About this file

The provided document is a Sources Sought Contractor Information Form for a Naval Facilities Engineering Command military construction project at Portsmouth Naval Shipyard. The form collects key contractor details including business type, bonding capacity, and potential small business certifications (8(a), HUBZone, Service-Disabled Veteran-Owned, Woman-Owned, etc.).

The related federal contract opportunity (Solicitation N6247025R0004) involves a Power Reliability and Water Resiliency Upgrade project valued at approximately $30-50 million. The on-base scope includes installing new 35 kV switchgear upgrades at 5 substations, power management switchgear, DC battery systems, approximately 11,000 linear feet of AC duct banks, 5,000 linear feet of DC duct bank, and 1,000 linear feet of gas main. The project aims to increase electric and water utility system reliability and capacity for nuclear submarine and support facilities, with complementary off-base utility modifications by Central Maine Power and Kittery Water District.

View the file

Other files

File Type Posted
PLA Request for Information.docx DOCX document
Sources Sought Notice.pdf PDF
Project Information Form.docx DOCX document
DOD CUI Non-Disclosure Agreement.pdf PDF
Project Matrix Template.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – CONTRACTOR INFORMATION FORM

Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.

1. Contractor Information:
EIN:
CAGE Code:
Firm Name:
Address:
Name of POC for firm:
Phone Number of POC:
Email of POC:

2. Type of Business: (check all that apply)

|_| SBA certified 8(a) firm
|_| SBA certified HUBZone Small Business

|_| Service-Disabled Veteran-Owned Small Business

|_| Veteran Owned Small Business

|_| Woman Owned Small Business

|_| Economically Disadvantaged Women-Owned |_| Small Business Small Business

3. Bonding Capacity:

Surety Name:
Maximum bonding capacity per project:
$
Aggregate maximum bonding capacity:
$

4. This space may be used to provide any additional information to clarify the above items only:

Please DO NOT change content of the form

File details come from the government source that posted it. Updated .