The document is a comprehensive set of project plans for the Depot Museum Paving Improvements, prepared for the City and County of Broomfield, Colorado, by Kimley-Horn and Associates, Inc. The project, designated as City Project No. OAZ0085, involves site improvements including asphalt and concrete paving, grading, utility work, traffic control, and striping. The plans are dated 6/10/2025 and include multiple detailed sheets covering site layout, phasing, traffic control, boring locations, utility plans, grading plans, and construction details. The contractor is required to minimize disruption to customer parking and access, provide construction status updates, ensure safety through proper barricades and traffic control, and meet specified grading requirements.
The project includes specific requirements for pavement type alternatives, with accessible pavement to be either asphalt or concrete and bid separately. Contractors must incorporate all necessary means to ensure compliant slopes, with no additional compensation for construction staking. The plans emphasize that any rework required due to non-compliance with design specifications will be at the contractor's expense. The project encompasses comprehensive site improvements, including removal and replacement of pavement, aggregate base, concrete curb and gutter, sidewalks, and associated elements such as ADA ramp upgrades, signing, striping, and landscaping rehabilitation. The detailed plans provide specific instructions for construction methods, materials testing, and adherence to City and County of Broomfield standards and specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Form.xlsx | XLSX spreadsheet | |
| Sample Construction Agreement.pdf | ||
| Project Plans - Outlook Park (Add-Alternate 2).pdf | ||
| Specifications.pdf | ||
| Project Plans - George DiCiero (Base Bid).pdf | ||
| Bid Document Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(ADD-ALTERNATE 1)
DEPOT MUSEUM
Know what's below.Call before you dig.
CONSTRUCTION BID PLANS FOR PROPOSED
CITY PROJECT NO. OAZ0085
VICINITY MAP
OWNER
CITY AND COUNTY OF BROOMFIELD
1 DESCOMBES DR
BROOMFIELD, CO 80020
CONTACT: ELIZABETH RACCA-JOHNSON
TEL: (303) 464-5791
ENGINEER
KIMLEY-HORN AND ASSOCIATES, INC.
11800 RIDGE PKWY, SUITE 200
BROOMFIELD, CO 80021
CONTACT: SCOTT SOUNART
TEL: (303) 356-0406
CITY AND COUNTY OF BROOMFIELD
1. CONTRACTOR TO COMPLETE WORK IN A MANNER TO MINIMIZE
DISRUPTION TO CUSTOMER PARKING AND ACCESS.
2. CONTRACTOR TO FULLY INFORM THE OWNER PRIOR TO COMMENCING
WORK. CONTRACTOR WILL BE RESPONSIBLE TO PROVIDE CONSTRUCTION
STATUS UPDATES AND SUBMIT CLOSURE SCHEDULES TO OWNER.
3. CONTRACTOR TO PROVIDE BARRICADES AND PROPER TRAFFIC CONTROL
AT ALL TIMES DURING CONSTRUCTION TO ENSURE THE SAFETY OF ALL
INDIVIDUALS PRESENT ON SITE.
4. CONTRACTOR IS RESPONSIBLE TO MEET THE GRADING AS SHOWN IN THE
CONTRACT DOCUMENTS. THIS INCLUDES ALL MEANS AND METHODS
AND AT THE CONTRACTOR'S DISCRETION, THE NEED TO OBTAIN A
SURVEYOR FOR CONSTRUCTION STAKING. CONTRACTOR, SHALL BID THIS
PROJECT WITH ALL NECESSARY MEANS INCORPORATED TO ENSURE
COMPLIANT SLOPES ARE MET. AFTER REVIEWING THE SLOPE
TRANSITION DETAIL ON THE DRAWINGS SHOULD THE CONTRACTOR
DETERMINE THAT CONSTRUCTION STAKING, OR ANY OTHER ACTIVITIES
ARE STILL REQUIRED FOR THE INSTALLATION, THESE SHOULD BE
INCLUDED/BUILT IN TO THE UNIT COSTS ON THE CONTRACTORS BID
FORM. NO EXTRAS WILL BE GIVEN TO THE CONTRACTOR FOR
CONSTRUCTION STAKING SERVICES. ADDITIONALLY, ANY REWORK
REQUIRED DUE TO THE WORK NOT MEETING THE DESIGN AS SHOWN IN
THESE CONSTRUCTION DRAWINGS WILL BE AT THE SOLE EXPENSE OF
THE CONTRACTOR UNTIL THE DESIGN HAS BEEN ADEQUATELY
CONSTRUCTED.
GENERAL PROJECT NOTES:
AERIAL OBTAINED FROM NEARMAP
2201 W 10TH AVE
BROOMFIELD, CO 80020
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
PROJECT TEAM
DPT-C0-00
COVER SHEET
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
SHEET INDEX
SHEET NO.: DESCRIPTION:
DPT-C0-00 COVER SHEET
DPT-C1-00 SITE IMPROVEMENTS - ASPHALT
DPT-C1-01 SITE IMPROVEMENTS - CONCRETE
DPT-C2-00 PHASING PLAN
DPT-C3-00 TRAFFIC CONTROL PLAN - PHASE 1
DPT-C3-01 TRAFFIC CONTROL PLAN - PHASE 2
DPT-C3-02 TRAFFIC CONTROL DETAILS
DPT-C4-00 BORING LOCATION PLAN
DPT-C5-00 UTILITY PLAN
DPT-C6-00 OVERALL GRADING PLAN
DPT-C6-01 GRADING PLAN - 1
DPT-C6-02 GRADING PLAN - 2
DPT-C6-03 GRADING PLAN - 3
DPT-C6-04 GRADING PLAN - 4
DPT-C6-05 GRADING PLAN - 5
DPT-C7-00 STRIPING PLAN
DPT-C8-00 CONSTRUCTION DETAILS - 1
DPT-C8-01 CONSTRUCTION DETAILS - 2
DPT-C8-02 CONSTRUCTION DETAILS - 3
DPT-C8-03 GENERAL NOTES
W 10TH AVE
U S
H
IG
H W
A Y
S RIDGE DR
6/10/2025
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
SITE IMPROVEMENTS - ASPHALT
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C1-00
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
NORTH
** CONTRACTOR TO NOTE THAT ALL PRICING FOR ALTERNATES SHALL INCLUDE RESTRIPING AND MATERIALS TESTING IN THE PROVIDED UNIT COSTS FOR EACH SEPARATE ALTERNATE. THE CONTRACTOR WILL BE REQUIRED TO PROVIDE MATERIALS TESTING AND RESTRIPING AT PROVIDED COSTS AND NO CHANGES TO THE CONTRACT WILL BE APPROVED FOR TESTING OR STRIPING IN THE EVENT IT IS NOT INCLUDED IN ALTERNATE
UNIT COSTS. **
*** NOTE: ACCESSIBLE PAVEMENT TYPE SHALL EITHER BE ASPHALT OR CONCRETE AS SHOWN AND SHALL BE
BID SEPARATELY AS PAVEMENT TYPE ALTERNATES. ***
SITE IMPROVEMENTS - CONCRETE
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
Know what's below.Call before you dig.
NORTH
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C1-01
PHASE 1 PHASE 2
PHASING PLAN
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C2-00
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
NORTH
ZONE
WORK
Know what's below.Call before you dig.
TRAFFIC CONTROL PLAN - PHASE 1
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C3-00
ZONE
WORK
ZONE
WORK
ZONE
WORK
ZONE
WORK
ZONE
WORK
ZONE
WORK
ZONE
WORK
ZO
NEWOR
K
ZONE
WORK
ZONE
WORK
ZONE
WORK
ZONE
WORK
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
ZONE
WORK
Know what's below.Call before you dig.
TRAFFIC CONTROL PLAN - PHASE 2
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C3-01
ZONE
WORK
ZONE
WORK ZONEWORK
ZONE
WORK
ZO
NEWORK
ZONE
WORK
ZONE
WORK
ZONE
WORK
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
DPT-C3-02
TRAFFIC CONTROL DETAILS
DETAIL
MUTCD - TRAFFIC CONES
DETAIL
TEMPORARY SIGNAGE
DETAIL
TEMPORARY SIGN BASE
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DETAIL
MUTCD - TEMPORARY TRAFFIC CONTROL
BORING LOCATION PLAN
NORTH
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C4-00
UTILITY PLAN
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C5-00
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
NORTH
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
OVERALL GRADING PLAN
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C6-00
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
N O
R
TH
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
GRADING PLAN - 1
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C6-01
M A
TC
H
LI
N
E
- S
EE
S
H
EE
T D
PT
-C
6-
MATCHLINE - SEE SHEET DPT-C6-02
MATCHLINE - S
EE SHEET DPT-C6-05
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
N O
R
TH
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
GRADING PLAN - 2
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C6-02
M A
TC
H
LI
N
E
- S
EE
S
H
EE
T D
PT
-C
6-
MATCHLINE - SEE SHEET DPT-C6-01
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
NORTH
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
GRADING PLAN - 3
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C6-03
MATCHLINE - SEE SHEET DPT-C6-02
MATCHLINE - SEE SHEET DPT-C6-01
MATCHLINE - SEE SHEET DPT-C6-05
M A
TC
H
LI
N
E
- S
EE
S
H
EE
T D
PT
-C
6- 04*
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
NORTH
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
GRADING PLAN - 4
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C6-04
M A
TC
H
LI
N
E
- S
EE
S
H
EE
T D
PT
-C
6-
MATCHLINE - SEE SHEET DPT-C6-05
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
NORTH
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
GRADING PLAN - 5
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C6-05
MATCHLINE - SEE SHEET DPT-C6-04 MATCHLINE - SEE SHEET DPT-C6-03
M A
TC
H
LI
N
E
- S
EE
S
H
EE
T D
PT
-C
6-
STRIPING PLAN
Know what's below.Call before you dig.
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C7-00
SCALED FOR 'D' SIZE
(24"x36") PLANS ONLY
ANY OTHER PLAN SIZE
MAY NOT BE TO SCALE
CONSTRUCTION DETAILS - 1
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C8-00
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
DETAIL
CONCRETE PAVEMENT - REMOVE AND REPLACE CONCRETE PAVEMENT
CP-RR
EXISTING PROPOSED
DETAIL
CONCRETE PAVEMENT - REMOVE, REGRADE, AND REPLACE SIDEWALK
CP-SW
EXISTING PROPOSED
DETAIL
EJ - EXPANSION JOINT
EXISTING PROPOSED
DETAIL
CJ - CONSTRUCTION JOINT
EXISTING PROPOSED
DETAIL
LJ - LONGITUDINAL JOINT
DETAIL
TYPICAL JOINTS FOR CONCRETE SLAB REPAIR
DETAIL
KJ - TRANSVERSE CONTRACTION JOINT
DETAIL
IJ - ISOLATION JOINT
DETAIL
CONCRETE JOINT SEALANT
CONSTRUCTION DETAILS - 2
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C8-01
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
DETAIL
ASPHALT PAVEMENT - 4.0" REMOVE AND REPLACE
AP-RR
DETAIL
ASPHALT PAVEMENT - REMOVE, REGRADE, AND REPLACE
AP-RRR
EXISTING PROPOSED
DETAIL
ASPHALT PAVEMENT - 2.0" MILL AND OVERLAY
AP-MO
DETAIL
CONCRETE PAVEMENT - REMOVE, REGRADE, AND REPLACE ASPHALT WITH CONCRETE
CP-RRR
EXISTING PROPOSED
STANDARD PAN
CONCRETE PAVEMENT - REMOVE AND REPLACE CURB AND GUTTER
DETAIL CP-CG
REVERSE PAN
CONSTRUCTION DETAILS - 3
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C8-02
DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN
DETAIL
MISCELLANEOUS IMPROVEMENTS - ADA SYMBOL
WITH BACKGROUND
MI-SYM
DETAIL
MISCELLANEOUS IMPROVEMENTS - ADA SIGN
AND POST
MI-S
DETAIL
MISCELLANEOUS IMPROVEMENTS - INSTALL
CHASE DRAIN
MI-CD
DETAIL
MISCELLANEOUS IMPROVEMENTS - INSTALL DETECTABLE WARNING SURFACE
MI-DW
CONCRETE PAVEMENT - REMOVE AND REPLACE VERTICAL CURB
CP-VCDETAIL
GENERAL NOTES
CITY ENGINEER (OR DESIGNEE)
ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD
STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED
AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND
SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE
ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE
PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.
DATE
CITY ENGINEER STATEMENT
DPT-C8-03
| Sheets and Views |
| DPT-C0-00 COVER SHEET |
| DPT-C1-00 SITE IMPROVEMENTS - ASPHALT |
| DPT-C1-01 SITE IMPROVEMENTS - CONCRETE |
| DPT-C2-00 PHASING PLAN |
| DPT-C3-00 TRAFFIC CONTROL PLAN - PHASE 1 |
| DPT-C3-01 TRAFFIC CONTROL PLAN - PHASE 2 |
| DPT-C3-02 TRAFFIC CONTROL DETAILS |
| DPT-C4-00 BORING LOCATION PLAN |
| DPT-C5-00 UTILITY PLAN |
| DPT-C6-00 OVERALL GRADING PLAN |
| DPT-C6-01 GRADING PLAN - 1 |
| DPT-C6-02 GRADING PLAN - 2 |
| DPT-C6-03 GRADING PLAN - 3 |
| DPT-C6-04 GRADING PLAN - 4 |
| DPT-C6-05 GRADING PLAN - 5 |
| DPT-C7-00 STRIPING PLAN |
| DPT-C8-00 CONSTRUCTION DETAILS - 1 |
| DPT-C8-01 CONSTRUCTION DETAILS - 2 |
| DPT-C8-02 CONSTRUCTION DETAILS - 3 |
| DPT-C8-03 GENERAL NOTES |
| 2025-06-10T13:54:30-0600 | |
| City and County of Broomfield | |
| Matthew Deaver |