This document package includes plans and specifications for the construction project to upgrade the chiller plant at the Lexington VA Medical Center in Lexington, Kentucky. The project involves replacing and upgrading chillers, pumps, piping, controls and related mechanical equipment in Building 67 to improve the efficiency of the central chilled water plant. Bidders are required to thoroughly review the drawings and specifications calling out demolition and new construction work. The project will be carried out in phases to maintain operations, with some planned shutdowns over weekends or winter months. The solicitation number is 36C24922R0094 and was issued by the Department of Veterans Affairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign In.pdf | ||
| Solicitation Questions and Answers.pdf | ||
| 36C24922R0094 0001.docx | DOCX document | |
| 36C24922R0094_1.docx | DOCX document | |
| Statement of Work.pdf | ||
| Project Specifications.pdf | ||
| Pricing Schedule.xlsx | XLSX spreadsheet | |
| Past Performance Questionnaire.pdf | ||
| Wage Determination KY20220090 08-05-2022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 20
BUILDING 39
BUILDING 113
BUILDING 47
BUILDING 48
BUILDING 41
BUILDING 22
BUILDING 37
BUILDING 117
BUILDING 115
BUILDING 74
BUILDING 69
BUILDING 12
BUILDING 5
BUILDING 8
BUILDING 7
BUILDING 6
BUILDING 122
BUILDING 67
BUILDING 29
BUILDING 28
BUILDING 27
BUILDING 16
BUILDING 17
BUILDING 25
BUILDING 2
BUILDING 1
BUILDING 3
BUILDING 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:0
P M
G-001
COVER SHEET UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
10/23/2020 PP KG
BID DOCUMENTS
SITE PLAN
UPGRADE CHILLER PLANT
VA PROJECT: 596-18-107
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
G-001 COVER SHEET
G-002 SITE PLAN - CONTRACTOR STAGING AREAS
MECHANICAL
M-001 MECHANICAL LEGEND
M-101 MECHANICAL SITE PLAN - CHILLED WATER CIRCULATION LOOP - NEW WORK
01-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK
02-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK
02-M-103 MECHANICAL ATTIC FLOOR PLAN - DEMOLITION AND NEW WORK
03-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK
04-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK
16-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK
17-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK
25-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK
27-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK
28-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK
29-M-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION AND NEW WORK
67-MD-101 MECHANICAL GROUND FLOOR PLAN - DEMOLITION
67-MD-102 MECHANICA ROOF FLOOR PLAN - DEMOLITION
67-M-101 MECHANICAL GROUND FLOOR PLAN - NEW WORK
67-M-102 MECHANICAL ROOF FLOOR PLAN - NEW WORK
M-301 MECHANICAL SECTIONS
M-501 MECHANICAL PIPING SCHEMATIC - DEMOLITION
M-502 MECHANICAL PIPING SCHEMATIC - NEW WORK
M-503 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-701 CONTROLS LEGEND AND SEQUENCE OF OPERATIONS
M-702 CONTROL DIAGRAM (CHILLED WATER PLANT)
M-703 CONTROL DIAGRAM (BUILDING CONTROLS)
ELECTRICAL
E-001 ELECTRICAL LEGEND AND ABBREVIATIONS
04-E-101 ELECTRICAL GROUND FLOOR PLAN
25-E-101 ELECTRICAL GROUND FLOOR PLAN
27-E-101 ELECTRICAL GROUND FLOOR PLAN
29-E-101 ELECTRICAL GROUND FLOOR PLAN
67-E-101 ELECTRICAL GROUND FLOOR PLAN
67-E-102 ELECTRICAL ROOF PLAN
E-601 ELECTRICAL SCHEDULES
GROUND SUPERVISOR
ELECTRICAL SHOP SUPERVISOR
INDUSTRIAL HYGIENE
UNION SAFETY REPRESENTATIVE
CHIEF, FIRE SERVICE
CHIEF, POLICE SERVICE
SAFETY SPECIALIST
GEMS COORDINATOR
PATIENT SAFETY MANAGER
INFECTION CONTROL OFFICER
CHIEF, ENVIRONMENTAL MANAGEMENT SECTION
CHIEF, ENGINEERING SECTION
CHIEF, FMS
CHIEF OF STAFF
ASSOCIATE DIRECTOR
DIRECTOR
PROJECT # 596-18-107 SIGNATURE DATE
APPROVALS
N
LEXINGTON KENTUCKY VETERANS AFFAIRS MEDICAL CENTER
LEXINGTON VA MEDICAL CENTER
SOUSLEY CAMPUS
2250 LEESTOWN ROAD
LEXINGTON, KENTUCKY 40511
Revisions: Date:
BUILDING 20
BUILDING 39
BUILDING 113
BUILDING 67
BUILDING 47
BUILDING 48
BUILDING 41
BUILDING 22
PROJECT 596-18-107
STAGING: APPROX. 750 SQFT
BUILDING 67
"CONTRACTOR VILLAGE"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:0
P M
G-002
SITE PLAN - CONTRACTOR STAGING AREAS UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
10/23/20 PP KG
BID DOCUMENTS
1" = 40'-0"
SITE PLAN - CONTRACTOR STAGING AREAS N
1. CONTRACTORS AND SUBCONTRACTORS SHALL PARK IN THE “CONTRACTOR VILLAGE” AREA.
OUTLINE SHOWN ON SITE PLAN.
2. CONTRACTOR MAY STAGE WITHIN THE CHILLER PLANT AND THE APPROX. 750 SQ FT OF
STAGING AREA TO ONE SIDE OF THE CHILLER PLANT DRIVEWAY SHOWN ON SITE PLAN.
3. STAGING LOCATIONS SHALL BE AGREED TO BY COR AND CONTRACTOR. THE CONTRACTOR
DOES NOT TAKE POSSESSION OF BUILDING 67 AND, THEREFORE, HAS TO MAINTAIN ACCESS
TO EQUIPMENT, MAINTAIN ACCESS SPACE FOR ENGINEERING SERVICE CONTRACTOR TO
CLEAN CHILLER TUBES DURING HEATING SEASON, MAINTAIN PATH FOR UTILITY SYSTEMS
OPERATORS TO ENTER/EXIT THE BUILDING, ETC.
4. FOR TRASH WASTE, RECYCLED MATERIAL HOLDING, NEW MATERIAL HOLDING, ETC. THE
CONTRACTOR WILL USE THE APPROX. 750 SQ FT SHOWN ON THE PLAN. THE CONTRACTOR
SHALL FENCE THE PERIMETER WITH TEMPORARY 8 FOOT FENCE AND INSTALL A GRAVEL BED
FOR SUPPORT OF DUMPSTERS AND STORED ITEMS, AND TO RESTORE THE AREA FOLLOWING
REMOVAL OF ALL ITEMS AND TEMPORARY FENCING.
5. RESTORATION SHALL CONSIST OF REMOVING GRAVEL BED, LEVELING SOIL TO REMOVE RUTS, AND SEEDING WITH STRAW COVERING AS NEEDED SO THE AREA WILL BE GRASS COVERED.
GRASS SEED SHALL MATCH STATION TYPICAL SPECIES AND SHALL BE SUBMITTED TO COR
APPROVAL.
CONTRACTOR STAGING NOTES:
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AUMS ADVANCED UTILITY METERING SYSTEM
B BOILER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CD CEILING DIFFUSER
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CT COOLING TOWER
CU CONDENSING UNIT
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWCLS CHILLED WATER CIRCULATION LOOP SYSTEM
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING TOWER)
CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EJ EXPANSION JOINT
ENT ENTERING
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
FA FREE AREA
FC FLEXIBLE CONNECTION
FD FLOOR DRAIN
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
GA GAUGE
GAL GALLONS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
ABBREVIATIONS
I/O INPUT/OUTPUT
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR METERS/SECOND)
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MTD MEAN TEMPERATURE DIFFERENCE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
Nm NEWTON METER
NO NORMALLY OPEN
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
P PUMP
Pa PASCAL
PD PRESSURE DROP
PDT PRESSURE DIFFERENTIAL TRANSMITTER
PG PRESSURE GAGE
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PT PRESSURE TRANSMITTER
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RV RELIEF VALVE
SAN SANITARY
SI SQUARE INCHES
SP GR SPECIFIC GRAVITY
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
SSR SOLID SEPARATOR
TAB TESTING, ADJUSTING, BALANCE
TDH TOTAL DYNAMIC HEAD
TDV TRIPLE DUTY VALVE
TT TEMPERATURE TRANSMITTER
UL UNDERWRITERS LABORATORY
V VALVE
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VPS VARIABLE PRIMARY SYSTEM
VSD VARIABLE SPEED DRIVE
VSMC VARIABLE SPEED MOTOR CONTROL
W WATTS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WFCV WATER FLOW CONTROL VALVE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
DRAWING SYMBOLS
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
H4
H7
A
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HOT WATER HEATING SUPPLY
CONDENSATE PUMP DISCHARGE
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
VENT LINE
SOLAR WATER RETURN
SOLAR WATER SUPPLY
GLYCOL-WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
REFRIGERANT SUCTION
REFRIGERANT HOT GAS
REFRIGERANT LIQUID
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
MAKE-UP WATER
CONDENSER WATER RETURN (TO TOWER)
CHILLED GLYCOL-WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
CONDENSER WATER SUPPLY (FROM TOWER)
HOT WATER HEATING RETURN
S-60
CR-60
S-30
CR-30
S-15
CR-15
PC
HWS
HWR
GHS
GHR
V
SWS
SWR
CWR
CHR
GCR
RL
RS
RHG
CWS
CHS
GCS
MW
D
GLYCOL-WATER RUN AROUND SUPPLY
GLYCOL-WATER RUN AROUND RETURNGRR
GRS
X EXISTING PIPE TO BE REMOVED
PIPING SYMBOLS
QUICK-COUPLE HOSE CONNECTOR
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
VENTURI FLOW METER
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
PIPE UP
PIPE DOWN
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
AV
MANUAL AIR VENTMV
THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
GENERAL PIPING SYMBOLS
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
LC
M
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
WYE STRAINER WITH VALVED DRAIN AND
QUICK-COUPLE HOSE CONNECTOR
VALVE SYMBOLS
TEMPERATURE TRANSMITTERTT
GENERAL
A. THE FOLLOWING NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS
B. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED
TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON
THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.
C. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC
AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
D. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE
WITH MANUFACTURERS’ RECOMMENDATIONS, CONTRACT DOCUMENTS, AND
APPLICABLE CODES AND REGULATIONS.
E. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT
TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.
F. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO, AND
WITHIN 50 FT OF, ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND
ANCHOR POINTS) THROUGHOUT MECHANICAL EQUIPMENT ROOMS.
G. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,
STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT
DOCUMENT DRAWINGS.
H. MAINTAIN A MINIMUM 7 FT CLEARANCE TO THE UNDERSIDE OF PIPES, DUCTS,
CONDUITS, SUSPENDED EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN
MECHANICAL ROOMS. PIPING IN HIGH BAY AREAS SHALL BE SUPPORTED AT THE
HEIGHTS INDICATED ON THE DRAWINGS.
I. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR
PIPING INSULATION IS APPLIED.
J. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN
ACCESSIBLE LOCATION WITH THE STRAIGHT SECTION OF PIPE OR DUCT UP-AND
DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.
K. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED,
THE PRODUCT OF ONE MANUFACTURER SHALL BE USED.
L. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED
DRAWINGS.
M. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED FOR
FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATION.
N. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE
SIZED AND LOCATED BY THE MECHANICAL CONTRACTOR. MINIMUM CONCRETE
PAD THICKNESS SHALL BE 6 IN. PAD SHALL EXTEND BEYOND THE EQUIPMENT A
MINIMUM OF 6 IN. ON EACH SIDE. CONCRETE HOUSEKEEPING PADS SHALL BE
PROVIDED BY THE GENERAL CONTRACTOR. IT SHALL BE THE RESPONSIBILITY OF
THE MECHANICAL CONTRACTOR TO COORDINATE THE SIZE AND LOCATION OF
CONCRETE HOUSEKEEPING PADS WITH THE GENERAL CONTRACTOR. SEE DETAILS
ON M-502 FOR ADDITIONAL REQUIREMENTS.
O. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE
APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST
CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE
CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING
INSTALLED. DO NOT SCALE DRAWINGS.
P. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND
AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS
OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL
CONTRACTOR.
Q. ALL EQUIPMENT, PIPING, DUCTWORK. ETC., SHALL BE SUPPORTED AS DETAILED,
SPECIFIED, AND REQUIRED TO PROVIDE A VIBRATION-FREE INSTALLATION.
R. MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED
FROM A METAL DECK.
S. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT
INSTALLATION.
T. ADDITIONAL GENERAL NOTES ON DRAWINGS
DEMOLITION
A. REMOVE ALL HANGERS, SUPPORTS, TUBING, AND CONTROL DEVICES ASSOCIATED
WITH EQUIPMENT TO BE REMOVED.
B. WORK MUST BE COORDINATED WITH OWNER TO MAINTAIN OPERATION OF THE
FACILITY. PROVIDE AT LEAST 14 DAYS ADVANCE NOTICE TO THE COR FOR ANY
UTILITY SHUT DOWN.
C. ASBESTOS ON EXISTING PIPING, DUCT, AND EQUIPMENT SHALL BE REMOVED
BACK TO MAIN BY ABATEMENT CONTRACTOR AND NEEDS TO BE RE-INSULATED BY
THE MECHANICAL CONTRACTOR. WORK TO BE COORDINATED WITH ABATEMENT
CONTRACTOR. REFER TO SPECIFICATIONS 02 81 11 (TRADITIONAL ASBESTOS
ABATEMENT) FOR ITEMS REQUIRING ABATEMENT.
D. PROTECT EXISTING PLUMBING, STEAM, AND CONDENSATE LINES FROM FREEZING
WHILE HEATING SYSTEM IS OUT OF SERVICE.
E. PIPING ADJACENT TO DEMOLITION SCOPE SHALL BE LEFT IN OPERATIONAL
CONDITION. REPAIR INSULATION AND VERIFY SUPPORTS REMAIN AS REQUIRED
PER SPECIFICATION.
PIPING
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED
TO INSTALL COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE
DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.
B. PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN THE HEATING-
WATER, CHILLED-WATER, AND OTHER CLOSED-WATER PIPING SYSTEMS. ALL
PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES AT THE
BOTTOM OF ALL RISERS AND LOW POINTS.
C. ALL PIPING IN MECHANICAL SPACES IS OVERHEAD, TIGHT TO THE UNDERSIDE OF
THE STRUCTURE OR SLAB, WITH SPACE FOR INSULATION IF REQUIRED. PIPING IN
HIGH BAY AREAS (SUCH AS CHILLER PLANT) SHALL BE INSTALLED AT THE HEIGHTS
INDICATED ON THE DRAWINGS.
D. INSTALL PIPING SO ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND
OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
E. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS IN SERVICE WHEN
EQUIPMENT OR PIPING ON THE EQUIPMENT SIDE OF THE VALVE IS REMOVED
F. PROVIDE CHAIN OPERATORS FOR ALL VALVES 6" AND LARGER IN EQUIPMENT
ROOMS MOUNTED GREATER THAN 8'0" ABOVE FLOOR LEVEL. CHAIN SHALL EXTEND
TO 7'0" ABOVE FLOOR LEVEL.
G. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE THE FULL SIZE
OF THE PIPE BEFORE REDUCING IN SIZE TO MAKE CONNECTIONS TO EQUIPMENT
AND CONTROLS.
H. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT
AND IN BYPASSES TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS.
I. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
J. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
K. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
L. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS
IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST
TO THE OWNER.
M. PROVIDE A LINE SIZE STRAINER UPSTREAM OF EACH AUTOMATIC VALVE.
N. ALL BUILDINGS IN SCOPE HAVE FLOW (STRAP-ON ULTRASONIC) AND
TEMPERATURE METERING TO A SITE UTILITY METERING SYSTEM THAT ARE
SEPERATE FROM THE BUILDING AUTOMATION CONTROL SYSTEM.
INSTRUMENTATION SHALL BE REMOVED, PROTECTED, AND REPLACED WHERE
INDICATED.
O. INSULATION ON EXTERIOR INSULATED PIPING SHALL CONTINUE THROUGH ROOF
OR WALL PENETRATION MINIMUM 18" BEYOND INTERIOR SURFACE.
GENERAL NOTES
GENERAL MECHANICAL PHASING
A. COORDINATE WORK WITH COR MINIMUM TWO (2) WEEKS PRIOR TO TAKING ANY
EQUIPMENT OFFLINE.
B. CONTRACTOR SHALL COMPLY WITH ALL PHASING REQUIREMENTS IDENTIFIED IN
CONTRACT DOCUMENTS INCLUDING SPECIFICATIONS AND DRAWING SPECIFIC
NOTES.
BUILDING 67 (CHILLER PLANT)
A. WORK ON PUMPS AND COOLING TOWERS SHALL BE PERFORMED ONE AT A TIME
WHILE CHILLER PLANT REMAINS OPERATIONAL. CONTRACTOR SHALL VERIFY
POSITIVE ISOLATION OF EXISTING VALVING PRIOR TO SCHEDULING WORK. FULL
SYSTEM SHUTDOWNS FOR THIS WORK MAY BE PERMISSIBLE IF APPROVED BY THE
COR.
B. BYPASS AND FLOW METER WORK WILL REQUIRE SHUT DOWN OF CHILLER PLANT.
C. OUTAGES SHALL BE PERFORMED DURING HEATING (WINTER) MONTHS ON A
SCHEDULE APPROVED BY THE VA.
D. THE GENERAL CONTRACTOR WILL NEED TO COORDINATE CONSTRUCTION
ACTIVITY TO NOT INTERFERE WITH SEASONAL SERVICING OF CHILLERS.
BUILDINGS 1, 2, 3, 4, 16, 17, 25, 27, 28, 29
A. SOME WORK IN THESE BUILDINGS WILL REQUIRE SHUT DOWN OF CHILLED AND/OR
HOT WATER DISTRIBUTION SYSTEM. CONTRACTOR SHALL COORDINATE OUTAGES
WITH COR TO MINIMIZE DISRUPTIONS TO BUILDING COOLING AND HEATING
SYSTEMS.
B. WORK MAY BE PERFORMED IN B27 AND B29 ON WEEKDAYS. OTHERS MAY REQUIRE
WEEKEND OUTAGES.
C. CONTRACTOR IS REQUIRED TO PROVIDE TEMPORARY HEATING AND/OR COOLING
TO THE FACILITY IF DURATION OF OUTAGE COULD RESULT IN DAMAGE TO
BUILDING (EX: WATER PIPE FREEZING).
D. CONTRACTOR MAY TAKE PUMPS OFFLINE ONE AT A TIME WHERE POSSIBLE.
CONTRACTOR SHALL VERIFY POSITIVE ISOLATION OF EXISTING VALVING.
CONTROLS
A. THE EXISTING METASYS CONTROLS SYSTEM SHALL BE UTILIZED DURING
CONSTRUCTION TO MAINTAIN OPERATION OF THE CENTRAL CHILLER PLANT.
CHILLER PLANT OPTIMIZATION SOFTWARE SHOULD BE COMISSIONED WHEN
EQUIPMENT IS INSTALLED AND APPROVED BY THE COR.
B. CONTROLS FOR BUILDING TEMPERATURE CONTROL SHALL BE COMISSIONED AS
EACH BUILDING IS RETURNED TO SERVICE.
PHASING
NOTE:
ALL SYMBOLS AND ABBREVIATIONS
ARE SUBJECT TO MODIFICATIONS
ON OTHER DRAWINGS. NOT ALL
SYMBOLS AND ABBREVIATIONS
SHOWN ON THIS SHEET ARE USED
IN THIS PROJECT.
SANITARYSAN
HEAT TRACING
ASBESTOS ABATEMENT
ASBESTOS-CONTAINING MATERIALS (ACM) ARE NOT EXPECTED TO BE ENCOUNTERED
DURING THE COURSE OF THE WORK. PRIOR ASBESTOS SURVEY/SAMPLING EVENTS WITHIN
THE EXPECTED PATH OF CONSTRUCTION HAD NOT REVEALED READILY ACCESSIBLE ACM.
HOWEVER, IF THE CONTRACTOR ENCOUNTERS MATERIALS WHICH ARE BELIEVED TO BE
ASBESTOS (SUSPECT ACM), THE CONTRACTOR SHALL FIRST CONTACT THE COR FOR
DISCUSSION AND DIRECTION PRIOR TO DISTURBING. IF ACM IS IDENTIFIED AS A RESULT OF
TESTING AND WILL NEED TO BE REMOVED TO FACILITATE THE PROJECT, A CONTRACTION
MODIFICATION MAY BE APPLICABLE. REFERENCE SPECIFICATIONS 02 82 11 "TRADITIONAL
ASBESTOS ABATEMENT" AND 02 82 13.13 "GLOVEBAG ASBESTOS ABATEMENT" FOR REMOVAL
REQUIREMENTS THAT SHALL BE FOLLOWED.
LEAD PAINT
LEAD-CONTAINING PAINT MUST BE ASSUMED ON ALL PAINTED SURFACES. CONTRACTOR IS
RESPONSIBLE FOR FOLLOWING SAFE WORK PRACTICES AND FOR ADDRESSING LEAD PAINT
AT ALL LOCATIONS TO BE DISTURBED. CONTRACTOR SHALL INCLUDE PROCEDURES FOR
INCIDENTAL LEAD ABATEMENT IN THE CONTRACTOR PROVIDED SAFETY MANUAL (SUBJECT
TO APPROVAL BY THE COR).
HAZARDOUS MATERIALS
LIMIT OF DEMOLITION
POINT OF CONNECTION TO EXISTING
PRESSURE DIFFERENTIAL TRANSMITTERPDT
PRESSURE TRANSMITTERPT
TEMPERATURE TRANSMITTERTT
TRIPLE DUTY VALVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:0
P M
M-001
MECHANICAL LEGEND UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
L
ELEV
UP
WM
S to c k a n d
In s tru m e n ts
BUILDING 1
BUILDING 3
(E) 6"ø CWCLS
(E) 6"ø CWCLS
(E) 4"ø CHS
(E) 4"ø CHR
MECHANICAL ROOM
WALKWAY BETWEEN
BUILDING 1 AND BUILDING 3
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE
NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.
E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS
SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:1
P M
M-101
MECHANICAL SITE PLAN - CHILLED WATER
CIRCULATION LOOP - NEW WORK
UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
DRAWING NOTES
1 INSTALL NEW PRESSURE DIFFERENTIAL TRANSMITTER IN WALKWAY CRAWL SPACE. CONTRACTOR TO CONNECT INSTRUMENT SIGNAL TO BAS CONTROLLER IN BUILDING 1 GROUND FLOOR MECHANICAL ROOM.
1/8" = 1'-0"
CHILLED WATER - SITE PLAN
N
Master - Ground Floor0' - 0" Master - Sub-Basement-5' - 0"
Master - Ground Floor0' - 0" Master - Sub-Basement-5' - 0"
MECHANICAL ROOM
(E) 6"ø CHS DN
(E) 3"ø CHR DN
(E) 6"ø CHS DN
CORRIDOR
CG13
(E) CWP-1 (E) CWP-2
TO/FROM USERS
TO/FROM USERS
TO/FROM
DISTRIBUTION
LOOP
(E) CHS
TO/FROM
USERS
(E) CHR
TO/FROM
USERS
(E) CWP-2
(E) CWP-1
(E) 2"ø CHS
(E) 2"ø CHR
(E) 3"ø CHR
(E) 3"ø CHS
(E) 6"ø CHS
(E) 3"ø CHR
(E) 6"ø CHS
TO DRAIN
(E) CHR
(E) CHS
6"ø CHR
ROLLED TEE TO
45 DEG UP
1-WFCV-1
MECHANICAL ROOM
(E) 6"ø CHS DN
(E) 3"ø CHR DN
(E) 6"ø CHS DN
CORRIDOR
CG13
(E) CWP-1 (E) CWP-2
TO/FROM USERS
TO/FROM USERS
(E) 6"ø CHS UP
(E) 3"ø CHR UP
(E) 6"ø CHS UP
CHR BELOW CHS PIPING
6"ø CHR
(E) 6"ø CHR
(E) 6"ø CHS
6"ø CHS
(E) 6"ø CHS UP
(E) 3"ø CHR UP
(E) 6"ø CHS UP
TO/FROM
DISTRIBUTION
LOOP
CHR BELOW CHS PIPING
(E) 6"ø CHR
(E) 6"ø CHS
TO/FROM
DISTRIBUTION
LOOP
(E) CHS
TO/FROM
USERS
(E) CHR
TO/FROM
USERS
(E) CWP-2
(E) CWP-1
(E) 2"ø CHS
(E) 2"ø CHR
(E) 3"ø CHR
(E) 3"ø CHS
(E) 6"ø CHS
(E) 3"ø CHR
(E) 6"ø CHS
TO DRAIN
(E) CHR
(E) CHS
ROLLED TEE TO
45 DEG UP
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE
NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.
E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS
SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:1
P M
01-M-101
MECHANICAL GROUND FLOOR PLAN -
DEMOLITION AND NEW WORK
UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - NEW WORK
NTS
CHILLED WATER - NEW WORK ISOMETRIC
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION
1/4" = 1'-0"
CHILLED WATER - SUB-BASEMENT PLAN - NEW WORK
1/4" = 1'-0"
CHILLED WATER - SUB-BASEMENT PLAN - DEMOLITION
NTS
CHILLED WATER - DEMOLITION ISOMETRIC
N
KEYPLAN
BUILDING 1
Revisions: Date:
DRAWING NOTES
1 REPLACE EXISTING TRANSMITTER WITH NEW.
2 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.
3 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE
WHERE SHOWN ON DRAWINGS.
4 NEW MAGNETIC FLOW METER. INSTALL AS RECOMMENDED BY MANUFACTURER.
5 CONTRACTOR SHALL LOCATE EXISTING PDT IN SYSTEM AND REPLACE WITH NEW. CONNECT PDT TO
BUILDING AUTOMATION SYSTEM FOR BUILDING PUMP SPEED CONTROL.
UPUP
Master - First Floor10' - 0"
Master - Ground Floor0' - 0"
Master - First Floor10' - 0"
Master - Ground Floor0' - 0"
TO/FROM
ATTIC
TO/FROM
DISTRIBUTION
LOOP
TO/FROM
ATTIC
TO/FROM
DISTRIBUTION
LOOP
(E) 4"ø CHR
(E) 4"ø CHS
TO/FROM
ATTIC
TO/FROM
DISTRIBUTION LOOP
(E) 4"ø CHR
(E) 4"ø CHS
TO/FROM
ATTIC
TO/FROM
DISTRIBUTION LOOP
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE
NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.
E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS
SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:1
P M
02-M-101
MECHANICAL GROUND FLOOR PLAN -
DEMOLITION AND NEW WORK
UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
1/4" = 1'-0"
CHILLED WATER - PUMP ROOM FLOOR PLAN - NEW WORK
1/4" = 1'-0"
CHILLED WATER - PUMP ROOM FLOOR PLAN - DEMOLITION
NTS
CHILLED WATER - NEW WORK ISOMETRIC
NTS
CHILLED WATER - DEMOLITION ISOMETRIC
N
KEYPLAN
BUILDING 2
Revisions: Date:
DRAWING NOTES
1 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE
WHERE SHOWN ON DRAWINGS.
2 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.
3 NEW MAGNETIC FLOW METER. INSTALL AS RECOMMENDED BY MANUFACTURER.
DN DN
B02 - Attic30' - 0"
B02 - Attic30' - 0"
2CWP-22CWP-1
(E) 4"ø CHR DN
(E) 4"ø CHS DN
(E) 4"ø CHS
(E) 4"ø CHR
TO/FROM USERS
ATTIC
2CWP-2
2CWP-1
(E) 4"ø CHR DN
(E) 4"ø CHS DN
(E) 4"ø CHS
(E) 4"ø CHR
TO/FROM USERS
ATTIC
TO/FROM
PUMP ROOM
TO/FROM
USERS
(E) CHR
(E) CHS
2CWP-2
2CWP-1
(E) CHR
(E) CHS
(E) CHS
(E) CHR
2-WFCV-1
TO/FROM
PUMP ROOM
TO/FROM
USERS
(E) CHR
(E) CHS
2CWP-2
2CWP-1
(E) CHR
(E) CHS
(E) CHS
(E) CHR
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE
NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.
E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS
SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:2
P M
02-M-103
MECHANICAL ATTIC FLOOR PLAN -
DEMOLITION AND NEW WORK
UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
1/4" = 1'-0"
CHILLED WATER - ATTIC FLOOR PLAN - DEMOLITION
1/4" = 1'-0"
CHILLED WATER - ATTIC FLOOR PLAN - NEW WORK
DRAWING NOTES
1 REPLACE EXISTING TRANSMITTER WITH NEW.
2 CONNECT NEW MODULATING TWO-WAY CONTROL VALVE TO EXISTING CHILLED WATER RETURN PIPE.
3 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.
