Project-605-CS-005 VA LL CT and X-Ray 100 Percent CD Drawings Part1.pdf

PDF 31 MB Posted

Attached to
Amendment 0003 Z1DA--Radiology Suite with CT Scanner and X-Ray Rooms in the Emergency Department, Project 605-CSI-005
Solicitation number
36C25821B0002_1
Issued by

About this file

This solicitation is for a construction project to build a Radiology Suite with a CT Scanner and X-Ray Rooms in the Emergency Department at a VA medical center. The project number is 605-CSI-005. The contractor will be responsible for general construction and alterations in accordance with the attached statement of work, drawings, and specifications. The delivery schedule is within one hundred and eighty calendar days of receiving the notice to proceed. The estimated value of the project is between $1,000,000 and $2,000,000. Interested contractors must be registered in the System for Award Management and Vendor Information Pages. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NON-RATED

3-HOUR BARRIER

DEMOLITION

CONCRETE

CMU

FIREWALL

SMOKE BARRIER

2-HOUR BARRIER

1-HOUR BARRIER

1-HOUR PARTITION

EXISTING

NEW

WITH LEAD SHIELDING

DEPARTMENT OF VETERANS AFFAIRS

LOMA LINDA HEALTHCARE SYSTEM

EMERGENCY DEPARTMENT

CT SCANNER & X-RAY

@ AT

A.B. ANCHOR BOLT

A.C. ASPHALT CONCRETE

ADJ. ADJUSTABLE

A.F.F. ABOVE FINISH FLOOR

ALUM. ALUMINUM

< ANGLE

ARCH. ARCHITECTURAL

AMP. AMPERE

BD. BOARD

BLDG. BUILDING

BLK. BLOCK

BM. BEAM

BD. BOTTOM

CAB'T. CABINET

C.B. CATCH BASIN

℄ CENTER LINE

C.J. CONTROL JOINT

CEM. CEMENT

CERM. CERAMIC

CFCI. CONTRACTOR FURNISH/

CONTRACTOR INSTALLED

CFOI. CONTRACTOR FURNISH/

OWNER INSTALLED

CLG. CEILING

CLR. CLEAR

C.M.U. CONCRETE MASONRY UNIT

C.O. CLEAN OUT

COL. COLUMN

COMP. COMPOSITION

CONC. CONCRETE

CONST. CONSTRUCTION

CONT. CONTINUOUS

CONTR. CONTRACTOR

CTS'K. COUNTERSINK

DBL. DOUBLE

DET. DETAIL

D.F. DRINKING FOUNTAIN

DIA. DIAMETER

DIAG. DIAGONAL

DIM. DIMENSION

DN. DOWN

D.S. DOWN SPOUT

DR. DOOR

DWG. DRAWING

(E) EXISTING

EA. EACH

EL. ELEVATION

ELEC. ELECTRIC

ELEV. ELEVATOR OR/ ELEVATION

EQ. EQUAL

EQUIP. EQUIPMENT

E.W.C. ELECTRIC WATER CHILLER

EXIST. EXISTING

EXP. EXPANSION

EXP. JT. EXPANSION JOINT

EXT. EXTERIOR

F.D. FLOOR DRAIN

F.E.C. FIRE EXTINGUISHER CABINET

F.F. FACTORY FINISH

F.GL. FIXED GLASS

F.H. FIRE HYDRANT

F.H.C FIRE HOSE CABINET

FIN. FINISH

F.L. FLOW LINE

FLR. FLOOR

F.O.C. FACE OF CONCRETE

F.O.F. FACE OF FINISH

F.O.M. FACE OF MASONRY

F.O.S. FACE OF STUD

F.S. FINISHED SURFACE

FTG. FOOTING

GA. GAUGE

GAL. GALLON

GALV. GALVANIZED

G.D. GARBAGE DISPOSAL

G.I. GALVANIZED IRON

GL. GLASS

GRD. GRADE

GYP. BD. GYPSUM WALLBOARD

JAN. JANITOR

JST. JOIST

JT. JOINT

LAM. LAMINATED

LAV. LAVATORY

L.F. LINEAL FEET

LT. LIGHT

LT. WT. LIGHTWEIGHT

MAX. MAXIMUM

M.B. MACHINE BOLT

M.C. MEDICINE CABINET

MECH. MECHANICAL

M.H. MANHOLE

MIN. MINIMUM

MISC. MISCELLANEOUS

M.O. MASONRY OPENING

MTD. MOUNTED

MTL. METAL

(N) NEW

N.I.C. NOT IN CONTRACT

NO. NUMBER

N.T.S. NOT TO SCALE

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

O.H. OVERHEAD

OCCUP. OCCUPANCY

OFCI OWNER FURNISHED/

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED/

OWNER INSTALLED

OPN'G OPENING

P.H. PANIC HARDWARE

P. LAM. PLASTIC LAMINATE

PEN. PENETRATION

PL. PLATE

PLAS. PLASTER

PLYWD. PLYWOOD

PR. PAIR

PSI. POUNDS PER SQ. INCH

PVC. POLYVINYL CHLORIDE

Q.T. QUARRY TILE

R. RISER OR/ RADIUS

R.D. ROOF DRAIN

R.O. ROUGH OPENING

R.S. ROUGH SAWN

RAD. RADIUS

REF. REFRIGERATOR

REINF. REINFORCING

REQ'D. REQUIRED

RF. ROOF

RM. ROOM

S.D. STORM DRAIN

S.F. SQUARE FEET

S.M.S. SHEET METAL SCREW

S.S. STAINLESS STEEL

S.Y. SQUARE YARD

SCHED. SCHEDULE

SHF. SHELF

SHT. SHEET

SIM. SIMILAR

SLDG. SLIDING

SQ. SQUARE

STD. STANDARD

STL. STEEL

STRUCT. STRUCTURAL

SUSP. SUSPENDED

SYM. SYMMETRICAL

T. TOILET OR/ TREAD

T.C. TOP OF CURB

T.O.C. TOP OF CURB

T.O.P. TOP OF PARAPET

T.O.S. TOP OF SLAB

T.O.W. TOP OF WALL

T.P. TOP OF PAVING

T.S. TOPSET BASE

T.S.W. TOP OF SIDEWALK

T.W. TOP OF WALL

TELE. TELEPHONE

THK. THICK(NESS)

TYP. TYPICAL

U.N.O. UNLESS NOTED OTHERWISE

VFCI VENDOR FURNISH/

CONTRACTOR INSTALL

VFVI VENDOR FURNISH/ VENDOR

INSTALL

W.C. WATER CLOSET

OWNER

DEPARTMENT OF VETERANS AFFAIRS

11201 BENTON STREET

LOMA LINDA, CA 92357

(909) 538-6826

ARCHITECT

c|a ARCHITECTS

3633 LONG BEACH BOULEVARD, SUITE 200

LONG BEACH, CALIFORNIA 90807

(562) 595-5666

STRUCTURAL

IMEG CORP.

300 N. LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

(626) 463-2800

MECHANICAL/PLUMBING/ELECTRICAL/FIRE PROTECTION

IMEG CORP.

222 S. HARBOR BLVD, SUITE 800

ANAHEIM, CA 92805

(714) 490-5555

VA PROJECT NUMBER: 605-CSI-005

11201 BENTON STREET

LOMA LINDA, CA 92357

100% CONSTRUCTION DOCUMENT SUBMITTAL

09/04/2020

GENERAL

G000 GENERAL NOTES, CODE REQUIREMENTS, SYMBOLS, PROJECT

SCOPE, SHEET INDEX, PROJECT LOCATION

G001 GENERAL NOTES, FIRE STOPPING NOTES, AND ICRA FORM

G003 INFECTION PREVENTION GUIDELINES

G004 INFECTION PREVENTION GUIDELINES

G101 FIRST FLOOR OVERALL FIRE LIFE SAFETY PLAN (FOR

REFERENCE ONLY)

