Project Bid Form.pdf

PDF 8 KB Posted

Attached to
2024 Webster Avenue Phase 2 and Fay Street Roadway Improvement Projects
Solicitation number
2024-10-40-54022
Issued by
Kit Carson County, Colorado

About this file

This is a Bid Form for the Burlington Webster Roadway Improvement Project, covering two project phases with detailed line items for road and infrastructure work. The document outlines quantities for various construction activities including sidewalk removal (40 linear feet), concrete pavement diamond grinding (13 square yards), curb and gutter removal (1,053 linear feet in Phase 1, 600 in Phase 2), asphalt mat planing (25,788 square yards in Phase 1, 24,272 in Phase 2), and multiple other roadway improvement tasks. The project involves multiple construction elements such as aggregate base course, hot mix asphalt paving, concrete sidewalk installation, pavement markings, and temporary traffic control.

The bid form includes unit pricing for each line item, with specific quantities for Phase 1 and Phase 2 of the project. Major material quantities include 2,838 tons of Hot Mix Asphalt (Grading SX) in Phase 1 and 2,669 tons in Phase 2, 1,251 gallons of Emulsified Asphalt in Phase 1 and 1,330 gallons in Phase 2, and various other materials and construction activities. The document provides a comprehensive breakdown of expected work volumes, allowing contractors to calculate total project costs based on the specified unit prices for each construction element.

View the file

Other files

File Type Posted
PAYBOND.DOC DOC document
BIDBOND.DOC DOC document
Agreement.doc DOC document
2024 BID FORM.ADDENDUM.docx DOCX document
NOTICPRO.DOC DOC document
ADVERTISEMENT FOR BIDS.2024.docx DOCX document
BFAY_Bid Form.pdf PDF
General Notes. Specifications. Drawings.2024 Webster Av.pdf PDF
PERFBOND.DOC DOC document
BFAY_Final Plans.pdf PDF
SGC.doc DOC document
GENERAL CONDITIONS.doc DOC document
NOTICAWD.DOC DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 202-00200 Removal of Sidewalk LF 40 2 202-00172 Diamond Grinding Concrete Pavement SY 13 3 202-00203 Removal of Curb and Gutter LF 1053 600 4 202-00210 Removal of Concrete Pavement SY 11 5 202-00240 Removal of Asphalt Mat (Planing) SY 25,788 24,272 6 208-00045 Concrete Washout Structure EA 1 1 7 202-04002 Clean Culvert EA 1 8 208-00106 Sweeping (Sediment Removal) HR 24 12 9 304-06000 Aggregate Base Course (Class 6) TON 116 37

10 403-00720 Hot Mix Asphalt (Patching) (Asphalt) TON 127 48 11 403-34751 Hot Mix Asphalt (Grading SX) (75) (PG 64-28) TON 2,838 2,669 12 411-10255 Emulsified Asphalt (Slow-Setting) GAL 1251 1330 13 412-00815 Concrete Pavement (8 Inch) (Reinforced) SY 11 14 604-50200 Manhole Ring and Cover EA 1 15 608-00000 Concrete Sidewalk SY 40 16 609-21023 Curb and Gutter Type 2 (Section II-B) (Special) LF 340 17 609-21900 Curb and Gutter Type 2 (Special) LF 713 600 18 620-00020 Sanitary Facility EA 1 1 19 626-00000 Mobilization LS 1 1 20 627-00005 Expoxy Pavement Marking GAL 35 38 21 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop Line) SF 1178 80 22 630-80001 Temporary Traffic Control Devices LS 1 1

Total Contractor Bid Price

BURLINGTON WEBSTER ROADWAY IMPROVEMENT - BID FORM

Phase 1 Phase 2 CostItem No Description Units Unit CostPhase 2 Phase 1 Cost