This document is a Questions and Answers (Q&A) file for Project No. OR FS DSHUT601 60(1), which involves Road 60 Improvements from Milepost 0 to 1.0. The Q&A document contains six technical questions from potential bidders, all of which received a standardized response directing vendors to wait for the full solicitation documents. The questions cover topics such as surveyor responsibilities, as-built documentation, erosion control substitutions, seed requirements, traffic signal specifications, and solicitation notification methods.
The project is anticipated to be advertised in early 2026, and interested vendors are advised to follow the project on SAM.gov and add their company to the Interested Vendors List to receive notifications. The specific solicitation documents, including the Invitation for Bids, Special Contract Requirements (SCRs), plans, and physical data, will be posted when the project goes to advertisement. The Q&A document was dated 12/12/25 and provides guidance for potential bidders on how to stay informed about the upcoming project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_12-12-2025.pdf | ||
| Prelim Letter_OR FS DSHUT601 60(1).pdf | ||
| prelim_orf-dshut60-1_plan.pdf | ||
| PROJECT DESCRIPTION_OR FS DSHUT601 60(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. OR FS DSHUT601 60(1) Project Road 60 Improvements, MP 0 to 1.0
# General Technical Question Answer Date
1 X
Please advise what the requirements will be for the surveyor as to responsibilities?
Will the surveyor be required to provide as builts and topo for this project?
Please wait for the solicitation documents (Invitation for Bids that includes the Special Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.
12/12/25
2 X Please advise what substitutions will be allowed for erosion control.
Please wait for the solicitation documents (Invitation for Bids that includes the Special Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.
12/12/25
3 X Please advise if seed from McPheeters Turf will suffice for “Turf Establishment”.
Please wait for the solicitation documents (Invitation for Bids that includes the Special Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.
12/12/25
4 X Please advise if Mobile/Portable traffic signals will suffice for traffic control?
Please wait for the solicitation documents (Invitation for Bids that includes the Special Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.
12/12/25
5 X Please advise if there is by chance a date that we should start looking for the solicitation.
We are anticipating advertisement in early 2026. 12/12/25
6 X How do we receive this and future solicitations?
To get notifications about this project, in SAM.gov, you can click on “Follow” and/or add your company to the Interested Vendors List.
12/12/25
Check General or Technical