The provided document is a set of preliminary roadway improvement plans prepared by Basis Partners for the City of Burlington, Colorado, specifically for the Webster Avenue Roadway Improvement Project. The project is divided into two phases, covering areas from Highway 24 to 8th Street and from 8th Street to Lincoln Avenue, and includes roadway improvements at Burlington Elementary and Middle Schools. The plans detail a 2-inch mill and overlay of asphalt street surfaces, replacement of curb and gutter, sidewalk repairs, and pavement markings. The work will be performed in sequence, with Phase 1 prioritized and Phase 2 potentially completed as funding allows, with a preference to perform construction during summer break to minimize disruption to school operations.
The project specifications indicate strict adherence to Colorado Department of Transportation (CDOT) Standard Specifications and M&S Standard Plans. Key technical requirements include using Class 6 Aggregate Base Course, Hot Mix Asphalt Grade S (75) (PG 64-28), and ensuring proper drainage and compaction. The contractor will be responsible for traffic control, erosion management, utility protection, and coordinating with local entities like fire and police departments, school districts, and postal services. Specific considerations include maintaining public access, protecting existing infrastructure, and following environmental control measures. The project appears to be funded by the City of Burlington, with the ability to phase or adjust work based on available budget.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PAYBOND.DOC | DOC document | |
| BIDBOND.DOC | DOC document | |
| Agreement.doc | DOC document | |
| 2024 BID FORM.ADDENDUM.docx | DOCX document | |
| NOTICPRO.DOC | DOC document | |
| Project Bid Form.pdf | ||
| ADVERTISEMENT FOR BIDS.2024.docx | DOCX document | |
| BFAY_Bid Form.pdf | ||
| PERFBOND.DOC | DOC document | |
| BFAY_Final Plans.pdf | ||
| SGC.doc | DOC document | |
| GENERAL CONDITIONS.doc | DOC document | |
| NOTICAWD.DOC | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. HANSEN
C. BELTZ
GENERAL 1
N/A N/A
ROADWAY IMPROVEMENT
WEBSTER AVE
25 N Spruce Street, Suite 310
Colorado Springs, CO 80905
Tel: 719-299-5077, basisp.com
INDEX OF SHEETS
Tel: 719-299-5077, basisp.com
Colorado Springs, CO 80905
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_GEN_Title.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENTS
WEBSTER AVE
of
C a le b B e lt z
/1
/2
:3
:1
A
M Z
S h a r e d
\1
P r o je c ts
\2
I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k
\9
S h e e ts
\T O
B
W E
B \B
W E
B
S H
T
G E
N
T it le .d g n
T S .R
W T S .R
W
T8S.R44W T9S.R44W
MP-436
MP-435
MP-437
MP-189
MP-439
MP-440
MP-190
MP-191
MP-438
Improvements
Webster Ave
US-70
US-7
H W
Y
H W
Y
HWY-24
PUBLIC WORKS DEPARTMENT
CITY OF BURLINGTON
PRELIMINARY PLANS OF PROPOSED
WEBSTER AVENUE ROADWAY IMPROVEMENT
May 12, 2023
1"=5,000'
Burlington Middle School Roadway Improvement Plans20to17
Burlington Elementary School Roadway Improvement Plans16to13
Webster Ave Roadway Improvement Plans12to6
Tabulation of Roadway5
Summary of Approximate Quantities4
General Notes3to2
Title Sheet1
Roadway Improvements
Burlington Elementary School
Roadway Improvements
Burlington Middle School https://basisp.com/ CalebBeltz Stamp
CalebBeltz Rectangle
C. JENNINGS
GENERAL 2
N/A N/A
GENERAL NOTES
Tel: 719-299-5077, basisp.com
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_GEN_Gen Notes (1-2).dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :2
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
G
E N
G e n N o te s
.d g n taken off-site.
utility equipment, and items designated for reset. Disposal of materials must be approved by City representative prior to being the Contractor and responsibility of the Contractor to properly dispose. Exceptions include, but are not limited to: traffic signs, Unless noted otherwise or directed by the city, all materials that are removed by the Contractor shall become the property of 22.
SF/GAL100Pavement Marking Paint
LB/CF133Aggregate Base Course
GAL/SY0.05Emulsified Asphalt (undiluted)
LB/(SY*INCH)110Asphalt
For plan quantities, the following rates were used:21.
Products List.
Concrete shall have a minimum compressive strength of 4,000 psi and be a Class D mix design on the CDOT Approved 20.
applied between lifts and above the Aggregate Base Course.
A tack coat shall be applied to all vertical edges including concrete edges. The tack coat shall have 100% coverage and be 19.
Asphalt materials shall use a CDOT APL mix that has been pre-approved by the City.18.
Aggregate Base Course shall be Class 6 and Hot Mix Asphalt shall be Grade S (75) (PG 64-28).17.
other method as approved by the Engineer. Sawcutting costs are included in the work and will not be paid for separately.
Where it is required to sawcut existing pavement, the cutting shall be done to a neat vertical work line with a cutting blade or 16.
MATERIALS
paving. Portions of overexcavation and replacement of subgrade may be required at the direction of the City.
15. The contractor shall patch ruts, depressions, holes or areas of asphlat that are too fragile for mill and overlay prior to material at the City's direction. Should the City reject the material, the contractor will be responsible for the disposal.
The contractor shall offer millings to the City of Burlington for stockpiling. The contractor will deliver and stockpile the 14.
approval of the City.
The Contractor shall not remove any existing signs, pavement markings, traffic signals or traffic control devices without prior 13.
Contact the City for instructions before disturbing trees or roots.12.
Record immediately and shall suspend affected work until directed by the City.
If field conditions are found to be different than shown on the plans, the Contractor shall notify the City and Engineer of 11.
The Contractor shall obtain all required permits at no additional cost to the project.10.
construction. Construction will not take place or interfere with school drop-off and pick-up times.
to any street closures or property access changes, or any water line or sewer construction at least 24 hours prior to any
The contractor shall notify the City of Burlington fire department, police department, school districts, and US postal service prior 9.
Potholing shall be utilized for determining required relocations. be marked before beginning any excavation work of any kind.
avoid damage thereto. The Contractor shall contact the Utility Notification Center of Colorado (UNCC) and wait for utilities to
Contractor is responsible for making his own determination as to the type and location of utilities as may be necessary to
The Underground utility lines are not shown on the plans and were not identified as part of the survey for this project. 8.
inspector and shall compensate utility owner for all overtime charges.
inspection. The Contractor shall coordinate inspections that will occur outside regular business hours with the utility owner owner. The Contractor shall notify the utility owner inspector at least two working days prior to beginning work that requires
All work done on or near utilities or appurtenances shall be inspected or be offered the opportunity for inspection by the utility 7.
Utility relocations are not anticipated with this project. Any utility conflict found should be relayed to the owner immediately.6.
Subsurface Utility Engineering was not performed for this project due to the limited depth of disturbance per ASCE 38-22.5.
reported to the utility owner. All repairs to gas shall be made by the utility owner staff and paid for by the Contractor.
repairs immediately to the satisfaction of the Engineer of Record and utility owner. Damage to gas lines will immediately be
The Contractor is responsible for any damage to utilities as a result of their actions. The Contractor shall make all the required 4.
All valves and manholes located within the project limits shall be adjusted to match proposed grade by the Contractor. 3.
or other utility owners shall meet the requirements of the latest version of the applicable utility owner's standards.
All work related to water lines, wastewater, gas, electric, and any other infrastructure operated by the City of Burlington (City) 2.
- Colorado Department of Transportation M&S Standard Plans
- Colorado Department of Transportation Standard Specifications for Road and Bridge Construction
All work shall be done in accordance with the latest versions of the following, in order of precedence:1.
and verify positive drainage grade of the forms before placing concrete.
Drainage at the Middle School is to be corrected to flow East along B St. in the curb and gutter. Contractor is to set hubs 42.
of the culvert.
No culvert extensions are anticipated. Any grading around the ends of culvert(s) shall not impede stormwater or the function 41.
work.
All culvert(s) in the project area shall be cleaned. It is assumed that 1 EA of Clean Culvert will be necessary to complete this 40.
DRAINAGE
39. Clearing and Grubbing will not be measured or paid seperately and shall be included in the cost of work.
historic drainage patterns.
Drainage shall not be concentrated and shall generally flow toward the proposed drainage swale or otherwise follow -
The finished surface shall have a smooth, even appearance with no significant grade breaks.-
Finished elevations of pavement shall meet the following criteria:38.
MISCELLANEOUS
roll cannot be achieved, the Contractor shall suspend work in the area until direction is provided by the City.
37. Recompacted subgrade shall be proof-rolled in accordance with CDOT Standard Specification Section 304. If accceptable proof-and asphalt shall not be placed atop frozen ground.
Frozen ground shall be allowed to thaw completely or shall be removed prior to placement of materials or compaction. Concrete 36.
Aggregate base course, backfill and subgrade shall be compacted per CDOT Standard Specifications Section 304.5.3
GEOTECHNICAL
At least one sanitary facility shall be provided on site by Contractor.34.
at any point during construction. Access to adjacent properties must be maintained at all times.
Minimize disturbance to areas outside of the work area. Road closures shall not prevent access to nearby homes or businesses 33.
traffic is to be paid on an hourly basis as approved by City.
and shall provide required traffic control measures to detour vehicular traffic at no additional cost to the project. Flagging of
Unless otherwise approved by the City, the Contractor shall at all times maintain public vehicle access through the project area 32.
additional cost to the project.
Installation and maintenance of all traffic control devices is the responsibility of the contractor. This will be completed at no 31.
Parking and staging areas for employees of the Contractor and staging areas shall be approved by the City prior to use.30.
the City.
public right of way including vehicle traveled ways and pedestrian paths within the project limits at all times until acceptance by
The Contractor shall be responsible for creation of a traffic control plan, installation of traffic control, and maintenance of the 27.
and will not be measured or paid separately.
The Contractor shall mitigate dust as directed by the City. Water used for dust and air pollution control is included in the work 26.
CONSTRUCTION PHASING
survey control on this project do not need to be reset.
all disturbed survey markers at no additional cost to the project, except that survey nails placed in asphalt for the purpose of
The Contractor shall carefully preserve all monuments, benchmarks, range ties, and property markers. The Contractor shall reset 25.
No survey was performed for this project. Data shown utilizes coordinates from Google Earth imagery.24.
SURVEY
strength of 3,200psi.
23. New asphalt shall not be placed against freshly poured concrete. Concrete shall be 5 days old or have reached a compressive
GENERAL NOTES
Stamp
C. JENNINGS
GENERAL 3
N/A N/A
GENERAL NOTES
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_GEN_Gen Notes (1-2).dgn
Project Name
Vert. Scale:
ROADWAY DEVELOPMENT
INDUSTRIAL CENTER
of
C a le b B e lt z
/1
/2
:3
:2
A
M Z
S h a r e d
\1
P r o je c ts
\2
I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k
\9
S h e e ts
\T O
B
W E
B \B
W E
B
S H
T
G E
N
G e n
N o te s
.d g n
Upon removal of Control Measures, all disturbed areas shall be replaced in kind matching existing materials.56.
Erosion control measures shall be in place prior to any blading or roadway construction activities.55.
Contractor to establish Erosion Control Supervisor for the site and management of Control Measures.54.
runoff.
Contractor shall place silt fencing and erosion control logs to protect adjacent properties and structures from stormwater 53.
State. In granting the use of such chemicals, special conditions and monitoring may be required.
No chemicals are to be added to the discharge unless permission for the use of a specific chemical is granted by the 52.
along with proper disposal methods.
appropriate cleanup methods can be employed. Manufacturer's recommended methods for spill cleanup shall be followed, containment or equivalent adequate protection. All spills shall be cleaned up immediately after discovery, or contained until drainage system or facility. Bulk storage structures for petroleum products and other chemicals shall have secondary to contain all spills and prevent any spilled material from entering the MS4, including any surface or subsurface storm
Spill prevention and containment measures shall be used at all storage, equipment fueling, and equipment servicing areas so as 51.
by stormwater runoff into the storm sewer system at any time.
original containers, with original manufacturer's labels. Materials shall not be stored in a location where they may be carried perform the work in an orderly sequence. All materials stored on-site shall be stored in a neat, orderly manner, in their
The quantity of materials stored on the project site shall be limited, as much as practical, to that quantity required to 50.
other public way, unless in accordance with an approved Traffic Control Plan.
Building, construction, excavation, or other waste materials shall not be temporarily placed or stored in the street, alley, or 49.
or facilities.
Concrete wash water shall not be discharged to or allowed to runoff to any surface or subsurface storm drainage system 48.
Construction Control Measures must be removed prior to closeout.
All Construction Control Measures shall be maintained until permanent stabilization measures are implemented. Temporary 47.
of State Waters.
Stormwater discharges from construction sites shall not cause or threaten to cause pollution, contamination, or degradation 46.
as outlined in the Erosion Control and Stormwater Quality Guide.
Stormwater Control Measures are required when excavation is performed or earth is disturbed and shall follow CDOT standards 45.
expense of the Contractor.
work, including damage that may be caused by the presence of a Control Measure, shall be repaired by the Contractor at the operation of erosion Control Measures. Any damage caused by storm water flows to temporary, partially-completed, or finished
The Contractor shall conduct and phase work so that the flow of storm water is not impeded except as necessary for proper 44.
regulations shall apply.
and water quality control laws, rules, or regulations of other Federal or State agencies, the more restrictive laws, rules, or included in the Colorado Department of Transportation's MS4 Permit. In the event of conflicts between these requirements
(33 USC 1344), including regulations promulgated and certifications or permits issued, in addition to the requirements
Individuals shall comply with the "Colorado Water Quality Control Act" (Title 25, Article 8, CRS) and the "Clean Water Act" 43.
GRADING AND EROSION CONTROL
GENERAL NOTES (CONT.)
To extent possible, the Contractor shall perform the work around the schools during summer break.
All concrete work shall be completed prior to milling.
portions of Phase 2 as funding allows. The City will direct the work to commence or stop to meet available funding.
Work will be performed as the budget accomodates. It is intended to perform all work in Phase 1 listed above, and may include
4. Webster from 8th St. to Lincoln Ave.
Phase 2:
3. Burlington Middle School
2. Burlington Elementary School
1. Webster Ave. from Hwy 24 to 8th St.
Phase 1:
The areas of work for the project are broken into these areas, in this order of perference:
SEQUENCE OF WORK
QTYS 4
N/A N/A
APPROXIMATE QUANTITIES
SUMMARY OF
AS CONSTPLANAS CONSTPLANAS CONSTPLANSHEETPAGEBOOK
TOTALS
PHASE 2 PROJECT
TOTALS
PHASE 1 PROJECT
ROADWAY
UNITCONTRACT ITEM
ITEM NO
CONTRACT
INDEX
112LSTemporary Traffic Control Devices630-80001
801,1781,258SFPreformed Thermoplastic Pavement Marking (Xwalk-Stop Line)627-30410
383573GALEpoxy Pavement Marking627-00005
112LSMobilization626-00000
112EASanitary Facility620-00020
6007131,313LFCurb and Gutter Type 2 (Special)609-21900
340340LFCurb and Gutter Type 2 (Section II-B) (Special)609-21023
4040SYConcrete Sidewalk608-00000
11EAManhole Ring and Cover604-50200
1111SYConcrete Pavement (8 Inch) (Reinforced)412-00815
1,3301,2512,581GALEmulsified Asphalt (Slow-Setting)411-10255
2,6692,8385,507TONHot Mix Asphalt (Grade SX) (75) (PG 64-28)403-34751
48127175TONHot Mix Asphalt (Patching) (Asphalt)403-00720
37116153TONAggregate Base Course (Class 6)304-06000
122436HRSweeping (Sediment Removal) 208-00106
11EAClean Culvert202-04002
112EAConcrete Washout Structure 208-00045
24,27225,78850,060SYRemoval of Asphalt Mat (Planing) 202-00240
1111SYRemoval of Concrete Pavement 202-00210
6001,0531,653LFRemoval of Curb and Gutter 202-00203
1313SYDiamond Grinding Concrete Pavement202-00172
4040SYRemoval of Sidewalk 202-00200
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_GEN_SOAQ.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :3
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
G
E N
S
O A
Q .d g n
*R&R Curb and Gutter Type 2 (Section II-B)(Special) not shown in plans. R&R of Curb and Gutter to be performed at the direction of the City prior to work commencing.
1,3133405,50750,060Project Totals:
501455110% Irregularities:
1,3133405,00645,509Subtotals:
63573130 Ave
Donelan
END55+8020
84766150 Ave
Harrison 55+8054+3019
1541,398230 Ave
Harrison 54+3052+0018
3131201,092200 Ave
Harrison
52+00BEGIN17
1631401,277210 Ave
SENTER
END32+1016
1772091,897210 Ave
SENTER
32+10BEGIN15
10998722011th St43+1040+9014
413749011th St40+90BEGIN13
1161,059313TOP
Ave
Webster
END284+0012
2191,992700BOT
Ave
Webster 284+00277+0011
3222,924700TOP
Ave
Webster 277+00270+0011
3563,232700BOT
Ave
Webster 270+00263+0010
2572,340680TOP
Ave
Webster 263+00256+2010
*400
1461,326320BOT
Ave
Webster 256+20253+009
1741,590360BOT
Ave
Webster 253+00249+409
3723,385720TOP
Ave
Railroad 249+40242+209
3713,374720BOT
Ave
Railroad 242+20235+008
3703,365680TOP
Ave
Railroad 235+00227+808
3202,908700BOT
Ave
Railroad 227+80220+807
3713,369720TOP
Ave
Railroad 220+80213+607
3613,283700BOT
Ave
Railroad 213+60206+606
*600
3302,998660TOP
Ave
Railroad
206+60BEGIN6
LFLFTONSYLFTOP/BOT
ENDBEGIN
(Special)
Curb and Gutter Type 2
(Section II-B) (Special)
Curb and Gutter Type 2
(75) (PG 64-28)
Hot Mix Asphalt (Grading SX)
(Planing)
Removal of Asphalt Mat
609-21900609-21023403-34751202-00240
LENGTHVIEW
NAME
STREET
STATION
SHEETPHASE
TABULATION OF ROADWAY
TAB 5
N/A N/A
TABULATION OF ROADWAY
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_GEN_TAB.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :4
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
G
E N
T
A B
.d g n
2" Mill and Overlay
(Phase 1)
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
(Phase 2)
ROADWAY 6
1"=50' N/A
WEBSTER AVE (PHASE 2)
ROADWAY PLAN
M A
T C
H L I N
E
M A
T C
H L I N
E
M A
T C
H L I N
E
0' 50'25'
0' 50'25'
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_50-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1
/2
:3
:1
A
M Z
S h a r e d
\1
P r o je c ts
\2
I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k
\9
S h e e ts
\T O
B
W E
B \B
W E
B
S H
T
R D
W Y
P la n
S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
L I N
C O
L N
S T
S RAILROAD AVE
P O
M E
R O
Y
S RAILROAD AVE
S T
C E
N T
E R
S T
C H
E R
R Y
Begin Phase 2
Match Existing
Begin Mill & Overlay
Begin Construction
200+22 Double Centerlines Yellow, 4" Wide
Stop Line White, 24" Wide
Double Centerlines Yellow, 4" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
T C
H L I N
E
M A
T C
H L I N
E
M A
T C
H L I N
E
M A
T C
H L I N
E
0' 50'25'
0' 50'25'
C. BELTZ
C. BELTZ
ROADWAY 7
1"=50' N/A
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_50-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1
/2
:3
:1
A
M Z
S h a r e d
\1
P r o je c ts
\2
I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k
\9
S h e e ts
\T O
B
W E
B \B
W E
B
S H
T
R D
W Y
P la n
S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h t
T
H
H
S RAILROAD AVE
S RAILROAD AVE
T
H
T
H
WEBSTER AVE
Match Existing Concrete
End Mill & Overlay
226+57
Match Existing Concrete
Begin Mill & Overlay
227+00
Double Centerlines Yellow, 4" Wide
Double Centerlines Yellow, 4" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
T C
H L
I N
E
M A
T C
H L
I N
E
M A
T C
H L
I N
E
M A
T C
H L
IN
E
0' 50'25'
0' 50'25'
C. BELTZ
C. BELTZ
ROADWAY 8
1"=50' N/A
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_50-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1
/2
:3
:1
A
M Z
S h a r e d
\1
P r o je c ts
\2
I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k
\9
S h e e ts
\T O
B
W E
B \B
W E
B
S H
T
R D
W Y
P la n
S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
WEBSTER AVE
WEBSTER AVE
T
H S
T
T H
S T
T H
S T
T
H S
T
Double Centerlines Yellow, 4" Wide
Double Centerlines Yellow, 4" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
0 2
T C
H L
IN
E
M A
T C
H L
I N
E
M A
T C
H L I N
E
M A
T C
H L I N
E
0' 50'25'
0' 50'25'
C. BELTZ
C. BELTZ
ROADWAY 9
1"=50' N/A
WEBSTER AVE (PHASE 1 & 2)
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_50-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :2
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
R
D W
Y P la n S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
WEBSTER AVE
WEBSTER AVE
T
H S
T
T
H S
T
H W
Y
End Phase 2
Match Existing Concrete
End Mill & Overlay
252+74
Begin Phase 1
Match Existing Concrete
Begin Mill & Overlay
253+23
Double Centerlines Yellow, 4" Wide
Double Centerlines Yellow, 4" Wide
Channelizing Lines White, 4" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
T C
H L I N
E
M A
T C
H L I N
E
M A
T C
H L I N
E
0' 50'25'
0' 50'25'
M A
T C
H L I N
E
C. BELTZ
C. BELTZ
ROADWAY 10
1"=50' N/A
WEBSTER AVE (PHASE 1)
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_50-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1
/2
:3
:2
A
M Z
S h a r e d
\1
P r o je c ts
\2
I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k
\9
S h e e ts
\T O
B
W E
B \B
W E
B
S H
T
R D
W Y
P la n
S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
WEBSTER AVE
WEBSTER AVE
M A
R B
L E
V
E
Match Existing Concrete
Begin Mill & Overlay
261+12Match Existing Concrete
End Mill & Overlay
259+75
Double Centerlines Yellow, 4" Wide
Double Centerlines Yellow, 4" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
T C
H L I N
E
M A
T C
H L I N
E
M A
T C
H L I N
E
M A
T C
H L I N
E
0' 50'25'
0' 50'25'
C. BELTZ
C. BELTZ
ROADWAY 11
1"=50' N/A
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_50-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1
/2
:3
:2
A
M Z
S h a r e d
\1
P r o je c ts
\2
I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k
\9
S h e e ts
\T O
B
W E
B \B
W E
B
S H
T
R D
W Y
P la n
S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
WEBSTER AVE
WEBSTER AVE
R
D
D
Double Centerlines Yellow, 4" Wide
Double Centerlines Yellow, 4" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
T C
H L I N
E
0' 50'25'
C. BELTZ
C. BELTZ
ROADWAY 12
1"=50' N/A
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_50-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :3
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
R
D W
Y P la n S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
WEBSTER AVE
OLD HWY 2
Match Existing
End Mill & Overlay
End Construction
287+13
Protect Sign
Protect Sign
110'
Past Driveway
Overlay Access Road
Double Centerlines Yellow, 4" Wide
Channelizing Line Yellow, 4" WideChannelizing Line Yellow, 4" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
ROADWAY 13
1"=20' N/A
ELEMENTARY SCHOOL (PHASE 1)
ROADWAY PLAN BURLINGTON
M A
T C
H L
IN
E
0' 40'20'
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_20-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :4
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
R
D W
Y P la n S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
11TH ST
M A
R T
IN
A
V E
Begin Mill & Overlay
Match Exisitng Concrete
Begin Construction
40+00
Double Centerline Yellow, 4" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
ROADWAY 14
1"=20' N/A
ELEMENTARY SCHOOL (PHASE 1)
ROADWAY PLAN BURLINGTON
M A
T C
H L
IN
E
M A
T C
H L
IN
E
0' 40'20'
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_20-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :4
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
R
D W
Y P la n S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
11TH STDouble Centerline Yellow, 4" Wide
Crosswalk Line White, 24" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
43+20
43+40
43+60
43+80
44+00
44+20
44+40
0' 20'10'
A
T C
H L
IN
E
C. BELTZ
C. BELTZ
ROADWAY 15
1"=20' N/A
ELEMENTARY SCHOOL (PHASE 1)
ROADWAY PLAN BURLINGTON
MATCHLINE 43+10
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_20-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :4
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
R
D W
Y P la n S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
SENTER AVE
T H
S T
Match Exisitng C&G
Begin Type 2 (Section II-B) (Special) C&G
30+38
43+87 11th Ave
30+00 Senter Ave =
Contact the City Prior to Replacement.
Replace Manhole Sanitary Ring and Lid.
Remove and Replace 25' of Heaved Sidewalk
Remove and Replace 5.5' of Damaged Sidewalk
Protect Sign Protect Sign
Match Existing
Begin Mill & Overlay
29+59
Match Existing
End Mill & Overlay
44+45
Double Centerlines Yellow, 4" Wide
Parking Stall Stripes White, 4" Wide
Stop Line White, 24" Wide
Crosswalk Line White, 24" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
C. BELTZ
ROADWAY 16
1"=20' N/A
ELEMENTARY SCHOOL (PHASE 1)
ROADWAY PLAN BURLINGTON
M A
T C
H L
IN
E
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_20-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :4
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
R
D W
Y P la n S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
SENTER AVE
T H
S T
P R
IV
A
T E
D R
IV
E
W A
Y
Match Existing Concrete
Match Existing
End Mill & Overlay
End Construction
34+20
Match Existing C&G
End Type 2 (Section II-B) (Special) C&G
34+20
Match Existing C&G
Begin Type 2 (Section II-B) (Special) C&G
33+79
Match Existing C&G
End Type 2 (Section II-B) (Special) C&G
33+36
Depress Sidewalk Into Driveway
Remove and Replace Sidewalk
Begin Curb Head Transition from Zero
33+79
End Curb Head Transition at full height
33+89
Double Centerline Yellow, 4" Wide
Parking Stall Stripes White, 4" Wide Crosswalk Line White, 24" WideStop Line White, 24" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
60+00
60+20
60+40
60+60
60+80
61+00
A
T C
H L
IN
E
C. BELTZ
C. BELTZ
ROADWAY 17
1"=20' N/A
MIDDLE SCHOOL (PHASE 1)
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_20-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1
/2
:3
:5
A
M Z
S h a r e d
\1
P r o je c ts
\2
I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k
\9
S h e e ts
\T O
B
W E
B \B
W E
B
S H
T
R D
W Y
P la n
S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
HARRISON ST
H W
Y
B S
T
B S
T
FL R=13.75'
FL R=13.75'
Match Existing
Begin Mill & Overlay
Begin Construction
50+00
(Rolled C&G)
Begin Type 2 (Special) C&G
50+20
60+00 B St
51+16 Harrison St =
Match Existing
End HMA Overlay
61+15
Protect Sign
Proper Drainage Down B St
Adjust Corner Elevation, Ensure
Proper Drainage Down B St
Adjust Corner Elevation, Ensure
Protect Sign
(Rolled C&G)
End Type 2 (Special) C&G
61+15
(Rolled C&G)
End Type 2 (Special) C&G
61+15
Double Centerline Yellow, 4" Wide
Crosswalk Line White, 24" Wide
Crosswalk Line White, 24" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
A
T C
H L
IN
E
M A
T C
H L
IN
E
C. BELTZ
C. BELTZ
ROADWAY 18
1"=20' N/A
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_20-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :5
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
R
D W
Y P la n S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
HARRISON ST
(Rolled C&G)
End Type 2 (Special) C&G
52+09
Double Centerline Yellow, 4" Wide
Parking Stall Stripes White, 4" Wide
Crosswalk Line White, 24" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
55+20
55+40
55+60
55+80
A
T C
H L
IN
E
MATCHLINE 55+80
C. BELTZ
C. BELTZ
ROADWAY 19
1"=20' N/A
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_20-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :5
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
R
D W
Y P la n S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
HARRISON ST
D O
N E
L
V
E
Overlay. See General Note 15.
that are too Fragile for Mill &
Patch any Asphalt Sections
Double Centerline Yellow, 4" Wide
R&R Curb and Gutter
Asphalt Patch
R&R Sidewalk
R&R 8" Reinforced
Driveway
Flow Direction
A
T C
H L
IN
E
C. BELTZ
C. BELTZ
ROADWAY 20
1"=20' N/A
25 N Spruce St, Suite 310
Basis Partners
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 5/15/2023Print Date:
Horiz. Scale:
File Name: BWEB_SHT_RDWY_Plan_20-Scale.dgn
Project Name
Vert. Scale:
ROADWAY IMPROVEMENT
WEBSTER AVE
of
C a le b B e lt z
/1 /2
:3 :5
A
M Z
S h a r e d \1
P r o je c ts
\2 I n d u s tr ia l
C e n te r R d w y D e v e lo p m e n t\
W o r k \9
S h e e ts
\T O
B
W E
B \B
W E
B S
H T
R
D W
Y P la n S c a le
.d g n
NOTE KEY MAPSLEGEND
1A 1B
2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Webste rAve
H W
Y
L in c o ln
S t
O ld
H
W Y t h
S t
Senter Ave
H a r r is o n
S t
Donelan Ave
10 11
No survey has been completed for this project. Aerial imagery is used to provide background information for design intent, but shall not be relied upon for exact dimensions. Aerial imagery may not be up to date.
t h
S t
DONELAN AVE
G E
N E
S S
E E
S T
Match Existing Concrete
End Mill & Overlay
End Construction
57+10Double Centerline Yellow, 4" Wide
| Title |
| BWEB_SHT_GEN_Title |
| Gen Notes |
| BWEB_SHT_GEN_Gen Notes (1-2) |
| BWEB_SHT_GEN_Gen Notes (1-2) |
| SOAQ |
| BWEB_SHT_GEN_SOAQ |
| TAB |
| BWEB_SHT_GEN_TAB |
| 50scale |
| BWEB_SHT_RDWY_Plan_50-Scale |
| BWEB_SHT_RDWY_Plan_50-Scale |
| BWEB_SHT_RDWY_Plan_50-Scale |
| BWEB_SHT_RDWY_Plan_50-Scale |
| BWEB_SHT_RDWY_Plan_50-Scale |
| BWEB_SHT_RDWY_Plan_50-Scale |
| BWEB_SHT_RDWY_Plan_50-Scale |
| 20scale |
| BWEB_SHT_RDWY_Plan_20-Scale |
| BWEB_SHT_RDWY_Plan_20-Scale |
| BWEB_SHT_RDWY_Plan_20-Scale |
| BWEB_SHT_RDWY_Plan_20-Scale |
| BWEB_SHT_RDWY_Plan_20-Scale |
| BWEB_SHT_RDWY_Plan_20-Scale |
| BWEB_SHT_RDWY_Plan_20-Scale |
| BWEB_SHT_RDWY_Plan_20-Scale |
File details come from the government source that posted it. Updated .