr ohi bi t ed unl ess j ust i f i cat i on i s pr ovi ded and appr oved by t he Cont r act i ng Of f i cer .
3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps
Lags must be r easonabl e as det er mi ned by t he Gover nment and not used i n pl ace of r eal i st i c or i gi nal dur at i ons, must not be i n pl ace t o ar t i f i c i al l y absor b f l oat , or t o r epl ace pr oper schedul e l ogi c.
a. Leads ( negat i ve l ags) ar e pr ohi bi t ed.
b. St ar t t o Fi ni sh ( SF) r el at i onshi ps ar e pr ohi bi t ed.
3. 3. 15 Ret ai ned Logi c
Schedul e cal cul at i ons must r et ai n t he l ogi c bet ween pr edecessor s and successor s ( " r et ai ned l ogi c" mode) even when t he successor act i v i t y( s) st ar t s and t he pr edecessor act i v i t y( s) has not f i ni shed ( out - of - sequence pr ogr ess) . Sof t war e f eat ur es t hat i n ef f ect sever t he t i e bet ween pr edecessor and successor act i v i t i es when t he successor has st ar t ed and t he pr edecessor l ogi c i s not sat i sf i ed ( " pr ogr ess over r i de" ) ar e not be al l owed.
3. 3. 16 Per cent Compl et e
Updat e t he per cent compl et e f or each act i v i t y st ar t ed, based on t he r eal i st i c assessment of ear ned val ue. Act i v i t i es whi ch ar e compl et e but f or r emai ni ng mi nor punch l i s t wor k and whi ch do not r est r ai n t he i ni t i at i on of successor act i v i t i es may be decl ar ed 100 per cent compl et e t o al l ow f or pr oper schedul e management .
SECTI ON 01 32 01. 00 10 Page 8
3. 3. 17 Remai ni ng Dur at i on
Updat e t he r emai ni ng dur at i on f or each act i v i t y based on t he number of est i mat ed wor k days i t wi l l t ake t o compl et e t he act i v i t y. Remai ni ng dur at i on may not mat hemat i cal l y cor r el at e wi t h per cent age f ound under par agr aph ent i t l ed Per cent Compl et e.
3. 3. 18 Cost Loadi ng of Cl oseout Act i v i t i es
Cost l oad t he " Cor r ect i on of punch l i s t f r om Gover nment pr e- f i nal i nspect i on" act i v i t y( i es) not l ess t han 1 per cent of t he pr esent cont r act val ue. Act i v i t y( i es) may be decl ar ed 100 per cent compl et e upon t he Gover nment ' s ver i f i cat i on of compl et i on and cor r ect i on of al l punch l i s t wor k i dent i f i ed dur i ng Gover nment pr e- f i nal i nspect i on( s) .
3. 3. 18. 1 As- Bui l t Dr awi ngs
I f t her e i s no separ at e cont r act l i ne i t em ( CLI N) f or as- bui l t dr awi ngs, cost l oad t he " Submi ssi on and appr oval of as- bui l t dr awi ngs" act i v i t y not l ess t han $35, 000 or 1 per cent of t he pr esent cont r act val ue, whi ch ever i s gr eat er , up t o $200, 000. Act i v i t y wi l l be decl ar ed 100 per cent compl et e upon t he Gover nment ' s appr oval .
3. 3. 18. 2 O & M Manual s
Cost l oad t he " Submi ssi on and appr oval of O & M manual s" act i v i t y not l ess t han $20, 000. Act i v i t y wi l l be decl ar ed 100 per cent compl et e upon t he Gover nment ' s appr oval of al l O & M manual s.
3. 3. 19 Ant i c i pat ed Adver se Weat her
Par agr aph appl i cabl e t o cont r act s wi t h c l ause ent i t l ed TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER. Ref l ect t he number of ant i c i pat ed adver se weat her del ays al l ocat ed t o a weat her sensi t i ve act i v i t y i n t he act i v i t y ' s calendar.
3. 3. 20 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y
An Ear l y Compl et i on Schedul e i s an I ni t i al Pr oj ect Schedul e ( I PS) t hat i ndi cat es al l scope of t he r equi r ed cont r act wor k wi l l be compl et ed bef or e t he cont r act ual l y r equi r ed compl et i on dat e.
a. No I PS i ndi cat i ng an Ear l y Compl et i on wi l l be accept ed wi t hout bei ng f ul l y r esour ce- l oaded ( i ncl udi ng cr ew si zes and manhour s) and t he Gover nment agr eei ng t hat t he schedul e i s r easonabl e and achi evabl e.
b. The Gover nment i s under no obl i gat i on t o accel er at e wor k i t ems i t i s r esponsi bl e f or t o ensur e t hat t he ear l y compl et i on i s met nor i s i t r esponsi bl e t o modi f y i ncr ement al f undi ng ( i f appl i cabl e) f or t he pr oj ect t o meet t he cont r act or ' s accel er at ed wor k.
3. 4 PROJECT SCHEDULE SUBMI SSI ONS
Pr ovi de t he submi ssi ons as descr i bed bel ow. The dat a CD/ DVD, r epor t s, and net wor k di agr ams r equi r ed f or each submi ssi on ar e cont ai ned i n par agr aph SUBMI SSI ON REQUI REMENTS. I f t he Cont r act or f ai l s or r ef uses t o f ur ni sh t he i nf or mat i on and schedul e updat es as set f or t h her ei n, t hen t he Cont r act or wi l l be deemed not t o have pr ovi ded an est i mat e upon whi ch a pr ogr ess payment can be made.
SECTI ON 01 32 01. 00 10 Page 9
Revi ew comment s made by t he Gover nment on t he schedul e( s) do not r el i eve t he Cont r act or f r om compl i ance wi t h r equi r ement s of t he Cont r act Document s.
3. 4. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on
Wi t hi n 15 cal endar days af t er t he NTP i s acknowl edged submi t t he Pr el i mi nar y Pr oj ect Schedul e def i ni ng t he pl anned oper at i ons det ai l ed f or t he f i r st 90 cal endar days f or appr oval . The appr oved Pr el i mi nar y Pr oj ect Schedul e wi l l be used f or payment pur poses not t o exceed 90 cal endar days af t er NTP. Compl et el y cost l oad t he Pr el i mi nar y Pr oj ect Schedul e t o bal ance t he cont r act awar d CLI NS shown on t he Pr i ce Schedul e. The Pr el i mi nar y Pr oj ect Schedul e may be summar y i n nat ur e f or t he r emai ni ng per f or mance per i od. I t must be ear l y st ar t and l at e f i ni sh const r ai ned and l ogi cal l y t i ed as speci f i ed. The Pr el i mi nar y Pr oj ect Schedul e f or ms t he basi s f or t he I ni t i al Pr oj ect Schedul e speci f i ed her ei n and must i ncl ude al l of t he r equi r ed pl an and pr ogr am pr epar at i ons, submi ssi ons and appr oval s i dent i f i ed i n t he cont r act ( f or exampl e, Qual i t y Cont r ol Pl an, Saf et y Pl an, and Envi r onment al Pr ot ect i on Pl an) as wel l as desi gn act i v i t i es, pl anned submi ssi ons of al l ear l y desi gn packages, per mi t t i ng act i v i t i es, desi gn r evi ew conf er ence act i v i t i es, and ot her non- const r uct i on act i v i t i es i nt ended t o occur wi t hi n t he f i r st 90 cal endar days. Gover nment accept ance of t he associ at ed desi gn package( s) and al l ot her speci f i ed Pr ogr am and Pl an appr oval s must occur pr i or t o any pl anned const r uct i on act i v i t i es. Act i v i t y code any act i v i t i es t hat ar e summar y i n nat ur e af t er t he f i r st 90 cal endar days wi t h Bi d I t em ( CLI N) code ( BI DI ) , Responsi bi l i t y Code ( RESP) and Feat ur e of Wor k code ( FOW) .
3. 4. 2 I ni t i al Pr oj ect Schedul e Submi ssi on
Submi t t he I ni t i al Pr oj ect Schedul e f or appr oval wi t hi n 42 cal endar days af t er not i ce t o pr oceed i s i ssued. The schedul e must demonst r at e a r easonabl e and r eal i st i c sequence of act i v i t i es whi ch r epr esent al l wor k t hr ough t he ent i r e cont r act per f or mance per i od. No payment wi l l be made f or wor k i t ems not f ul l y det ai l ed i n t he Pr oj ect Schedul e.
3. 4. 3 Per i odi c Schedul e Updat es
Updat e t he Pr oj ect Schedul e on a r egul ar basi s, mont hl y at a mi ni mum.
Pr ovi de a dr af t Per i odi c Schedul e Updat e f or r evi ew. These updat es wi l l enabl e t he Gover nment t o assess Cont r act or ' s pr ogr ess.
a. Updat e i nf or mat i on i ncl udi ng Act ual St ar t Dat es ( AS) , Act ual Fi ni sh Dat es ( AF) , Remai ni ng Dur at i ons ( RD) , and Per cent Compl et e i s subj ect t o t he appr oval of t he Gover nment .
b. AS and AF dat es must mat ch t he dat e( s) r epor t ed on t he Cont r act or ' s Qual i t y Cont r ol Repor t f or an act i v i t y st ar t or f i ni sh.
3. 5 SUBMI SSI ON REQUI REMENTS
Submi t t he f ol l owi ng i t ems f or t he Pr el i mi nar y Schedul e, I ni t i al Schedul e, and ever y Per i odi c Schedul e Updat e t hr oughout t he l i f e of t he pr oj ect :
3. 5. 1 Dat a CD/ DVDs
Pr ovi de t wo set s of dat a CD/ DVDs cont ai ni ng t he cur r ent pr oj ect schedul e and al l pr evi ousl y submi t t ed schedul es i n t he f or mat of t he schedul i ng sof t war e ( e. g. . xer ) . Al so i ncl ude on t he dat a CD/ DVDs t he Nar r at i ve
SECTI ON 01 32 01. 00 10 Page 10
Repor t and al l r equi r ed Schedul e Repor t s. Label each CD/ DVD i ndi cat i ng t he t ype of schedul e ( Pr el i mi nar y, I ni t i al , Updat e) , f ul l cont r act number , Dat a Dat e and f i l e name. Each schedul e must have a uni que f i l e name and use pr oj ect speci f i c set t i ngs.
3. 5. 2 Nar r at i ve Repor t
Pr ovi de a Nar r at i ve Repor t wi t h each schedul e submi ssi on. The Nar r at i ve Repor t i s expect ed t o communi cat e t o t he Gover nment t he t hor ough anal ysi s of t he schedul e out put and t he pl ans t o compensat e f or any pr obl ems, ei t her cur r ent or pot ent i al , whi ch ar e r eveal ed t hr ough t hat anal ysi s. I ncl ude t he f ol l owi ng i nf or mat i on as mi ni mum i n t he Nar r at i ve Repor t :
a. I dent i f y and di scuss t he wor k schedul ed t o st ar t i n t he next updat e period.
b. A descr i pt i on of act i v i t i es al ong t he t wo most cr i t i cal pat hs wher e t he t ot al f l oat i s l ess t han or equal t o 20 wor k days.
c. A descr i pt i on of cur r ent and ant i c i pat ed pr obl em ar eas or del ayi ng f act or s and t hei r i mpact and an expl anat i on of cor r ect i ve act i ons t aken or r equi r ed t o be t aken.
d. I dent i f y and expl ai n why act i v i t i es based on t hei r cal cul at ed l at e dat es shoul d have ei t her st ar t ed or f i ni shed dur i ng t he updat e per i od but di d not .
e. I dent i f y and di scuss al l schedul e changes by act i v i t y I D and act i v i t y name i ncl udi ng what speci f i cal l y was changed and why t he change was needed. I ncl ude at a mi ni mum new and del et ed act i v i t i es, l ogi c changes, dur at i on changes, cal endar changes, l ag changes, r esour ce changes, and act ual st ar t and f i ni sh dat e changes.
f . I dent i f y and di scuss out - of - sequence wor k.
3. 5. 3 Schedul e Repor t s
The f or mat , f i l t er i ng, or gani z i ng and sor t i ng f or each schedul e r epor t wi l l be as di r ect ed by t he Cont r act i ng Of f i cer . Typi cal l y , r epor t s cont ai n Act i v i t y Number s, Act i v i t y Descr i pt i on, Or i gi nal Dur at i on, Remai ni ng Dur at i on, Ear l y St ar t Dat e, Ear l y Fi ni sh Dat e, Lat e St ar t Dat e, Lat e Fi ni sh Dat e, Tot al Fl oat , Act ual St ar t Dat e, Act ual Fi ni sh Dat e, and Per cent Compl et e. Pr ovi de t he r epor t s el ect r oni cal l y i n . pdf f or mat . The f ol l owi ng l i s t s t ypi cal r epor t s t hat wi l l be r equest ed:
3. 5. 3. 1 Act i v i t y Repor t
Li st of al l act i v i t i es sor t ed accor di ng t o act i v i t y number .
3. 5. 3. 2 Logi c Repor t
Li st of det ai l ed pr edecessor and successor act i v i t i es f or ever y act i v i t y i n ascendi ng or der by act i v i t y number .
3. 5. 3. 3 Tot al Fl oat Repor t
A l i s t of al l i ncompl et e act i v i t i es sor t ed i n ascendi ng or der of t ot al f l oat . Li st act i v i t i es whi ch have t he same amount of t ot al f l oat i n ascendi ng or der of Ear l y St ar t Dat es. Do not show compl et ed act i v i t i es on
SECTI ON 01 32 01. 00 10 Page 11 t hi s r epor t .
3. 5. 3. 4 Ear ni ngs Repor t by CLI N
A compi l at i on of t he Tot al Ear ni ngs on t he pr oj ect f r om t he NTP t o t he dat a dat e, whi ch r ef l ect s t he ear ni ngs of act i v i t i es based on t he agr eement s made at mont hl y pay est i mat e r evi ew meet i ngs. Pr ovi ded a compl et e schedul e updat e has been f ur ni shed, t hi s r epor t ser ves as t he basi s of det er mi ni ng pr ogr ess payment s. Gr oup act i v i t i es by CLI N number and sor t by act i v i t y number . Pr ovi de a t ot al CLI N per cent ear ned val ue, CLI N per cent compl et e, and pr oj ect per cent compl et e. The pr i nt ed r epor t must cont ai n t he f ol l owi ng f or each act i v i t y: t he Act i v i t y Number , Act i v i t y Descr i pt i on, Or i gi nal Budget ed Amount , Ear ni ngs t o Dat e, Ear ni ngs t hi s per i od, Tot al Quant i t y, Quant i t y t o Dat e, and Per cent Compl et e ( based on cost ) .
3. 5. 3. 5 Schedul e Log
Pr ovi de a Schedul i ng/ Level i ng Repor t gener at ed f r om t he cur r ent pr oj ect schedul e bei ng submi t t ed.
3. 5. 4 Net wor k Di agr am
The Net wor k Di agr am i s r equi r ed f or t he Pr el i mi nar y, I ni t i al and Per i odi c Updat es. Depi ct and di spl ay t he or der and i nt er dependence of act i v i t i es and t he sequence i n whi ch t he wor k i s t o be accompl i shed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .