PROJECT DESCRIPTION_WA NP OLYMP PMS(1).pdf
PDF 238 KB Posted
- Solicitation number
- 69056726R000011
About this file
This is a presolicitation document for a federal construction contract involving pavement preservation and minor guardrail installation work across multiple National Park Service projects in Washington State.
The work encompasses four projects: WA NP OLYM PMS(1) Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2) Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2) Pavement Preservation Stehekin; and WA FLAP JEFFER 91420(6) Upper Hoh Road Resurfacing. The work is located in Olympic National Park and North Cascades National Park across Chelan, Clallam, Grays Harbor, Jefferson, and Mason Counties. The base schedule covers 60.59 miles and parking areas with three optional phases: Option X adds 1.92 miles, Option Y adds 12.07 miles, and Option Z adds 6.92 miles. The estimated price range is $10,000,000 to $20,000,000 with a tentative solicitation date of Fall/Winter 2026 and a tentative fixed completion date of Fall 2028.
The scope of work includes contractor quality control and assurance, sampling and testing, and construction scheduling requirements. Work encompasses earthwork (guardrail removal), aggregate and base courses, asphalt pavements and surface treatments including micro surfacing and chip seal operations, asphalt concrete pavement patching, guardrail system installation, permanent and temporary pavement markings, rumble strips, and extensive temporary traffic control requirements including flaggers, pilot cars, traffic control supervisors, cones, portable message signs, and construction signage. The base schedule requires rental equipment and general labor, while options X, Y, and Z do not. Quantities vary significantly across the base schedule and optional phases.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WA OLYM NOCA Hoh Prelim Plans.pdf | ||
| Prelim Letter_WA NP OLYM PMS(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1;
WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2;
WA NP NOCA PMS(2), Pavement Preservation Stehekin; &
WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing
North Cascades National Park and Olympic National Park
Chelan, Clallam, Grays Harbor, Jefferson, and Mason Counties
Washington
The work consists of pavement preservation and minor guardrail installation.
Project length: BASE SCHEDULE: 60.59 miles and parking areas
OPTION X: 1.92 miles and parking areas
OPTION Y: 12.07 miles and parking areas
OPTION Z: 6.92 miles and parking areas
Tentative Fixed Completion Date: Fall 2028
(Once solicitation is issued, see SF1442 Continuation, Block 11 for exact date.)
Tentative Solicitation Date: Fall/Winter 2026
Estimated Price Range: $10,000,000 to $20,000,000
Location: This project is in Washington State in/adjacent to Olympic National Park and Stehekin in North Cascades National Park.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-24
B as e
O p ti o n X
O p ti o
Y ti o
Z
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) No No No No
153 Contractor Quality Control and Assurance (yes/no) Yes Yes Yes Yes
154 Contractor Sampling & Testing (yes/no) Yes Yes Yes Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes Yes
DIVISION 200 – Earthwork
203 Removal of Guardrail 250 LNFT e
O p ti o ti o ti o
DIVISION 300 – Aggregate and Base Courses
302 Roadway Aggregate, Method 2 12 TON
308 Emulsified Asphalt-Treated Aggregate Base, Grading D 375 SQYD
DIVISION 400 – Asphalt Pavements & Surface Treatments
403 Asphalt Concrete Pavement 340 TON
406 Fog Seal 100 TON 45 TON
Chip Seal, Type 1C Emulsified Asphalt Blotter
80 TON
4,400 SQYD
7.8 TON
150,000
SQYD
280 TON
75,000 SQYD
240 TON
409 Micro Surfacing, Type 2 235,000 SQYD 30,000 SQYD
412 Micro Surfacing, Type 3 780,000 SQYD
414 Cracks, Cleaning, and Sealing 7 MILE 1.9 MILE 2.3 MILE
Asphalt Concrete Pavement Patching, Type 1 Asphalt Concrete Pavement Patching, Type 2
680 SQYD
4,500 SQYD 1,650 SQYD
1,400 SQYD
1,600 SQYD 125 SQYD
DIVISION 600 – Incidental Construction
617 Guardrail System MGS, Type 2, Class A, Steel Posts 650 LNFT
622 Rental Equipment (yes/no) Yes No No No
623 General Labor (yes/no) Yes No No No
633 Rumble Strip, Transverse 30 SQYD
Permanent Pavement Markings (Type B) Permanent Pavement Markings, Symbols (Type B)
1,900,000
LNFT
200 EACH
30,000 LNFT
55 EACH
390,000 LNFT
33,400 LNFT
40 EACH
635 Temporary Traffic Control – Flagger 5,500 HOUR 1,600 HOUR 1,500 HOUR 1,100 HOUR
635 Temporary Traffic Control – Pilot Car 350 HOUR 120 HOUR
635 Temporary Traffic Control – Traffic Control Supervisor 75 DAY 25 DAY 25 DAY 45 DAY e
O p ti o ti o ti o
Temporary Traffic Control, Cone Temporary Traffic Control, Portable Changeable Message Sign Temporary Traffic Control, Pavement Markings Temporary Traffic Control, Construction Sign
750 EACH
6 EACH
300,000 LNFT
480 SQFT
4,100 LNFT
65,000 LNFT
File details come from the government source that posted it. Updated .