Project_8_-_26th_Ave_-_Plans.pdf
PDF 12 MB Posted
- Attached to
- Sidewalk Gap Construction
- Solicitation number
- 26-44
- Issued by
- Jefferson County, Weston CDP, Colorado
About this file
This is a 100% construction plans document for Project 08 - 26th Avenue Sidewalk Gap Improvements in the City of Wheat Ridge, Colorado, prepared by Connect Engineering and dated July 24, 2026. The project encompasses sidewalk gap construction along West 26th Avenue from Oak Street to Paramount Parkway, spanning 1,783.33 linear feet (station 100+72.31 to 118+55.64). The project involves construction of concrete sidewalks (6-inch thickness), curb and gutter work, full-depth HMA pavement patches, curb ramps, driveway restoration, and drainage improvements. Major work items include removal of existing asphalt pavement, curb and gutter, sidewalk, and various obstructions; installation of new concrete sidewalk with integral curb and gutter; placement of aggregate base course; and restoration of driveways with either concrete or gravel surfaces. The plans designate the roadway as a Collector with a 35 mph posted speed limit, maximum grade of 7.3 percent, and minimum grade of 0.5 percent, with a 4-foot clearzone width including curb and gutter.
The construction plans include twenty-nine detailed sheets addressing survey control, geometric layout, typical cross-sections, removal plans, sidewalk and driveway details, curb ramp specifications, drainage design with storm sewer connections, signing and pavement marking requirements, and erosion control measures. Specifications reference CDOT Standard Specifications for Road and Bridge Construction and City of Wheat Ridge standard details. The contractor must submit a construction schedule at the pre-construction meeting showing major contract item dates, updated every ten working days; provide construction staking; coordinate utility relocations with owning companies; implement erosion mitigation measures; maintain traffic control in accordance with FHWA Manual on Uniform Traffic Control Devices; and furnish as-constructed drawings upon project completion. The project requires notification to property owners 48 hours prior to utility shutoffs or driveway closures and compliance with OSHA safety regulations for all trenching and excavation work.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT AREA
END PROJECT
118+55.64
BEGIN PROJECT
100+72.31
O
AK
S T
25TH AVE
N
EL
SO
N
S T
W 26TH AVE CI
RC
LE
D
R
SK
YL
IN
E
D R
PA
R
AM
O
U N
T
PK
W Y
N
EW
C O
M
BE
ST
M O
O R
E
ST
M
IL
LE
R
S T
KI
PL
IN
G
S T
HILLSIDE DR
O
AK
D R
COVER SHEET
1 1TTL 1
JB
RM
N/AN/A
PROJECT 08
100% PLANS
07/24/26
VICINITY MAP
SCALE IN FEET
1000' 2000'500'0'
CITY OF WHEAT RIDGE
PROJECT 08 - 26TH AVE, OAK ST TO PARAMOUNT PKWY
SIDEWALK GAP PROGRAM
JEFFERSON COUNTY
CITY PROJECT NO. 25-029B
JULY 2026
TABULATION OF LENGTH & DESIGN DATA
STATION
LINEAR FEET
ROADWAY
W 26TH AVE
1783.33
BEGIN ROADWAY
STA. 100+72.31
END ROADWAY
STA. 118+55.64
TOTAL 1783.33
SUMMARY OF PROJECT LENGTH FEET
ROADWAY (NET LENGTH) 1783.33
STRUCTURE (NET LENGTH) -
PROJECT GROSS LENGTH 1783.33
DESIGN DATA W 26TH AVE
ROADWAY CLASSIFICATION COLLECTOR
POSTED SPEED 35 MPH
ROADWAY CROSS SLOPE MATCH EXIST. (2.0%)
MAX. ROADWAY GRADE MATCH EXIST. (7.3%)
MIN. ROADWAY GRADE MATCH EXIST. (0.5%)
CLEARZONE (W/ CURB & GUTTER) 4' (W/ VERT. CURB)
SHEET INDEX
SHEET NO. DESCRIPTION
1 COVER SHEET
2 STANDARD PLANS
3 GENERAL NOTES
4 SUMMARY OF APPROXIMATE QUANTITIES
5 SURVEY CONTROL PLAN
6 GEOMETRIC CONTROL LAYOUT
7 TYPICAL SECTIONS
8-10 REMOVAL PLAN
11-13 SIDEWALK PLAN
14-16 DRIVEWAY DETAILS
17 SIDEWALK DETAILS
18-21 CURB RAMP DETAILS
22 - 23 DRAINAGE PLAN
24-26 SIGNING AND PAVEMENT MARKING PLAN
27-29 EROSION CONTROL PLAN
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_C O
VE
R
S H
EE
T.
dw g
U
SE
R
: a ro ba in a D
AT
E:
J ul
4, :1 0p m
X R
EF
S:
X R
EF
-T
TB
L
C on ne ct E ng in ee rin g_ lo go _1
-c ol or
EF
-T
TB
L
T_COVER SHEET.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
STANDARD PLANS
1 1STD 2
JB
RM
N/AN/A
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_S
TD
P
LA
N S.
R
: a ro ba in a D
AT
E:
J ul
4, :1
EF
S:
X R
EF
-T ne ct E ng in ee rin g_ lo go _1
-c ol or
T_STD PLANS.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE STANDARD AND SPECIAL PROVISIONS, THE CONSTRUCTION PLANS FOR THE PROJECT, THE CURRENT EDITION OF THE CDOT STANDARD
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND THE CDOT STANDARD PLANS AS
APPLICABLE TO THE WORK.
2. THE CONTRACTOR SHALL ADDRESS EROSION MITIGATION & PROTECTIVE MEASURES TO LIMIT
EROSION RELATING TO CONSTRUCTION ACTIVITIES.
3. THE CONTRACTOR WILL BE REQUIRED TO SUBMIT A CONSTRUCTION SCHEDULE AT THE PROJECT
PRE-CONSTRUCTION MEETING. THIS SCHEDULE WILL SHOW THE BEGINNING AND ENDING DATES
OF MAJOR CONTRACT ITEMS. THIS SCHEDULE WILL BE UPDATED BY THE CONTRACTOR EVERY 10
WORKING DAYS, OR AS REQUIRED BY THE CITY.
4. CONSTRUCTION STAKING SHALL BE PROVIDED BY THE CONTRACTOR.
5. SUBSEQUENT ASPHALT LIFTS SHALL NOT BE PLACED ON THE SAME DAY AS THE PREVIOUS LIFT, UNLESS APPROVED BY THE CITY IN THE FIELD.
6. FOR FINAL PLAN QUANTITIES THE FOLLOWING RATES OF APPLICATION WERE USED: BITUMINOUS PAVEMENT AT 149.75 LBS/CUBIC FOOT (.05615 TONS/ SY-IN), AGGREGATE BASE COURSE AT 133
LBS/CUBIC FOOT.
7. A TACK COAT OF EMULSIFIED ASPHALT (SLOW SETTING) IS TO BE APPLIED AT 0.1 GAL/SY
BETWEEN PAVEMENT COURSE AND ON ALL VERTICAL EDGES TO IMPROVE BOND BETWEEN
PAVEMENT LAYERS. TACK COATING IS INCIDENTAL WORK TO HMA PAY ITEMS.
8. SUBGRADE PREPARATION WILL NOT BE PAID FOR SEPARATELY AND IS INCLUDED IN THE COST
OF THE WORK.
9. FULL DEPTH ASPHALT TO BE REMOVED HAS BEEN CALCULATED AS REMOVAL OF ASPHALT MAT.
REMOVED ASPHALTIC PAVEMENT MATERIAL WILL BECOME THE PROPERTY OF THE CONTRACTOR.
10. ATTACHED SIDEWALK, CURB AND GUTTER SHALL BE PLACED MONOLITHICALLY, UNLESS
OTHERWISE SPECIFIED OR DIRECTED BY THE CITY. REFER TO CITY OF WHEAT RIDGE STANDARD
DETAIL C-D02.
11. BREAK POINTS ON SLOPES AND IN BOTTOMS OF DITCHES SHALL BE ROUNDED DURING
CONSTRUCTION AS DIRECTED BY THE CITY. SEE STANDARDS FOR DETAILS OF CUT SLOPE
TREATMENT, FLARING AND WIDENING.
12. CLEARING AND GRUBBING SHALL INCLUDE REMOVAL OF ALL SHRUBS, WEEDS, SMALL TREES (4"
CALIPER OR LESS), ALL ASSOCIATED ROOTS AND OTHER VEGETATION WITHIN THE
CONSTRUCTION LIMITS UNLESS SEPARATE PAY ITEM IS PROVIDED.
13. LIMITS OF ASPHALT REMOVAL SHALL BE CUT TO A STRAIGHT LINE WITH A VERTICAL EDGE. THE
VERTICAL EDGE SHALL BE SAW CUT UNLESS OTHERWISE APPROVED BY CITY. ASPHALT
PAVEMENT SHALL BE REMOVED IN ACCORDANCE WITH THE PLANS BUT IN NO CASE SHALL
REMOVAL RESULT IN A PATCH LESS THAN TWO FEET IN WIDTH. ASPHALT PATCHBACK SHALL BE
PLACED IN ACCORDANCE WITH THE PLANS AND PROJECT SPECIAL PROVISIONS.
14. COMPACTION TESTING FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE CDOT FIELD
MATERIAL MANUAL.
15. EXCAVATION FOR THE COMPACTION OF THE BASE OF CUTS AND FILLS WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE COST OF EXCAVATION & EMBANKMENT PAY ITEMS.
16. DEPTH OF MOISTURE-DENSITY CONTROL FOR THIS PROJECT SHALL BE AS FOLLOWS: FULL
DEPTH OF ALL EMBANKMENTS, BASE OF CUTS AND FILLS SHALL BE 6 INCHES, COMPACTION OF BASES OF CUTS AND FILLS SHALL NOT BE PAID FOR SEPARATELY, BUT SHALL BE INCLUDED IN
THE COST OF EXCAVATION & EMBANKMENT PAY ITEMS. WATER FOR COMPACTION WILL NOT BE
PAID FOR SEPARATELY BUT SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. WATER FOR
DUST CONTROL SHALL NOT BE PAID FOR SEPARATELY BUT SHALL BE CONSIDERED INCIDENTAL
TO CONSTRUCTION.
17. SWEEPING SHALL BE DONE BY A PICKUP TYPE BROOM WITH DUST CONTROL AND BEYOND
INCLUDED PAY ITEMS, SHALL BE DONE AT NO ADDITIONAL COST TO THE PROJECT.
18. SALVAGE ITEMS REMAINING AS PROPERTY OF THE CITY OF WHEAT RIDGE SHALL BE DELIVERED TO THE CITY MAINTENANCE FACILITY LOCATED AT 11220 W. 45TH AVE. EQUIPMENT & OPERATOR
FOR UNLOADING WILL BE PROVIDED BY THE CITY IF REQUESTED IN ADVANCE. CONTRACTOR
WILL ASSIST WITH UNLOADING. DELIVERY AND UNLOADING SHALL BE CONSIDERED INCIDENTAL
TO CONSTRUCTION.
19. DRIVEWAY RESTORATION SHALL BE AS FOLLOWS:
RE-GRADE & REPLACE GRAVEL DRIVEWAY - SALVAGE AND STOCKPILE EXISTING DRIVEWAY
GRAVEL. PREPARE THE SUBGRADE FROM BACK OF SIDEWALK TO MATCH POINT. PLACE A 1"
LIFT OF AGGREGATE BASE COURSE (CLASS 6) FOLLOWED BY A 1" LIFT OF SALVAGED
DRIVEWAY GRAVEL AND COMPACT. BASE MATERIAL TO BE PAID AS AGGREGATE BASE
COURSE (CLASS 6) AND GRAVEL TO BE PAID AS RESET DRIVEWAY GRAVEL.
REPLACE CONCRETE DRIVEWAY - PREPARE SUBGRADE FROM BACK OF CURB TO MATCH
POINT. SEE SIDEWALK PLAN FOR PAVEMENT SECTION AND PAYMENT.
20. ALL TRENCHES AND PITS SHALL BE ADEQUATELY SUPPORTED AND THE SAFETY OF WORKERS
PROVIDED FOR AS REQUIRED BY THE MOST RECENT OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) "SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION." THESE
REGULATIONS ARE DESCRIBED IN SUBPART P, PART 1926 OF THE CODE OF FEDERAL
REGULATIONS. SHEETING AND SHORING SHALL BE UTILIZED WHERE NECESSARY TO PREVENT
ANY EXCESSIVE WIDENING OR SLOUGHING OF THE TRENCH OR PIT WHICH MAY BE DETRIMENTAL
TO HUMAN SAFETY, TO THE PIPE BEING PLACED, TO TREES OR TO ANY EXISTING STRUCTURE
WHERE EXCAVATIONS ARE MADE. UNDER SEVERE WATER CONDITIONS, THE CONTRACTOR MAY
BE REQUIRED TO USE AN APPROVED PILING INSTEAD OF SHEETING AND SHORING.
21. THE CONTRACTOR SHALL HAVE ONE SIGNED FULL SIZE COPY OF THE PLANS APPROVED BY THE
GOVERNING AGENCIES AND ONE COPY OF THE APPROPRIATE DESIGN AND CONSTRUCTION
STANDARDS AND SPECIFICATIONS ON THE JOB SITE AT ALL TIMES.
22. REPAIR OF ANY DAMAGE TO EXISTING IMPROVEMENTS AND/OR LANDSCAPING NOT NOTED FOR
REMOVAL IS THE RESPONSIBILITY OF THE CONTRACTOR AT THEIR EXPENSE.
23. ALL DAMAGE CAUSED TO EXISTING CURB, GUTTER AND SIDEWALK DURING CONSTRUCTION
SHALL BE REPAIRED PRIOR TO ACCEPTANCE OF COMPLETED IMPROVEMENTS.
24. THE CONTRACTOR SHALL NOTIFY ALL PROPERTY OWNERS IN WRITING A MINIMUM OF 48 HOURS
PRIOR TO ANY UTILITY SHUT OFF OR CLOSURE OF DRIVEWAYS. THE NOTICES MUST HAVE
CONTRACTOR'S PHONE NUMBER AND NAME OF CONTACT PERSON, AND EMERGENCY PHONE
NUMBER FOR AFTER-HOURS CALLS. CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING
LOCAL ACCESS TO ALL DRIVEWAYS.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CLEANLINESS ON ALL LOCAL
ROADWAYS AFFECTED BY HIS/HER CONSTRUCTION.
26. AS A CONDITION FOR QUALIFYING FOR FINAL PAYMENT THE CONTRACTOR SHALL FURNISH, UPON
COMPLETION OF THE PROJECT, 1 SET OF AS-CONSTRUCTED DRAWINGS PER CDOT STANDARD
SPECIFICATIONS AT NO ADDITIONAL COST TO THE PROJECT.
27. SEEDING SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 212 OF THE SPECIAL
PROVISIONS.
28. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS
OF CONSTRUCTION AND/OR TOES OF SLOPE AS SHOWN ON THE PLANS. ANY DISTURBANCE
BEYOND THESE LIMITS SHALL BE RESTORED TO ORIGINAL CONDITION BY THE CONTRACTOR AT
HIS/HER EXPENSE. CONSTRUCTION ACTIVITIES, IN ADDITION TO NORMAL CONSTRUCTION
PROCEDURES, SHALL INCLUDE THE PARKING OF VEHICLES OR EQUIPMENT, DISPOSAL OF LITTER, AND ANY OTHER ACTION WHICH WOULD INCLUDE CLEARING AND GRUBBING, AND LANDSCAPE
RESTORATION LUMP SUM ITEMS SHALL BE BID TO INCLUDE ALL AREAS DISTURBED DURING
CONSTRUCTION, WHETHER WITHIN OR OUTSIDE THE LIMITS OF CONSTRUCTION.
29. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCEPTANCE AND CONTROL OF ALL
SUBSURFACE DRAINAGE AND GROUNDWATER ENTERING THE PROJECT AREA. CONTRACTOR IS
RESPONSIBLE FOR PROVIDING DEWATERING, IF NEEDED, AT NO ADDITIONAL COST TO THE
PROJECT. DEWATERING METHODS SHALL BE APPROVED BY THE CITY.
30. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESERVING ALL LAND MONUMENTS.
MONUMENTS DISTURBED DURING CONSTRUCTION ACTIVITY SHALL BE RESET AT NO ADDITIONAL
COST TO THE PROJECT. THE RESETTING OF MONUMENTS SHALL BE DONE UNDER THE DIRECT
SUPERVISION OF A REGISTERED LAND SURVEYOR. THE CONTRACTOR SHALL FILE MONUMENT
RECORDS WITH THE BOARD OF REGISTRATION OF PROFESSIONAL ENGINEERS AND LAND
SURVEYORS FOR ALL LAND MONUMENTS RESET DURING CONSTRUCTION.
TRAFFIC CONTROL
1. THE CONTRACTOR SHALL PREPARE AND PRESENT HIS/HER METHOD FOR HANDLING
CONSTRUCTION ZONE TRAFFIC TO THE CITY FOR APPROVAL AT THE PRE-CONSTRUCTION
MEETING.
2. SUBSEQUENT CHANGES TO THE TRAFFIC CONTROL PLAN AND SEQUENCE OF WORK REQUESTED
BY THE CONTRACTOR SHALL BE SUBMITTED FOR APPROVAL 72 HOURS PRIOR TO
IMPLEMENTATION OF THE REVISED PLAN.
3. TRAFFIC CONTROL PLAN SHALL ADDRESS SPECIFIC PHASES OF CONSTRUCTION AND BE DRAWN
TO SCALE OR DIMENSIONED. TRAFFIC PLANNING WILL BE DIRECTED TO THE SAFETY OF THE
CONSTRUCTION FORCE AS WELL AS THE SAFE AND EXPEDITIOUS MOVEMENT OF TRAFFIC.
4. WORK WITHIN CITY ROW ROADWAY AREAS CLOSED TO THROUGH TRAFFIC MAY PROCEED
BETWEEN THE HOURS OF 7:00 AM AND 5:00 PM ON LOCAL STREETS, AND BETWEEN THE HOURS
OF 8:30 AM AND 3:30 PM ON COLLECTOR, ARTERIAL AND HIGH VOLUME LOCAL STREETS AS
DETERMINED IN WRITING BY THE CITY.
5. TRAFFIC CONTROL DURING CONSTRUCTION SHALL COMPLY WITH THE LATEST EDITION OF THE
FHWA'S "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AND OTHER DOCUMENTS DETAILED
IN THE SPECIFICATIONS.
6. MINIMUM TEMPORARY LANE WIDTH SHALL BE TEN (10) FEET, UNLESS OTHERWISE APPROVED IN
WRITING BY THE CITY.
7. PROVISIONS FOR PEDESTRIAN TRAFFIC SHALL BE MADE FOR ALL PHASES OF CONSTRUCTION
WHERE EXISTING PAVED PEDESTRIAN PATHS EXIST PRE-PROJECT.
UTILITIES
1. THE CONTRACTOR IS RESPONSIBLE TO EXCAVATE AND LOCATE ALL EXISTING UTILITIES WHICH
MAY AFFECT CONSTRUCTION. ALL EXPLORATORY EXCAVATIONS SHALL OCCUR FAR ENOUGH IN
ADVANCE TO PERMIT ANY NECESSARY RELOCATION TO BE MADE WITH MINIMAL DELAYS TO THE
PROJECT. UNLESS A PAY ITEM HAS BEEN INCLUDED FOR EXPLORATORY EXCAVATIONS
(POTHOLING), ALL EXPLORATORY EXCAVATIONS SHALL BE CONSIDERED INCIDENTAL TO THE
PROJECT. LACK OF THE CITY TO INCLUDE A POTHOLING PAY ITEM SHALL NOT PRECLUDE THE
CONTRACTOR FOR PERFORMING ALL NECESSARY EXPLORATORY EXCAVATIONS. THE
CONTRACTOR SHALL NOT BE COMPENSATED FOR ANY DELAY DUE TO UTILITY CONFLICTS.
2. ALL UTILITY RELOCATES WILL BE PERFORMED BY THE OWNING UTILITY COMPANY DURING THE
COURSE OF THE PROJECT, UNLESS A SEPARATE PAY ITEM IS PROVIDED.
3. THE CONTRACTOR SHALL PROVIDE UTILITY STAKING TO SUPPORT RELOCATIONS, IF REQUESTED
BY UTILITY OWNERS, AT NO ADDITIONAL COST TO THE PROJECT.
4. UTILITY LOCATIONS SHOWN ON THE PLAN ARE PLOTTED TO THE BEST INFORMATION AT TIME OF
DESIGN. UTILITY LOCATIONS SHOWN ON THE PLANS ARE FOR DESCRIPTIVE PURPOSES ONLY.
THE CONTRACTOR IS REQUIRED TO CONTACT THE PROPER UTILITY COMPANY AND/OR UTILITY
LOCATE COMPANY PRIOR TO CONSTRUCTION. LOCATION OF ALL UTILITIES WHETHER SHOWN ON
THE PLANS OR NOT, IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ANY DAMAGES TO
EXISTING UTILITIES CAUSED BY THE CONTRACTOR, OR ANY OF HIS SUBCONTRACTORS, SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR FOR ALL REPAIRS AT HIS EXPENSE.
5. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO AT LEAST
48 HOURS PRIOR TO CONSTRUCTION. CALL 800-922-1987.
6. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT
ALL UTILITIES TO COORDINATE SCHEDULES.
7. STORM SEWER PIPE SHALL BE PVC, SDR-35, OR RCP AS SPECIFIED ON DRAWINGS.
8. ALL STORM STRUCTURES TO BE CAST IN PLACE UNLESS OTHERWISE APPROVED IN WRITING BY
THE CITY OR AS NOTED IN THESE PLANS.
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_G
EN
N O
TE
S.
R
: a ro ba in a D
AT
E:
J ul
4, :1 1p
EF
S:
X R
EF
-T ne ct E ng in ee rin g_ lo go _1
-c ol or
T_GEN NOTES.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION GENERAL NOTES
1 1GEN 3
JB
RM
N/AN/A
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_Q
TY
.d w
R : a ro ba in a
D
AT
E:
J ul
4, :1
EF
S:
X
R
EF
-T ne ct
E ng in ee rin g_ lo go
_1 -c ol or
T_QTY.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION SUMMARY OF APPROXIMATE QUANTITIES
1 1SOQ 4
JB
RM
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
F:
\2
5\
1-
0\
5-
1- B\
-D es ig n\ Au to C
AD
\F in al
P la ns \S he et s\
_P ro je ct
\T
_S R
V0 8_
B2
.d
R : n st oc k D
AT
E:
J ul
4, :0 8p
EF
S:
X R
EF
-P
TT
N
V
_X
BN
D Y0
8_ A2
TO
PO
_A
EF
-D
SG
N R
D
T
_A
ER
L0 8_
B2
_P
TB
LK
_B
ER
O
SB
_B
ER
O S0
8_ B2
ER
O
SA
_B
U
TI
L0 8_
B2
EF
-D
SG
N R
D
_T
E
AN
N
O
_B
T_SRV08_B2503001.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 400 Denver, CO 80204
1525 Raleigh St
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION SURVEY CONTROL PLAN
1 1SRV 5
MRE
MRE
N/A1"=100'
SK
YL
IN
E
D R
PA
R
AM
O
U N
T
PK
W Y
W 26TH AVE HCL STA: 118+55.64
END CONSTRUCTION
POE:119+00.00W 26TH AVEW 26TH AVE HCL
M
IL
LE
R
S T
C
IR
C
LE
D R
L2 L3
W 26TH AVE
N
EW
C O
M
BE
S T
O
AK
S T
N
EL
SO
N
S T
M O
O R
E
ST
POB: 100+00.00 W 26TH AVE HCL
W 26TH AVE HCL STA: 100+72.31
BEGIN CONSTRUCTION
L1 L2
GEOMETRIC CONTROL LAYOUT
1 1GEO 6
JB
RM
N/A1"=80'
PROJECT 08
W 26TH AVE HCL
NO. STATION NORTHING EASTING LENGTH LENGTH/CHORD BEARING DELTA TANGENT RADIUS
L1 100+00.00 107+00.00
699996.33 699995.79
107114.10
107814.14 700.00' S89°57'19.13"E
L2 107+00.00 112+00.00
699995.79 699999.61
107814.14
108314.09 500.00' N89°33'41.59"E
L3 112+00.00 119+00.00
699999.61 700009.60
108314.09
109014.07 700.00' N89°10'56.52"E
SCALE IN FEET
0' 80'40'
M
AT
C H
LI
N
E
ST
A.
+0
M
AT
C H
LI
N
E
ST
A.
+0
SCALE IN FEET
0' 80'40'
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_G
EO
M
ET
R
IC
C O
N
TR
O L.
R
: a ro ba in a D
AT
E:
J ul
4, :1
EF
S:
V _X
BN
D
Y0 8_
A2
EF
-A
ER
IA
EF
-D
SG
N R
EF
-A
LG
N R
EF
-T ne ct
E ng in ee rin g_ lo go
_1 -c ol or
T_GEOMETRIC CONTROL.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
6" CONCRETE SIDEWALK
6" ABC (CLASS 6)
SUBGRADE COMPACTED TO MINIMUM DENSITY PER
SOIL CLASSIFICATION, CDOT SECTION 203.07
CONCRETE SIDEWALK & CURB RAMP
SECTION
TACK COAT BETWEEN LIFTS
(CSS-1H)
(INCIDENTAL)
3" HMA (GRADING S) (75) (PG 64-22)
6" ABC (CLASS 6) 1
SUBGRADE COMPACTED TO MINIMUM DENSITY PER
SOIL CLASSIFICATION, CDOT SECTION 203.07
FULL DEPTH HMA PATCH
SECTION
9"
4" HMA (GRADING S) (75) (PG 64-22)
2" HMA (GRADING SX) (75) (PG 64-22)
END CONDITIONS
CURB TYPE 2 (SECTION B) (8 INCH)
(SEE DETAIL)
INTEGRAL WITH CONCRETE SIDEWALK
CUT & FILL
PEDESTRIAN CURB
STA. 110+62.91 TO STA. 111+66.53
INSERTION POINT
INSERTION POINT
4:1 TYP(3:1 MAX)
4:1
4:1 TYP(3:1 MAX)
CURB TYPE 2
(SECTION B) (8 INCH)
DETAIL
R 1 12"
8"
6"
R 18" TO 14"
1 14"
6"
CONCRETE
SIDEWALK
10.0'
TRAVEL LANE
6.0'
SIDEWALK
PAID AS
CONCRETE
SIDEWALK
(6 INCH)
(26.7' - 41.4')VARIES
EX PAVEMENT
W 26TH AVE
HCL
EX
ROWTCE
W 26TH AVE
STA. 100+72.31 TO STA. 115+60.14
STA. 117+62.01 TO STA. 118+55.64
±13'
EX TRAVEL LANE
PAID AS VERTICAL
CURB AND GUTTER
VERTICAL CURB WITH SIDEWALK
(WR STD. DTL. C-D02 & SEE
CONCRETE SIDEWALK SECTION)
END CONDITION INSERTION POINT
(SEE END CONDITIONS)
2.0%
MAX.
2.5'VARIES
2.0'
BUFFER
1.5%
10.0'
TRAVEL LANE
6.0'
SIDEWALK
PAID AS
CONCRETE
SIDEWALK
(6 INCH)
(26.7' - 41.4')VARIES
EX PAVEMENT
W 26TH AVE
HCL
EX
ROWTCE
W 26TH AVE
STA. 115+60.14 TO STA. 117+62.01
±13'
EX TRAVEL LANE 2.5'VARIES
END CONDITION INSERTION POINT
(SEE END CONDITIONS)
VERTICAL CURB & GUTTER
(WR STD. DTL. C-D01)
FULL DEPTH HMA PATCH
(SEE SECTION)
FULL DEPTH HMA PATCH
(SEE SECTION)
1.5'
BIKE BUFFER4.5'
BIKE LANE
1.5'
BIKE BUFFER4.5'
BIKE LANE
MEDIAN COVER MATERIAL
(6 INCH PATTERNED CONCRETE)
(WR STD. DTL. C-G02)
2.0%
2.0%
TYPICAL SECTIONS
1 1TYP 7
JB
RM
N/AN/A
PROJECT 08
NOT TO SCALE
PLACE TOPSOIL (6" MIN) UPON COMPLETION OF FINAL GRADING.
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_T
YP
IC
AL
.d
R : a ro ba in a
D
AT
E:
J ul
4, :1
EF
S:
X
R
EF
-T ne ct
E ng in ee rin g_ lo go
_1 -c ol or
T_TYPICAL.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
1 THICKNESSES SHOWN ARE MINIMUMS.
CONTRACTOR SHALL MATCH EXISTING
THICKNESSES OR THE MINIMUMS SHOWN,
WHICHEVER IS GREATER.
ABBREVIATIONS
TCE = TEMPORARY CONSTRUCTION EASEMENT
ROW = RIGHT OF WAY
CHISLED CROSS
AS NOTED
IRR
MLB
FOV
WV
WMMLB
WM
WV
30MPH
IRR
WV
STOP
WV
WV
WV WV
T
LTP MLB
12"
WM
BU
BU
BU
BU
BU
BU
BU
BU
BU BU
BU
BU
BU
23" 36"
RESET MAILBOX
STRUCTURE (1 EA)
RESET FENCE (82 LF)
W 26TH AVE HCLW 26TH AVE
O
AK
S
T EX. ROW
(TYP.)
SAWCUT (TYP.)
ADJUST WATER
VALVE BOX (1 EA)
ADJUST WATER
METER (1 EA)
ADJUST WATER
VALVE BOX (1 EA)
ADJUST WATER
METER (1 EA)
RELOCATE IRRIGATION
VALVE BOX (1 EA)
REMOVAL OF CURB AND
GUTTER (106 LF)
STA: 103+92.96, 25.50' L
STA: 103+12.89, 25.42' L
TCE (TYP.)
PROPERTY LINE (TYP.) RESET MAILBOX
STRUCTURE (1 EA)
ADJUST FIBER OPTIC
VAULT (1 EA)
APPROXIMATE LOCATION OF EXIST. FIBER OPTIC,
CONTRACTOR SHALL USE CAUTION
NAIL AND DISK "OLSSON CNTL"
IRR
MLB
IRR
WV
MLB
T
IRR
MLBMLB
IRR
WM
IRR
IRR
8" 20"
BU
8"
WM
BU
BU
BU
12"BU
BU
BU
BU
BU 8"
6" 6"
6"6" 6"
6" BU
42" 43" 43"
D
RESET MAILBOX
STRUCTURE (1 EA)
RESET MAILBOX
STRUCTURE (1 EA)
RESET MAILBOX
STRUCTURE (1 EA)
W 26TH AVE HCL W 26TH AVE
EX. ROW
(TYP.)
SAWCUT (TYP.)
ADJUST WATER VALVE BOX
(1 EA)
RELOCATE IRRIGATION
VALVE BOX (1 EA)
ADJUST TELEPHONE
MANHOLE (1 EA)
RELOCATE IRRIGATION
VALVE BOX (1 EA)
RELOCATE IRRIGATION
VALVE BOX (1 EA)
REMOVAL OF
WALL (8 LF)
STA: 108+31.28, 17.64' L
STA: 108+35.69, 21.50' L
TCE (TYP.)
PROPERTY LINE (TYP.)
REMOVAL OF BOLLARD
(1 EA) (INCIDENTAL)
REMOVAL OF BUSH
(1 EA) (INCIDENTAL)
REMOVAL OF BUSH
(2 EA) (INCIDENTAL)
APPROXIMATE LOCATION OF EXIST. FIBER OPTIC,
CONTRACTOR SHALL USE CAUTION
REMOVAL OF
PIPE (21 LF)
STA: 107+92.78, 30.06' L
STA: 108+12.89, 31.87' L
REMOVAL PLAN
1 3REM 8
JB
RM
N/A1"=30'
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_P
LA
N R
D _R
EM
O
VA
L0
1.
R : a ro ba in a
D
AT
E:
J ul
4, :1
EF
S:
X
R
EF
-T ne ct
E ng in ee rin g_ lo go
_1 -c
EF
-A
LG
N R
TO
PO
_A
BN
D
Y0 8_
A2
EF
-D
SG
N R
D
_R
EM
O
VA
EF
-P
TT
N
_R
EM
O
EF
-D
SG
N R
EF
-D
SG
N R
D
_T
EF
-E
XI
ST
IN
G
P
AV
M
EN
T M
AR
KI
N G
S
EF
-E
XI
ST
U
TI
LI
TI
ES
T_PLANRD_REMOVAL01.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
REMOVAL LEGEND
REMOVAL OF
ASPHALT MAT
REMOVAL OF
SIDEWALK
REMOVAL OF
CONCRETE PAVEMENT
REMOVAL OF
CURB AND GUTTER
REMOVAL OF PIPE
REMOVAL OF WALL
REMOVAL OF FENCE
RESET FENCE
REMOVAL OF PAVEMENT
MARKING
NOTES
1. SEE SIDEWALK PLAN AND DETAILS FOR LIMITS OF CONSTRUCTION AND RESET LOCATIONS.
2. SEE SIGNING & STRIPING PLANS FOR ADDITIONAL RESETS AND REMOVALS.
3. CONTRACTOR TO REMOVE PAVEMENT, SIDEWALK AND CURB & GUTTER TO THE NEAREST JOINT AND REPLACE FULL
CONCRETE PANELS TO THE GREATEST EXTENT FEASIBLE.
4. ANY EXISTING FEATURES NOT SPECIFICALLY NOTED FOR REMOVAL SHALL BE PROTECTED IN PLACE. ANY DAMAGE TO
EXISTING FEATURES NOT NOTED FOR REMOVAL SHALL BE RESTORED TO THE PRE-PROJECT CONDITION OR BETTER AT
THE CONTRACTOR'S EXPENSE.
5. SAWCUTTING WILL NOT BE PAID SEPARATELY AND IS INCIDENTAL TO THE WORK.
6. CONTRACTOR SHALL EXERCISE EXTREME CAUSE WHEN EXCAVATING NEAR TREES AND SHRUBS AND SHALL CONTACT
THE CITY OF CRITICAL ROOTS (>1" DIAMETER WITHIN DRIPLINE) ARE ENCOUNTERED PRIOR TO CUTTING.\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
SCALE IN FEET
0' 30'15'
M
AT
C H
LI
N
E
ST
A.
+0
M
AT
C
H
LI
N E
ST
A.
+4
M
AT
C H
LI
N
E
ST
A.
+0
SCALE IN FEET
0' 30'15'
WV
25MPH
STOP
MLB
FOV
MLB
WM
BU6"
BU BU
4" BU BU BU BU BU BU
BU
60"
4" BU
12"
BU
BU
23"
BU
P-OHP-OHP-OHP-OHP-OH
RESET MAILBOX
STRUCTURE (1 EA)
REMOVAL OF WALL (25 LF)
W 26TH AVE HCLW 26TH AVE
C
IR
C
LE
D R
EX. ROW
(TYP.)
SAWCUT (TYP.)
ADJUST FIBER OPTIC
VAULT (1 EA)
ADJUST WATER
VALVE BOX (1 EA)
STA: 111+89.74, 31.82' L
PROPERTY LINE (TYP.)
STA: 111+66.53, 26.80' L
STA: 110+43.07, 34.10' L
STA: 110+57.90, 33.44' L
RESET FENCE (15 LF)
REMOVAL OF BOLLARD
(1 EA) (INCIDENTAL)
REMOVAL OF BOLLARD
(1 EA) (INCIDENTAL)
APPROXIMATE LOCATION OF EXIST. FIBER OPTIC,
CONTRACTOR SHALL USE CAUTION
TCE (TYP.)
REMOVAL OF BUSH (2 EA) (INCIDENTAL)
REMOVAL OF BUSH (1 EA) (INCIDENTAL)
MLBIRR
WV
WV
W
STOP
WV
35MPH
W
TP
WWV
ARROW LEFT ARROW RIGHT ARROW LEFT ARROW RIGHT
12" 8"
15"
15"
15"
BU
BU
BU
20"
20" 36"
30"
BU
P-OHP-OHP-OHP-OHP-OHP-OHP-OHP-OH
25MPH RESET MAILBOX
STRUCTURE (1 EA)
W 26TH AVE HCLW 26TH AVE
SK
YL
IN
E
D R
EX. ROW
(TYP.)
SAWCUT (TYP.)
ADJUST WATER
VALVE BOX (2 EA)
REMOVAL OF BUSH
(1 EA) (INCIDENTAL)
REMOVAL OF BUSH
(1 EA) (INCIDENTAL)
RELOCATE IRRIGATION
VALVE BOX (1 EA)
ADJUST WATER
MANHOLE (1 EA)
PROPERTY LINE (TYP.)
REMOVAL OF
BOLLARD (1 EA)
(INCIDENTAL)
REMOVAL OF BOLLARD
(1 EA) (INCIDENTAL)
APPROXIMATE LOCATION OF EXIST. FIBER OPTIC,
CONTRACTOR SHALL USE CAUTION
REMOVAL PLAN
2 3REM 9
JB
RM
N/A1"=30'
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_P
LA
N R
D _R
EM
O
VA
L0
1.
R : a ro ba in a
D
AT
E:
J ul
4, :1
EF
S:
X
R
EF
-T ne ct
E ng in ee rin g_ lo go
_1 -c
EF
-A
LG
N R
TO
PO
_A
BN
D
Y0 8_
A2
EF
-D
SG
N R
D
_R
EM
O
EF
-P
TT
N
_R
EM
O
EF
-D
SG
N R
EF
-D
SG
N R
D
_T
EF
-E
XI
ST
IN
G
P
AV
M
EN
T M
AR
KI
N
EF
-E
XI
ST
U
TI
LI
TI
ES
T_PLANRD_REMOVAL01.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
REMOVAL LEGEND
REMOVAL OF
ASPHALT MAT
REMOVAL OF
SIDEWALK
REMOVAL OF
CONCRETE PAVEMENT
REMOVAL OF
CURB AND GUTTER
REMOVAL OF PIPE
REMOVAL OF WALL
REMOVAL OF FENCE
RESET FENCE
REMOVAL OF PAVEMENT
MARKING
NOTES
1. SEE SIDEWALK PLAN AND DETAILS FOR LIMITS OF CONSTRUCTION AND RESET LOCATIONS.
2. SEE SIGNING & STRIPING PLANS FOR ADDITIONAL RESETS AND REMOVALS.
3. CONTRACTOR TO REMOVE PAVEMENT, SIDEWALK AND CURB & GUTTER TO THE NEAREST JOINT AND REPLACE FULL
CONCRETE PANELS TO THE GREATEST EXTENT FEASIBLE.
4. ANY EXISTING FEATURES NOT SPECIFICALLY NOTED FOR REMOVAL SHALL BE PROTECTED IN PLACE. ANY DAMAGE TO
EXISTING FEATURES NOT NOTED FOR REMOVAL SHALL BE RESTORED TO THE PRE-PROJECT CONDITION OR BETTER AT
THE CONTRACTOR'S EXPENSE.
5. SAWCUTTING WILL NOT BE PAID SEPARATELY AND IS INCIDENTAL TO THE WORK.
6. CONTRACTOR SHALL EXERCISE EXTREME CAUSE WHEN EXCAVATING NEAR TREES AND SHRUBS AND SHALL CONTACT
THE CITY OF CRITICAL ROOTS (>1" DIAMETER WITHIN DRIPLINE) ARE ENCOUNTERED PRIOR TO CUTTING.\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
M
AT
C H
LI
N
E
ST
A.
+8
M
AT
C
H
LI
N E
ST
A.
+2
M
AT
C H
LI
N
E
ST
A.
+8
M
AT
C
H
LI
N E
ST
A.
+4
SCALE IN FEET
0' 30'15'
NAIL AND DISK "OLSSON CNTL"
WV
WV
FOVTP
IRRMLB
WV
WV
WV
WV
4"
IRRIRR
4"LTP
C
EV
T
WV WV
WV
BU
P-OHP-OHP-OHP-OHP-OHP-OHP-OH
SD
RESET MAILBOX
STRUCTURE (1 EA)
W 26TH AVE
PA
R
AM
O U
N T
PK
W
Y
W 26TH AVE HCL
EX. ROW
(TYP.)
SAWCUT (TYP.)
RELOCATE IRRIGATION
VALVE BOX (1 EA)
ADJUST WATER
VALVE BOX (1 EA)
APPROXIMATE LOCATION OF EXIST. FIBER OPTIC,
CONTRACTOR SHALL USE CAUTION
ADJUST TELEPHONE
PEDESTAL (1 EA)
ADJUST FIBER OPTIC
VAULT (1 EA)
RESET FENCE (55 LF)
STA: 118+13.29, 34.13' L STA: 118+43.15, 59.16' L
REMOVAL PLAN
3 3REM 10
JB
RM
N/A1"=30'
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_P
LA
N R
D _R
EM
O
VA
L0
1.
R : a ro ba in a
D
AT
E:
J ul
4, :1
EF
S:
X
R
EF
-T ne ct
E ng in ee rin g_ lo go
_1 -c
EF
-A
LG
N R
TO
PO
_A
BN
D
Y0 8_
A2
EF
-D
SG
N R
D
_R
EM
O
EF
-P
TT
N
_R
EM
O
EF
-D
SG
N R
EF
-D
SG
N R
D
_T
EF
-E
XI
ST
IN
G
P
AV
M
EN
T M
AR
KI
N
EF
-E
XI
ST
U
TI
LI
TI
ES
T_PLANRD_REMOVAL01.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
REMOVAL LEGEND
REMOVAL OF
ASPHALT MAT
REMOVAL OF
SIDEWALK
REMOVAL OF
CONCRETE PAVEMENT
REMOVAL OF
CURB AND GUTTER
REMOVAL OF PIPE
REMOVAL OF WALL
REMOVAL OF FENCE
RESET FENCE
REMOVAL OF PAVEMENT
MARKING
NOTES
1. SEE SIDEWALK PLAN AND DETAILS FOR LIMITS OF CONSTRUCTION AND RESET LOCATIONS.
2. SEE SIGNING & STRIPING PLANS FOR ADDITIONAL RESETS AND REMOVALS.
3. CONTRACTOR TO REMOVE PAVEMENT, SIDEWALK AND CURB & GUTTER TO THE NEAREST JOINT AND REPLACE FULL
CONCRETE PANELS TO THE GREATEST EXTENT FEASIBLE.
4. ANY EXISTING FEATURES NOT SPECIFICALLY NOTED FOR REMOVAL SHALL BE PROTECTED IN PLACE. ANY DAMAGE TO
EXISTING FEATURES NOT NOTED FOR REMOVAL SHALL BE RESTORED TO THE PRE-PROJECT CONDITION OR BETTER AT
THE CONTRACTOR'S EXPENSE.
5. SAWCUTTING WILL NOT BE PAID SEPARATELY AND IS INCIDENTAL TO THE WORK.
6. CONTRACTOR SHALL EXERCISE EXTREME CAUSE WHEN EXCAVATING NEAR TREES AND SHRUBS AND SHALL CONTACT
THE CITY OF CRITICAL ROOTS (>1" DIAMETER WITHIN DRIPLINE) ARE ENCOUNTERED PRIOR TO CUTTING.\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
SCALE IN FEET
0' 30'15'
M
AT
C H
LI
N
E
ST
A.
+2
IRR
MLB
FOV
WV
WMMLB
WM
WV
30MPH
IRR
WV
STOP
WV
WV
WV WV
T
LTP MLB
12"
WM
BU
BU
BU
BU
BU
BU
BU
BU BU
BU
BU
BU
23" 36"
V
W 26TH AVE HCLW 26TH AVE
O
AK
S T
PROP. 6' x 8'
CONCRETE
BOARDING PAD
EX. ROW
(TYP.)
RESET MAILBOX
STA: 101+90.48, 26.00' L
SAWCUT (TYP.)
40.0'2.0' 2.0'
DW - A1 DW - A2
DW - A3
DW - B1
PROPERTY LINE (TYP.) TCE (TYP.)
STA: 100+72.31, 16.69' L
EL= MATCH EXIST.
STA: 100+79.31, 0.00'
EL= MATCH EXIST.
STA: 101+19.31, 0.00'
EL= MATCH EXIST.
STA: 100+77.31, 15.99' L
EL= 5580.66
STA: 101+21.31, 16.00' L
EL= 5581.13
STA: 101+29.51, 16.00' L
EL= 5581.24
STA: 101+35.51, 16.00' L
EL= 5581.33
STA: 101+47.19, 16.00' L
EL= 5581.67
STA: 101+53.19, 16.00' L
EL= 5581.64
STA: 101+73.13, 16.00' L
EL= 5581.97
STA: 101+79.13, 16.00' L
EL= 5582.12
STA: 102+27.88, 16.00' L
EL= 5583.94
STA: 102+21.88, 16.00' L
EL= 5583.63
STA: 101+98.39, 16.00' L
EL= 5582.73
STA: 101+92.39, 16.00' L
EL= 5582.47
STA: 103+16.01, 16.00' L
EL= 5587.24
STA: 103+10.01, 16.00' L
EL= 5586.98
STA: 102+63.49, 16.00' L
EL= 5585.14
STA: 102+57.49, 16.00' L
EL= 5584.92
STA: 103+66.01, 16.00' L
EL= 5590.57
STA: 100+77.31, 24.50' L
EL= 5581.11
STA: 100+79.31, 26.50' L
EL= 5581.15
STA: 103+18.51, 26.00' L
STA: 103+92.98, 26.00' L
RESET MAILBOX
STA: 103+17.51, 26.00' L
RESET FENCE
DW - B1
6.
0'
.0
4.
5'
RELOCATED
IRRIGATION
VALVE BOX
IRR
MLB
IRR
WV
MLB
T
IRR
MLBMLB
IRR
WM
IRR
IRR
8" 20"
BU
8"
WM
BU
BU
BU
12"BU
BU
BU
BU
BU 8"
6" 6"
6"6" 6"
6" BU
42" 43" 43"
D
MH
V
W 26TH AVE HCL W 26TH AVE
EX. ROW
(TYP.)
RESET MAILBOX
STA: 105+17.95, 26.00' L
RESET MAILBOX
STA: 106+54.78, 26.00' L
RESET MAILBOX
STA: 107+11.89, 26.05' L
SAWCUT (TYP.)
DW - A4 DW - A5 DW - A6
DW - A7
DW - A8
DW - A9
PROPERTY LINE (TYP.)
TCE (TYP.)
C
STA: 104+16.01, 16.00' L
EL= 5593.81
STA: 104+89.34, 16.00' L
EL= 5598.67
STA: 104+83.34, 16.00' L
EL= 5598.24
STA: 104+59.34, 16.00' L
EL= 5596.59
STA: 104+53.34, 16.00' L
EL= 5596.19
STA: 105+49.34, 16.00' L
EL= 5601.51
STA: 105+43.34, 16.00' L
EL= 5601.45
STA: 105+26.34, 16.00' L
EL= 5600.98
STA: 105+20.34, 16.00' L
EL= 5600.76
STA: 106+00.93, 16.00' L
EL= 5602.15
STA: 105+94.93, 16.00' L
EL= 5602.12
STA: 105+84.93, 16.00' L
EL= 5602.06
STA: 105+78.93, 16.00' L
EL= 5602.02
STA: 106+49.53, 16.00' L
EL= 5601.42
STA: 106+43.53, 16.00' L
EL= 5601.61
STA: 106+19.53, 16.00' L
EL= 5602.10
STA: 106+13.53, 16.00' L
EL= 5602.14
.0
6.
0'
STA: 106+83.34, 16.00' L
EL= 5600.52
STA: 107+44.28, 16.00' L
EL= 5598.67
STA: 107+38.28, 16.00' L
EL= 5598.87
STA: 107+23.28, 16.00' L
EL= 5599.38
STA: 107+17.28, 16.00' L
EL= 5599.61
STA: 108+19.24, 16.00' L
EL= 5596.70
STA: 108+09.24, 16.00' L
EL= 5596.88
STA: 107+95.24, 16.00' L
EL= 5597.33
STA: 107+85.24, 16.03' L
EL= 5597.51
D4.
5'
RELOCATED IRRIGATION
VALVE BOX
RELOCATED
IRRIGATION
VALVE BOX
RELOCATED
IRRIGATION
VALVE BOX
STA: 104+53.88, 34.50' L
EL= MATCH EXIST.
STA: 104+88.47, 34.50' L
EL= MATCH EXIST.
SIDEWALK PLAN
1 3PLN 11
JB
RM
N/A1"=30'
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_P
LA
N R
D _S
ID
EW
AL
K0
1.
R : a ro ba in a
D
AT
E:
J ul
4, :1
EF
S:
X
R
EF
-T ne ct
E ng in ee rin g_ lo go
_1 -c
EF
-A
LG
N R
TO
PO
_A
BN
D
Y0 8_
A2
EF
-D
SG
N R
D
_T
EF
-D
SG
N
R
EF
-E
XI
ST
U
TI
LI
TI
ES
6-
-2
2_ T_
PU
TI
L0 8_
B2
EF
-D
SG
N R
D
_G R
AD
EL
IN
EF
-P
TT
N
T_PLANRD_SIDEWALK01.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
M
AT
C H
LI
N
E
ST
A.
+0
M
AT
C
H
LI
N E
ST
A.
+4
M
AT
C H
LI
N
E
ST
A.
+0
SCALE IN FEET
0' 30'15'
SCALE IN FEET
0' 30'15'
ROADWAY LEGEND
FULL DEPTH HMA PATCH
(SEE TYPICAL SECTIONS)
HIGH-EARLY STRENGTH
CONC PVMT (6") ON
ABC (CLASS 6) (6")
HIGH EARLY STRENGTH
CONCRETE (11") (PER RTD STD.
DTL. SD-C104)
CONCRETE SIDEWALK
(SEE TYPICAL SECTIONS)
CONCRETE CURB RAMP
(SEE TYPICAL SECTIONS)
MEDIAN COVER MATL
(6" PATT CONC)
RESET DRIVEWAY GRAVEL (1")
ABC (CLASS 6) (1")
WR VERTICAL C&G
CURB & GUTTER TYPE 2
SECTION IB (PER CDOT
STD. DTL. M-608-1)
ALLEY CURB HEAD
(PER CITY & COUNTY OF
DENVER STD. DTL. 10.4)
CURB TYPE 2 (SECTION B) (8")
(SEE TYPICAL SECTIONS)
GRADING LIMITV
C
D
B
NOTES
1. STATION AND OFFSET CALLOUTS ARE RELATIVE TO THE W 26TH AVE HCL.
2. SEE SIDEWALK AND CURB RAMP DETAILS FOR ADDITIONAL GEOMETRIC AND ELEVATION INFORMATION.
3. SEE DRAINAGE PLAN FOR ADDITIONAL INFORMATION ON PROPOSED PIPE AND STRUCTURES.
4. RESET ITEMS ARE SHOWN AT NEW LOCATIONS. SEE REMOVAL PLAN FOR EXISTING LOCATIONS.
5. FENCES SHALL BE RESET IN PLACE UNLESS LOCATED WITHIN EXISTING ROW; IN THAT CASE, FENCES SHALL BE
INSTALLED 1' OUTSIDE OF EXISTING ROW.
6. MAILBOXES IDENTIFIED FOR RESET SHALL BE RESET TO PRE-PROJECT CONDITION AND SHALL BE LOCATED SUCH THAT
THE MAILBOX DOES NOT ENCROACH INTO THE SIDEWALK, ROADWAY, OR DRIVEWAY. STATION AND OFFSET CALLOUTS
REFER TO THE CENTER OF POST BUT SHALL BE FIELD VERIFIED.
7. SEE TYPICAL SECTIONS FOR MONOLITHIC CURB, GUTTER, AND SIDEWALK APPLICATIONS.
STOP
MLB
FOV
MLB
WM
BU6"
BU BU
4" BU BU BU BU BU BU
BU
60"
4" BU
12"
BU
BU
23"
BU
P-OHP-OHP-OHP-OHP-OH
V V
W 26TH AVE HCL
W 26TH AVE
C
IR
C
LE
D R
R1 5.
0'
PROP. 6' x 8' CONCRETE
BOARDING PAD
STA: 110+97.83, 16.00' L
EL= 5589.78
EX. ROW
(TYP.)
R15.0'
RESET MAILBOX
STA: 109+55.31, 26.00' L
.0
6.
0'
SAWCUT (TYP.)
5.
5'
5.
5'
40.0' 2.0'2.0'
DW - A10 DW - A11
DW - A12
7.
3'
B
TCE (TYP.)
PROPERTY LINE (TYP.)
STA: 110+99.83, 0.00'
EL= MATCH EXIST.
STA: 111+39.83, 0.00'
EL= MATCH EXIST.
STA: 109+03.21, 16.00' L
EL= 5594.31
STA: 108+79.21, 16.00' L
EL= 5594.84
STA: 108+73.21, 16.00' L
EL= 5594.92
STA: 108+45.24, 16.00' L
EL= 5595.78
STA: 109+09.21, 16.00' L
EL= 5594.09
STA: 109+34.38, 16.00' L
EL= 5593.58
STA: 110+12.25, 16.00' L
EL= 5591.93
STA: 110+06.25, 16.00' L
EL= 5592.06
STA: 109+82.25, 16.00' L
EL= 5592.70
STA: 109+75.80, 16.00' L
EL= 5592.98
STA: 109+63.80, 16.00' L
EL= 5593.00
6.
0'
.0
STA: 110+62.91, 16.00' L
EL= 5590.88
STA: 110+56.91, 16.00' L
EL= 5591.04
STA: 110+43.91, 16.00' L
EL= 5591.33
STA: 110+37.91, 16.00' L
EL= 5591.46
STA: 110+62.91, 25.75' L
EL= 5591.35
STA: 111+41.83, 16.00' L
EL= 5588.38
STA: 111+62.70, 18.50' L
EL= 5587.76
STA: 111+66.53, 25.75' L
EL= 5587.84
STA: 111+76.62, 30.00' L
EL= 5587.67
STA: 111+87.13, 30.00' L
EL= 5586.93
STA: 112+11.65, 16.00' L
EL= 5586.15
STA: 112+11.65, 24.00' L
EL= 5586.38
STA: 111+89.55, 16.00' L
EL= 5586.87
STA: 111+89.49, 24.00' L
EL= 5586.87
STA: 112+13.96, 30.00' L
EL= 5586.31
STA: 112+40.13, 16.00' L
EL= 5585.33
STA: 112+24.47, 30.00' L
EL= 5586.34
5.0' 5.0'
STA: 110+43.07, 34.10' L
STA: 110+57.90, 33.44' L
4.
5' 4.
5'
2.0' 2.0'
RESET FENCE
STA: 109+16.10, 40.28' L
EL= MATCH EXIST.
STA: 110+23.13, 38.89' L
EL= MATCH EXIST.
STA: 110+99.83, 25.75' L
EL= 5590.24
MLBIRR
WV
WV
W
STOP
WV
35MPH
W
TP
WWV
ARROW LEFT ARROW RIGHT ARROW LEFT ARROW RIGHT
12" 8"
15"
15"
15"
BU
BU
BU
20"
20" 36"
30"
BU
P-OHP-OHP-OHP-OHP-OHP-OHP-OHP-OH
25MPH
V V
W 26TH AVE HCLW 26TH AVE
SK
YL
IN
E
D R
R20.0' R20.0'
EX. ROW
(TYP.)
RESET MAILBOX
STA: 116+52.94, 28.00' L
.0
6.
0'
SAWCUT (TYP.)
2.
0'
DW - A13PROPERTY LINE (TYP.)
STA: 112+90.13, 16.00' L
EL= 5583.88
STA: 113+40.13, 16.00' L
EL= 5582.45
STA: 113+90.13, 16.00' L
EL= 5581.17
STA: 114+40.13, 16.00' L
EL= 5580.41
STA: 114+90.13, 16.00' L
EL= 5579.54
STA: 115+26.87, 26.50' L
EL= 5579.05
STA: 115+16.26, 26.50' L
EL= 5579.29
STA: 115+70.76, 26.50' L
EL= 5578.86
STA: 115+60.14, 26.50' L
EL= 5578.37
STA: 115+96.89, 16.00' L
EL= 5578.34
STA: 116+96.63, 16.00' L
EL= 5577.94
STA: 116+90.63, 16.00' L
EL= 5577.96
STA: 116+66.63, 16.00' L
EL= 5578.06
STA: 116+60.63, 16.00' L
EL= 5578.08
STA: 116+46.89, 16.00' L
EL= 5578.28
5.0' 5.0'
4.
5' 6.
0'
.0
4.
5'
2.0'
RELOCATED
IRRIGATION
VALVE BOX
SWALE FLOWLINE
STA: 115+00.85, 26.75' L
EL= 5579.00
STA: 115+17.65, 43.26' L
EL= 5578.69
SIDEWALK PLAN
2 3PLN 12
JB
RM
N/A1"=30'
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_P
LA
N R
D _S
ID
EW
AL
K0
1.
R : a ro ba in a
D
AT
E:
J ul
4, :1
EF
S:
X
R
EF
-T ne ct
E ng in ee rin g_ lo go
_1 -c
EF
-A
LG
N R
TO
PO
_A
BN
D
Y0 8_
A2
EF
-D
SG
N R
D
_T
EF
-D
SG
N
R
EF
-E
XI
ST
U
TI
LI
-2
2_ T_
PU
TI
L0 8_
B2
EF
-D
SG
N R
D
_G R
AD
EL
EF
-P
TT
N
T_PLANRD_SIDEWALK01.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
M
AT
C H
LI
N
E
ST
A.
+8
M
AT
C
H
LI
N E
ST
A.
+2
M
AT
C H
LI
N
E
ST
A.
+8
M
AT
C
H
LI
N E
ST
A.
+4
SCALE IN FEET
0' 30'15'
SCALE IN FEET
0' 30'15'
ROADWAY LEGEND
FULL DEPTH HMA PATCH
(SEE TYPICAL SECTIONS)
HIGH-EARLY STRENGTH
CONC PVMT (6") ON
ABC (CLASS 6) (6")
HIGH EARLY STRENGTH
CONCRETE (11") (PER RTD STD.
DTL. SD-C104)
CONCRETE SIDEWALK
(SEE TYPICAL SECTIONS)
CONCRETE CURB RAMP
(SEE TYPICAL SECTIONS)
MEDIAN COVER MATL
(6" PATT CONC)
RESET DRIVEWAY GRAVEL (1")
ABC (CLASS 6) (1")
WR VERTICAL C&G
CURB & GUTTER TYPE 2
SECTION IB (PER CDOT
STD. DTL. M-608-1)
ALLEY CURB HEAD
(PER CITY & COUNTY OF
DENVER STD. DTL. 10.4)
CURB TYPE 2 (SECTION B) (8")
(SEE TYPICAL SECTIONS)
GRADING LIMITV
C
D
B
NOTES
1. STATION AND OFFSET CALLOUTS ARE RELATIVE TO THE W 26TH AVE HCL.
2. SEE SIDEWALK AND CURB RAMP DETAILS FOR ADDITIONAL GEOMETRIC AND ELEVATION INFORMATION.
3. SEE DRAINAGE PLAN FOR ADDITIONAL INFORMATION ON PROPOSED PIPE AND STRUCTURES.
4. RESET ITEMS ARE SHOWN AT NEW LOCATIONS. SEE REMOVAL PLAN FOR EXISTING LOCATIONS.
5. FENCES SHALL BE RESET IN PLACE UNLESS LOCATED WITHIN EXISTING ROW; IN THAT CASE, FENCES SHALL BE
INSTALLED 1' OUTSIDE OF EXISTING ROW.
6. MAILBOXES IDENTIFIED FOR RESET SHALL BE RESET TO PRE-PROJECT CONDITION AND SHALL BE LOCATED SUCH THAT
THE MAILBOX DOES NOT ENCROACH INTO THE SIDEWALK, ROADWAY, OR DRIVEWAY. STATION AND OFFSET CALLOUTS
WV
FOVTP
IRRMLB
WV
WV
WV
WV
4"
IRRIRR
4"LTP
C
EV
T
WV WV
WV
BU
P-OHP-OHP-OHP-OHP-OHP-OHP-OH
SD
V
V
W 26TH AVE
PA
R
AM
O U
N T
PK
W
Y
W 26TH AVE HCL
EX. ROW
(TYP.)
RESET MAILBOX
STA: 117+89.69, 26.00' L
.0
6.
0'
SAWCUT (TYP.)
DW - A14
R15.0'
STA: 118+55.64, 11.50' L
EL= MATCH EXIST.
STA: 117+62.01, 16.00' L
EL= 5577.68
STA: 117+56.01, 16.00' L
EL= 5577.70
STA: 117+32.01, 16.00' L
EL= 5577.80
STA: 117+26.01, 16.00' L
EL= 5577.82
STA: 118+36.89, 16.00' L
EL= 5577.38
STA: 117+99.45, 16.00' L
EL= 5577.53
STA: 118+43.95, 29.24' L
EL= 5577.93
STA: 118+13.29, 34.13' L
STA: 118+51.55, 47.00' L
EL= 5576.50
STA: 118+45.05, 47.00' L
EL= 5577.13
STA: 118+51.85, 25.02' L
EL= 5576.98
4.
5'
2.0'
RELOCATED IRRIGATION
VALVE BOX
STA: 118+43.15, 59.16' L
RESET FENCE
SIDEWALK PLAN
3 3PLN 13
JB
RM
N/A1"=30'
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_P
LA
N R
D _S
ID
EW
AL
K0
1.
R : a ro ba in a
D
AT
E:
J ul
4, :1
EF
S:
X
R
EF
-T ne ct
E ng in ee rin g_ lo go
_1 -c
EF
-A
LG
N R
TO
PO
_A
BN
D
Y0 8_
A2
EF
-D
SG
N R
D
_T
EF
-D
SG
N
R
EF
-E
XI
ST
U
TI
LI
-2
2_ T_
PU
TI
L0 8_
B2
EF
-D
SG
N R
D
_G R
AD
EL
EF
-P
TT
N
T_PLANRD_SIDEWALK01.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
M
AT
C H
LI
N
E
ST
A.
+2
SCALE IN FEET
0' 30'15'
ROADWAY LEGEND
FULL DEPTH HMA PATCH
(SEE TYPICAL SECTIONS)
HIGH-EARLY STRENGTH
CONC PVMT (6") ON
ABC (CLASS 6) (6")
HIGH EARLY STRENGTH
CONCRETE (11") (PER RTD STD.
DTL. SD-C104)
CONCRETE SIDEWALK
(SEE TYPICAL SECTIONS)
CONCRETE CURB RAMP
(SEE TYPICAL SECTIONS)
MEDIAN COVER MATL
(6" PATT CONC)
RESET DRIVEWAY GRAVEL (1")
ABC (CLASS 6) (1")
WR VERTICAL C&G
CURB & GUTTER TYPE 2
SECTION IB (PER CDOT
STD. DTL. M-608-1)
ALLEY CURB HEAD
(PER CITY & COUNTY OF
DENVER STD. DTL. 10.4)
CURB TYPE 2 (SECTION B) (8")
(SEE TYPICAL SECTIONS)
GRADING LIMITV
C
D
B
NOTES
1. STATION AND OFFSET CALLOUTS ARE RELATIVE TO THE W 26TH AVE HCL.
2. SEE SIDEWALK AND CURB RAMP DETAILS FOR ADDITIONAL GEOMETRIC AND ELEVATION INFORMATION.
3. SEE DRAINAGE PLAN FOR ADDITIONAL INFORMATION ON PROPOSED PIPE AND STRUCTURES.
4. RESET ITEMS ARE SHOWN AT NEW LOCATIONS. SEE REMOVAL PLAN FOR EXISTING LOCATIONS.
5. FENCES SHALL BE RESET IN PLACE UNLESS LOCATED WITHIN EXISTING ROW; IN THAT CASE, FENCES SHALL BE
INSTALLED 1' OUTSIDE OF EXISTING ROW.
6. MAILBOXES IDENTIFIED FOR RESET SHALL BE RESET TO PRE-PROJECT CONDITION AND SHALL BE LOCATED SUCH THAT
THE MAILBOX DOES NOT ENCROACH INTO THE SIDEWALK, ROADWAY, OR DRIVEWAY. STATION AND OFFSET CALLOUTS
DRIVEWAY WIDTH SHOWN ON PLANS
2%
2% 12:1
12:1
6' 6'
2%
6' 6'
A
A
2%2%
12:1
6'
6'
CONCRETE
SIDEWALK
SIDEWALK WIDTH
SHOWN ON PLANS
DRIVEWAY
ENTRANCE
SIDEWALK
(TYP.)
DRIVEWAY
TAPER (TYP.)
6' 6'
CONCRETE CURB
AND GUTTER
CONCRETE DRIVEWAY ENTRANCE TYPE 1
SLOPE VARIES
SECTION A-A
DRIVEWAY TRANSITION
SHOWN ON PLANS
SIDEWALK WIDTH
SHOWN ON PLAN S
VARIES
6" 6" CURB & GUTTER
EXISTING
DRIVEWAY
2% MAX
P1 P2 P3
P4
P5 P6
CENTER
DRIVEWAY DETAILS
1 3DTL 14
JB
RM
N/AN/A
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_D R
IV
EW
AY
D
ET
AI
LS
.d
R
: a ro ba in a D
AT
E:
J ul
4, :1
EF
S:
X R
EF
-T ne ct E ng in ee rin g_ lo go _1
-c
EF
-A
LG
N
R
TO
PO
_A
EF
-D
SG
N R
D
T_DRIVEWAY DETAILS.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
6' DRIVEWAY WIDTH
SHOW IN PLANS
6'
B
B
2%2%2%2%2%
SLOPE VARIES
12:1 12:1
SIDEWALK WIDTH
SHOWN ON PLANS
CONCRETE
PEDESTRIAN CURB (TYP.)
(WHEN SPECIFIED IN PLANS)
CONCRETE
SIDEWALK
CONCRETE CURB
AND GUTTER
PER CDOT STD M-609-1
CONCRETE DRIVEWAY ENTRANCE TYPE 2 SECTION B-B
DRIVEWAY TRANSITION
SHOWN ON PLANS
SIDEWALK WIDTH
SHOWN ON PLAN S
VARIES
6" 6" CURB & GUTTER
EXISTING
DRIVEWAY
2% MAX
C1P2 P4
P3
P1
P5
P7
P6
P8
DRIVEWAY DETAILS
2 3DTL 15
JB
RM
N/AN/A
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_D R
IV
EW
AY
D
ET
AI
LS
.d
R
: a ro ba in a D
AT
E:
J ul
4, :1
EF
S:
X R
EF
-T ne ct E ng in ee rin g_ lo go _1
-c
EF
-A
LG
N
R
TO
PO
_A
EF
-D
SG
N R
D
T_DRIVEWAY DETAILS.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
6' 17' 10.5'
C
2% 2%2%2%
SLOPE VARIES
12:1 6'
SECTION C-C
DRIVEWAY TRANSITION
SHOWN ON PLANS
SIDEWALK WIDTH
SHOWN ON PLAN S
VARIES
6" 6" CURB & GUTTER
EXISTING
DRIVEWAY
2% MAX
CONCRETE DRIVEWAY ENTRANCE TYPE 3 (MODIFIED)
6'
C
C
2%2%2% 2%
SLOPE VARIES
12:1 6'
CONCRETE
PEDESTRIAN CURB (TYP.)
(WHEN SPECIFIED IN PLANS)
CONCRETE
SIDEWALK
CONCRETE CURB
AND GUTTER
19'
C1P2
P4
P5
P6 P3
P1
C2
P7
P8
P9 P10 P11 P12
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_D R
IV
EW
AY
D
ET
AI
LS
.d
R
: a ro ba in a D
AT
E:
J ul
4, :1
EF
S:
X R
EF
-T ne ct E ng in ee rin g_ lo go _1
-c
EF
-A
LG
N
R
TO
PO
_A
EF
-D
SG
N R
D
T_DRIVEWAY DETAILS.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION DRIVEWAY DETAILS
3 3DTL 16
JB
RM
FOV
MLB
WM
IRR
12"
43"
43"
60"
4"
SD
STA: 108+25.20, 24.50' L
EL= 5596.85
W 26TH AVE
SAWCUT
W 26TH AVE HCL
DW - A9
DW - A10
R 1.0'
R 1.0'R
1.
0'R 1.
0'
3.7' 31.6'16.4'
5.5'5.0'
EX. ROW
PROPERTY LINE (TYP.)
4.
0'
TCE (TYP.)
VC
D
V
STA: 108+19.24, 16.00' L
EL= 5596.70
STA: 108+73.38, 16.00' L
EL= 5594.91
STA: 108+45.20, 18.00' L
EL= 5595.99
STA: 108+40.19, 17.00' L
EL= 5595.85STA: 108+30.20, 17.00' L
EL= 5596.16
STA: 108+25.20, 18.00' L
EL= 5596.23
STA: 108+73.21, 27.03' L
EL= 5595.48
STA: 108+41.64, 24.50' L
EL= 5596.34
STA: 108+35.69, 21.50' L
EL= 5596.41
STA: 108+30.20, 21.50' L
EL= 5596.61
STA: 108+32.94, 16.00' L
EL= 5596.16
6.
0'
8.
0'
2.3'
SIDEWALK DETAILS
1 1DTL 17
JB
RM
N/A1"=10'
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_S
ID
EW
AL
K D
ET
AI
LS
.d
R
: a ro ba in a D
AT
E:
J ul
4, :1
EF
S:
X R
EF
-T ne ct E ng in ee rin g_ lo go _1
-c
EF
-A
LG
N
R
TO
PO
_A
BN
D Y0
8_ A2
EF
-D
SG
N
R
EF
-D
SG
N
R D
_T
EF
-P
-2
2_ T_
PU
TI
L0 8_
B2
T_SIDEWALK DETAILS.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
SCALE IN FEET
0' 10'5'
ROADWAY LEGEND
FULL DEPTH HMA PATCH
(SEE TYPICAL SECTIONS)
CONC PVMT (6") ON
ABC (CLASS 6) (6")
CONCRETE SIDEWALK
(SEE TYPICAL SECTIONS)
WR VERTICAL C&G
CURB & GUTTER TYPE 2
SECTION IB (PER CDOT
STD. DTL. M-608-1)
ALLEY CURB HEAD
(PER CITY & COUNTY OF
DENVER STD. DTL. 10.4)
V
C
D
NOTES
1. STATION AND OFFSET CALLOUTS ARE RELATIVE TO THE W 26TH AVE HCL.
2. SEE TYPICAL SECTIONS FOR MONOLITHIC CURB, GUTTER, AND SIDEWALK APPLICATIONS.
3. SEE SIDEWALK PLAN FOR PAY LIMITS
MLB
BU
P-OHP-OHP-OHP-OH
2.
M
AX
2.
M
AX
2.
M
AX
2.
M
AX
8.30%
MAX.
8.30%
MAX.
6.0' 6.0' 6.5' 24.0' 6.0'
6.
0'
PED CURB (TYP.)
H = 4" AT LANDING
STA: 109+63.80, 16.00' L
EL= 5593.00
STA: 109+69.80, 16.00' L
EL= 5593.18
STA: 109+75.80, 16.00' L
EL= 5592.98
STA: 109+82.25, 16.00' L
EL= 5592.70
STA: 110+12.25, 16.00' L
EL= 5591.93
STA: 110+06.25, 16.00' L
EL= 5592.06
W 26TH AVEW 26TH AVE HCL
SAWCUT (TYP.)
EX. ROW
TCE
STA: 110+12.25, 18.50' L
EL= 5592.26
STA: 110+06.25, 18.50' L
EL= 5592.06
STA: 109+82.25, 18.50' L
EL= 5592.70
STA: 109+75.80, 18.50' L
EL= 5592.92
STA: 109+69.80, 18.50' L
EL= 5593.13
STA: 109+63.80, 18.50' L
EL= 5593.33
PROPERTY LINE
CURB RAMP DETAILS
1 4RMP 18
JB
RM
N/A1"=10'
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_C U
R B
R
AM
P D
ET
AI
LS
.d
R
: a ro ba in a D
AT
E:
J ul
4, :1
EF
S:
X R
EF
-T ne ct E ng in ee rin g_ lo go _1
-c
EF
-A
LG
N
R
TO
PO
_A
BN
D Y0
8_ A2
EF
-D
SG
N
R
EF
-P
TT
N
_C
U R
B_ R
AM
P
EF
-D
SG
N R
D
_T C
E
T_CURB RAMP DETAILS.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
SCALE IN FEET
0' 10'5'
CURB RAMP LEGEND
SIDEWALK
(5% MAX RUNNING SLOPE,
2% MAX XSLOPE)
RAMP
(12:1 MAX RUNNING SLOPE,
2% TYP. MAX XSLOPE)
LANDING - 4'X4' MIN AREA
(2% MAX SLOPE PARALLEL TO RAMP,
LESS THAN RAMP XSLOPE PERPENDICULAR TO RAMP)
GUTTER
(5% MAX SLOPE)
NOTES
1. SEE SIDEWALK PLAN FOR PAY LIMITS.
2. GUTTER SLOPE TRANSITIONS SHALL OCCUR
OVER A LENGTH OF 5' MINIMUM AND MAINTAIN
0.5% FLOWLINE SLOPE MINIMUM.
ABBREVIATIONS
M.E. = MATCH EXISTING
F.L. = FLOWLINE
S.W. = SIDEWALK
T.R. = TOP OF RAMP
B.R. = BOTTOM OF RAMP
PED = PEDESTRIAN
XSLOPE = CROSS SLOPE
W 26TH AVE SIGNALIZED CROSSWALK
STA: 112+29.47, 24.00' L
EL= 5585.93
WV
25MPH
STOP
BU
BU
23"
BU
P-OHP-OHP-OHP-OHP-OHP-OH
STA: 112+09.65, 26.00' L
EL= 5586.45
STA: 111+91.48, 26.00' L
EL= 5586.88
7.
3'
5.0' 7.2' 2.8' 5.0'7.2'2.8'
EX. ROW
EX. ROW
W 26TH AVEW 26TH AVE HCL
SAWCUT (TYP.)
C
IR
C
LE
D R
PED CURB (TYP.)
H = 4" AT LANDING
8.30%
MAX.
8.30%
MAX. 2.
M
AX
2.
M
AX
2.
M
AX
2.
M
AX
8.
0'
4.
0'
2.0' 22.0' 2.0'
8.0' CROSS PAN
(PER WR STD. DTL. C-B02)
STA: 111+89.55, 16.00' L
EL= 5586.87
STA: 112+11.65, 16.00' L
EL= 5586.15
STA: 111+86.62, 30.00' L
EL= 5586.89
STA: 111+87.13, 30.00' L
EL= 5586.93
STA: 112+13.96, 30.00' L
EL= 5586.31
STA: 112+11.91, 43.11' L
EL= 5587.20
STA: 112+09.65, 43.11' L
EL= MATCH EXIST.
STA: 111+91.37, 43.11' L
EL= MATCH EXIST.
STA: 111+88.87, 43.11' L
EL= 5587.87
STA: 112+28.65, 18.00' L
EL= 5585.53
R15.0' R15 .0'
6.
0'
2.
0'
5.0'5.0'
2.
0'
STA: 111+72.43, 18.00' L
EL= 5587.19
STA: 111+66.53, 25.75' L
EL= 5587.84
STA: 111+69.96, 18.50' L
EL= 5587.51
STA: 111+76.62, 24.00' L
EL= 5587.51
STA: 111+84.43, 24.00' L
EL= 5587.09
STA: 111+83.80, 24.00' L
EL= 5587.11
STA: 111+76.87, 43.11' L
EL= 5588.35
STA: 112+22.15, 43.11' L
EL= 5587.65
STA: 112+17.29, 24.00' L
EL= 5586.44
STA: 112+16.65, 24.00' L
EL= 5586.46
STA: 112+14.47, 30.00' L
EL= 5586.48
STA: 112+42.70, 18.50' L
EL= 5585.33
STA: 112+51.04, 24.50' L
EL= 5585.27
STA: 112+33.88, 29.04' L
EL= 5585.87
CROSS PAN F.L.
(TYP.)
6.
0'
6.
0'
STA: 112+17.15, 43.11' L
EL= 5587.57
STA: 111+76.90, 38.11' L
EL= 5588.03
STA: 112+22.15, 38.11' L
EL= 5587.15
STA: 112+17.15, 35.66' L
EL= 5587.08
STA: 111+72.89, 24.00' L
EL= 5587.64
STA: 112+24.47, 24.00' L
EL= 5586.16
CURB RAMP DETAILS
2 4RMP 19
JB
RM
N/A1"=10'
PROJECT 08
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 24, 2026PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
D W
G
W :\P ro je ct s\
\C E0
- 2 6t h Av e Si de w al k
G ap
W he at rid ge
C O
\p la ns \T
_C U
R B
R
AM
P D
ET
AI
LS
.d
R
: a ro ba in a D
AT
E:
J ul
4, :1
EF
S:
X R
EF
-T ne ct E ng in ee rin g_ lo go _1
-c
EF
-A
LG
N
R
TO
PO
_A
BN
D Y0
8_ A2
EF
-D
SG
N
R
EF
-P
TT
N
_C
U R
B_ R
EF
-D
SG
N R
D
_T C
E
T_CURB RAMP DETAILS.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 205 Golden, CO 80401
722 Washington Ave
PROJECT NO.:
OF
City of Wheat Ridge 7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
25-029B
100% PLANS
NOT FOR CONSTRUCTION
SCALE IN FEET
0' 10'5'
CURB RAMP LEGEND
SIDEWALK
(5% MAX RUNNING SLOPE,
2% MAX XSLOPE)
RAMP
(12:1 MAX RUNNING SLOPE,
2% TYP. MAX XSLOPE)
LANDING - 4'X4' MIN AREA
(2% MAX SLOPE PARALLEL TO RAMP,
LESS THAN RAMP XSLOPE PERPENDICULAR TO RAMP)
GUTTER
(5% MAX SLOPE)
NOTES
1. SEE SIDEWALK PLAN FOR PAY LIMITS.
2. GUTTER SLOPE TRANSITIONS SHALL OCCUR
OVER A LENGTH OF 5' MINIMUM AND MAINTAIN
0.5% FLOWLINE SLOPE MINIMUM.
ABBREVIATIONS
M.E. = MATCH EXISTING
F.L. = FLOWLINE
S.W. = SIDEWALK
T.R. = TOP OF RAMP
B.R. = BOTTOM OF RAMP
PED = PEDESTRIAN
W 26TH AVE AND CIRCLE DR INTERSECTION
W
STOP
WV
15"
15"
15"
BU
BU
BU
20"
P-OHP-OHP-OHP-OHP-OHP-OH
25MPH
6.
0'
6.
0'
6.
0' 6.
0'
5.0' 5.0' 5.0' 5.0' 5.0'5.0'
EX. ROW
EX. ROW
W 26TH AVEW 26TH AVE HCL
SAWCUT (TYP.)
SK
YL
IN
E
D R
PED CURB (TYP.)
H = 4" AT LANDING
8.30%
MAX.
8.30%
MAX.
2.
M
AX
2.
M
AX
2.
M
AX
2.
M
AX
22.0' 2.0'2.0'
STA: 115+52.51, 11.50' L
EL= MATCH EXIST.
STA: 115+34.51, 11.50' L
EL= MATCH EXIST.
STA: 115+10.51, 16.00' L
EL= 5579.00
STA: 115+76.51, 16.00' L
EL= 5578.42
STA: 115+03.89, 18.50' L
EL= 5579.35
STA: 115+11.26, 20.50' L
EL= 5579.33
STA: 115+20.19, 20.50' L
EL= 5579.08
STA: 115+19.11, 20.50' L
EL= 5579.10
STA: 115+26.87, 26.50' L
EL= 5579.05
STA: 115+26.26, 26.50' L
EL= 5579.12
STA: 115+11.26, 26.50' L
EL=…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .