The document is a comprehensive set of project plans for the Depot Museum Paving Improvements, prepared for the City and County of Broomfield, Colorado, by Kimley-Horn and Associates, Inc. The project, designated as City Project No. OAZ0085, involves site improvements including asphalt and concrete paving, grading, utility work, traffic control, and striping. The plans are dated 6/10/2025 and include multiple detailed sheets covering site layout, phasing, traffic control, boring locations, utility plans, grading plans, and construction details. The contractor is required to minimize disruption to customer parking and access, provide construction status updates, ensure safety through proper barricades and traffic control, and meet specified grading requirements.

The project includes specific requirements for pavement type alternatives, with accessible pavement to be either asphalt or concrete and bid separately. Contractors must incorporate all necessary means to ensure compliant slopes, with no additional compensation for construction staking. The plans emphasize that any rework required due to non-compliance with design specifications will be at the contractor's expense. The project encompasses comprehensive site improvements, including removal and replacement of pavement, aggregate base, concrete curb and gutter, sidewalks, and associated elements such as ADA ramp upgrades, signing, striping, and landscaping rehabilitation. The detailed plans provide specific instructions for construction methods, materials testing, and adherence to City and County of Broomfield standards and specifications.

View the file

Other files

File Type Posted
Bid Form.xlsx XLSX spreadsheet
Sample Construction Agreement.pdf PDF
Project Plans - Outlook Park (Add-Alternate 2).pdf PDF
Specifications.pdf PDF
Project Plans - George DiCiero (Base Bid).pdf PDF
Bid Document Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ADD-ALTERNATE 1)

DEPOT MUSEUM

Know what's below.Call before you dig.

CONSTRUCTION BID PLANS FOR PROPOSED

CITY PROJECT NO. OAZ0085

VICINITY MAP

OWNER

CITY AND COUNTY OF BROOMFIELD

1 DESCOMBES DR

BROOMFIELD, CO 80020

CONTACT: ELIZABETH RACCA-JOHNSON

TEL: (303) 464-5791

ENGINEER

KIMLEY-HORN AND ASSOCIATES, INC.

11800 RIDGE PKWY, SUITE 200

BROOMFIELD, CO 80021

CONTACT: SCOTT SOUNART

TEL: (303) 356-0406

CITY AND COUNTY OF BROOMFIELD

1. CONTRACTOR TO COMPLETE WORK IN A MANNER TO MINIMIZE

DISRUPTION TO CUSTOMER PARKING AND ACCESS.

2. CONTRACTOR TO FULLY INFORM THE OWNER PRIOR TO COMMENCING

WORK. CONTRACTOR WILL BE RESPONSIBLE TO PROVIDE CONSTRUCTION

STATUS UPDATES AND SUBMIT CLOSURE SCHEDULES TO OWNER.

3. CONTRACTOR TO PROVIDE BARRICADES AND PROPER TRAFFIC CONTROL

AT ALL TIMES DURING CONSTRUCTION TO ENSURE THE SAFETY OF ALL

INDIVIDUALS PRESENT ON SITE.

4. CONTRACTOR IS RESPONSIBLE TO MEET THE GRADING AS SHOWN IN THE

CONTRACT DOCUMENTS. THIS INCLUDES ALL MEANS AND METHODS

AND AT THE CONTRACTOR'S DISCRETION, THE NEED TO OBTAIN A

SURVEYOR FOR CONSTRUCTION STAKING. CONTRACTOR, SHALL BID THIS

PROJECT WITH ALL NECESSARY MEANS INCORPORATED TO ENSURE

COMPLIANT SLOPES ARE MET. AFTER REVIEWING THE SLOPE

TRANSITION DETAIL ON THE DRAWINGS SHOULD THE CONTRACTOR

DETERMINE THAT CONSTRUCTION STAKING, OR ANY OTHER ACTIVITIES

ARE STILL REQUIRED FOR THE INSTALLATION, THESE SHOULD BE

INCLUDED/BUILT IN TO THE UNIT COSTS ON THE CONTRACTORS BID

FORM. NO EXTRAS WILL BE GIVEN TO THE CONTRACTOR FOR

CONSTRUCTION STAKING SERVICES. ADDITIONALLY, ANY REWORK

REQUIRED DUE TO THE WORK NOT MEETING THE DESIGN AS SHOWN IN

THESE CONSTRUCTION DRAWINGS WILL BE AT THE SOLE EXPENSE OF

THE CONTRACTOR UNTIL THE DESIGN HAS BEEN ADEQUATELY

CONSTRUCTED.

GENERAL PROJECT NOTES:

AERIAL OBTAINED FROM NEARMAP

2201 W 10TH AVE

BROOMFIELD, CO 80020

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

PROJECT TEAM

DPT-C0-00

COVER SHEET

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

SHEET INDEX

SHEET NO.: DESCRIPTION:

DPT-C0-00 COVER SHEET

DPT-C1-00 SITE IMPROVEMENTS - ASPHALT

DPT-C1-01 SITE IMPROVEMENTS - CONCRETE

DPT-C2-00 PHASING PLAN

DPT-C3-00 TRAFFIC CONTROL PLAN - PHASE 1

DPT-C3-01 TRAFFIC CONTROL PLAN - PHASE 2

DPT-C3-02 TRAFFIC CONTROL DETAILS

DPT-C4-00 BORING LOCATION PLAN

DPT-C5-00 UTILITY PLAN

DPT-C6-00 OVERALL GRADING PLAN

DPT-C6-01 GRADING PLAN - 1

DPT-C6-02 GRADING PLAN - 2

DPT-C6-03 GRADING PLAN - 3

DPT-C6-04 GRADING PLAN - 4

DPT-C6-05 GRADING PLAN - 5

DPT-C7-00 STRIPING PLAN

DPT-C8-00 CONSTRUCTION DETAILS - 1

DPT-C8-01 CONSTRUCTION DETAILS - 2

DPT-C8-02 CONSTRUCTION DETAILS - 3

DPT-C8-03 GENERAL NOTES

W 10TH AVE

U S

H

IG

H W

A Y

S RIDGE DR

6/10/2025

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

SITE IMPROVEMENTS - ASPHALT

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C1-00

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

NORTH

** CONTRACTOR TO NOTE THAT ALL PRICING FOR ALTERNATES SHALL INCLUDE RESTRIPING AND MATERIALS TESTING IN THE PROVIDED UNIT COSTS FOR EACH SEPARATE ALTERNATE. THE CONTRACTOR WILL BE REQUIRED TO PROVIDE MATERIALS TESTING AND RESTRIPING AT PROVIDED COSTS AND NO CHANGES TO THE CONTRACT WILL BE APPROVED FOR TESTING OR STRIPING IN THE EVENT IT IS NOT INCLUDED IN ALTERNATE

UNIT COSTS. **

*** NOTE: ACCESSIBLE PAVEMENT TYPE SHALL EITHER BE ASPHALT OR CONCRETE AS SHOWN AND SHALL BE

BID SEPARATELY AS PAVEMENT TYPE ALTERNATES. ***

SITE IMPROVEMENTS - CONCRETE

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

Know what's below.Call before you dig.

NORTH

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C1-01

PHASE 1 PHASE 2

PHASING PLAN

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C2-00

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

NORTH

ZONE

WORK

Know what's below.Call before you dig.

TRAFFIC CONTROL PLAN - PHASE 1

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C3-00

ZONE

WORK

ZONE

WORK

ZONE

WORK

ZONE

WORK

ZONE

WORK

ZONE

WORK

ZONE

WORK

ZO

NEWOR

K

ZONE

WORK

ZONE

WORK

ZONE

WORK

ZONE

WORK

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

ZONE

WORK

Know what's below.Call before you dig.

TRAFFIC CONTROL PLAN - PHASE 2

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C3-01

ZONE

WORK

ZONE

WORK ZONEWORK

ZONE

WORK

ZO

NEWORK

ZONE

WORK

ZONE

WORK

ZONE

WORK

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

DPT-C3-02

TRAFFIC CONTROL DETAILS

DETAIL

MUTCD - TRAFFIC CONES

DETAIL

TEMPORARY SIGNAGE

DETAIL

TEMPORARY SIGN BASE

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DETAIL

MUTCD - TEMPORARY TRAFFIC CONTROL

BORING LOCATION PLAN

NORTH

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C4-00

UTILITY PLAN

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C5-00

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

NORTH

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

OVERALL GRADING PLAN

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C6-00

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

N O

R

TH

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

GRADING PLAN - 1

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C6-01

M A

TC

H

LI

N

E

- S

EE

S

H

EE

T D

PT

-C

6-

MATCHLINE - SEE SHEET DPT-C6-02

MATCHLINE - S

EE SHEET DPT-C6-05

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

N O

R

TH

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

GRADING PLAN - 2

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C6-02

M A

TC

H

LI

N

E

- S

EE

S

H

EE

T D

PT

-C

6-

MATCHLINE - SEE SHEET DPT-C6-01

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

NORTH

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

GRADING PLAN - 3

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C6-03

MATCHLINE - SEE SHEET DPT-C6-02

MATCHLINE - SEE SHEET DPT-C6-01

MATCHLINE - SEE SHEET DPT-C6-05

M A

TC

H

LI

N

E

- S

EE

S

H

EE

T D

PT

-C

6- 04*

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

NORTH

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

GRADING PLAN - 4

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C6-04

M A

TC

H

LI

N

E

- S

EE

S

H

EE

T D

PT

-C

6-

MATCHLINE - SEE SHEET DPT-C6-05

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

NORTH

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

GRADING PLAN - 5

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C6-05

MATCHLINE - SEE SHEET DPT-C6-04 MATCHLINE - SEE SHEET DPT-C6-03

M A

TC

H

LI

N

E

- S

EE

S

H

EE

T D

PT

-C

6-

STRIPING PLAN

Know what's below.Call before you dig.

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C7-00

SCALED FOR 'D' SIZE

(24"x36") PLANS ONLY

ANY OTHER PLAN SIZE

MAY NOT BE TO SCALE

CONSTRUCTION DETAILS - 1

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C8-00

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

DETAIL

CONCRETE PAVEMENT - REMOVE AND REPLACE CONCRETE PAVEMENT

CP-RR

EXISTING PROPOSED

DETAIL

CONCRETE PAVEMENT - REMOVE, REGRADE, AND REPLACE SIDEWALK

CP-SW

EXISTING PROPOSED

DETAIL

EJ - EXPANSION JOINT

EXISTING PROPOSED

DETAIL

CJ - CONSTRUCTION JOINT

EXISTING PROPOSED

DETAIL

LJ - LONGITUDINAL JOINT

DETAIL

TYPICAL JOINTS FOR CONCRETE SLAB REPAIR

DETAIL

KJ - TRANSVERSE CONTRACTION JOINT

DETAIL

IJ - ISOLATION JOINT

DETAIL

CONCRETE JOINT SEALANT

CONSTRUCTION DETAILS - 2

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C8-01

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

DETAIL

ASPHALT PAVEMENT - 4.0" REMOVE AND REPLACE

AP-RR

DETAIL

ASPHALT PAVEMENT - REMOVE, REGRADE, AND REPLACE

AP-RRR

EXISTING PROPOSED

DETAIL

ASPHALT PAVEMENT - 2.0" MILL AND OVERLAY

AP-MO

DETAIL

CONCRETE PAVEMENT - REMOVE, REGRADE, AND REPLACE ASPHALT WITH CONCRETE

CP-RRR

EXISTING PROPOSED

STANDARD PAN

CONCRETE PAVEMENT - REMOVE AND REPLACE CURB AND GUTTER

DETAIL CP-CG

REVERSE PAN

CONSTRUCTION DETAILS - 3

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C8-02

DEPOT MUSEUM PAVING IMPROVEMENTS100% DESIGN

DETAIL

MISCELLANEOUS IMPROVEMENTS - ADA SYMBOL

WITH BACKGROUND

MI-SYM

DETAIL

MISCELLANEOUS IMPROVEMENTS - ADA SIGN

AND POST

MI-S

DETAIL

MISCELLANEOUS IMPROVEMENTS - INSTALL

CHASE DRAIN

MI-CD

DETAIL

MISCELLANEOUS IMPROVEMENTS - INSTALL DETECTABLE WARNING SURFACE

MI-DW

CONCRETE PAVEMENT - REMOVE AND REPLACE VERTICAL CURB

CP-VCDETAIL

GENERAL NOTES

CITY ENGINEER (OR DESIGNEE)

ALL WORK SHALL BE CONSTRUCTED TO CITY AND COUNTY OF BROOMFIELD

STANDARDS AND SPECIFICATIONS. THIS DRAWING HAS BEEN REVIEWED

AND FOUND TO BE IN GENERAL COMPLIANCE WITH THESE STANDARDS AND

SPECIFICATIONS AND OTHER BROOMFIELD REQUIREMENTS. THE

ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE

PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE APPEAR HEREON.

DATE

CITY ENGINEER STATEMENT

DPT-C8-03

Sheets and Views
DPT-C0-00 COVER SHEET
DPT-C1-00 SITE IMPROVEMENTS - ASPHALT
DPT-C1-01 SITE IMPROVEMENTS - CONCRETE
DPT-C2-00 PHASING PLAN
DPT-C3-00 TRAFFIC CONTROL PLAN - PHASE 1
DPT-C3-01 TRAFFIC CONTROL PLAN - PHASE 2
DPT-C3-02 TRAFFIC CONTROL DETAILS
DPT-C4-00 BORING LOCATION PLAN
DPT-C5-00 UTILITY PLAN
DPT-C6-00 OVERALL GRADING PLAN
DPT-C6-01 GRADING PLAN - 1
DPT-C6-02 GRADING PLAN - 2
DPT-C6-03 GRADING PLAN - 3
DPT-C6-04 GRADING PLAN - 4
DPT-C6-05 GRADING PLAN - 5
DPT-C7-00 STRIPING PLAN
DPT-C8-00 CONSTRUCTION DETAILS - 1
DPT-C8-01 CONSTRUCTION DETAILS - 2
DPT-C8-02 CONSTRUCTION DETAILS - 3
DPT-C8-03 GENERAL NOTES
2025-06-10T13:54:30-0600
City and County of Broomfield
Matthew Deaver