This document is a Statement of Work for the IEMA Rodger Street AV Upgrade Project, an audiovisual upgrade for the Illinois Emergency Management Agency's Rodger Street Training Room. The vendor will implement a new Crestron AV display and switching system, which includes replacing the existing overhead projector, removing the two front TVs, and integrating with the existing podium, AV rack, audio amplifier, speaker system, and side displays. The vendor will also provide new microphone, Blu-ray player, and Comcast cable tuner. The vendor will be responsible for installation, configuration, testing, documentation, and end-user training, with a completion date prior to June 30, 2019. The Rodger Street Training Room will be unavailable on June 13, 2019.

The pricing terms, set-asides, funding requirements, and other financial details are not provided in this document. However, it does specify the IEMA's responsibilities, including providing a point of contact, adequate working space, power, Internet access, and meeting defined project milestones.

View the file

Other files

File Type Posted
RFQ EM19050547 - AV Upgrade.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IEMA Rodger Street AV Upgrade Project

IEMA Project

Statement of Work

The purpose of this project is to upgrade the existing A/V equipment in the Rodger Street

Training Room.

Project Outline

Vendor will implement an A/V display and switching system at IEMA’s Rodger Street facility and will complete the following tasks:

Replace the existing overhead projector

Remove the existing two front TVs

Using the existing podium, A/V rack, audio amplifier, speaker system and side displays, install and configure the new Crestron system components.

Provide all project required connectors and cabling.

AV routing for three displays (projector & two side displays).

Main Sources to Include:

o Existing Lectern Room PC o Existing Laptop o Optional Wireless PC (air media) o New microphone o new Blu-ray DVD player o Comcast Cable tuner

A Lectern 10" Touch Panel will be the user's control of the AV system and room configuration.

Perform the testing procedures to verify proper operation

Document the hardware configuration

Create user guide documentation for system operation

Training the site end-user

Project Management

The vendor will perform the following responsibilities:

Designate a primary point of contact for the project team

Define, manage and maintain the project plan

Perform project planning as mutually agreed with IEMA

Communicate important dates and pending tasks

Conduct status meeting

Provide agenda for meetings

Manage issue logs

Implementation

Vendor will perform the following services:

Installation and cabling of the displays

Placement and configuration of the transmitter/receiver devices

Cabling and mounting of projector and displays

Installation of input plate

Racking and wiring of audiovisual equipment

System configuration and control programming

Testing

Documentation

End-User training

Testing

Vendor will perform the following tasks in this phase:

Verify audio and video clarity and adjust as needed for optimal performance

Knowledge Transfer

Vendor will perform the following tasks in this phase:

Conduct a training session o Training will be provided after system installation completion o End user training guides & technical guides will be provided via electronic format

Deliverable Documentation

Equipment Information Documentation

Test plan and documented test results

Training guides

IEMA Site Responsibilities

Provide point of contact (IEMA)

Provide adequate working space with power and Internet access (IEMA)

Provide access to all locations and staff reasonably required for this project (IEMA)

Provide equipment environmental, power, and space requirements (IEMA)

Meet milestones defined for the project; if delayed, IEMA will promptly notify vendor

Project Scheduling

All work must be completed, and the project finalized, prior to June 30, 2019.

The Rodger Street Training Room will be unavailable to the vendor on June 13, 2019.

IEMA Rodger Street Training Room

IEMA Rodger Street Training Room’s current configuration:

Podium

Podium room view

Back room view