Project Drawings.pdf

PDF 7 MB Posted

Attached to
Y1DA--Project # 596-18-107 Construction to Upgrade Chiller Plant
Solicitation number
36C24922R0094
Issued by

About this file

This document package includes plans and specifications for the construction project to upgrade the chiller plant at the Lexington VA Medical Center in Lexington, Kentucky. The project involves replacing and upgrading chillers, pumps, piping, controls and related mechanical equipment in Building 67 to improve the efficiency of the central chilled water plant. Bidders are required to thoroughly review the drawings and specifications calling out demolition and new construction work. The project will be carried out in phases to maintain operations, with some planned shutdowns over weekends or winter months. The solicitation number is 36C24922R0094 and was issued by the Department of Veterans Affairs.

View the file

Other files

File Type Posted
Site Visit Sign In.pdf PDF
Solicitation Questions and Answers.pdf PDF
36C24922R0094 0001.docx DOCX document
36C24922R0094_1.docx DOCX document
Statement of Work.pdf PDF
Project Specifications.pdf PDF
Pricing Schedule.xlsx XLSX spreadsheet
Past Performance Questionnaire.pdf PDF
Wage Determination KY20220090 08-05-2022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 20

BUILDING 39

BUILDING 113

BUILDING 47

BUILDING 48

BUILDING 41

BUILDING 22

BUILDING 37

BUILDING 117

BUILDING 115

BUILDING 74

BUILDING 69

BUILDING 12

BUILDING 5

BUILDING 8

BUILDING 7

BUILDING 6

BUILDING 122

BUILDING 67

BUILDING 29

BUILDING 28

BUILDING 27

BUILDING 16

BUILDING 17

BUILDING 25

BUILDING 2

BUILDING 1

BUILDING 3

BUILDING 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:0

P M

G-001

COVER SHEET UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

10/23/2020 PP KG

BID DOCUMENTS

SITE PLAN

UPGRADE CHILLER PLANT

VA PROJECT: 596-18-107

SHEET INDEX

SHEET

NUMBER SHEET NAME

GENERAL

G-001 COVER SHEET

G-002 SITE PLAN - CONTRACTOR STAGING AREAS

MECHANICAL

M-001 MECHANICAL LEGEND

M-101 MECHANICAL SITE PLAN - CHILLED WATER CIRCULATION LOOP - NEW WORK

01-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK

02-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK

02-M-103 MECHANICAL ATTIC FLOOR PLAN - DEMOLITION AND NEW WORK

03-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK

04-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK

16-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK

17-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK

25-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK

27-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK

28-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK

29-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK

67-MD-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION

67-MD-102 MECHANICA ROOF FLOOR PLAN - DEMOLITION

67-M-101 MECHANICAL GROUND FLOOR PLAN - NEW WORK

67-M-102 MECHANICAL ROOF FLOOR PLAN - NEW WORK

M-301 MECHANICAL SECTIONS

M-501 MECHANICAL PIPING SCHEMATIC - DEMOLITION

M-502 MECHANICAL PIPING SCHEMATIC - NEW WORK

M-503 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-701 CONTROLS LEGEND AND SEQUENCE OF OPERATIONS

M-702 CONTROL DIAGRAM (CHILLED WATER PLANT)

M-703 CONTROL DIAGRAM (BUILDING CONTROLS)

ELECTRICAL

E-001 ELECTRICAL LEGEND AND ABBREVIATIONS

04-E-101 ELECTRICAL GROUND FLOOR PLAN

25-E-101 ELECTRICAL GROUND FLOOR PLAN

27-E-101 ELECTRICAL GROUND FLOOR PLAN

29-E-101 ELECTRICAL GROUND FLOOR PLAN

67-E-101 ELECTRICAL GROUND FLOOR PLAN

67-E-102 ELECTRICAL ROOF PLAN

E-601 ELECTRICAL SCHEDULES

GROUND SUPERVISOR

ELECTRICAL SHOP SUPERVISOR

INDUSTRIAL HYGIENE

UNION SAFETY REPRESENTATIVE

CHIEF, FIRE SERVICE

CHIEF, POLICE SERVICE

SAFETY SPECIALIST

GEMS COORDINATOR

PATIENT SAFETY MANAGER

INFECTION CONTROL OFFICER

CHIEF, ENVIRONMENTAL MANAGEMENT SECTION

CHIEF, ENGINEERING SECTION

CHIEF, FMS

CHIEF OF STAFF

ASSOCIATE DIRECTOR

DIRECTOR

PROJECT # 596-18-107 SIGNATURE DATE

APPROVALS

N

LEXINGTON KENTUCKY VETERANS AFFAIRS MEDICAL CENTER

LEXINGTON VA MEDICAL CENTER

SOUSLEY CAMPUS

2250 LEESTOWN ROAD

LEXINGTON, KENTUCKY 40511

Revisions: Date:

BUILDING 20

BUILDING 39

BUILDING 113

BUILDING 67

BUILDING 47

BUILDING 48

BUILDING 41

BUILDING 22

PROJECT 596-18-107

STAGING: APPROX. 750 SQFT

BUILDING 67

"CONTRACTOR VILLAGE"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:0

P M

G-002

SITE PLAN - CONTRACTOR STAGING AREAS UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

10/23/20 PP KG

BID DOCUMENTS

1" = 40'-0"

SITE PLAN - CONTRACTOR STAGING AREAS N

1. CONTRACTORS AND SUBCONTRACTORS SHALL PARK IN THE “CONTRACTOR VILLAGE” AREA.

OUTLINE SHOWN ON SITE PLAN.

2. CONTRACTOR MAY STAGE WITHIN THE CHILLER PLANT AND THE APPROX. 750 SQ FT OF

STAGING AREA TO ONE SIDE OF THE CHILLER PLANT DRIVEWAY SHOWN ON SITE PLAN.

3. STAGING LOCATIONS SHALL BE AGREED TO BY COR AND CONTRACTOR. THE CONTRACTOR

DOES NOT TAKE POSSESSION OF BUILDING 67 AND, THEREFORE, HAS TO MAINTAIN ACCESS

TO EQUIPMENT, MAINTAIN ACCESS SPACE FOR ENGINEERING SERVICE CONTRACTOR TO

CLEAN CHILLER TUBES DURING HEATING SEASON, MAINTAIN PATH FOR UTILITY SYSTEMS

OPERATORS TO ENTER/EXIT THE BUILDING, ETC.

4. FOR TRASH WASTE, RECYCLED MATERIAL HOLDING, NEW MATERIAL HOLDING, ETC. THE

CONTRACTOR WILL USE THE APPROX. 750 SQ FT SHOWN ON THE PLAN. THE CONTRACTOR

SHALL FENCE THE PERIMETER WITH TEMPORARY 8 FOOT FENCE AND INSTALL A GRAVEL BED

FOR SUPPORT OF DUMPSTERS AND STORED ITEMS, AND TO RESTORE THE AREA FOLLOWING

REMOVAL OF ALL ITEMS AND TEMPORARY FENCING.

5. RESTORATION SHALL CONSIST OF REMOVING GRAVEL BED, LEVELING SOIL TO REMOVE RUTS, AND SEEDING WITH STRAW COVERING AS NEEDED SO THE AREA WILL BE GRASS COVERED.

GRASS SEED SHALL MATCH STATION TYPICAL SPECIES AND SHALL BE SUBMITTED TO COR

APPROVAL.

CONTRACTOR STAGING NOTES:

A/E ARCHITECT / ENGINEER

AAV AUTOMATIC AIR VENT

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AHU AIR-HANDLING UNIT

AMP AMPERE

AP ACCESS PANEL

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AUMS ADVANCED UTILITY METERING SYSTEM

B BOILER

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CD CEILING DIFFUSER

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CT COOLING TOWER

CU CONDENSING UNIT

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWCLS CHILLED WATER CIRCULATION LOOP SYSTEM

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO COOLING TOWER)

CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)

Db DRY-BULB TEMPERATURE

DB DECIBELS

DCW DOMESTIC COLD WATER

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DP DEW POINT TEMPERATURE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EJ EXPANSION JOINT

ENT ENTERING

ET EXPANSION TANK

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

FA FREE AREA

FC FLEXIBLE CONNECTION

FD FLOOR DRAIN

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

GA GAUGE

GAL GALLONS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HX HEAT EXCHANGER

HZ HERTZ

ABBREVIATIONS

I/O INPUT/OUTPUT

ID INSIDE DIAMETER

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

L LITER

L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND (OR METERS/SECOND)

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MTD MEAN TEMPERATURE DIFFERENCE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

Nm NEWTON METER

NO NORMALLY OPEN

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD REQUIRED

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

P PUMP

Pa PASCAL

PD PRESSURE DROP

PDT PRESSURE DIFFERENTIAL TRANSMITTER

PG PRESSURE GAGE

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PT PRESSURE TRANSMITTER

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RV RELIEF VALVE

SAN SANITARY

SI SQUARE INCHES

SP GR SPECIFIC GRAVITY

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

SSR SOLID SEPARATOR

TAB TESTING, ADJUSTING, BALANCE

TDH TOTAL DYNAMIC HEAD

TDV TRIPLE DUTY VALVE

TT TEMPERATURE TRANSMITTER

UL UNDERWRITERS LABORATORY

V VALVE

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VPS VARIABLE PRIMARY SYSTEM

VSD VARIABLE SPEED DRIVE

VSMC VARIABLE SPEED MOTOR CONTROL

W WATTS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WFCV WATER FLOW CONTROL VALVE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

DRAWING SYMBOLS

26-SF 3

26-TU-I-I

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

DRAWING NUMBER WHERE DRAWN

BUILDING NO. WHERE EQUIPMENT IS LOCATED

H4

H7

A

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

HOT WATER HEATING SUPPLY

CONDENSATE PUMP DISCHARGE

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

VENT LINE

SOLAR WATER RETURN

SOLAR WATER SUPPLY

GLYCOL-WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLY

REFRIGERANT SUCTION

REFRIGERANT HOT GAS

REFRIGERANT LIQUID

CHILLED WATER SUPPLY

CHILLED WATER RETURN

DRAIN LINE

MAKE-UP WATER

CONDENSER WATER RETURN (TO TOWER)

CHILLED GLYCOL-WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

CONDENSER WATER SUPPLY (FROM TOWER)

HOT WATER HEATING RETURN

S-60

CR-60

S-30

CR-30

S-15

CR-15

PC

HWS

HWR

GHS

GHR

V

SWS

SWR

CWR

CHR

GCR

RL

RS

RHG

CWS

CHS

GCS

MW

D

GLYCOL-WATER RUN AROUND SUPPLY

GLYCOL-WATER RUN AROUND RETURNGRR

GRS

X EXISTING PIPE TO BE REMOVED

PIPING SYMBOLS

QUICK-COUPLE HOSE CONNECTOR

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PRESSURE GAGE

THERMOMETER

VENTURI FLOW METER

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

INVERTED BUCKET TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

PIPE UP

PIPE DOWN

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

AV

MANUAL AIR VENTMV

THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

GENERAL PIPING SYMBOLS

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

WATER LEVEL CONTROLLER

FLOW METER

LC

M

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

WYE STRAINER WITH VALVED DRAIN AND

QUICK-COUPLE HOSE CONNECTOR

VALVE SYMBOLS

TEMPERATURE TRANSMITTERTT

GENERAL

A. THE FOLLOWING NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS

B. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED

TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON

THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.

C. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC

AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

D. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE

WITH MANUFACTURERS’ RECOMMENDATIONS, CONTRACT DOCUMENTS, AND

APPLICABLE CODES AND REGULATIONS.

E. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT

TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.

F. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO, AND

WITHIN 50 FT OF, ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND

ANCHOR POINTS) THROUGHOUT MECHANICAL EQUIPMENT ROOMS.

G. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,

STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT

DOCUMENT DRAWINGS.

H. MAINTAIN A MINIMUM 7 FT CLEARANCE TO THE UNDERSIDE OF PIPES, DUCTS,

CONDUITS, SUSPENDED EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN

MECHANICAL ROOMS. PIPING IN HIGH BAY AREAS SHALL BE SUPPORTED AT THE

HEIGHTS INDICATED ON THE DRAWINGS.

I. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR

PIPING INSULATION IS APPLIED.

J. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN

ACCESSIBLE LOCATION WITH THE STRAIGHT SECTION OF PIPE OR DUCT UP-AND

DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.

K. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED,

THE PRODUCT OF ONE MANUFACTURER SHALL BE USED.

L. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED

DRAWINGS.

M. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED FOR

FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND

COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATION.

N. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE

SIZED AND LOCATED BY THE MECHANICAL CONTRACTOR. MINIMUM CONCRETE

PAD THICKNESS SHALL BE 6 IN. PAD SHALL EXTEND BEYOND THE EQUIPMENT A

MINIMUM OF 6 IN. ON EACH SIDE. CONCRETE HOUSEKEEPING PADS SHALL BE

PROVIDED BY THE GENERAL CONTRACTOR. IT SHALL BE THE RESPONSIBILITY OF

THE MECHANICAL CONTRACTOR TO COORDINATE THE SIZE AND LOCATION OF

CONCRETE HOUSEKEEPING PADS WITH THE GENERAL CONTRACTOR. SEE DETAILS

ON M-502 FOR ADDITIONAL REQUIREMENTS.

O. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE

SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE

APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST

CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE

CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING

INSTALLED. DO NOT SCALE DRAWINGS.

P. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND

AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS

OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL

CONTRACTOR.

Q. ALL EQUIPMENT, PIPING, DUCTWORK. ETC., SHALL BE SUPPORTED AS DETAILED,

SPECIFIED, AND REQUIRED TO PROVIDE A VIBRATION-FREE INSTALLATION.

R. MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED

FROM A METAL DECK.

S. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT

INSTALLATION.

T. ADDITIONAL GENERAL NOTES ON DRAWINGS

DEMOLITION

A. REMOVE ALL HANGERS, SUPPORTS, TUBING, AND CONTROL DEVICES ASSOCIATED

WITH EQUIPMENT TO BE REMOVED.

B. WORK MUST BE COORDINATED WITH OWNER TO MAINTAIN OPERATION OF THE

FACILITY. PROVIDE AT LEAST 14 DAYS ADVANCE NOTICE TO THE COR FOR ANY

UTILITY SHUT DOWN.

C. ASBESTOS ON EXISTING PIPING, DUCT, AND EQUIPMENT SHALL BE REMOVED

BACK TO MAIN BY ABATEMENT CONTRACTOR AND NEEDS TO BE RE-INSULATED BY

THE MECHANICAL CONTRACTOR. WORK TO BE COORDINATED WITH ABATEMENT

CONTRACTOR. REFER TO SPECIFICATIONS 02 81 11 (TRADITIONAL ASBESTOS

ABATEMENT) FOR ITEMS REQUIRING ABATEMENT.

D. PROTECT EXISTING PLUMBING, STEAM, AND CONDENSATE LINES FROM FREEZING

WHILE HEATING SYSTEM IS OUT OF SERVICE.

E. PIPING ADJACENT TO DEMOLITION SCOPE SHALL BE LEFT IN OPERATIONAL

CONDITION. REPAIR INSULATION AND VERIFY SUPPORTS REMAIN AS REQUIRED

PER SPECIFICATION.

PIPING

A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED

TO INSTALL COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE

DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.

B. PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN THE HEATING-

WATER, CHILLED-WATER, AND OTHER CLOSED-WATER PIPING SYSTEMS. ALL

PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES AT THE

BOTTOM OF ALL RISERS AND LOW POINTS.

C. ALL PIPING IN MECHANICAL SPACES IS OVERHEAD, TIGHT TO THE UNDERSIDE OF

THE STRUCTURE OR SLAB, WITH SPACE FOR INSULATION IF REQUIRED. PIPING IN

HIGH BAY AREAS (SUCH AS CHILLER PLANT) SHALL BE INSTALLED AT THE HEIGHTS

INDICATED ON THE DRAWINGS.

D. INSTALL PIPING SO ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND

OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.

E. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS IN SERVICE WHEN

EQUIPMENT OR PIPING ON THE EQUIPMENT SIDE OF THE VALVE IS REMOVED

F. PROVIDE CHAIN OPERATORS FOR ALL VALVES 6" AND LARGER IN EQUIPMENT

ROOMS MOUNTED GREATER THAN 8'0" ABOVE FLOOR LEVEL. CHAIN SHALL EXTEND

TO 7'0" ABOVE FLOOR LEVEL.

G. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE THE FULL SIZE

OF THE PIPE BEFORE REDUCING IN SIZE TO MAKE CONNECTIONS TO EQUIPMENT

AND CONTROLS.

H. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT

AND IN BYPASSES TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS.

I. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.

J. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

K. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.

L. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS

IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST

TO THE OWNER.

M. PROVIDE A LINE SIZE STRAINER UPSTREAM OF EACH AUTOMATIC VALVE.

N. ALL BUILDINGS IN SCOPE HAVE FLOW (STRAP-ON ULTRASONIC) AND

TEMPERATURE METERING TO A SITE UTILITY METERING SYSTEM THAT ARE

SEPERATE FROM THE BUILDING AUTOMATION CONTROL SYSTEM.

INSTRUMENTATION SHALL BE REMOVED, PROTECTED, AND REPLACED WHERE

INDICATED.

O. INSULATION ON EXTERIOR INSULATED PIPING SHALL CONTINUE THROUGH ROOF

OR WALL PENETRATION MINIMUM 18" BEYOND INTERIOR SURFACE.

GENERAL NOTES

GENERAL MECHANICAL PHASING

A. COORDINATE WORK WITH COR MINIMUM TWO (2) WEEKS PRIOR TO TAKING ANY

EQUIPMENT OFFLINE.

B. CONTRACTOR SHALL COMPLY WITH ALL PHASING REQUIREMENTS IDENTIFIED IN

CONTRACT DOCUMENTS INCLUDING SPECIFICATIONS AND DRAWING SPECIFIC

NOTES.

BUILDING 67 (CHILLER PLANT)

A. WORK ON PUMPS AND COOLING TOWERS SHALL BE PERFORMED ONE AT A TIME

WHILE CHILLER PLANT REMAINS OPERATIONAL. CONTRACTOR SHALL VERIFY

POSITIVE ISOLATION OF EXISTING VALVING PRIOR TO SCHEDULING WORK. FULL

SYSTEM SHUTDOWNS FOR THIS WORK MAY BE PERMISSIBLE IF APPROVED BY THE

COR.

B. BYPASS AND FLOW METER WORK WILL REQUIRE SHUT DOWN OF CHILLER PLANT.

C. OUTAGES SHALL BE PERFORMED DURING HEATING (WINTER) MONTHS ON A

SCHEDULE APPROVED BY THE VA.

D. THE GENERAL CONTRACTOR WILL NEED TO COORDINATE CONSTRUCTION

ACTIVITY TO NOT INTERFERE WITH SEASONAL SERVICING OF CHILLERS.

BUILDINGS 1, 2, 3, 4, 16, 17, 25, 27, 28, 29

A. SOME WORK IN THESE BUILDINGS WILL REQUIRE SHUT DOWN OF CHILLED AND/OR

HOT WATER DISTRIBUTION SYSTEM. CONTRACTOR SHALL COORDINATE OUTAGES

WITH COR TO MINIMIZE DISRUPTIONS TO BUILDING COOLING AND HEATING

SYSTEMS.

B. WORK MAY BE PERFORMED IN B27 AND B29 ON WEEKDAYS. OTHERS MAY REQUIRE

WEEKEND OUTAGES.

C. CONTRACTOR IS REQUIRED TO PROVIDE TEMPORARY HEATING AND/OR COOLING

TO THE FACILITY IF DURATION OF OUTAGE COULD RESULT IN DAMAGE TO

BUILDING (EX: WATER PIPE FREEZING).

D. CONTRACTOR MAY TAKE PUMPS OFFLINE ONE AT A TIME WHERE POSSIBLE.

CONTRACTOR SHALL VERIFY POSITIVE ISOLATION OF EXISTING VALVING.

CONTROLS

A. THE EXISTING METASYS CONTROLS SYSTEM SHALL BE UTILIZED DURING

CONSTRUCTION TO MAINTAIN OPERATION OF THE CENTRAL CHILLER PLANT.

CHILLER PLANT OPTIMIZATION SOFTWARE SHOULD BE COMISSIONED WHEN

EQUIPMENT IS INSTALLED AND APPROVED BY THE COR.

B. CONTROLS FOR BUILDING TEMPERATURE CONTROL SHALL BE COMISSIONED AS

EACH BUILDING IS RETURNED TO SERVICE.

PHASING

NOTE:

ALL SYMBOLS AND ABBREVIATIONS

ARE SUBJECT TO MODIFICATIONS

ON OTHER DRAWINGS. NOT ALL

SYMBOLS AND ABBREVIATIONS

SHOWN ON THIS SHEET ARE USED

IN THIS PROJECT.

SANITARYSAN

HEAT TRACING

ASBESTOS ABATEMENT

ASBESTOS-CONTAINING MATERIALS (ACM) ARE NOT EXPECTED TO BE ENCOUNTERED

DURING THE COURSE OF THE WORK. PRIOR ASBESTOS SURVEY/SAMPLING EVENTS WITHIN

THE EXPECTED PATH OF CONSTRUCTION HAD NOT REVEALED READILY ACCESSIBLE ACM.

HOWEVER, IF THE CONTRACTOR ENCOUNTERS MATERIALS WHICH ARE BELIEVED TO BE

ASBESTOS (SUSPECT ACM), THE CONTRACTOR SHALL FIRST CONTACT THE COR FOR

DISCUSSION AND DIRECTION PRIOR TO DISTURBING. IF ACM IS IDENTIFIED AS A RESULT OF

TESTING AND WILL NEED TO BE REMOVED TO FACILITATE THE PROJECT, A CONTRACTION

MODIFICATION MAY BE APPLICABLE. REFERENCE SPECIFICATIONS 02 82 11 "TRADITIONAL

ASBESTOS ABATEMENT" AND 02 82 13.13 "GLOVEBAG ASBESTOS ABATEMENT" FOR REMOVAL

REQUIREMENTS THAT SHALL BE FOLLOWED.

LEAD PAINT

LEAD-CONTAINING PAINT MUST BE ASSUMED ON ALL PAINTED SURFACES. CONTRACTOR IS

RESPONSIBLE FOR FOLLOWING SAFE WORK PRACTICES AND FOR ADDRESSING LEAD PAINT

AT ALL LOCATIONS TO BE DISTURBED. CONTRACTOR SHALL INCLUDE PROCEDURES FOR

INCIDENTAL LEAD ABATEMENT IN THE CONTRACTOR PROVIDED SAFETY MANUAL (SUBJECT

TO APPROVAL BY THE COR).

HAZARDOUS MATERIALS

LIMIT OF DEMOLITION

POINT OF CONNECTION TO EXISTING

PRESSURE DIFFERENTIAL TRANSMITTERPDT

PRESSURE TRANSMITTERPT

TEMPERATURE TRANSMITTERTT

TRIPLE DUTY VALVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:0

P M

M-001

MECHANICAL LEGEND UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

L

ELEV

UP

WM

S to c k a n d

In s tru m e n ts

BUILDING 1

BUILDING 3

(E) 6"ø CWCLS

(E) 6"ø CWCLS

(E) 4"ø CHS

(E) 4"ø CHR

MECHANICAL ROOM

WALKWAY BETWEEN

BUILDING 1 AND BUILDING 3

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE

NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.

E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS

SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:1

P M

M-101

MECHANICAL SITE PLAN - CHILLED WATER

CIRCULATION LOOP - NEW WORK

UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

DRAWING NOTES

1 INSTALL NEW PRESSURE DIFFERENTIAL TRANSMITTER IN WALKWAY CRAWL SPACE. CONTRACTOR TO CONNECT INSTRUMENT SIGNAL TO BAS CONTROLLER IN BUILDING 1 GROUND FLOOR MECHANICAL ROOM.

1/8" = 1'-0"

CHILLED WATER - SITE PLAN

N

Master - Ground Floor0' - 0" Master - Sub-Basement-5' - 0"

Master - Ground Floor0' - 0" Master - Sub-Basement-5' - 0"

MECHANICAL ROOM

(E) 6"ø CHS DN

(E) 3"ø CHR DN

(E) 6"ø CHS DN

CORRIDOR

CG13

(E) CWP-1 (E) CWP-2

TO/FROM USERS

TO/FROM USERS

TO/FROM

DISTRIBUTION

LOOP

(E) CHS

TO/FROM

USERS

(E) CHR

TO/FROM

USERS

(E) CWP-2

(E) CWP-1

(E) 2"ø CHS

(E) 2"ø CHR

(E) 3"ø CHR

(E) 3"ø CHS

(E) 6"ø CHS

(E) 3"ø CHR

(E) 6"ø CHS

TO DRAIN

(E) CHR

(E) CHS

6"ø CHR

ROLLED TEE TO

45 DEG UP

1-WFCV-1

MECHANICAL ROOM

(E) 6"ø CHS DN

(E) 3"ø CHR DN

(E) 6"ø CHS DN

CORRIDOR

CG13

(E) CWP-1 (E) CWP-2

TO/FROM USERS

TO/FROM USERS

(E) 6"ø CHS UP

(E) 3"ø CHR UP

(E) 6"ø CHS UP

CHR BELOW CHS PIPING

6"ø CHR

(E) 6"ø CHR

(E) 6"ø CHS

6"ø CHS

(E) 6"ø CHS UP

(E) 3"ø CHR UP

(E) 6"ø CHS UP

TO/FROM

DISTRIBUTION

LOOP

CHR BELOW CHS PIPING

(E) 6"ø CHR

(E) 6"ø CHS

TO/FROM

DISTRIBUTION

LOOP

(E) CHS

TO/FROM

USERS

(E) CHR

TO/FROM

USERS

(E) CWP-2

(E) CWP-1

(E) 2"ø CHS

(E) 2"ø CHR

(E) 3"ø CHR

(E) 3"ø CHS

(E) 6"ø CHS

(E) 3"ø CHR

(E) 6"ø CHS

TO DRAIN

(E) CHR

(E) CHS

ROLLED TEE TO

45 DEG UP

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE

NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.

E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS

SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:1

P M

01-M-101

MECHANICAL GROUND FLOOR PLAN -

DEMOLITION AND NEW WORK

UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - NEW WORK

NTS

CHILLED WATER - NEW WORK ISOMETRIC

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION

1/4" = 1'-0"

CHILLED WATER - SUB-BASEMENT PLAN - NEW WORK

1/4" = 1'-0"

CHILLED WATER - SUB-BASEMENT PLAN - DEMOLITION

NTS

CHILLED WATER - DEMOLITION ISOMETRIC

N

KEYPLAN

BUILDING 1

Revisions: Date:

DRAWING NOTES

1 REPLACE EXISTING TRANSMITTER WITH NEW.

2 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.

3 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE

WHERE SHOWN ON DRAWINGS.

4 NEW MAGNETIC FLOW METER. INSTALL AS RECOMMENDED BY MANUFACTURER.

5 CONTRACTOR SHALL LOCATE EXISTING PDT IN SYSTEM AND REPLACE WITH NEW. CONNECT PDT TO

BUILDING AUTOMATION SYSTEM FOR BUILDING PUMP SPEED CONTROL.

UPUP

Master - First Floor10' - 0"

Master - Ground Floor0' - 0"

Master - First Floor10' - 0"

Master - Ground Floor0' - 0"

TO/FROM

ATTIC

TO/FROM

DISTRIBUTION

LOOP

TO/FROM

ATTIC

TO/FROM

DISTRIBUTION

LOOP

(E) 4"ø CHR

(E) 4"ø CHS

TO/FROM

ATTIC

TO/FROM

DISTRIBUTION LOOP

(E) 4"ø CHR

(E) 4"ø CHS

TO/FROM

ATTIC

TO/FROM

DISTRIBUTION LOOP

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE

NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.

E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS

SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:1

P M

02-M-101

MECHANICAL GROUND FLOOR PLAN -

DEMOLITION AND NEW WORK

UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

1/4" = 1'-0"

CHILLED WATER - PUMP ROOM FLOOR PLAN - NEW WORK

1/4" = 1'-0"

CHILLED WATER - PUMP ROOM FLOOR PLAN - DEMOLITION

NTS

CHILLED WATER - NEW WORK ISOMETRIC

NTS

CHILLED WATER - DEMOLITION ISOMETRIC

N

KEYPLAN

BUILDING 2

Revisions: Date:

DRAWING NOTES

1 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE

WHERE SHOWN ON DRAWINGS.

2 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.

3 NEW MAGNETIC FLOW METER. INSTALL AS RECOMMENDED BY MANUFACTURER.

DN DN

B02 - Attic30' - 0"

B02 - Attic30' - 0"

2CWP-22CWP-1

(E) 4"ø CHR DN

(E) 4"ø CHS DN

(E) 4"ø CHS

(E) 4"ø CHR

TO/FROM USERS

ATTIC

2CWP-2

2CWP-1

(E) 4"ø CHR DN

(E) 4"ø CHS DN

(E) 4"ø CHS

(E) 4"ø CHR

TO/FROM USERS

ATTIC

TO/FROM

PUMP ROOM

TO/FROM

USERS

(E) CHR

(E) CHS

2CWP-2

2CWP-1

(E) CHR

(E) CHS

(E) CHS

(E) CHR

2-WFCV-1

TO/FROM

PUMP ROOM

TO/FROM

USERS

(E) CHR

(E) CHS

2CWP-2

2CWP-1

(E) CHR

(E) CHS

(E) CHS

(E) CHR

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE

NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.

E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS

SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:2

P M

02-M-103

MECHANICAL ATTIC FLOOR PLAN -

DEMOLITION AND NEW WORK

UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

1/4" = 1'-0"

CHILLED WATER - ATTIC FLOOR PLAN - DEMOLITION

1/4" = 1'-0"

CHILLED WATER - ATTIC FLOOR PLAN - NEW WORK

DRAWING NOTES

1 REPLACE EXISTING TRANSMITTER WITH NEW.

2 CONNECT NEW MODULATING TWO-WAY CONTROL VALVE TO EXISTING CHILLED WATER RETURN PIPE.

3 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.

4 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE

WHERE SHOWN ON DRAWINGS.

NTS

CHILLED WATER - NEW WORK ISOMETRIC

NTS

CHILLED WATER - DEMOLITION ISOMETRIC

N

KEYPLAN

BUILDING 2

DN.DN.

Master - Ground Floor0' - 0"

Master - First Floor10' - 0"

Master - Ground Floor0' - 0"

PUMP ROOM

3A

TO/FROM

DISTRIBUTION LOOP

TO/FROM USERS

TO/FROM USERS

(E) 3CP-2

(E) 3CP-1

PUMP ROOM

3A

TO/FROM

DISTRIBUTION LOOP

TO/FROM USERS

TO/FROM USERS

(E) 3CP-2

(E) 3CP-1

TO/FROM

USERS

TO/FROM

USERS

TO/FROM

DISTRIBUTION

LOOP

(E) CHR

(E) CHS

(E) CHR

(E) CHS

(E) 3CP-2

(E) 3CP-1

3-WFCV-1

TO/FROM

USERS

TO/FROM

USERS

TO/FROM

DISTRIBUTION

LOOP

(E) CHR

(E) CHS

(E) CHR

(E) CHS

(E) 3CP-2

(E) 3CP-1

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE

NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.

E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS

SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:2

P M

03-M-101

MECHANICAL GROUND FLOOR PLAN -

DEMOLITION AND NEW WORK

UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - NEW WORK

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION

NTS

CHILLED WATER - NEW WORK ISOMETRIC

NTS

CHILLED WATER - DEMOLITION ISOMETRIC

N

KEYPLAN

BUILDING 3

Revisions: Date:

DRAWING NOTES

1 REPLACE EXISTING TRANSMITTER WITH NEW.

2 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE

WHERE SHOWN ON DRAWINGS.

3 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.

4 CONNECT NEW MODULATING TWO-WAY CONTROL VALVE TO EXISTING CHILLED WATER RETURN PIPE.

5 CONTRACTOR SHALL LOCATE EXISTING PDT IN SYSTEM AND REPLACE WITH NEW. CONNECT PDT TO

Master - First Floor10' - 0"

Master - Ground Floor0' - 0"

MECHANICAL

RM 5

(E) HWR

(E) HWS

MECHANICAL

RM 5

(E) 4CP-1

(E) HWS

(E) HWR

TO/FROM

DISTRIBUTION LOOP

FROM

AC-2

TO AC-2

(OTHER

USERS)

(E) CHS

(E) CHR

(E) CHR

(E) CHR/HWR UP

(E) 4"ø CHS

(E) 4"ø CHR

4-WFCV-1

4-CHWP-1

4-CHWP-2

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE

NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.

E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS

SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.

TO/FROM

DISTRIBUTION LOOP

FROM

AC-2

TO AC-2

(OTHER

USERS)

(E) CHS

(E) CHR

(E) CHR

(E) CHR/HWR UP

(E) 4"ø CHS

(E) 4"ø CHR

(E) 4CP-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:2

P M

04-M-101

MECHANICAL GROUND FLOOR PLAN -

DEMOLITION AND NEW WORK

UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

1/2" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - NEW WORK

1/2" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION

NTS

CHILLED WATER - NEW WORK ISOMETRIC

N

KEYPLAN

BUILDING 4

NTS

CHILLED WATER - DEMOLITION ISOMETRIC

Revisions: Date:

DRAWING NOTES

1 EXISTING AUMS INSTRUMENTATION. REMOVE AND RE-INSTALL AS REQUIRED.

2 EXISTING AIR RELEASE DRAIN

3 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE

WHERE SHOWN ON DRAWINGS.

4 CONNECT NEW MODULATING TWO-WAY CONTROL VALVE TO EXISTING CHILLED WATER RETURN PIPE.

5 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.

6 REMOVE EXISTING BASE MOUNTED PUMP, PIPING, AND SUCTION/DISCHARGE VALVES AND SPECIALTIES TO

POINT SHOWN.

7 REMOVE EXISTING 3-WAY VALVE.

8 REMOVE EXISTING CONTROL VALVE.

Master - First Floor10' - 0"

Master - Ground Floor0' - 0"

(E) 16CP-2

(E) 16CP-1

TO/FROM

DISTRIBUTION LOOP

TO/FROM

USERS

(E) 5"ø CHR (E) 5"ø CHS

(E) 5"ø CHS

(E) 5"ø CHR

(E) 5"ø CHS

(E) 5"ø CHS

(E) 16CP-2

(E) 16CP-1

(E) 5"ø CHS

(E) 5"ø CHR

(E) 5"ø CHS

(E) 5"ø CHRTO/FROM

DISTRIBUTION LOOP

TO/FROM

USERS

(E) 5"ø CHS

(E) 5"ø CHS

16-WFCV-1

(E) 16CP-1

(E) 16CP-2

TO/FROM

DISTRIBUTION LOOP

TO/FROM

USERS

(E) 16CP-2

(E) 16CP-1

(E) 5"ø CHS

(E) 5"ø CHR

(E) 5"ø CHS

(E) 5"ø CHRTO/FROM

DISTRIBUTION LOOP

TO/FROM

USERS

(E) 5"ø CHS

(E) 5"ø CHS

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE

NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.

E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS

SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:3

P M

16-M-101

MECHANICAL GROUND FLOOR PLAN -

DEMOLITION AND NEW WORK

UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - NEW WORK

NTS

CHILLED WATER - NEW WORK ISOMETRIC

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION

NTS

CHILLED WATER - DEMOLITION ISOMETRIC

N

KEYPLAN

BUILDING 16

Revisions: Date:

DRAWING NOTES

1 EXISTING AUMS INSTRUMENTATION. REMOVE AND RE-INSTALL AS REQUIRED.

2 REPLACE EXISTING TRANSMITTER WITH NEW.

3 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.

4 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE

WHERE SHOWN ON DRAWINGS.

5 NEW MAGNETIC FLOW METER. INSTALL AS RECOMMENDED BY MANUFACTURER.

6 NEW TEE WITH BRANCH UP (VERTICAL) TO 90 DEG FITTING.

7 REMOVE EXISTING 3-WAY VALVE.

8 CONTRACTOR SHALL LOCATE EXISTING PDT IN SYSTEM AND REPLACE WITH NEW. CONNECT PDT TO

Master - First Floor10' - 0"

Master - Ground Floor0' - 0" Master - Sub-Basement-5' - 0"

Master - First Floor10' - 0"

Master - Ground Floor0' - 0" Master - Sub-Basement-5' - 0"

Master - First Floor10' - 0"

Master - Ground Floor0' - 0"

(E) 4"ø CHS

(E) 4"ø CHS

(E) 4"ø CHS

(E) 4"ø CHS

(E) 17CP-1

(E) 17CP-2

(E) Air Separator

(E) CHS TO BUILDING

(E) CHS FROM PLANT

10a

(E) 4"ø CHS

(E) 4"ø CHS

(E) 17CP-1

(E) 17CP-2

(E) 4"ø CHS

(E) 4"ø CHS

(E) Air Separator

(E) CHS TO BUILDING

(E) CHS FROM PLANT

10a

4"ø CHR

6"ø CHR

(E) 6"ø CHS

(E) 6"ø CHR

(E) 4"ø CHR(E) 4"ø CHS

(E) 4"ø CHS

(E) 4"ø CHR

4"ø CHS

SVC RM

TO/FROM

DISTRIBUTION LOOP

(E) 6"ø CHS

(E) 6"ø CHR

(E) 4"ø CHR

(E) 4"ø CHS

(E) 4"ø CHR

(E) 4"ø CHS

(E) CHS/R TO BUILDING

SVC RM

TO/FROM

DISTRIBUTION LOOP

(E) 17CP-2

(E) 17CP-1

(E) 4"ø CHS

(E) 4"ø CHS

(E) 4"ø CHS

(E) 4"ø CHS

(E) CHS TO BUILDING

(E) CHS FROM PLANT

(E) 4"ø CHR

(E) 4"ø CHS

(E) CHS/R TO/FROM

DISTRIBUTION LOOP

(E) 6"ø CHS

(E) 6"ø CHR

(E) CHS/R UP

(E) CHS/R

(E) CHS/R TO

MECHANICAL

ROOM 4"ø CHS

4"ø CHR

6"ø CHR

(E) 4"ø CHR

(E) 4"ø CHS

17-WFCV-1

(E) 4"ø CHR

(E) 4"ø CHS

(E) CHS/R TO/FROM

DISTRIBUTION LOOP

(E) 6"ø CHS

(E) 6"ø CHR

(E) CHS/R UP

(E) CHS/R

(E) CHS/R TO

MECHANICAL

ROOM

(E) 4"ø CHR

(E) 4"ø CHS

(E) 17CP-2

(E) 17CP-1

(E) 4"ø CHS

(E) 4"ø CHS

(E) 4"ø CHS

(E) 4"ø CHS

(E) CHS TO BUILDING

(E) CHS FROM PLANT

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE

NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.

E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS

SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:3

P M

17-M-101

MECHANICAL GROUND FLOOR PLAN -

DEMOLITION AND NEW WORK

UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - NEW WORK

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION1/4" = 1'-0"

CHILLED WATER - SUB-BASEMENT PLAN - NEW WORK

1/4" = 1'-0"

CHILLED WATER - SUB-BASEMENT PLAN - DEMOLITION

NTS

CHILLED WATER - GROUND FLOOR - NEW WORK ISOMETRIC

NTS

CHILLED WATER - SUB-BASEMENT - NEW WORK ISOMETRIC

NTS

CHILLED WATER - SUB-BASEMENT - DEMOLITION ISOMETRIC

NTS

CHILLED WATER - GROUND FLOOR - DEMOLITION ISOMETRIC

N

KEYPLAN

BUILDING 17

Revisions: Date:

DRAWING NOTES

1 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE

WHERE SHOWN ON DRAWINGS.

2 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.

3 NEW MAGNETIC FLOW METER. INSTALL AS RECOMMENDED BY MANUFACTURER.

4 CONTRACTOR SHALL LOCATE EXISTING PDT IN SYSTEM AND REPLACE WITH NEW. CONNECT PDT TO

MECHANICAL ROOM

TO/FROM

DISTRIBUTION LOOP

TO/FROM

USERS

TO/FROM USERS (FIRST

FLOOR CHILLED WATER ONLY)

TO/FROM

USERS

MECHANICAL ROOM

TO/FROM

DISTRIBUTION LOOP

TO/FROM

USERS

TO/FROM USERS (FIRST

FLOOR CHILLED WATER ONLY)

TO/FROM

USERS

TO/FROM

DISTRIBUTION LOOP

TO/FROM USERS ("SECOND AND

GROUND FLOOR HEATING/COOLING;

FIRST FLOOR HEAT")

TO/FROM USERS ("FIRST

FLOOR CHILLED WATER ONLY")

(E) CHS

(E) CHR

TO/FROM

HOT WATER

BOILERS

(E) HWS

(E) HWR

TO/FROM USERS

("ATTIC ONLY")

(E) CHS

(E) CHR

CHW ONLY (VALVE OFF

DURING HEATING MONTHS

PER NOTE IN FIELD)

CHW AND HW

(SEASONAL)

25-CHWP/HWP-1

25-CHWP/HWP-2

25-CHWP-1

25-WFCV-1

TO/FROM

DISTRIBUTION LOOP

TO/FROM USERS ("SECOND AND

GROUND FLOOR HEATING/COOLING;

FIRST FLOOR HEAT")

TO/FROM USERS ("FIRST

FLOOR CHILLED WATER ONLY")

(E) CHS

(E) CHR

TO/FROM

HOT WATER

BOILERS

(E) HWS

(E) HWR

TO/FROM USERS

("ATTIC ONLY")

(E) CHS

(E) CHR

CHW ONLY (VALVE OFF

DURING HEATING MONTHS

PER NOTE IN FIELD)

CHW AND HW

(SEASONAL)

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE

NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.

E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS

SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:3

P M

25-M-101

MECHANICAL GROUND FLOOR PLAN -

DEMOLITION AND NEW WORK

UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - NEW WORK

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION

NTS

CHILLED WATER - NEW WORK ISOMETRIC

NTS

CHILLED WATER - DEMOLITION ISOMETRIC

N

KEYPLAN

BUILDING 25

Revisions: Date:

DRAWING NOTES

1 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.

2 ISOLATION VALVES TO BE REPLACED. CONTRACTOR SHALL ISOLATE CHILLED WATER SYSTEM FROM 4"

GATE VALVES NORTH OF BUILDING 17.

3 REMOVE EXISTING BASE MOUNTED PUMP, PIPING, AND SUCTION/DISCHARGE VALVES AND SPECIALTIES TO

POINT SHOWN.

Master - First Floor10' - 0"

Master - Ground Floor0' - 0"

TO/FROM

DISTRIBUTION LOOP

MECHANICAL ROOM

27-CHWP/HWP-2

27-CHWP/HWP-1

TO/FROM

DISTRIBUTION LOOP

MECHANICAL ROOM

(E) 27P-2

(E) 27P-1

(TYP)

"SUMMER - CLOSED

WINTER - OPEN"

(E) HWR

(E) HWS

TO/FROM

HOT WATER

BOILERS

(E) CHS

(E) HWR

(E) HWS

(E) CHR

(E) CHR

(E) CHS

(E) CHS

(E) CHR

27-CHWP/HWP-1

27-CHWP/HWP-2

27-WFCV-1

FROM

CHEMICAL

FEEDER

TO CHEMICAL

FEEDER

"SUMMER - CLOSED

WINTER - OPEN"

(E) HWR

(E) HWS

TO/FROM

HOT WATER

BOILERS

(E) CHS

(E) HWR

(E) HWS

(E) CHR

(E) CHR

(E) CHS

(E) CHR

(E) CHS

(E) 27P-2(E) 27P-1

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE

NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.

E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS

SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

LEXINGTON VA

MEDICAL CENTER

FRANKLIN R.

SOUSLEY CAMPUS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

A/E OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

L e x in g to n

C h ill e r P la n t_ M

E P k y le

.g u g g e n h e im .r v t

/1 /2

:3

:4

P M

27-M-101

MECHANICAL GROUND FLOOR PLAN -

DEMOLITION AND NEW WORK

UPGRADE CHILLER PLANT

2250 Leestown Road, Lexington KY

596-18-107

11/17/2020 PP KG

BID DOCUMENTS

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - NEW WORK

1/4" = 1'-0"

CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION

NTS

CHILLED WATER - NEW WORK ISOMETRIC

NTS

CHILLED WATER - DEMOLITION ISOMETRIC

N

KEYPLAN

BUILDING 27

Revisions: Date:

DRAWING NOTES

1 RECONNECT CHEMICAL FEEDER TO SUCTION AND DISCHARGE OF NEW PUMPS.

2 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.

3 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE

WHERE SHOWN ON DRAWINGS.

4 CONNECT NEW MODULATING TWO-WAY CONTROL VALVE TO EXISTING CHILLED WATER RETURN PIPE.

5 REMOVE EXISTING BASE MOUNTED PUMP, PIPING, AND SUCTION/DISCHARGE VALVES AND SPECIALTIES TO

POINT SHOWN.

6 REMOVE EXISTING 3-WAY VALVE.

4.2 6 7 7.37.154

H

I

J

H.1

I.1

(E) 6"ø CHS

(E) 6"ø CHR

(E) 6"ø CHS

(E) 6"ø CHR

TO/FROM

DISTRIBUTION LOOP

TO/FROM

USERS

28-CHP2

28-CHP1

6"ø

28-WFCV-1

GENERAL NOTES

A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.

PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS

FOR BOTH CHILLER PLANT AND OUT BUILDINGS.

B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED

ON EACH VIEW.

C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING

PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.

D…

This is the start of the file's text. The full file is on GovTribe.