G111 FIRST FLOOR ENLARGED FIRE LIFE SAFETY PLAN

ARCHITECTURAL DEMOLITION

AD111 FIRST FLOOR DEMOLITION PLAN

ARCHITECTURAL

A111 FIRST FLOOR PLAN

A112 FIRST FLOOR SHIELDING PLAN

A121 FIRST FLOOR REFLECTED CEILING PLAN

A131 FIRST FLOOR EQUIPMENT PLAN

A190 ROOF PLAN

A200 INTERIOR ELEVATIONS

A300 PARTIAL BUILDING SECTIONS

A501 DETAILS

A502 DETAILS

A503 DETAILS

A504 DETAILS

A600 SCHEDULES

STRUCTURAL

S100 GENERAL NOTES

S101 GENERAL NOTES

S102 TYPICAL DETAILS

S200 PARTIAL PLANS

S300 SECTIONS AND DETAILS

S301 SECTIONS AND DETAILS

S302 SECTIONS AND DETAILS

S303 SECTIONS AND DETAILS

MECHANICAL

M001 GENERAL NOTES, SYMBOL LIST, ABBREVIATIONS,

APPLICABLE CODES AND SHEET INDEX

M002 MECHANICAL SCHEDULES

M120 MECHANICAL REMODEL PLAN

M220 MECHANICAL ROOF PLAN

M510 MECHANICAL DETAILS

M520 MECHANICAL DETAILS

M530 MECHANICAL DETAILS

M610 MECHANICAL CONTROLS

PLUMBING

P001 NOTES, SYMBOL LIST, ABBREVIATIONS, APPLICABLE CODES

SHEET INDEX AND FIXTURE SCHEDULE

P002 EQUIPMENT SCHEDULES

P110 PLUMBING DEMOLITION PLAN

P210 PLUMBING REMODEL PLAN

P410 ENLARGED PLANS

P510 PLUMBING DETAILS

P520 PLUMBING DETAILS

SHEET INDEX

ABBREVIATIONS

PROJECT

LOCATION

1ST FLOOR

PROJECT LOCATION

PROJECT TEAM

BC

G000

COVER SHEET

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o n e i g h t c o f o t o q u a r t r o t t h r g h t s o t o a l o t t h r a r t e o t o o t o d c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

KEY PLAN

VICINITY MAP

APPLICABLE CODE AND STANDARDS

CALIFORNIA BUILDING CODE 2019

(BASED ON INTERNATIONAL BUILDING CODE 2018)

LIFE SAFETY CODE, NFPA 101-2018

VA FIRE PROTECTION DESIGN MANUAL,

DECEMBER 2015 ICC / ANSI A117.1 2003 EDITION

UNIFORM FEDERAL ACCESSIBILITY STANDARDS, LATEST EDITION

NATIONAL FIRE CODES, 2018 EDITION

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD AND BIM STANDARDS, APPLICATIONS GUIDES, VA

BARRIER FREE DESIGN GUIDE AND OTHER GUIDANCE ON THE

TECHNICAL INFORMATION LIBRARY. PROJECT SHALL CONFORM TO VA

STANDARDS, 18-3 AND 18-8.

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

INTERNATIONAL BUILDING CODE (2018 OR LATEST EDITION).

INTERNATIONAL PLUMBING CODE (2018 OR LATEST EDITION).

CALIFORNIA BUILDING CODE (2019).

NATIONAL FIRE PROTECTION ASSOCIATION FIRE CODES, REFER TO FIRE

PROTECTION SPECIFICATIONS AND DRAWINGS.

WHERE CONFLICTS EXIST BETWEEN CODES, THE CODE SPECIFIED IN

THE VA FIRE PROTECTION DESIGN GUIDE SHALL BE FOLLOWED. FIRE

PROTECTION FEATURES NOT ADDRESSED IN THE NATIONAL FIRE

CODES SHALL BE DESIGNED TO COMPLY WITH THE 2018 IBC OR AS

OTHERWISE ADDRESSED IN THE DESIGN GUIDE.

CODE ANALYSIS

A2

A-000

A-000

A-000

SYMBOLS

ELEVATION NUMBER

SHEET NUMBER

INTERIOR ELEVATION

REVISION

DOOR REFERENCE

SEE SHT XX.X FOR

SCHEDULE

KEYNOTE

SHEET NUMBER

DETAIL NUMBER

DETAIL REFERENCE

SHEET NUMBER

WALL SECTION

SECTION NUMBER

BUILDING SECTION

ROOM NUMBER

GRID REFERENCE

SECTION NUMBER

SHEET NUMBER

WINDOW REFERENCE

SEE SHEET XX.X FOR

SCHEDULE

EQUIPMENT REFERENCE

SEE SHEET XX.X FOR

SCHEDULE

ELECTRICAL

E001 GENERAL NOTES, SYMBOL LIST, ABBREVIATIONS, APPLICABLE

CODES AND SHEET INDEX

E002 DEMOLITION NOTES, NURSE CALL SYSTEM DEFERRED

APPROVAL NOTES, PUBLIC ADDRESS SYSTEM DEFERRED

APPROVAL NOTES, PANEL SCHEDULES AND LOAD SUMMARIES

E003 PARTIAL SINGLE LINE DIAGRAMS (NORMAL POWER)

E004 PARTIAL SINGLE LINE DIAGRAMS (EMERGENCY POWER)

E005 ELECTRICAL KEY PLAN FIRST FLOOR

E110 ELECTRICAL ENLARGED DEMOLITION PLANS

E120 ELECTRICAL ENLARGED POWER AND SIGNAL PLAN

E121 ELECTRICAL ENLARGED LIGHTING PLAN

E200 ELECTRICAL DETAILS

E210 ELECTRICAL ROOF PLAN

E310 ELECTRICAL SHOP DRAWINGS - CT SCAN (FOR REFERENCE)

E311 ELECTRICAL SHOP DRAWINGS - CT SCAN (FOR REFERENCE)

E312 ELECTRICAL SHOP DRAWINGS - X-RAY (FOR REFERENCE)

E313 ELECTRICAL SHOP DRAWINGS - X-RAY (FOR REFERENCE)

FIRE PROTECTION

FP001 NOTES, SYMBOL LIST, ABBREVIATIONS, APPLICABLE CODES,

SHEET INDEX, AND FIXTURE SCHEDULE

FP110 FIRE PROTECTION DEMOLITION PLAN

FP210 FIRE PROTECTION REMODEL PLAN

FP410 FIRE PROTECTION ENLARGED PLANS

FP510 FIRE PROTECTION DETAILS

EQUIPMENT (FOR REFERENCE ONLY)

Q101 SIEMENS A-101, CT SCAN EQUIPMENT PLANS

Q102 SIEMENS A-102, CT SCAN EQUIPMENT PLANS

Q103 SIEMENS S-101, CT SCAN EQUIPMENT PLANS

Q104 SIEMENS S-102. CT SCAN EQUIPMENT PLANS

Q105 SIEMENS E-101, CT SCAN EQUIPMENT PLANS

Q106 SIEMENS E-501, CT SCAN EQUIPMENT PLANS

Q107 SIEMENS M-101, CT SCAN EQUIPMENT PLANS

Q108 SIEMENS M-501, CT SCAN EQUIPMENT PLANS

Q111 SIEMENS A-101, XRAY EQUIPMENT PLANS

Q112 SIEMENS A-102, XRAY EQUIPMENT PLANS

Q113 SIEMENS S-101, XRAY EQUIPMENT PLANS

Q114 SIEMENS S-102, XRAY EQUIPMENT PLANS

Q115 SIEMENS E-101, XRAY EQUIPMENT PLANS

Q116 SIEMENS E-102, XRAY EQUIPMENT PLANS

Q121 GULDMANN GUL101, FACILITY SIGNOFF

Q122 GULDMANN GUL102, GEN. INFO

Q123 GULDMANN GUL103, ATTACHMENT

Q124 GULDMANN GUL104, PROJECT DETAILS

Q125 GULDMANN GUL105, CT SCAN 1A-277

N

PROJECT

SITE

N

REDLANDS BLVD.

FWY

M O

U N

T A

I N

V

E

W

A

V E

A

N

D

E

R

S

O

S

T

B E

N T

PROSPECT AVE. PROSPECT AVE.

BARTON RD.

LAWTON AVE.

A N

D E

R S

BARTON RD.

PROSPECT AVE.

B E

N T

VA REPRESENTATIVE APPROVALS

NAME AND TITLE DATE SIGNATURE

Alex YI

Chief of Imaging

Conrad Salinas

Chief of Emergency Department

Mark Moritz

Chief of FMS

Shane Elliot

Associate Director

APPROVALS

CONSTRUCTION TYPE: I-A - FIRE SPRINKLERED, WITH

INTERSTITIAL SPACE

OCCUPANCY: I-2 - HOSPITAL

PROJECT SQUARE FOOTAGE: 1,540 SQ. FT.

NET DESIGN SQUARE FOOTAGE: 1540 SQ. FT.

DESIGN SQUARE FOOTAGE: 1540 SQ. FT.

PROJECT BUILDING INFORMATION:

BUILDING STORIES: 4 STORIES WITH PARTIAL BASEMENT

PROJECT LOCATION: 1st FLOOR

PROJECT DESCRIPTION:

CONSTRUCT NEW CT SCAN ROOM, X-RAY ROOM, CONTROL

ROOM, READING ROOM AND EQUIPMENT ROOM ON THE 1ST

FLOOR OF THE EMERGENCY DEPARTMENT.

FIRE RESISTIVE RATING REQUIREMENTS:

EXISTING MAIN CORRIDORS ARE 2-HOUR RATED FIRE WALLS.

AUTOMATIC SPRINKLER SYSTEM:

FULLY FIRE SPRINKLERED

WORK TO BE IN ACCORDANCE WITH 903.1.1

PROJECT DATA

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

BC

G001

GENERAL NOTES, FIRE STOPPING

NOTES, AND ICRA FORM

GENERAL NOTES

01 - GENERAL

1. ALL WORK SHALL CONFORM TO LISTED BUILDING CODES AND ALL APPLICABLE STATE

AND MUNICIPAL ORDINANCES AND ALL OTHER RULES AND REGULATIONS HAVING

JURISDICTION OVER THIS PROJECT. IN THE EVENT THAT TWO OR MORE REGULATIONS

CONFLICT, THE MORE RESTRICTIVE SHALL GOVERN.

2. FOR CONSTRUCTION PURPOSES, USE NOTED DIMENSIONS ONLY. DO NOT SCALE

DRAWINGS.

3. EXERCISE CARE TO PREVENT DAMAGE TO EXISTING EQUIPMENT, STRUCTURES AND

SERVICES. DAMAGE AS A RESULT OF THIS WORK SHALL BE REPAIRED OR REPLACED AT

NO ADDITIONAL COST TO THE OWNER.

4. VERIFY THE PRECISE LOCATIONS OF ALL EQUIPMENT WITH THE OWNER PRIOR TO THE

INSTALLATION OF THAT EQUIPMENT OR THE SERVICES THAT SUPPORT IT.

5. IT IS HEREBY UNDERSTOOD THAT THE HOSPITAL MUST MAINTAIN IT'S REGULAR

SERVICE DURING THE TIME WORK IS IN PROGRESS. ADVANCE SCHEDULING WITH THE

ENGINEERING DEPARTMENT SHALL BE ARRANGED BY THE CONTRACTOR TO ENSURE

NO DISRUPTION TO FACILITY SERVICES. SOME WORK MAY BE REQUIRED ON NIGHTS

AND WEEKENDS.

6. UPON COMPLETION OF EACH PHASE OF THE WORK AND AT SUCH TIMES AS DIRECTED

BY THE OWNER, REMOVE ALL SURPLUS MATERIAL, TOOLS AND DEBRIS AND LEAVE THE

SITE IN A CLEAN AND NEAT CONDITION.

7. PROVIDE PROTECTION FROM DUST, DIRT AND MOISTURE FOR THE PROTECTION OF THE

WORKMEN, STAFF, PATIENTS, THE PUBLIC AND EXISTING COMPUTER EQUIPMENT AS

REQUIRED BY ALL PERTINENT CODES, REGULATIONS, AND FACILITY STANDARDS.

8. THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO CONSTRUCT THE PROJECT IN

ACCORDANCE WITH THE 2019 CBC. SHOULD ANY CONDITION DEVELOP NOT COVERED

BY THE APPROVED CONSTRUCTION DOCUMENTS, WHEREIN THE FINISHED WORK WILL

NOT COMPLY WITH THE 2019 CBC, AMENDED CONSTRUCTION DOCUMENTS (ACDs)

DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED FOR COR

REVIEW AND ACCEPTANCE PRIOR TO INSTALLATION.

9. DIMENSIONS: ALL DIMENSIONS ARE TO FACE OF STUD (F.O.S.) OR CENTER LINE OF STUD

UNLESS NOTED OTHERWISE.

10. CHANGES IN LEVEL ON ACCESSIBLE ROUTE SHALL CONFORM WITH SECTION 11B-303 OF

THE 2019 CALIFORNIA BUILDING CODE.

11. CONTRACTOR SHALL COORDINATE WITH FACILITY TO MAINTAIN CONTINUOUS

ESSENTIAL SERVICES DURING CONSTRUCTION.

12. DO NOT CUT, NOTCH, DRILL, OR ALTER STRUCTURAL ELEMENTS UNLESS SPECIFICALLY

DETAILED ON APPROVED PLANS OR OTHERWISE ACCEPTED BY COR AND SEOR.

13. ALL ANCHORAGE EXPOSED TO WEATHER MUST BE STAINLESS STEEL OR HOT DIPPED

GALVANIZED.

14. UTILITY SHUTDOWNS REQUIRE A MINIMUM 21 DAY NOTICE TO THE COR.THE

CONTRACTOR SHALL COORDINATE WITH THE VA PROJECT MANAGER ALL UTILITY

SHUTDOWNS A MINIMUM OF 21 DAYS BEFORE THE REQUIRED SHUTDOWN

15. AN INFECTION CONTROL PERMIT (ICRA) MUST BE OBTAINED PRIOR TO BEGINNING OF

ANY CONSTRUCTION ACTIVITY. ALL REQUIREMENTS MUST BE MET BY GENERAL

CONTRACTOR. SEE SAMPLE ICRA ON THIS PAGE FOR REFERENCE.

16. THE CONTRACTOR SHALL COORDINATE WITH THE COR ALL WORK TO BE

ACCOMPLISHED IN OCCUPIED SPACES. A MINIMUM OF 21 DAYS NOTICE SHALL BE GIVEN

PRIOR TO STARTING THE WORK.

17. NO OVERCUTTING OF THE EXISTING CONCRETE SLAB SHALL BE ALLOWED. SEE DETAIL

1/S1.2.

18. TESTING LAB SHALL BE PROVIDED BY THE CONTRACTOR PENDING THE APPROVAL OF

THE V.A. THE TESTING LAB SHALL BE ISSUED AS A SUBMITTAL FOR REVIEW AND

APPROVAL.

19. WHERE POSSIBLE EXISTING UTILITIES SHALL BE RELOCATED TO ALLOW FOR

INSTALLATION OF THE NEW WORK.

20. ALL PIPING, CONDUIT, DUCTWORK AND PENETRATIONS THROUGH FIRE RATED OR

SMOKE WALLS SHALL BE FIRE STOPPED. SEE SHEET A503/DETAIL 1 FOR FIRESTOPPING

SYSTEMS.

21. ANY CHANGES MUST BE APPROVED BY THE CONTRACTING OFFICER BEFORE DOING

ANY ADDITIONAL WORK. WORK TO BE SCHEDULED DURING REGULAR DAY HOURS.

22. FOR ACCESSIBLE HEIGHTS REQUIRED IN THIS PROJECT, REFER TO 3/A503

02 - EXISTING CONDITIONS

1. VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE AND NOTIFY THE

ARCHITECT OF ANY DEVIATION FROM THE CONDITIONS PRESENTED HEREIN. FAILURE

TO DO SO SHALL CONSTITUTE ACCEPTANCE OF THE EXISTING CONDITIONS AND ANY

ADDITIONAL WORK REQUIRED SHALL BE ACCOMPLISHED AT NO ADDITIONAL COST TO

THE OWNER.

2. SALVAGE MATERIALS NOT SCHEDULED FOR REUSE SHALL BE STORED OR DISPOSED OF

AS INSTRUCTED BY THE OWNER.

3. DEMOLITION PLAN AND NOTES ARE INCLUDED FOR GENERAL INFORMATION ONLY AND

ARE NOT INTENDED TO REPRESENT ALL CONDITIONS PRESENT AT THE SITE. THE

CONTRACTOR IS RESPONSIBLE FOR PREPARING THE SITE FOR CONSTRUCTION AS

DESCRIBED AND DETAILED IN THE CONTRACT.

4. WHENEVER CUTTING, PATCHING, ETC. IS REQUIRED, ALL ADJACENT SURFACES SHALL

BE FINISHED TO ACHIEVE A MATCHING SURFACE CONDITION. SAW CUTTING AND CORE

DRILLING SHALL BE USED IN LIEU OF JACK HAMMERING.

5. ASBESTOS OR HAZARDOUS MATERIALS. IT IS UNDERSTOOD AND AGREED THAT THIS

CONTRACT DOES NOT CONTEMPLATE THE HANDLING OF ASBESTOS OR ANY

HAZARDOUS MATERIALS. IF ASBESTOS OR ANY HAZARDOUS MATERIALS IS

ENCOUNTERED, NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY. DO NOT

DISTURB, HANDLE OR ATTEMPT TO REMOVE.

07 - THERMAL AND MOISTURE PROTECTION

1. SEAL PENETRATIONS THROUGH RATED WALLS AND FLOORS WITH A MATERIAL CAPABLE

OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASES WHEN SUBJECT TO THE

REQUIREMENTS OF THE TEST STANDARD: SPECIFIC OF FIRE STOPS ASTM E-814.

2. SEE DETAIL 1/A503 FOR FIRE STOPPING SCHEDULE. CONTRACTOR TO PROVIDE

FIRESTOPPING SUBMITTAL TO ARCHITECT OF RECORD FOR REVIEW AND APPROVAL.

SUBMITTAL SHALL INCLUDE FIRESTOPPING DETAILS (WITH APPROVED UL REFERENCE)

COORDINATED WITH A LOCATION FLOOR PLAN. SUBMITTAL TO INCLUDE ENGINEERING

JUDGEMENT IF REQUIRED, SIMILAR FOR FIRE PROOFING PROVISIONS IF NECESSARY.

3. WHERE PROVIDED, THROUGH-PENETRATION FIRESTOP SYSTEM AND MEMBRANE

PENETRATION DETAILS ARE FOR REFERENCE ONLY. THROUGH-PENETRATIONS AND

MEMBRANE PENETRATIONS SHALL BE PROTECTED BY AN APPROVED PENETRATION

FIRESTOP SYSTEM OR MEMBRANE PENETRATION FIRESTOP SYSTEM INSTALLED AS

TESTED IN ACCORDANCE WITH ASTM E 814 OR UL 1479, WITH A MINIMUM POSITIVE

PRESSURE DIFFERENTIAL OF 0.01 INCH (2.49 PA) OF WATER OR AS OTHERWISE

PERMITTED BY CBC, SECTION 714. LISTED THROUGH-PENETRATION FIRESTOP SYSTEMS

AND MEMBRANE PENETRATIONS SHALL BE INSTALLED IN ACCORDANCE WITH THE

INSTALLATION DETAILS FOR LISTED SYSTEMS. LISTED THROUGH-PENETRATION

FIRESTOP SYSTEMS, MEMBRANE PENETRATION PROTECTION AND OTHER PERMITTED

MEANS AND METHODS OF PENETRATION PROTECTION SHALL BE SUBMITTED TO COR

FOR REVIEW AND ACCEPTANCE PRIOR TO INSTALLATION.

4. SEE FIRE-STOPPING REQUIREMENTS SECTION ON THIS PAGE FOR ADDITIONAL

INFORMATION.

08 - OPENINGS

1. MAXIMUM EFFORT TO OPEN DOORS SHALL BE: 5 LBS. INTERIOR, 5 LBS. EXTERIOR, AND

15 LBS AT FIRE DOORS.

2. HAND-ACTIVATED HARDWARE SHALL BE CENTERED BETWEEN 34 INCHES AND 44 INCHES

ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND

WHICH ARE IN A PATH OF TRAVEL, SHALL BE OPERABLE WITH A SINGLE EFFORT BY

HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO

GRASP.

3. ACCESS DOORS - PROVIDE ACCESS DOORS IN ALL HARD CEILINGS CONTAINING

JUNCTION BOXES AND/OR VALVES. LABEL ALL ACCESS DOORS AS TO VALVES LOCATED

ABOVE. NOTIFY HOSPITAL ENGINEERING DEPARTMENT PRIOR TO CLOSING UP CEILING

FOR FINAL REVIEW.

09 - FINISHES

1. FINISH MATERIALS IN EXIT WAYS, CORRIDORS, ROOMS AND ENCLOSED SPACES OF

SPRINKLERED BUILDINGS SHALL HAVE A FLAME SPREAD OF 75 OR LESS (CLASS B) AND A

SMOKE DEVELOPMENT OF 450 OR LESS (CLASS B). FINISH MATERIALS IN EXIT WAYS AND

CORRIDORS OF NON-SPRINKLERED BUILDINGS SHALL HAVE A FLAME SPREAD OF 25 OR

LESS (CLASS A) AND A SMOKE DEVELOPMENT OF 450 OR LESS (CLASS A) AND IN ROOMS

AND ENCLOSED SPACES FLAME SPREAD OF 75 OR LESS (CLASS B) AND A SMOKE

DEVELOPMENT OF 450 OR LESS (CLASS B). PER CBC TABLE 803.5.

2. PAINT SHALL BE THE PRODUCT OF ONE MANUFACTURER AND SHALL BE

DELIVERED TO JOB SITE IN SEALED CONTAINERS.

3. PAINT SHALL BE CONSIST OF MINIMUM TWO (2) COAT APPLICATION AND

APPROPRIATE SEALER.

4. RECESSED MOUNTED FIXTURES IN RATED WALLS/CEILINGS SHALL BE BACK

BOXED WITH MATERIALS EQUAL TO RATED WALL ASSEMBLY.

5. CEILINGS SHALL BE SMOOTH, EASILY CLEANED WITH NO ROUGH TEXTURES.

FLOORS SHALL BE SMOOTH, WATERPROOF AND DURABLE.

6. INTERIOR WALL FINISHES SHALL BE SMOOTH, WATERPROOF AND DURABLE.

7. GYPSUM BOARD SHALL BE PRIMED PRIOR TO INSTALLATION OF CASEWORK.

8. SET ALL TOPSET BASE ON SHEET VINYL IN A CONTINUOUS BEAD OF WATER

RESISTANT CAULKING.

26 - ELECTRICAL

1. 6'-0" MAX. FLEX CONDUIT WILL BE ALLOWED ABOVE LAY-IN CEILINGS FOR LIGHT

FIXTURES ONLY.

2. VERIFY AND PROVIDE SPRAY PAINTED EMERGENCY CIRCUIT CONDUIT AND

BOXES PER FACILITY STANDARD COLOR.

3. VERIFY AND PROVIDE SPRAY PAINTED FIRE ALARM CIRCUIT CONDUIT AND BOXES

PER FACILITY STANDARD COLOR.

4. ELECTRICAL COVER PLATES SHALL BE STAINLESS STEEL IN CLINICAL AREAS AND

IVORY IN OFFICE AREAS. CIRCUITS NUMBERS AND PANELS SHALL BE ENGRAVED

IN STAINLESS STEEL PLATES AND ENGRAVED LABELS SHALL BE ADHERED TO

IVORY PLATES.

5. LABEL ALL JUNCTION BOXES AS TO CIRCUIT NUMBERS LOCATED WITHIN.

6. FLEXIBLE CONDUIT CAN BE USED FOR LOW VOLTAGE WIRING.

1. ADMINISTRATIVE REQUIREMENTS:

A. THE PERSON WITH OVERALL RESPONSIBILITY FOR CONSTRUCTION OR THE PERSON

RESPONSIBLE FOR THE INSTALLATION OF REGULATED MANUFACTURED DEVICES

SHALL POST, OR MAKE AVAILABLE WITH THE BUILDING PERMIT(S) ISSUED FOR THE

BUILDING, THE INSTALLATION CERTIFICATE(S) FOR MANUFACTURED DEVICES

REGULATED BY THE APPLIANCE EFFICIENCY REGULATIONS OR PART 6. SUCH INSTALL

AT ION CERTIFICATE(S) SHALL BE MADE AVAILABLE TO THE ENFORCEMENT AGENCY

FOR ALL APPROPRIATE INSPECTIONS. THESE CERTIFICATES SHALL:

· IDENTIFY FEATURES REQUIRED TO VERIFY COMPLIANCE WITH THE APPLIANCE

EFFICIENCY REGULATIONS AND PART 6.

· INCLUDE A STATEMENT INDICATING THAT THE INSTALLED DEVICES CONFORM TO

THE APPLIANCE EFFICIENCY REGULATIONS AND PART 6 AND THE REQUIREMENTS

FOR SUCH DEVICES GIVEN IN THE PLANS AND SPECIFICATIONS APPROVED BY THE

LOCAL ENFORCEMENT AGENCY.

· STATE THE NUMBER OF THE BUILDING PERMIT UNDER WHICH THE CONSTRUCTION

OR INSTALLATION WAS PERFORMED. SEC. 10-103 (A) 3 A

B. AFTER INSTALLING WALL, CEILING, OR FLOOR INSULATION, THE INSTALLER SHALL

MAKE AVAILABLE TO THE ENFORCEMENT AGENCY OR POST IN A CONSPICUOUS

LOCATION IN THE BUILDING A CERTIFICATE SIGNED BY THE INSTALLER STATING THAT

THE INSTALLATION IS CONSISTENT WITH THE PLANS AND SPECIFICATIONS

DESCRIBED IN SEC. 10-103 (A) 2 A. THE CERTIFICATE SHALL ALSO STATE THE

MANUFACTURER'S NAME, MATERIAL IDENTIFICATION, AND THE INSTALLED R-VALUE.

SEC. 10-103 (A) 4

C. THE APPLICANT SHALL FILE ALL CERTIFICATE(S) OF ACCEPTANCE, REQUIRED BY THE

MECH-1-C, WITH THE ENFORCEMENT AGENCY PRIOR TO RECEIVING A FINAL

OCCUPANCY PERMIT. THE SIGNER(S) SHALL BE ELIGIBLE UNDER DIVISION 3 OF THE

BUSINESS AND PROFESSIONS CODE TO SIGN SUCH DOCUMENTS. SEC. 10-103 (B)

D. THE BUILDER SHALL PROVIDE THE BUILDING OWNER OR THE PERSON(S) RESPONSIBLE

FOR BUILDING MAINTENANCE (IN CASE OF MULTI-TENANT OR CENTRALLY OPERATED

BUILDINGS) AT OCCUPANCY THE FOLLOWING:

2. OPERATING INFORMATION: THE APPROPRIATE CERTIFICATE(S) OF COMPLIANCE AND A LIST

OF THE FEATURES, MATERIALS COMPONENT, AND MECHANICAL DEVICES INSTALLED IN THE

BUILDING AND INSTRUCTIONS ON HOW TO OPERATE THEM EFFICIENTLY.

3. MAINTENANCE INFORMATION: REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE

CLEARLY STATED AND INCORPORATED OR A READILY ACCESSIBLE LABEL. THE LABEL MAY BE

LIMITED TO IDENTIFYING THE OPERATION AND MAINTENANCE MANUAL.

4. VENTILATION INFORMATION: A DESCRIPTION OF THE QUANTITIES OF OUTDOOR AND

RECIRCULATED AIR THAT THE VENTILATION SYSTEMS ARE DESIGNED TO PROVIDE TO EACH

AREA. SEC. 10-103 (C)

E. FOR BUILDINGS THAT HAVE USED A COMPLIANCE OPTION THAT REQUIRES FIELD

VERIFICATION AND DIAGNOSTIC TESTING, THE BUILDING DEPARTMENT SHALL NOT

APPROVE THE BUILDING UNTIL THE BUILDING DEPARTMENT HAS RECEIVED A

CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING THAT HAS BEEN

SIGNED AND DATED BY THE HERS RATER. SEC. 10-103 (E) 2

APPLIANCE EFFICIENCY REGULATIONS

FIRE-STOPPING REQUIREMENTS - HORIZONTAL ASSEMBLIES

1. PENETRATIONS OF THE FIRE RESISTANCE-RATED HORIZONTAL ASSEMBLIES SHALL

COMPLY WITH SECTION 713.4. THROUGH PENETRATIONS SHALL COMPLY WITH SECTION

713.4.1.1.1 OR 713.4.1.1.2, OR AS NOTED BELOW:

A. STEEL, FERROUS, OR COPPER CONDUITS MAY PENETRATE A SINGLE

FIRE-RESISTANCE-RATED FLOOR ASSEMBLY WHEN THE ANNULAR SPACE IS

PROTECTED WITH MATERIAL THAT MEETS ASTM E119. (712.4.1.1 EXCEPTION 1)

B. PENETRATING ITEMS, AS NOTED ABOVE, WITH A MAXIMUM 6-INCH NOMINAL

DIAMETER SHALL NOT BE LIMITED TO THE PENETRATION OF A SINGLE

FIRE-RESISTANCE-RATED, PROVIDED THAT THE AREA OF THE OPENINGS DOES NOT

EXCEED 144 SQ. IN. IN ANY 100 SQ. FT. OF FLOOR AREA. (713.4.1.1 EXCEPTION 1)

C. PENETRATIONS SHALL BE FIRE-STOPPED BY A SYSTEM INSTALLED AS TESTED IN

ACCORDANCE WITH ASTM E814 OR UL 1479. THE SYSTEM SHALL HAVE AN F AND T

RATING OF NOT LESS THAN 1-HR. BUT NOT LESS THAN THE REQUIRED RATING OF

THE FLOOR PENETRATED. (713.4.1.1.2)

D. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL OUTLET BOXES ARE PERMITTED

PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE-RATED

ASSEMBLIES, AND THE SPACE BETWEEN THE CEILING MEMBRANE AND THE BOX

DOES NOT EXCEED 1/8 INCH UNLESS LISTED OTHERWISE. (713.4.1.2 EXCEPTION 3)

E. A FIRE SPRINKLER SHALL BE PERMITTED TO BE UNPROTECTED PROVIDED SUCH

SPACE IS COVERED BY A METAL ESCUTCHEON PLATE. (713.4.1.2 EXCEPTION 4)

FIRE-STOPPING REQUIREMENTS - WALLS:

1. PENETRATION S IN FIRE-RESISTANCE-RATED WALLS SHALL COMPLY WITH SECTION 712.3.

THROUGH PENETRATIONS SHALL COMPLY WITH SECTION 713.3.1.1 OR 713.3.1.2, OR AS

NOTED BELOW:

A. STEEL, FERROUS, OR COPPER PIPES MAY PENETRATE FIRE-RESISTANCE-RATED

WALLS, PROVIDED THE OPENING IS PROTECTED AS FOLLOWS: (713.3.1 EXCEPTION)

i. ITEM PENETRATING CONCRETE OR MASONRY WALLS IS A MAXIMUM OF 6"

NOMINAL DIAMETER AND THE AREA OF THE OPENING THROUGH THE WALL DOES

NOT EXCEED 144 SQ. IN., CONCRETE, GROUT, OR MORTAR IS PERMITTED WHERE

IT IS INSTALLED THE FULL THICKNESS OF THE WALL OR THE THICKNESS

REQUIRED TO MAINTAIN THE FIRE-RESISTANCE-RATING, OR

ii. WHEN THE ANNULAR SPACE IS PROTECTED WITH MATERIAL THAT MEETS ASTM

E119.

B. PENETRATIONS SHALL BE FIRE-STOPPED BY A SYSTEM INSTALLED AS TESTED IN

ACCORDANCE WITH ASTM E814 OR UL 1479, AND SHALL HAVE AN F RATING OF NOT

LESS THAN THE REQUIRED FIRE-RESISTANCE-RATING OF THE WALL PENETRATED.

C. MEMBRANE PENETRATIONS OF MAXIMUM 2 HR. FIRE-RESISTANCE -RATED WALLS BY

STEEL ELECTRICAL BOXES ARE PERMITTED, PROVIDED THAT EACH DOES NOT

EXCEED 16 SQ. IN. IN AREA AND THE TOTAL AREA OF SUCH OPENINGS DOES NOT

EXCEED 100 SQ. IN. FOR ANY 100 SQ. FT OF WALL AREA, AND THE SPACE BETWEEN

THE WALL MEMBRANE AND THE BOX DOES NOT EXCEED 1/8". ADDITIONALLY, OUTLET

BOXES ON OPPOSITE SIDES OF THE WALL SHALL BE SEPARATED BY A HORIZONTAL

DISTANCE OF NOT LESS THAN 24" (713.3.2 EXCEPTION 1)

D. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL BOXES OF ANY MATERIAL ARE

PERMITTED, PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN

FIRE-RESISTANCE-RATED ASSEMBLIES, AND THE SPACE BETWEEN THE WALL

MEMBRANE AND THE BOX DOES NOT EXCEED 1/8", UNLESS LISTED OTHERWISE.

ADDITIONALLY, OUTLET BOXES ON OPPOSITE SIDES OF THE WALL SHALL BE

SEPARATED BY A HORIZONTAL DISTANCE OF NOT LESS THAN 24" (713.3.2 EXCEPTION

2)

E. A FIRE SPRINKLER SHALL BE PERMITTED TO BE UNPROTECTED PROVIDE D SUCH

SPACE IS COVERED BY A METAL ESCUTCHEON PLATE. (713.3.2 EXCEPTION 3)

F. WHERE WALLS ARE PENETRATED BY OTHER MATERIALS OR OPENINGS LARGER

THAN THOSE MENTIONED ABOVE, THEY MUST BE QUALIFIED BY TESTS IN

ACCORDANCE WITH SECTION 703.2.

FIRE DAMPERS, SMOKE AND FIRE DAMPERS, DUCTS AND RETURN AIR PLENUM NOTES:

1. FIRE DAMPERS ARE TO BE INSTALLED IN THE FOLLOWING LOCATIONS:

A. FIRE BARRIERS IN OTHER THAN HIGH-RISE BUILDINGS, GROUP A, E, H, I, L AND R

OCCUPANCIES.

2. SMOKE AND FIRE DAMPERS TO BE INSTALLED AT PENETRATIONS IN THE FOLLOWING

LOCATIONS:

B. SHAFT ENCLOSURES.

3. PENETRATIONS INTO AND OPENINGS THROUGH AN EXIT ENCLOSURE ARE PROHIBITED

EXCEPT FOR REQUIRED EXIT DOORS, EQUIPMENT AND DUCTWORK NECESSARY FOR

INDEPENDENT PRESSURIZATION, SPRINKLER PIPING, STANDPIPES, ELECTRICAL

RACEWAY FOR FIRE DEPARTMENT COMMUNICATION SYSTEMS, AND ELECTRICAL

RACEWAY SERVING THE EXIT ENCLOSURE AND TERMINATING AT A STEEL BOX NOT

EXCEEDING 16 SQ IN. SUCH PENETRATIONS SHALL BE PROTECTED IN ACCORDANCE

WITH SECTION 713.

4. MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL BE NON-COMBUSTIBLE OR

SHALL HAVE FLAME SPREAD INDEX < 25, AND A SMOKE DEVELOPED INDEX < 50. (MC

602.2)

5. NO MECHANICAL DUCT PENETRATIONS ARE PERMITTED (EXCEPT FOR THOSE

INDEPENDENT SYSTEMS SERVING THE EXIT ENCLOSURE WALLS OR CEILINGS (1020.1.2)

* SEE SHEET 1/A503 FOR UL DESIGN FIRE-STOPPING DETAILS FOR MEP PENETRATIONS AT

FIRE-RATED WALLS.

FIRE-STOPPING REQUIREMENTS

ICRA - FOR REFERENCE ONLY

AN INFECTION CONTROL PERMIT (ICRA) MUST BE OBTAINED PRIOR TO BEGINNING OF ANY CONSTRUCTION ACTIVITY. ALL REQUIREMENTS MUST BE MET BY GENERAL CONTRACTOR.

STORM WATER POLLUTION CONTROL REQUIREMENTS FOR CONSTRUCTION ACTIVITIES

MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR AII DEVELOPMENT

CONSTRUCTION PROJECTS/CERTIFICATION STATEMENT

THE FOLLOWING IS INTENDED AS MINIMUM NOTES OR AS AN ATTACHMENT FOR BUILDING AND

GRADING PLANS AND REPRESENT THE MINIMUM STANDARD OF GOOD HOUSEKEEPING THAT

MUST BE IMPLEMENTED ON ALL

CONSTRUCTION SITES REGARDLESS OF SIZE. (APPLIES TO ALL PERMITS)

• ERODED SEDIMENTS AND OTHER POLLUTANTS MUST BE RETAINED ON SITE AND MAY

NOT BE TRANSPORTED FROM THE SITE VIA SHEETFLOW, SWALES, AREA DRAINS,

NATURAL DRAINAGE COURSES OR WIND.

• STOCKPILES OF EARTH AND OTHER CONSTRUCTION RELATED MATERIALS MUST BE

PROTECTED FROM BEING TRANSPORTED FROM THE SITE BY THE FORCES OF WIND OR

WATER.

• FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN

ACCORDANCE WITH THEIR LISTING AND ARE NOT TO CONTAMINATE THE SOIL AND

SURFACE WATERS. ALL APPROVED STORAGE CONTAINERS ARE TO BE PROTECTED

FROM THE WEATHER. SPILLS MUST BE CLEANED UP IMMEDIATELY AND DISPOSED OF IN

A PROPER MANNER. SPILLS MAY NOT BE WASHED INTO THE DRAINAGE SYSTEM.

• NON-STORMWATER RUNOFF FROM EQUIPMENT AND VEHICLE WASHING AND ANY OTHER

ACTIVITY SHALL BE CONTAINED AT THE PROJECT SITE.

• EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY

OTHER DRAINAGE SYSTEM. PROVISIONS SHALL

BE MADE TO RETAIN CONCRETE WASTES ON SITE UNTIL THEY CAN BE DISPOSED OF AS

SOLID WASTE.

• TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITED INTO A

COVERED RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL

BY WIND

• SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE

TRAFFIC. THE CONSTRUCTION ENTRANCE ROADWAYS MUST BE STABILIZED SO AS TO

INHIBIT SEDIMENTS FROM BEING DEPOSITED INTO THE PUBLIC WAY. ACCIDENTAL

DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY AND MAY NOT BE WASHED DOWN BY

RAIN OR OTHER MEANS.

• ANY SLOPES WITH DISTURBED SOILS OR DENUDE D OF VEGETATION MUST BE

STABILIZED SO AS TO INHIBIT EROSION BY WIND AND WATER

• OTHER: ____________________________________________________

AS THE PROJECT OWNER OR AUTHORIZED AGENT OF THE OWNER, I HAVE READ AND

UNDERSTAND THE REQUIREMENTS LISTED ABOVE, NECESSARY TO CONTROL STORM

WATER POLLUTION FROM SEDIMENTS, EROSION, AND CONSTRUCTION MATERIALS, AND

l CERTIFY THAT I WILL COMPLY WITH THESE REQUIREMENTS.

PRINT NAME ___________________________________________

OWNER OR AUTHORIZED AGENT OF THE OWNER)

SIGNATURE ____________________________________________ DATE________________

(OWNER OR AUTHORIZED AGENT OF THE OWNER)

BEST MANAGEMENT PRACTICES

FOR CONSTRUCTION ACTIVITIES

BC

G003

INFECTION PREVENTION GUIDELINES

GENERAL NOTES

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

BC

G004

INFECTION PREVENTION GUIDELINES

GENERAL NOTES

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

G101

FIRST FLOOR OVERALL FIRE LIFE

SAFETY PLAN (FOR REFERENCE ONLY)

CONCRETE WALK

POLICE

VEHICLE

PARKING

ONLY

LANDSCAPE

LANDSCAPE

LANDSCAPE

DRIVEWAY

CONCRETE WALK

GURNEY

MANEUVER

CLEARANCE

POLICE

VEHICLE

PARKING

ONLY

POLICE

VISITOR

ONLY

EMERGENCY

VEHICLE

ONLY

EMERGENCY

VEHICLE

ONLY

EMERGENCY

VEHICLE

ONLY

EMERGENCY

DROP-OFF

ONLY

EMERGENCY

DROP-OFF

ONLY

EMERGENCY

DROP-OFF

ONLY

POLICE

VEHICLE

PARKING

ONLY

POLICE

VEHICLE

PARKING

ONLY

POLICE

VISITOR

ONLY

EMERGENCY

VEHICLE

ONLY

EMERGENCY

VEHICLE

ONLY

EMERGENCY

VEHICLE

ONLY

EMERGENCY

DROP-OFF

ONLY

EMERGENCY

DROP-OFF

ONLY

EMERGENCY

DROP-OFF

ONLY

1A-275A

EQUIPMENT ROOM

1A-275

ROOM

CONTROL

1A-244

ROOM

READING

1A-277

SCAN

CT

1A-276

X-RAY

SERVBAY

SB01-1

EQUIP

SB01-1A

FIRST FLOOR ENLARGED FIRE LIFE SAFTELY PLAN 1SCALE: 1/16" = 1'-0"

NH

G111

PARTIAL SITE PLAN

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

KEYNOTES

KEYPLAN

AREA OF WORK

AREA OF WORK

IN EMERGENCY

DEPARTMENT ABOVE

CEILING TO EQUIPMENT

MOUNTED ON ROOF

EGRESS PATH OF TRAVEL

GRADE LEVEL EXIT

LEGEND

EGRESS PATH OF TRAVEL

GRADE LEVEL EXIT

EXISTING 1-HR SMOKE/FIRE

BARRIER

EXISTING 2-HR FIRE BARRIER

EXISTING 1-HR FIRE BARRIER

SMOKE COMPARTMENT 'C'

19,600 S.F.

CR

EXAM RM

EXAM RM

EXAM RM

C R

CR

C1-06

CORR

1A-322

CORR

1A-241

EXAM 21

C1-01B

CORR

C1-01C

CORR

1A-247

OFFICE

1A-245

OBSERVATION

1A-243

OBSERVATION

1A-242

TOILET

1A-220

HOLD 6

PSYCH

1A-222

HOLD 5

BAR PSYCH

C1-01

CORR

1A-404

MEN

1A-403

WOMEN

1A-117

EXAM RM

1A-118

EXAM RM

1A-113

WAITING RM

1A-301

WAITING RM

SERVBAY

SB01-1

EQUIP

SB01-1A

F O

F

F.O.F.

F O

F

SYMBOL

NON-RATED PARTITION

PARTITION

1 HOUR FIRE BARRIER

NON-RATED PARTITION

NON-RATED PARTITION

EXISTING CONCRETE WALL

TYPE

F

C

A

S

N

PARTITION TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

AREA NOT IN SCOPE

WALL TYPE (SEE SHEET A500)

NON-RATED PARTITION B

26 25.5 25.4 25 24.9 24 23 22

M

L.5

L

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

FIRST FLOOR DEMOLITON PLAN 1SCALE: 1/4" = 1'-0"

XX KEYNOTE SYMBOL

KEYNOTES KEY PLANLEGEND

NH

AD111

FIRST FLOOR DEMOLITION PLAN

N

GENERAL DEMOLITION NOTES

NOTE: THIS SHEET IS PENDING

COMPLETION OF SURROUNDING

EMERGENCY DEPARTMENT

REMODEL CURRENTLY IN

CONSTRUCTION. FINAL FIELD

VERIFICATION TO TAKE PLACE

AFTER COMPLETION OF

CONSTRUCTION

GENERAL NOTES

2 24

TYP.

EXAM RM

EXAM RM

C R

CR

1A-275A

EQUIPMENT ROOM

1A-275

ROOM

CONTROL

C1-06

CORR

1A-322

CORR

1A-241

EXAM 21

C1-01B

CORR

C1-01C

CORR

1A-247

OFFICE

1A-245

OBSERVATION

1A-243

OBSERVATION

1A-242

TOILET

1A-220

HOLD 6

PSYCH

1A-222

HOLD 5

BAR PSYCH

C1-01

CORR

1A-404

MEN

1A-403

WOMEN

1A-117

EXAM RM

1A-118

EXAM RM

1A-113

WAITING RM

1A-301

WAITING RM

1A-244

ROOM

READING

1A-277

SCAN

CT

1A-276

X-RAY

SERVBAY

SB01-1

EQUIP

SB01-1A

A200

3A

A200

4C

4A

A200

2A

2B

A200

1A

1B

A200

5A

F O

S

F O

S

F O

S

F.O.S.

F.O.F.

F.O.S.

4B

F.O.S.

F O

S

F.O.S.

F O

F

4D

SYMBOL

FURRED PARTITION

PARTITION

EXISTING 1 HOUR FIRE BARRIER

NON-RATED PARTITION

LEAD LINED PARTITION

EXISTING CONCRETE WALL

TYPE

F

B

S

PARTITION TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

AREA NOT IN SCOPE

WALL TYPE (SEE SHEET A500)

EXISTING 1 HOUR FIRE/SMOKE BARRIER

26 25.5 25.4 25 24.9 24 23 22

M

L.5

L

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

FIRST FLOOR PLAN 1SCALE: 1/4" = 1'-0"

XX KEYNOTE SYMBOL

KEYNOTES KEY PLANLEGEND GENERAL NOTES

BC

A111

FIRST FLOOR PLAN

N

A-300

A-300

1. SOME REFERENCED NOTES MIGHT NOT BE USED ON THIS SHEET.

2. SEE SHEET G000 AND G001 FOR ARCHITECTURAL GENERAL NOTES, ABBREVIATIONS, AND

SYMBOLS.

3. SEE SHEET A600 FOR ROOM FINISH SCHEDULES FOR FLOOR, WALL, AND CEILING FINISH.

4. REFER TO DETAIL 1/A503 FOR FIRE STOPPING AT ALL RATED WALL/FLOOR PENETRATIONS.

5. NO OVERCUTTING OF THE EXISTING CONCRETE SLAB SHALL BE ALLOWED. SEE DETAIL

1/S102.

6. PATCH AND REPAIR ALL CORRIDOR SURFACES DAMAGED BY THE WORK. COLORS AND

MATERIAL TO MATCH EXISTING SURROUNDING SURFACES.

7. FIRE SPRINKLERS IN CONSTRUCTION AREA SHALL REMAIN OPERABLE AT ALL TIMES

DURING CONSTRUCTION.

8. PATCH AND REPAIR INTERSTITIAL FLOOR WHERE HOLES OR DAMAGE IS FOUND.

INTERSTITIAL FLOOR IS RATED. USE FIRE SEALANT WHERE NECESSARY TO REPAIR

WHERE DAMAGE OCCURS.

9. MAINTAIN ALL FIRE RATING AT RATED WALLS. PROVIDE FIRE CHAULKING AT ALL EXISTING

AND NEW PENETRATIONS. SEE 1/A503.

10. FOR ACCESSIBLE HEIGHTS, SEE 3/A503

A-300

A503

A503

EXAM RM

EXAM RM

C R

CR

1A-275A

EQUIPMENT ROOM

1A-275

ROOM

CONTROL

C1-06

CORR

1A-322

CORR

1A-241

EXAM 21

C1-01B

CORR

C1-01C

CORR

1A-247

OFFICE

1A-245

OBSERVATION

1A-243

OBSERVATION

1A-242

TOILET

1A-220

HOLD 6

PSYCH

1A-222

HOLD 5

BAR PSYCH

C1-01

CORR

1A-404

MEN

1A-403

WOMEN

1A-117

EXAM RM

1A-118

EXAM RM

1A-113

WAITING RM

1A-301

WAITING RM

1A-244

ROOM

READING

1A-277

SCAN

CT

1A-276

X-RAY

SERVBAY

SB01-1

EQUIP

SB01-1A

SYMBOL

NON-RATED PARTITION

PARTITION

1 HOUR FIRE BARRIER

NON-RATED PARTITION

NON-RATED PARTITION

EXISTING CONCRETE WALL

TYPE

F

C

A

S

N

PARTITION TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

AREA NOT IN SCOPE

WALL TYPE (SEE SHEET A500)

NON-RATED PARTITION B

26 25.5 25.4 25 24.9 24 23 22

M

L.5

L

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

FIRST FLOOR SHIELDING PLAN 1SCALE: 1/4" = 1'-0"

XX KEYNOTE SYMBOL

KEYNOTES KEY PLANLEGEND GENERAL NOTES

1.

2.

3.

SOME REFERENCED NOTES MIGHT NOT BE USED ON THIS SHEET.

SEE SHEET G000 AND G001 FOR ARCHITECTURAL GENERAL NOTES, ABBREVIATIONS AND

SYMBOLS.

SEE SHEET A-600 FOR ROOM FINISH SCHEDULES FOR FLOOR, WALL AND CEILING

FINISH.

BC

A112

FIRST FLOOR SHIELDING PLAN

N

SHIELDING NOTES

1. NO LEAD SHIELDING IS REQUIRED FOR FLOOR OR CEILING OF CT SCAN 1A-277

OR X-RAY 1A-276

1. NO LEAD SHIELDING IS REQUIRED FOR FLOOR TO CEILING OF CT SCAN 1A-277

OR X-RAY 1A-276

2. ALL LEAD SHIELDING IN WALLS TO BE INSTALLED TO A HEIGHT OF 7'-0" ABOVE

FINISHED FLOOR. REFER TO PHYSICIST'S REPORT FOR ALL SHIELDING

REQUIREMENTS.

2# / SQ.FT. LEAD = 0.79 MM = 1/32"

4# / SQ.FT. LEAD = 1.58 MM = 1/16"

INSTALL:

A-300

A-300

A-300

SHIELDING REPORT

BY: PETAR SESLIJA, M.S., MCCPM

THERAPY PHYSICS, INC.

DATE: APRIL 1, 2020

NOTE:

EXAM RM

EXAM RM

C R

CR

1A-275A

EQUIPMENT ROOM

1A-275

ROOM

CONTROL

C1-06

CORR

1A-322

CORR

1A-241

EXAM 21

C1-01B

CORR

C1-01C

CORR

1A-247

OFFICE

1A-245

OBSERVATION

1A-243

OBSERVATION

1A-242

TOILET

1A-220

HOLD 6

PSYCH

1A-222

HOLD 5

BAR PSYCH

C1-01

CORR

1A-404

MEN

1A-403

WOMEN

1A-117

EXAM RM

1A-118

EXAM RM

1A-113

WAITING RM

1A-301

WAITING RM

1A-244

ROOM

READING

1A-277

SCAN

CT

1A-276

X-RAY

SERVBAY

SB01-1

EQUIP

SB01-1A

26 25.5 25.4 25 24.9 24 23 22

M

L.5

L

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

EXIT SIGN

SMOKE DETECTOR

RECESSED DOWN LIGHT

ACCESS PANEL

EXHAUST AIR GRILL

CEILING HEIGHT

2' X 4' FLUORESCENT LIGHT FIXTURE

6" X 4' DIRECT AND INDIRECT LIGHT FIXTURE

2' X 2' FLUORESCENT LIGHT FIXTURE

SPEAKERS

RETURN AIR GRILL

SUPPLY AIR GRILL

REFLECTED CEILING LEGEND

FIRE SPRINKLER

SHADE INDICATES TEXT SIDE. ARROW INDICATES

ARROW SYMBOL AND DIRECTION.

SEE MECHANICAL AND/OR

ELECTRICAL FOR ADDITIONAL

INFORMATION.

FIRST FLOOR REFLECTED CEILING PLAN 1SCALE: 1/4" = 1'-0"

XX KEYNOTE SYMBOL

KEYNOTES KEY PLANGENERAL NOTES

BC

A121

FIRST FLOOR REFLECTED CEILING PLAN

2 3

8 6

A-300

A-300

N

A-300

11 11

S3.3

S3.3

1. SOME REFERENCED NOTES MIGHT NOT BE USED ON THIS SHEET.

2. SEE SHEET G000 AND G001 FOR ARCHITECTURAL GENERAL NOTES, ABBREVIATION AND

SYMBOLS.

3. SEE SHEET A600 FOR ROOM FINISH SCHEDULES FOR FLOOR, WALL AND CEILING FINISH.

4. SEE ELECTRICAL SHEETS E120 AND E121 FOR SMOKE DETECTOR LOCATIONS,

ADDITIONAL LIGHT FIXTURES, AND OTHER LOW VOLTAGE ITEMS.

5. ALL CONDUITS AND DUCT WORK PENETRATIONS THROUGH INTERSTITIAL FLOOR SHALL

BE FIRE CAULKED TO MAINTAIN EXISTING FIRE RATING.

6. FOR FIRE SPRINKLER HEAD LOCATIONS, SEE FIRE PROTECTION SHEETS FP0-01 TO

FP5-10.

EXAM RM

EXAM RM

C R

CR

1A-275A

EQUIPMENT ROOM

1A-275

ROOM

CONTROL

C1-06

CORR

1A-322

CORR

1A-241

EXAM 21

C1-01B

CORR

C1-01C

CORR

1A-247

OFFICE

1A-245

OBSERVATION

1A-243

OBSERVATION

1A-242

TOILET

1A-220

HOLD 6

PSYCH

1A-222

HOLD 5

BAR PSYCH

C1-01

CORR

1A-404

MEN

1A-403

WOMEN

1A-117

EXAM RM

1A-118

EXAM RM

1A-113

WAITING RM

1A-301

WAITING RM

1A-244

ROOM

READING

1A-277

SCAN

CT

1A-276

X-RAY

SERVBAY

SB01-1

EQUIP

SB01-1A

TYP.

"MAA"

26 25.5 25.4 25 24.9 24 23 22

M

L.5

L

ITEM ID

DESCRIPTION

OPERATING CONSOLE

SYNGO ACQUISITION WORKPLACE AND STANDARD COMPONENTS

CONTAINER FOR ICE/IES

SOMATOM FORCE GANTRY

PATIENT TABLE - MULTI PURPOSE TABLE (MPT4) (OPTION)

POWER DISTRIBUTION CABINET

IMAGE RECONSTRUCTION SYSTEM

HEAT EXCHANGER CABINET - WATER/AIR SPLIT

OUTDOOR UNIT - WATER/AIR SPLIT

CARE VISION DUAL MONITOR

MEDREAD DISPLAY CONTROL UNIT/BASE UNIT

CEILING MOUNTED MEDRAD INJECTOR

EATON 9395 U.P.S. ELECTRONICS MODULE - 275KVA

EATON 9395 MAINTENANCE BYPASS PANEL

INTEGRATED ELECTRICAL CABINET

FLUOROSPOT-COMPACT CONTAINER W/ CD-DVD RECORDER - RAD

POLYDOROS F80 (80 KW) GENERATOR CABINET

MULTITOM RAX PATIENT TABLE

TRANSVERSE BRIDGE AND DETECTOR STAND (FIXED DETECTOR)

TRANSVERSE BRIDGE AND X-RAY TUBE STAND

LONGITUDINAL RAILS, 4.25M (ONE FULL SET)

EMERGENCY MECHANICAL STOP SWITCH

GRID HOLDER

MULTIPURPOSE STAND W/ 3D PATIENT STOP

CHARGING STATION FOR MAX DETECTORS

PATIENT LIFT

PORTABLE PATIENT LIFT

STAFF CHAIRS

UP/DOWN DESK

COMPUTERS

PRINTER

UP/DOWN DESK

STAFF CHAIRS

MONITOR

DESCRIPTIONITEM ID

CONTROL ROOM MODULE

IMAGING SYSTEM - KEYBOARD AND MOUSE

CONTROL ROOM LIVE IMAGE MONTIOR

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

XX KEYNOTE SYMBOL

2 3

FIRST FLOOR EQUIPMENT PLAN 1SCALE: 1/4" = 1'-0"

KEYNOTES KEY PLANGENERAL NOTES

1. SOME REFERENCED NOTES MIGHT NOT BE USED ON THIS SHEET.

2. SEE SHEETS G000 AND G001 FOR ARCHITECTURAL GENERAL NOTES,

ABBREVIATIONS AND SYMBOLS.

3. SEE SHEET A600 FOR ROOM FINISH SCHEDULES FOR FLOOR, WALL AND

CEILING FINISH.

4. LAYOUT EQUIPMENT PRIOR TO INSTALLATION AND OBTAIN SIEMANS

APPROVAL.

5. SEE SHEETS Q101 - Q116 FOR SEIMENS DRAWINGS.

6. SEE SHEETS Q121 - Q125 FOR GULDMANN LIFT DRAWINGS.

7. SEE SHEETS A600, S3.1 AND S3.2 FOR EQUIPMENT ANCHORAGE.

BC

A131

FIRST FLOOR EQUIPMENT PLAN

EQUIPMENT LEGEND LEGEND

N

A-300

A-300

A-300

FEC FEC

26 25.5 25 2224 23 21 20 19 18 17 16

M.5

DN UP

MATCH "B"MATCH "A"

2B-118

BHOST

C2-04A

CORR

2B-765

OFF

2B-760

2B-755

CONF RM

2B-750

PAT RM 2B

2B-745A

PAT TOIL

PAT RM 2B

C2-15

CORR

2B-117

PCMH

ST02-1

STAIR

ACC02-1

ACCESS

BAL02-1

BALCONY

2B-119

BHIP

2B-121

BHIP

BHIP PHARMACIST

DEPRESSION

CARE MGMT

2B-131

HUD-VASH

HOMELESS

PROGRAM

DEPRESSION

CARE MGMT SERVICE

HOMELESS

PROGRAM

2B-136

VASH PROGRAM

2B-138

DEPRESSION

CARE MGMT

2B-110

OFFICE

2B-114

PSYCHOLOGY

2B-115

PSYCHOLOGY

2B-116

PSYCHOLOGY

2B-111

TREATMENT

2B-113

TREATMENT

2B-169

OFFICE SHARED

C-104

WAITING 3

MENS

STAFF TOILET

WOMENS

STAFF TOILET

C-109

CORRIDOR

2B-139

GROUP

2B-132

GROUP ROOM E

2B-122

GROUP ROOM D

2B-128

GROUP ROOM C

2B-158

CORRIDOR

2B-126

GROUP ROOM B

2B-120

GROUP ROOM A

2B-168

OFFICE SHARED

2B-123 2B-124

2B-125 2B-133

SOCIAL WORK

2B-127 2B-1342B-129

2B-130

2B-135

2B-137

PROGRAM

HUD-VASH

PROGRAM

C-103

CORRIDOR

PROGRAM RESIDENT

ROOM F

2B-112

PSYCHOLOGY

EQUIPMENT

PLATFORM

18.7 19.520.5

N.3

N.7

P

P.7

Q

Q.2

17.2

Revisions: Date

Approved: VA Project Engineer

ARCHITECT

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Construction and Facilities

Management

Dwg. of

VA FORM 08-6231

o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

Project Number

11201 BENTON STREET

LOMA LINDA, CA 92357

605- CSI-005

09.04.20

VA Loma Linda

Healthcare System

Expand Emergency Department

ISSUED FOR

100%

SUBMITTAL

CONSTRUCTION

DOCUMENT

DRAWINGS

1497.01

65% VA SUBMITTAL 04.07.20

CT SCANNER & X-RAY

95% VA SUBMITTAL 05.22.20

Stamp

100% VA SUBMITTAL 09.04.20

ROOF PLAN 1SCALE: 1/8" = 1'-0"

BC

A190

ROOF PLAN

KEY PLAN

XX KEYNOTE SYMBOL

KEYNOTES

TYP.

N

GENERAL NOTES

1A

EQUIPMENT ROOM (1A-257B)

CONTROL ROOM (1A-275)

X-RAY (1A-276)

CORRIDOR (C1-06)

1B

2A 2B

4C4A

5A

CT SCAN (1A-277)

3A

4B 4D

ITEM ID

16-20 N/A

DESCRIPTION

OPERATING CONSOLE

SYNGO ACQUISITION WORKPLACE AND STANDARD COMPONENTS

CONTAINER FOR ICE/IES

SOMATOM FORCE GANTRY

PATIENT TABLE - MULTI PURPOSE TABLE (MPT4) (OPTION)

POWER DISTRIBUTION CABINET

IMAGE RECONSTRUCTION SYSTEM

HEAT EXCHANGER CABINET - WATER/AIR SPLIT

OUTDOOR UNIT - WATER/AIR SPLIT

CARE VISION DUAL MONITOR

MEDREAD DISPLAY CONTROL UNIT/BASE UNIT

CEILING MOUNTED MEDRAD INJECTOR

EATON 9395 U.P.S. ELECTRONICS MODULE - 275KVA

EATON 9395 MAINTENANCE BYPASS PANEL

INTEGRATED ELECTRICAL CABINET

CONTROL ROOM MODULE

IMAGING SYSTEM - KEYBOARD AND MOUSE

CONTROL ROOM LIVE IMAGE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .