PROJECT DESCRIPTION_OR FS DSHUT601 60(1).pdf
PDF 183 KB Posted
- Solicitation number
- 69056725B000011
About this file
This document is a detailed Description of Work for the OR FS DSHUT601 60(1) Road 60 Improvements project in the Deschutes National Forest, Klamath County, Oregon. The project involves roadway improvements on a 1.02-mile stretch, with an estimated price range of $700,000 to $2,000,000 and a tentative fixed completion date of Summer 2026. Located 14 miles west of Gilchrist, OR, the work includes full depth reclamation, asphalt concrete paving, culvert cleaning, and various traffic control measures.
The project scope encompasses multiple divisions of work, including project requirements (construction survey, quality control, and soil erosion control), aggregate and base courses (full depth reclamation), asphalt pavements and surface treatments (2,600 tons of asphalt concrete), and incidental construction tasks. Specific activities include asphalt pavement milling, sign system installation, pavement markings, temporary traffic control with flaggers, and construction signage. The contract requires contractor survey and staking, quality control, sampling and testing, and adherence to construction schedules.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_12-12-2025_2.pdf | ||
| QA_12-12-2025.pdf | ||
| Prelim Letter_OR FS DSHUT601 60(1).pdf | ||
| prelim_orf-dshut60-1_plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Deschutes National Forest
Klamath County, Oregon
The work consists of grinding, paving, striping of approximately 1 mile of roadway, and other small items of work.
Project length: 1.02 miles
Tentative Fixed Completion Date: Summer 2026
(Once solicitation is issued, see SF1442 Continuation, Block 11)
Estimated Price Range: $700,000 to $2,000,000
Location: 14 miles west of Gilchrist, OR
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
B as e
S ch ed u le
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes
153 Contractor Quality Control and Assurance (yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
157 Soil Erosion Control, Fiber Roll 90 LNFT
DIVISION 300 – Aggregate and Base Courses
304 Full Depth Reclamation 1.11 miles
DIVISION 400 – Asphalt Pavements & Surface Treatments
403 Asphalt Concrete 2600 Tons
412 Asphalt Tack Coat 9 Tons
413 Asphalt Pavement Milling 550 SY
DIVISION 600 – Incidental Construction
607 Cleaning Culvert in Place 2 ea
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
633 Sign System 28 SQFT
634 Pavement Markings, Type B 15,000 LNFT
635 Temporary Traffic Control – Flagger 480 Hours
635 Temporary Traffic Control – Construction Sign 165 SQFT
635 Temporary Traffic Control Tubular Marker 110 ea
File details come from the government source that posted it. Updated .