4 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE
WHERE SHOWN ON DRAWINGS.
NTS
CHILLED WATER - NEW WORK ISOMETRIC
NTS
CHILLED WATER - DEMOLITION ISOMETRIC
N
KEYPLAN
BUILDING 2
DN.DN.
Master - Ground Floor0' - 0"
Master - First Floor10' - 0"
Master - Ground Floor0' - 0"
PUMP ROOM
3A
TO/FROM
DISTRIBUTION LOOP
TO/FROM USERS
TO/FROM USERS
(E) 3CP-2
(E) 3CP-1
PUMP ROOM
3A
TO/FROM
DISTRIBUTION LOOP
TO/FROM USERS
TO/FROM USERS
(E) 3CP-2
(E) 3CP-1
TO/FROM
USERS
TO/FROM
USERS
TO/FROM
DISTRIBUTION
LOOP
(E) CHR
(E) CHS
(E) CHR
(E) CHS
(E) 3CP-2
(E) 3CP-1
3-WFCV-1
TO/FROM
USERS
TO/FROM
USERS
TO/FROM
DISTRIBUTION
LOOP
(E) CHR
(E) CHS
(E) CHR
(E) CHS
(E) 3CP-2
(E) 3CP-1
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE
NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.
E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS
SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:2
P M
03-M-101
MECHANICAL GROUND FLOOR PLAN -
DEMOLITION AND NEW WORK
UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - NEW WORK
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION
NTS
CHILLED WATER - NEW WORK ISOMETRIC
NTS
CHILLED WATER - DEMOLITION ISOMETRIC
N
KEYPLAN
BUILDING 3
Revisions: Date:
DRAWING NOTES
1 REPLACE EXISTING TRANSMITTER WITH NEW.
2 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE
WHERE SHOWN ON DRAWINGS.
3 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.
4 CONNECT NEW MODULATING TWO-WAY CONTROL VALVE TO EXISTING CHILLED WATER RETURN PIPE.
5 CONTRACTOR SHALL LOCATE EXISTING PDT IN SYSTEM AND REPLACE WITH NEW. CONNECT PDT TO
Master - First Floor10' - 0"
Master - Ground Floor0' - 0"
MECHANICAL
RM 5
(E) HWR
(E) HWS
MECHANICAL
RM 5
(E) 4CP-1
(E) HWS
(E) HWR
TO/FROM
DISTRIBUTION LOOP
FROM
AC-2
TO AC-2
(OTHER
USERS)
(E) CHS
(E) CHR
(E) CHR
(E) CHR/HWR UP
(E) 4"ø CHS
(E) 4"ø CHR
4-WFCV-1
4-CHWP-1
4-CHWP-2
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE
NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.
E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS
SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.
TO/FROM
DISTRIBUTION LOOP
FROM
AC-2
TO AC-2
(OTHER
USERS)
(E) CHS
(E) CHR
(E) CHR
(E) CHR/HWR UP
(E) 4"ø CHS
(E) 4"ø CHR
(E) 4CP-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:2
P M
04-M-101
MECHANICAL GROUND FLOOR PLAN -
DEMOLITION AND NEW WORK
UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
1/2" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - NEW WORK
1/2" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION
NTS
CHILLED WATER - NEW WORK ISOMETRIC
N
KEYPLAN
BUILDING 4
NTS
CHILLED WATER - DEMOLITION ISOMETRIC
Revisions: Date:
DRAWING NOTES
1 EXISTING AUMS INSTRUMENTATION. REMOVE AND RE-INSTALL AS REQUIRED.
2 EXISTING AIR RELEASE DRAIN
3 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE
WHERE SHOWN ON DRAWINGS.
4 CONNECT NEW MODULATING TWO-WAY CONTROL VALVE TO EXISTING CHILLED WATER RETURN PIPE.
5 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.
6 REMOVE EXISTING BASE MOUNTED PUMP, PIPING, AND SUCTION/DISCHARGE VALVES AND SPECIALTIES TO
POINT SHOWN.
7 REMOVE EXISTING 3-WAY VALVE.
8 REMOVE EXISTING CONTROL VALVE.
Master - First Floor10' - 0"
Master - Ground Floor0' - 0"
(E) 16CP-2
(E) 16CP-1
TO/FROM
DISTRIBUTION LOOP
TO/FROM
USERS
(E) 5"ø CHR (E) 5"ø CHS
(E) 5"ø CHS
(E) 5"ø CHR
(E) 5"ø CHS
(E) 5"ø CHS
(E) 16CP-2
(E) 16CP-1
(E) 5"ø CHS
(E) 5"ø CHR
(E) 5"ø CHS
(E) 5"ø CHRTO/FROM
DISTRIBUTION LOOP
TO/FROM
USERS
(E) 5"ø CHS
(E) 5"ø CHS
16-WFCV-1
(E) 16CP-1
(E) 16CP-2
TO/FROM
DISTRIBUTION LOOP
TO/FROM
USERS
(E) 16CP-2
(E) 16CP-1
(E) 5"ø CHS
(E) 5"ø CHR
(E) 5"ø CHS
(E) 5"ø CHRTO/FROM
DISTRIBUTION LOOP
TO/FROM
USERS
(E) 5"ø CHS
(E) 5"ø CHS
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE
NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.
E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS
SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:3
P M
16-M-101
MECHANICAL GROUND FLOOR PLAN -
DEMOLITION AND NEW WORK
UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - NEW WORK
NTS
CHILLED WATER - NEW WORK ISOMETRIC
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION
NTS
CHILLED WATER - DEMOLITION ISOMETRIC
N
KEYPLAN
BUILDING 16
Revisions: Date:
DRAWING NOTES
1 EXISTING AUMS INSTRUMENTATION. REMOVE AND RE-INSTALL AS REQUIRED.
2 REPLACE EXISTING TRANSMITTER WITH NEW.
3 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.
4 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE
WHERE SHOWN ON DRAWINGS.
5 NEW MAGNETIC FLOW METER. INSTALL AS RECOMMENDED BY MANUFACTURER.
6 NEW TEE WITH BRANCH UP (VERTICAL) TO 90 DEG FITTING.
7 REMOVE EXISTING 3-WAY VALVE.
8 CONTRACTOR SHALL LOCATE EXISTING PDT IN SYSTEM AND REPLACE WITH NEW. CONNECT PDT TO
Master - First Floor10' - 0"
Master - Ground Floor0' - 0" Master - Sub-Basement-5' - 0"
Master - First Floor10' - 0"
Master - Ground Floor0' - 0" Master - Sub-Basement-5' - 0"
Master - First Floor10' - 0"
Master - Ground Floor0' - 0"
(E) 4"ø CHS
(E) 4"ø CHS
(E) 4"ø CHS
(E) 4"ø CHS
(E) 17CP-1
(E) 17CP-2
(E) Air Separator
(E) CHS TO BUILDING
(E) CHS FROM PLANT
10a
(E) 4"ø CHS
(E) 4"ø CHS
(E) 17CP-1
(E) 17CP-2
(E) 4"ø CHS
(E) 4"ø CHS
(E) Air Separator
(E) CHS TO BUILDING
(E) CHS FROM PLANT
10a
4"ø CHR
6"ø CHR
(E) 6"ø CHS
(E) 6"ø CHR
(E) 4"ø CHR(E) 4"ø CHS
(E) 4"ø CHS
(E) 4"ø CHR
4"ø CHS
SVC RM
TO/FROM
DISTRIBUTION LOOP
(E) 6"ø CHS
(E) 6"ø CHR
(E) 4"ø CHR
(E) 4"ø CHS
(E) 4"ø CHR
(E) 4"ø CHS
(E) CHS/R TO BUILDING
SVC RM
TO/FROM
DISTRIBUTION LOOP
(E) 17CP-2
(E) 17CP-1
(E) 4"ø CHS
(E) 4"ø CHS
(E) 4"ø CHS
(E) 4"ø CHS
(E) CHS TO BUILDING
(E) CHS FROM PLANT
(E) 4"ø CHR
(E) 4"ø CHS
(E) CHS/R TO/FROM
DISTRIBUTION LOOP
(E) 6"ø CHS
(E) 6"ø CHR
(E) CHS/R UP
(E) CHS/R
(E) CHS/R TO
MECHANICAL
ROOM 4"ø CHS
4"ø CHR
6"ø CHR
(E) 4"ø CHR
(E) 4"ø CHS
17-WFCV-1
(E) 4"ø CHR
(E) 4"ø CHS
(E) CHS/R TO/FROM
DISTRIBUTION LOOP
(E) 6"ø CHS
(E) 6"ø CHR
(E) CHS/R UP
(E) CHS/R
(E) CHS/R TO
MECHANICAL
ROOM
(E) 4"ø CHR
(E) 4"ø CHS
(E) 17CP-2
(E) 17CP-1
(E) 4"ø CHS
(E) 4"ø CHS
(E) 4"ø CHS
(E) 4"ø CHS
(E) CHS TO BUILDING
(E) CHS FROM PLANT
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE
NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.
E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS
SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:3
P M
17-M-101
MECHANICAL GROUND FLOOR PLAN -
DEMOLITION AND NEW WORK
UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - NEW WORK
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION1/4" = 1'-0"
CHILLED WATER - SUB-BASEMENT PLAN - NEW WORK
1/4" = 1'-0"
CHILLED WATER - SUB-BASEMENT PLAN - DEMOLITION
NTS
CHILLED WATER - GROUND FLOOR - NEW WORK ISOMETRIC
NTS
CHILLED WATER - SUB-BASEMENT - NEW WORK ISOMETRIC
NTS
CHILLED WATER - SUB-BASEMENT - DEMOLITION ISOMETRIC
NTS
CHILLED WATER - GROUND FLOOR - DEMOLITION ISOMETRIC
N
KEYPLAN
BUILDING 17
Revisions: Date:
DRAWING NOTES
1 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE
WHERE SHOWN ON DRAWINGS.
2 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.
3 NEW MAGNETIC FLOW METER. INSTALL AS RECOMMENDED BY MANUFACTURER.
4 CONTRACTOR SHALL LOCATE EXISTING PDT IN SYSTEM AND REPLACE WITH NEW. CONNECT PDT TO
MECHANICAL ROOM
TO/FROM
DISTRIBUTION LOOP
TO/FROM
USERS
TO/FROM USERS (FIRST
FLOOR CHILLED WATER ONLY)
TO/FROM
USERS
MECHANICAL ROOM
TO/FROM
DISTRIBUTION LOOP
TO/FROM
USERS
TO/FROM USERS (FIRST
FLOOR CHILLED WATER ONLY)
TO/FROM
USERS
TO/FROM
DISTRIBUTION LOOP
TO/FROM USERS ("SECOND AND
GROUND FLOOR HEATING/COOLING;
FIRST FLOOR HEAT")
TO/FROM USERS ("FIRST
FLOOR CHILLED WATER ONLY")
(E) CHS
(E) CHR
TO/FROM
HOT WATER
BOILERS
(E) HWS
(E) HWR
TO/FROM USERS
("ATTIC ONLY")
(E) CHS
(E) CHR
CHW ONLY (VALVE OFF
DURING HEATING MONTHS
PER NOTE IN FIELD)
CHW AND HW
(SEASONAL)
25-CHWP/HWP-1
25-CHWP/HWP-2
25-CHWP-1
25-WFCV-1
TO/FROM
DISTRIBUTION LOOP
TO/FROM USERS ("SECOND AND
GROUND FLOOR HEATING/COOLING;
FIRST FLOOR HEAT")
TO/FROM USERS ("FIRST
FLOOR CHILLED WATER ONLY")
(E) CHS
(E) CHR
TO/FROM
HOT WATER
BOILERS
(E) HWS
(E) HWR
TO/FROM USERS
("ATTIC ONLY")
(E) CHS
(E) CHR
CHW ONLY (VALVE OFF
DURING HEATING MONTHS
PER NOTE IN FIELD)
CHW AND HW
(SEASONAL)
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE
NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.
E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS
SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:3
P M
25-M-101
MECHANICAL GROUND FLOOR PLAN -
DEMOLITION AND NEW WORK
UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - NEW WORK
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION
NTS
CHILLED WATER - NEW WORK ISOMETRIC
NTS
CHILLED WATER - DEMOLITION ISOMETRIC
N
KEYPLAN
BUILDING 25
Revisions: Date:
DRAWING NOTES
1 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.
2 ISOLATION VALVES TO BE REPLACED. CONTRACTOR SHALL ISOLATE CHILLED WATER SYSTEM FROM 4"
GATE VALVES NORTH OF BUILDING 17.
3 REMOVE EXISTING BASE MOUNTED PUMP, PIPING, AND SUCTION/DISCHARGE VALVES AND SPECIALTIES TO
POINT SHOWN.
Master - First Floor10' - 0"
Master - Ground Floor0' - 0"
TO/FROM
DISTRIBUTION LOOP
MECHANICAL ROOM
27-CHWP/HWP-2
27-CHWP/HWP-1
TO/FROM
DISTRIBUTION LOOP
MECHANICAL ROOM
(E) 27P-2
(E) 27P-1
(TYP)
"SUMMER - CLOSED
WINTER - OPEN"
(E) HWR
(E) HWS
TO/FROM
HOT WATER
BOILERS
(E) CHS
(E) HWR
(E) HWS
(E) CHR
(E) CHR
(E) CHS
(E) CHS
(E) CHR
27-CHWP/HWP-1
27-CHWP/HWP-2
27-WFCV-1
FROM
CHEMICAL
FEEDER
TO CHEMICAL
FEEDER
"SUMMER - CLOSED
WINTER - OPEN"
(E) HWR
(E) HWS
TO/FROM
HOT WATER
BOILERS
(E) CHS
(E) HWR
(E) HWS
(E) CHR
(E) CHR
(E) CHS
(E) CHR
(E) CHS
(E) 27P-2(E) 27P-1
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D. MODIFICATIONS TO PUMP SUCTION AND DISCHARGE PIPING SHALL BE EXPECTED TO ACCOMDATE
NEW END-TO-END DIMENSIONS AND OTHER VARIATIONS IN PUMP PHYSICAL SIZE.
E. REDUCERS SHALL BE PROVIDED WHERE REQUIRED AT PUMP CONNECTIONS. SUCTION REDUCERS
SHALL BE ECCENTRIC TYPE TO PREVENT ACCUMULATION OF AIR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
LEXINGTON VA
MEDICAL CENTER
FRANKLIN R.
SOUSLEY CAMPUS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
L e x in g to n
C h ill e r P la n t_ M
E P k y le
.g u g g e n h e im .r v t
/1 /2
:3
:4
P M
27-M-101
MECHANICAL GROUND FLOOR PLAN -
DEMOLITION AND NEW WORK
UPGRADE CHILLER PLANT
2250 Leestown Road, Lexington KY
596-18-107
11/17/2020 PP KG
BID DOCUMENTS
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - NEW WORK
1/4" = 1'-0"
CHILLED WATER - GROUND FLOOR PLAN - DEMOLITION
NTS
CHILLED WATER - NEW WORK ISOMETRIC
NTS
CHILLED WATER - DEMOLITION ISOMETRIC
N
KEYPLAN
BUILDING 27
Revisions: Date:
DRAWING NOTES
1 RECONNECT CHEMICAL FEEDER TO SUCTION AND DISCHARGE OF NEW PUMPS.
2 CONNECT NEW CHILLED WATER PIPING TO EXISTING CHILLED WATER PIPING.
3 CONNECT NEW PRESSURE, TEMPERATURE, OR FLOW TRANSMITTER TO EXISTING CHILLED WATER PIPE
WHERE SHOWN ON DRAWINGS.
4 CONNECT NEW MODULATING TWO-WAY CONTROL VALVE TO EXISTING CHILLED WATER RETURN PIPE.
5 REMOVE EXISTING BASE MOUNTED PUMP, PIPING, AND SUCTION/DISCHARGE VALVES AND SPECIALTIES TO
POINT SHOWN.
6 REMOVE EXISTING 3-WAY VALVE.
4.2 6 7 7.37.154
H
I
J
H.1
I.1
(E) 6"ø CHS
(E) 6"ø CHR
(E) 6"ø CHS
(E) 6"ø CHR
TO/FROM
DISTRIBUTION LOOP
TO/FROM
USERS
28-CHP2
28-CHP1
6"ø
28-WFCV-1
GENERAL NOTES
A. REFERENCE M-501 SERIES FOR PIPING SINGLE LINE DIAGRAM AND STANDARD CONTROL DIAGRAMS.
PIPING MODIFICATIONS SHOWN ON PLANS AND ISOMETRICS FOLLOW STANDARD CONTROL DIAGRAMS
FOR BOTH CHILLER PLANT AND OUT BUILDINGS.
B. WORK IN A PARTICULAR DRAWING VIEW MAY BE HIDDEN BY EXISTING OR NEW WORK. SEVERAL VIEWS ARE PROVIDED TO ENSURE THAT ALL WORK IS VISIBLE. KEYNOTES ARE NOT NECESSARILY REPEATED
ON EACH VIEW.
C. WHERE INSTRUMENT TAPS AND CONNECTIONS TO EXISTING PIPE ARE REQUIRED, CONTRACTOR HAS THE OPTION TO PROVIDE NEW PIPING SPOOLS. NEW SPOOL MUST BE PROVIDED WHERE EXISTING
PIPE INTEGRITY IS DETERMINED TO BE UNSUITABLE FOR MODIFICATION.
D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .