Project Location Map_2024_Topo Revised.pdf
PDF 3 MB Posted
- Attached to
- Holden Springs Water Enhancement Project 2024
- Solicitation number
- AS25-23
- Issued by
- Utah
About this file
This document is a project location map related to the Holden Springs Water Enhancement Project 2024, a state and local contract opportunity issued by the Utah Division of Wildlife Resources. The project involves the installation of approximately 8,250 feet of HDPE fusible pipe and four water troughs. The map shows the project location, land ownership, and the proposed pipeline route. The state and local contract opportunity seeks a vendor to supply the required materials and installation services for this project.
The contract opportunity does not provide details on pricing terms, set-asides, incumbents, funding requirements and sources, or any other salient information beyond the project scope and location. The document focuses on the technical details of the project, such as the pipeline route and land ownership, to support the procurement process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Changing Your Time Zone 2022.pptx | PPTX presentation | |
| Attachment A Terms and Conditions for Goods and Services (Purchase Orders).docx | DOCX document | |
| Attachment B Scope of Work.docx | DOCX document | |
| Project Location Map_2024_Imagery Revised.pdf | ||
| 1256752-event.pdf | ||
| Claim of Business Confidentiality 12.7.20.pdf | ||
| Performance evaluation document--- FOR REFERENCE USE ONLY. | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLM
DNR
DNR
Private
USFS
DNR
DNR
BLMPrivate
Legend %, Metal Trough Location $+ Rubber Trire Trough Locations
Holden Spring Proposed Pipeline_2024 LandOwnership
AGENCY
BLM
DNR ¹
Holden Springs Water Enhancement Project
File details come from the government source that posted it. Updated .