This document is a Scope of Work for the Holden Springs Water Enhancement Project 2024 in the state of Utah. The Division of Wildlife Resources is seeking a vendor to supply and install approximately 8,250 feet of HDPE Fuseable Pipe and four (4) Water Troughs. The project overview, item quantities, and any response dates, due dates, site visits, bidder's meetings, award dates, or contract term details are not provided in this document.
The pricing terms, set asides, incumbents, funding requirements and sources, and other salient information are also not included in this Scope of Work document. Any additional details regarding this state and local contract opportunity would need to be obtained from the related solicitation or other supporting documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Holden Springs Pipeline/Trough Project 2024
Introduction:
The Utah Division of Wildlife Resources (UDWR) and the Bureau of Land Management (BLM) is requesting services for the installation of an estimated 8,250 feet of HDPE Fuseable Pipe along with four (4) Water Trough. Project will consist of a Contractor installing an estimated 7,700’ of 2” fuseable pipe (SDR 11 minimum of 200 PSI), and installing 16,000’ of 1.5” fuseable pipe (SDR 11 minimum of 200 PSI) along with setting four (4) Rubber Tire troughs and one (1) metal water trough to grade and plumbed for water. Project is located in Millard County within BLM and UDWR Administrated Lands. Contractor will need to provide all pipe sizes listed above, four (4) rubber tire troughs along with escape ramps, and 30” HDPE corrugated double walled culvert pipe used for a float protector. Include all labor costs, equipment and materials to install the pipeline, fuse fittings and the installation of four (4) Rubber Tire Troughs and one (1) Metal Tire Trough. UDWR will provide the concrete, and or additional pipe fittings and connectors for the project.
PROJECT INSTALLTION SPECIFICATIONS
Project: Holden Springs Pipeline/Trough Install Project 2024.
Location: Project is located east of Holden, Utah. Elevation is 5,400 – 6,600 feet with moderate rolling topography. Vicinity maps showing sites are attached. Access to site is by dirt road. Some north facing slopes will have trees and brush. Project will follow an existing pipeline and will need to be installed within the original footprint.
Linear Feet: Estimated up to 23,700 Feet approximately ~ (7,700’ of 2” HDPE and 16,000’ 1.5” HDPE SDR 11 4710 resin min 200 psi )
Pricing: Bids are to be submitted as a lump sum for all work and supplies required.
| Installation Dates: | Application scheduled to take place during the time frame of September 10th – October 31st 2024. |
| There will be no site tour, contractor is to conduct his own inspections of the project before submitting a bid. Project is ready to move forward. Contractor will work closely with the Project Manager, Permittee and the BLM to schedule optimal installation dates. All HDPE Pipe along with the four (4) Rubber Tire Troughs will be provided by the contractor. UDWR will provide the metal water trough. Contractor will be required to deliver the pipe and the tire troughs to the project location. Contractor will need to connect new pipeline to an existing pipeline already established. Contractor will be required to prepare and set grade a pad for the tire troughs, set and plumb the four (4) rubber tire troughs for water, along with creating a small overflow pond if needed. |
| The contractor will need to be equipped with the necessary equipment to install the HDPE pipe underground approximately 3’Feet. Also have equipment to dig up pipe and fuse as needed. | |
| Experience: | Contractor must have prior experience in the use of this pipe, provide his own equipment to fuse the pipe together, haul and load the pipe and move it to the site. Contractor will be required to install the pipeline cross country, over rough terrain, removal of some trees maybe necessary to install the pipeline. Contractor will be expected to have equipment to handle the pipe. Preferred equipment would be to have a tracked Dozer with a vibratory ripper for the pipe to be installed. References can be submitted with this bid. |
Use of Subcontractors: If subcontractors will be completing any part of the outlined work, a list of the subcontractors (including name, primary contact, address and telephone number) must be included with submission of the bid to State Purchasing.
Enclosed Project Maps of Pipeline Location:
image1.emf
BLM
DNR
Private
USFS
BLMPrivate
Legend %, Metal Trough Location $+ Rubber Trire Trough Locations
Holden Spring Proposed Pipeline_2024 LandOwnership
AGENCY
DNR ¹
Holden Springs Water Enhancement Project image2.emf
Private
USFS
BLMPrivate
Legend %, Metal Trough Location $+ Rubber Trire Trough Locations
Holden Spring Proposed Pipeline_2024 LandOwnership
AGENCY
DNR ¹
Holden Springs Water Enhancement Project