About this file

The file is a Project Matrix Template in Excel format, designed to capture detailed information about construction projects for a potential bid on a Military Construction (MILCON) project at Portsmouth Naval Shipyard. The template requires contractors to document project details including project size, scope, complexity, location, completion year, contract type (prime/sub), and delivery method (Design-Build or Design-Bid-Build).

The related federal contract opportunity (Solicitation N6247025R0004) is a pre-solicitation for power reliability and water resiliency upgrades at Portsmouth Naval Shipyard in Kittery, Maine. The project involves on-base upgrades to power distribution, energy storage, and onsite generation, including installation of new 35 kV switchgear, upgrades to 5 substations, power management switchgear, approximately 11,000 linear feet of AC duct banks, 5,000 linear feet of DC duct bank, and 1,000 linear feet of gas main. The project is being solicited by the Department of the Navy Naval Facilities Engineering Command and aims to increase reliability and capacity for nuclear submarine and support facilities.

View the file

Other files

File Type Posted
PLA Request for Information.docx DOCX document
Sources Sought Notice.pdf PDF
Project Information Form.docx DOCX document
DOD CUI Non-Disclosure Agreement.pdf PDF
Contractor Information Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

SIZESCOPECOMPLEXITY
#Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year)Was your firm Prime or Sub?DB or DBBDoD / FedA final construction cost of $100M or greaterProject demonstrating experience with water and/or power distribution. (1 water and 1 power OR 2 with both)a) Work within congested urban or industrial areas with limited construction laydown spaceb) Detailed sequencing of work, including approval from stakeholders for outagesc) Experience with multi-year porojects with consistentkly high scheduyle performance throughout the projectd) Demonstrated ability to identify schedule risks in advance, develop corrective actions and implement solutions to regain schedule compliance.
1
2
3
4
5
General Information:Bonding CapacityUEICageAddressSB StatusPOCPOC Contact InformationAnnual Revenue#Offices

File details come from the government source that posted it. Updated .