Project-605-CS-005 VA LL CT and X-Ray 100 Percent CD Drawings Part1.pdf
PDF 31 MB Posted
- Solicitation number
- 36C25821B0002_1
About this file
This solicitation is for a construction project to build a Radiology Suite with a CT Scanner and X-Ray Rooms in the Emergency Department at a VA medical center. The project number is 605-CSI-005. The contractor will be responsible for general construction and alterations in accordance with the attached statement of work, drawings, and specifications. The delivery schedule is within one hundred and eighty calendar days of receiving the notice to proceed. The estimated value of the project is between $1,000,000 and $2,000,000. Interested contractors must be registered in the System for Award Management and Vendor Information Pages. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NON-RATED
3-HOUR BARRIER
DEMOLITION
CONCRETE
CMU
FIREWALL
SMOKE BARRIER
2-HOUR BARRIER
1-HOUR BARRIER
1-HOUR PARTITION
EXISTING
NEW
WITH LEAD SHIELDING
DEPARTMENT OF VETERANS AFFAIRS
LOMA LINDA HEALTHCARE SYSTEM
EMERGENCY DEPARTMENT
CT SCANNER & X-RAY
@ AT
A.B. ANCHOR BOLT
A.C. ASPHALT CONCRETE
ADJ. ADJUSTABLE
A.F.F. ABOVE FINISH FLOOR
ALUM. ALUMINUM
< ANGLE
ARCH. ARCHITECTURAL
AMP. AMPERE
BD. BOARD
BLDG. BUILDING
BLK. BLOCK
BM. BEAM
BD. BOTTOM
CAB'T. CABINET
C.B. CATCH BASIN
℄ CENTER LINE
C.J. CONTROL JOINT
CEM. CEMENT
CERM. CERAMIC
CFCI. CONTRACTOR FURNISH/
CONTRACTOR INSTALLED
CFOI. CONTRACTOR FURNISH/
OWNER INSTALLED
CLG. CEILING
CLR. CLEAR
C.M.U. CONCRETE MASONRY UNIT
C.O. CLEAN OUT
COL. COLUMN
COMP. COMPOSITION
CONC. CONCRETE
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONTR. CONTRACTOR
CTS'K. COUNTERSINK
DBL. DOUBLE
DET. DETAIL
D.F. DRINKING FOUNTAIN
DIA. DIAMETER
DIAG. DIAGONAL
DIM. DIMENSION
DN. DOWN
D.S. DOWN SPOUT
DR. DOOR
DWG. DRAWING
(E) EXISTING
EA. EACH
EL. ELEVATION
ELEC. ELECTRIC
ELEV. ELEVATOR OR/ ELEVATION
EQ. EQUAL
EQUIP. EQUIPMENT
E.W.C. ELECTRIC WATER CHILLER
EXIST. EXISTING
EXP. EXPANSION
EXP. JT. EXPANSION JOINT
EXT. EXTERIOR
F.D. FLOOR DRAIN
F.E.C. FIRE EXTINGUISHER CABINET
F.F. FACTORY FINISH
F.GL. FIXED GLASS
F.H. FIRE HYDRANT
F.H.C FIRE HOSE CABINET
FIN. FINISH
F.L. FLOW LINE
FLR. FLOOR
F.O.C. FACE OF CONCRETE
F.O.F. FACE OF FINISH
F.O.M. FACE OF MASONRY
F.O.S. FACE OF STUD
F.S. FINISHED SURFACE
FTG. FOOTING
GA. GAUGE
GAL. GALLON
GALV. GALVANIZED
G.D. GARBAGE DISPOSAL
G.I. GALVANIZED IRON
GL. GLASS
GRD. GRADE
GYP. BD. GYPSUM WALLBOARD
JAN. JANITOR
JST. JOIST
JT. JOINT
LAM. LAMINATED
LAV. LAVATORY
L.F. LINEAL FEET
LT. LIGHT
LT. WT. LIGHTWEIGHT
MAX. MAXIMUM
M.B. MACHINE BOLT
M.C. MEDICINE CABINET
MECH. MECHANICAL
M.H. MANHOLE
MIN. MINIMUM
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
MTD. MOUNTED
MTL. METAL
(N) NEW
N.I.C. NOT IN CONTRACT
NO. NUMBER
N.T.S. NOT TO SCALE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.H. OVERHEAD
OCCUP. OCCUPANCY
OFCI OWNER FURNISHED/
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED/
OWNER INSTALLED
OPN'G OPENING
P.H. PANIC HARDWARE
P. LAM. PLASTIC LAMINATE
PEN. PENETRATION
PL. PLATE
PLAS. PLASTER
PLYWD. PLYWOOD
PR. PAIR
PSI. POUNDS PER SQ. INCH
PVC. POLYVINYL CHLORIDE
Q.T. QUARRY TILE
R. RISER OR/ RADIUS
R.D. ROOF DRAIN
R.O. ROUGH OPENING
R.S. ROUGH SAWN
RAD. RADIUS
REF. REFRIGERATOR
REINF. REINFORCING
REQ'D. REQUIRED
RF. ROOF
RM. ROOM
S.D. STORM DRAIN
S.F. SQUARE FEET
S.M.S. SHEET METAL SCREW
S.S. STAINLESS STEEL
S.Y. SQUARE YARD
SCHED. SCHEDULE
SHF. SHELF
SHT. SHEET
SIM. SIMILAR
SLDG. SLIDING
SQ. SQUARE
STD. STANDARD
STL. STEEL
STRUCT. STRUCTURAL
SUSP. SUSPENDED
SYM. SYMMETRICAL
T. TOILET OR/ TREAD
T.C. TOP OF CURB
T.O.C. TOP OF CURB
T.O.P. TOP OF PARAPET
T.O.S. TOP OF SLAB
T.O.W. TOP OF WALL
T.P. TOP OF PAVING
T.S. TOPSET BASE
T.S.W. TOP OF SIDEWALK
T.W. TOP OF WALL
TELE. TELEPHONE
THK. THICK(NESS)
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VFCI VENDOR FURNISH/
CONTRACTOR INSTALL
VFVI VENDOR FURNISH/ VENDOR
INSTALL
W.C. WATER CLOSET
OWNER
DEPARTMENT OF VETERANS AFFAIRS
11201 BENTON STREET
LOMA LINDA, CA 92357
(909) 538-6826
ARCHITECT
c|a ARCHITECTS
3633 LONG BEACH BOULEVARD, SUITE 200
LONG BEACH, CALIFORNIA 90807
(562) 595-5666
STRUCTURAL
IMEG CORP.
300 N. LAKE AVENUE, 14TH FLOOR
PASADENA, CA 91101
(626) 463-2800
MECHANICAL/PLUMBING/ELECTRICAL/FIRE PROTECTION
IMEG CORP.
222 S. HARBOR BLVD, SUITE 800
ANAHEIM, CA 92805
(714) 490-5555
VA PROJECT NUMBER: 605-CSI-005
11201 BENTON STREET
LOMA LINDA, CA 92357
100% CONSTRUCTION DOCUMENT SUBMITTAL
09/04/2020
GENERAL
G000 GENERAL NOTES, CODE REQUIREMENTS, SYMBOLS, PROJECT
SCOPE, SHEET INDEX, PROJECT LOCATION
G001 GENERAL NOTES, FIRE STOPPING NOTES, AND ICRA FORM
G003 INFECTION PREVENTION GUIDELINES
G004 INFECTION PREVENTION GUIDELINES
G101 FIRST FLOOR OVERALL FIRE LIFE SAFETY PLAN (FOR
REFERENCE ONLY)
G111 FIRST FLOOR ENLARGED FIRE LIFE SAFETY PLAN
ARCHITECTURAL DEMOLITION
AD111 FIRST FLOOR DEMOLITION PLAN
ARCHITECTURAL
A111 FIRST FLOOR PLAN
A112 FIRST FLOOR SHIELDING PLAN
A121 FIRST FLOOR REFLECTED CEILING PLAN
A131 FIRST FLOOR EQUIPMENT PLAN
A190 ROOF PLAN
A200 INTERIOR ELEVATIONS
A300 PARTIAL BUILDING SECTIONS
A501 DETAILS
A502 DETAILS
A503 DETAILS
A504 DETAILS
A600 SCHEDULES
STRUCTURAL
S100 GENERAL NOTES
S101 GENERAL NOTES
S102 TYPICAL DETAILS
S200 PARTIAL PLANS
S300 SECTIONS AND DETAILS
S301 SECTIONS AND DETAILS
S302 SECTIONS AND DETAILS
S303 SECTIONS AND DETAILS
MECHANICAL
M001 GENERAL NOTES, SYMBOL LIST, ABBREVIATIONS,
APPLICABLE CODES AND SHEET INDEX
M002 MECHANICAL SCHEDULES
M120 MECHANICAL REMODEL PLAN
M220 MECHANICAL ROOF PLAN
M510 MECHANICAL DETAILS
M520 MECHANICAL DETAILS
M530 MECHANICAL DETAILS
M610 MECHANICAL CONTROLS
PLUMBING
P001 NOTES, SYMBOL LIST, ABBREVIATIONS, APPLICABLE CODES
SHEET INDEX AND FIXTURE SCHEDULE
P002 EQUIPMENT SCHEDULES
P110 PLUMBING DEMOLITION PLAN
P210 PLUMBING REMODEL PLAN
P410 ENLARGED PLANS
P510 PLUMBING DETAILS
P520 PLUMBING DETAILS
SHEET INDEX
ABBREVIATIONS
PROJECT
LOCATION
1ST FLOOR
PROJECT LOCATION
PROJECT TEAM
BC
G000
COVER SHEET
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o n e i g h t c o f o t o q u a r t r o t t h r g h t s o t o a l o t t h r a r t e o t o o t o d c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
KEY PLAN
VICINITY MAP
APPLICABLE CODE AND STANDARDS
CALIFORNIA BUILDING CODE 2019
(BASED ON INTERNATIONAL BUILDING CODE 2018)
LIFE SAFETY CODE, NFPA 101-2018
VA FIRE PROTECTION DESIGN MANUAL,
DECEMBER 2015 ICC / ANSI A117.1 2003 EDITION
UNIFORM FEDERAL ACCESSIBILITY STANDARDS, LATEST EDITION
NATIONAL FIRE CODES, 2018 EDITION
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD AND BIM STANDARDS, APPLICATIONS GUIDES, VA
BARRIER FREE DESIGN GUIDE AND OTHER GUIDANCE ON THE
TECHNICAL INFORMATION LIBRARY. PROJECT SHALL CONFORM TO VA
STANDARDS, 18-3 AND 18-8.
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
INTERNATIONAL BUILDING CODE (2018 OR LATEST EDITION).
INTERNATIONAL PLUMBING CODE (2018 OR LATEST EDITION).
CALIFORNIA BUILDING CODE (2019).
NATIONAL FIRE PROTECTION ASSOCIATION FIRE CODES, REFER TO FIRE
PROTECTION SPECIFICATIONS AND DRAWINGS.
WHERE CONFLICTS EXIST BETWEEN CODES, THE CODE SPECIFIED IN
THE VA FIRE PROTECTION DESIGN GUIDE SHALL BE FOLLOWED. FIRE
PROTECTION FEATURES NOT ADDRESSED IN THE NATIONAL FIRE
CODES SHALL BE DESIGNED TO COMPLY WITH THE 2018 IBC OR AS
OTHERWISE ADDRESSED IN THE DESIGN GUIDE.
CODE ANALYSIS
A2
A-000
A-000
A-000
SYMBOLS
ELEVATION NUMBER
SHEET NUMBER
INTERIOR ELEVATION
REVISION
DOOR REFERENCE
SEE SHT XX.X FOR
SCHEDULE
KEYNOTE
SHEET NUMBER
DETAIL NUMBER
DETAIL REFERENCE
SHEET NUMBER
WALL SECTION
SECTION NUMBER
BUILDING SECTION
ROOM NUMBER
GRID REFERENCE
SECTION NUMBER
SHEET NUMBER
WINDOW REFERENCE
SEE SHEET XX.X FOR
SCHEDULE
EQUIPMENT REFERENCE
SEE SHEET XX.X FOR
SCHEDULE
ELECTRICAL
E001 GENERAL NOTES, SYMBOL LIST, ABBREVIATIONS, APPLICABLE
CODES AND SHEET INDEX
E002 DEMOLITION NOTES, NURSE CALL SYSTEM DEFERRED
APPROVAL NOTES, PUBLIC ADDRESS SYSTEM DEFERRED
APPROVAL NOTES, PANEL SCHEDULES AND LOAD SUMMARIES
E003 PARTIAL SINGLE LINE DIAGRAMS (NORMAL POWER)
E004 PARTIAL SINGLE LINE DIAGRAMS (EMERGENCY POWER)
E005 ELECTRICAL KEY PLAN FIRST FLOOR
E110 ELECTRICAL ENLARGED DEMOLITION PLANS
E120 ELECTRICAL ENLARGED POWER AND SIGNAL PLAN
E121 ELECTRICAL ENLARGED LIGHTING PLAN
E200 ELECTRICAL DETAILS
E210 ELECTRICAL ROOF PLAN
E310 ELECTRICAL SHOP DRAWINGS - CT SCAN (FOR REFERENCE)
E311 ELECTRICAL SHOP DRAWINGS - CT SCAN (FOR REFERENCE)
E312 ELECTRICAL SHOP DRAWINGS - X-RAY (FOR REFERENCE)
E313 ELECTRICAL SHOP DRAWINGS - X-RAY (FOR REFERENCE)
FIRE PROTECTION
FP001 NOTES, SYMBOL LIST, ABBREVIATIONS, APPLICABLE CODES,
SHEET INDEX, AND FIXTURE SCHEDULE
FP110 FIRE PROTECTION DEMOLITION PLAN
FP210 FIRE PROTECTION REMODEL PLAN
FP410 FIRE PROTECTION ENLARGED PLANS
FP510 FIRE PROTECTION DETAILS
EQUIPMENT (FOR REFERENCE ONLY)
Q101 SIEMENS A-101, CT SCAN EQUIPMENT PLANS
Q102 SIEMENS A-102, CT SCAN EQUIPMENT PLANS
Q103 SIEMENS S-101, CT SCAN EQUIPMENT PLANS
Q104 SIEMENS S-102. CT SCAN EQUIPMENT PLANS
Q105 SIEMENS E-101, CT SCAN EQUIPMENT PLANS
Q106 SIEMENS E-501, CT SCAN EQUIPMENT PLANS
Q107 SIEMENS M-101, CT SCAN EQUIPMENT PLANS
Q108 SIEMENS M-501, CT SCAN EQUIPMENT PLANS
Q111 SIEMENS A-101, XRAY EQUIPMENT PLANS
Q112 SIEMENS A-102, XRAY EQUIPMENT PLANS
Q113 SIEMENS S-101, XRAY EQUIPMENT PLANS
Q114 SIEMENS S-102, XRAY EQUIPMENT PLANS
Q115 SIEMENS E-101, XRAY EQUIPMENT PLANS
Q116 SIEMENS E-102, XRAY EQUIPMENT PLANS
Q121 GULDMANN GUL101, FACILITY SIGNOFF
Q122 GULDMANN GUL102, GEN. INFO
Q123 GULDMANN GUL103, ATTACHMENT
Q124 GULDMANN GUL104, PROJECT DETAILS
Q125 GULDMANN GUL105, CT SCAN 1A-277
N
PROJECT
SITE
N
REDLANDS BLVD.
FWY
M O
U N
T A
I N
V
E
W
A
V E
A
N
D
E
R
S
O
S
T
B E
N T
PROSPECT AVE. PROSPECT AVE.
BARTON RD.
LAWTON AVE.
A N
D E
R S
BARTON RD.
PROSPECT AVE.
B E
N T
VA REPRESENTATIVE APPROVALS
NAME AND TITLE DATE SIGNATURE
Alex YI
Chief of Imaging
Conrad Salinas
Chief of Emergency Department
Mark Moritz
Chief of FMS
Shane Elliot
Associate Director
APPROVALS
CONSTRUCTION TYPE: I-A - FIRE SPRINKLERED, WITH
INTERSTITIAL SPACE
OCCUPANCY: I-2 - HOSPITAL
PROJECT SQUARE FOOTAGE: 1,540 SQ. FT.
NET DESIGN SQUARE FOOTAGE: 1540 SQ. FT.
DESIGN SQUARE FOOTAGE: 1540 SQ. FT.
PROJECT BUILDING INFORMATION:
BUILDING STORIES: 4 STORIES WITH PARTIAL BASEMENT
PROJECT LOCATION: 1st FLOOR
PROJECT DESCRIPTION:
CONSTRUCT NEW CT SCAN ROOM, X-RAY ROOM, CONTROL
ROOM, READING ROOM AND EQUIPMENT ROOM ON THE 1ST
FLOOR OF THE EMERGENCY DEPARTMENT.
FIRE RESISTIVE RATING REQUIREMENTS:
EXISTING MAIN CORRIDORS ARE 2-HOUR RATED FIRE WALLS.
AUTOMATIC SPRINKLER SYSTEM:
FULLY FIRE SPRINKLERED
WORK TO BE IN ACCORDANCE WITH 903.1.1
PROJECT DATA
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
BC
G001
GENERAL NOTES, FIRE STOPPING
NOTES, AND ICRA FORM
GENERAL NOTES
01 - GENERAL
1. ALL WORK SHALL CONFORM TO LISTED BUILDING CODES AND ALL APPLICABLE STATE
AND MUNICIPAL ORDINANCES AND ALL OTHER RULES AND REGULATIONS HAVING
JURISDICTION OVER THIS PROJECT. IN THE EVENT THAT TWO OR MORE REGULATIONS
CONFLICT, THE MORE RESTRICTIVE SHALL GOVERN.
2. FOR CONSTRUCTION PURPOSES, USE NOTED DIMENSIONS ONLY. DO NOT SCALE
DRAWINGS.
3. EXERCISE CARE TO PREVENT DAMAGE TO EXISTING EQUIPMENT, STRUCTURES AND
SERVICES. DAMAGE AS A RESULT OF THIS WORK SHALL BE REPAIRED OR REPLACED AT
NO ADDITIONAL COST TO THE OWNER.
4. VERIFY THE PRECISE LOCATIONS OF ALL EQUIPMENT WITH THE OWNER PRIOR TO THE
INSTALLATION OF THAT EQUIPMENT OR THE SERVICES THAT SUPPORT IT.
5. IT IS HEREBY UNDERSTOOD THAT THE HOSPITAL MUST MAINTAIN IT'S REGULAR
SERVICE DURING THE TIME WORK IS IN PROGRESS. ADVANCE SCHEDULING WITH THE
ENGINEERING DEPARTMENT SHALL BE ARRANGED BY THE CONTRACTOR TO ENSURE
NO DISRUPTION TO FACILITY SERVICES. SOME WORK MAY BE REQUIRED ON NIGHTS
AND WEEKENDS.
6. UPON COMPLETION OF EACH PHASE OF THE WORK AND AT SUCH TIMES AS DIRECTED
BY THE OWNER, REMOVE ALL SURPLUS MATERIAL, TOOLS AND DEBRIS AND LEAVE THE
SITE IN A CLEAN AND NEAT CONDITION.
7. PROVIDE PROTECTION FROM DUST, DIRT AND MOISTURE FOR THE PROTECTION OF THE
WORKMEN, STAFF, PATIENTS, THE PUBLIC AND EXISTING COMPUTER EQUIPMENT AS
REQUIRED BY ALL PERTINENT CODES, REGULATIONS, AND FACILITY STANDARDS.
8. THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO CONSTRUCT THE PROJECT IN
ACCORDANCE WITH THE 2019 CBC. SHOULD ANY CONDITION DEVELOP NOT COVERED
BY THE APPROVED CONSTRUCTION DOCUMENTS, WHEREIN THE FINISHED WORK WILL
NOT COMPLY WITH THE 2019 CBC, AMENDED CONSTRUCTION DOCUMENTS (ACDs)
DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED FOR COR
REVIEW AND ACCEPTANCE PRIOR TO INSTALLATION.
9. DIMENSIONS: ALL DIMENSIONS ARE TO FACE OF STUD (F.O.S.) OR CENTER LINE OF STUD
UNLESS NOTED OTHERWISE.
10. CHANGES IN LEVEL ON ACCESSIBLE ROUTE SHALL CONFORM WITH SECTION 11B-303 OF
THE 2019 CALIFORNIA BUILDING CODE.
11. CONTRACTOR SHALL COORDINATE WITH FACILITY TO MAINTAIN CONTINUOUS
ESSENTIAL SERVICES DURING CONSTRUCTION.
12. DO NOT CUT, NOTCH, DRILL, OR ALTER STRUCTURAL ELEMENTS UNLESS SPECIFICALLY
DETAILED ON APPROVED PLANS OR OTHERWISE ACCEPTED BY COR AND SEOR.
13. ALL ANCHORAGE EXPOSED TO WEATHER MUST BE STAINLESS STEEL OR HOT DIPPED
GALVANIZED.
14. UTILITY SHUTDOWNS REQUIRE A MINIMUM 21 DAY NOTICE TO THE COR.THE
CONTRACTOR SHALL COORDINATE WITH THE VA PROJECT MANAGER ALL UTILITY
SHUTDOWNS A MINIMUM OF 21 DAYS BEFORE THE REQUIRED SHUTDOWN
15. AN INFECTION CONTROL PERMIT (ICRA) MUST BE OBTAINED PRIOR TO BEGINNING OF
ANY CONSTRUCTION ACTIVITY. ALL REQUIREMENTS MUST BE MET BY GENERAL
CONTRACTOR. SEE SAMPLE ICRA ON THIS PAGE FOR REFERENCE.
16. THE CONTRACTOR SHALL COORDINATE WITH THE COR ALL WORK TO BE
ACCOMPLISHED IN OCCUPIED SPACES. A MINIMUM OF 21 DAYS NOTICE SHALL BE GIVEN
PRIOR TO STARTING THE WORK.
17. NO OVERCUTTING OF THE EXISTING CONCRETE SLAB SHALL BE ALLOWED. SEE DETAIL
1/S1.2.
18. TESTING LAB SHALL BE PROVIDED BY THE CONTRACTOR PENDING THE APPROVAL OF
THE V.A. THE TESTING LAB SHALL BE ISSUED AS A SUBMITTAL FOR REVIEW AND
APPROVAL.
19. WHERE POSSIBLE EXISTING UTILITIES SHALL BE RELOCATED TO ALLOW FOR
INSTALLATION OF THE NEW WORK.
20. ALL PIPING, CONDUIT, DUCTWORK AND PENETRATIONS THROUGH FIRE RATED OR
SMOKE WALLS SHALL BE FIRE STOPPED. SEE SHEET A503/DETAIL 1 FOR FIRESTOPPING
SYSTEMS.
21. ANY CHANGES MUST BE APPROVED BY THE CONTRACTING OFFICER BEFORE DOING
ANY ADDITIONAL WORK. WORK TO BE SCHEDULED DURING REGULAR DAY HOURS.
22. FOR ACCESSIBLE HEIGHTS REQUIRED IN THIS PROJECT, REFER TO 3/A503
02 - EXISTING CONDITIONS
1. VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE AND NOTIFY THE
ARCHITECT OF ANY DEVIATION FROM THE CONDITIONS PRESENTED HEREIN. FAILURE
TO DO SO SHALL CONSTITUTE ACCEPTANCE OF THE EXISTING CONDITIONS AND ANY
ADDITIONAL WORK REQUIRED SHALL BE ACCOMPLISHED AT NO ADDITIONAL COST TO
THE OWNER.
2. SALVAGE MATERIALS NOT SCHEDULED FOR REUSE SHALL BE STORED OR DISPOSED OF
AS INSTRUCTED BY THE OWNER.
3. DEMOLITION PLAN AND NOTES ARE INCLUDED FOR GENERAL INFORMATION ONLY AND
ARE NOT INTENDED TO REPRESENT ALL CONDITIONS PRESENT AT THE SITE. THE
CONTRACTOR IS RESPONSIBLE FOR PREPARING THE SITE FOR CONSTRUCTION AS
DESCRIBED AND DETAILED IN THE CONTRACT.
4. WHENEVER CUTTING, PATCHING, ETC. IS REQUIRED, ALL ADJACENT SURFACES SHALL
BE FINISHED TO ACHIEVE A MATCHING SURFACE CONDITION. SAW CUTTING AND CORE
DRILLING SHALL BE USED IN LIEU OF JACK HAMMERING.
5. ASBESTOS OR HAZARDOUS MATERIALS. IT IS UNDERSTOOD AND AGREED THAT THIS
CONTRACT DOES NOT CONTEMPLATE THE HANDLING OF ASBESTOS OR ANY
HAZARDOUS MATERIALS. IF ASBESTOS OR ANY HAZARDOUS MATERIALS IS
ENCOUNTERED, NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY. DO NOT
DISTURB, HANDLE OR ATTEMPT TO REMOVE.
07 - THERMAL AND MOISTURE PROTECTION
1. SEAL PENETRATIONS THROUGH RATED WALLS AND FLOORS WITH A MATERIAL CAPABLE
OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASES WHEN SUBJECT TO THE
REQUIREMENTS OF THE TEST STANDARD: SPECIFIC OF FIRE STOPS ASTM E-814.
2. SEE DETAIL 1/A503 FOR FIRE STOPPING SCHEDULE. CONTRACTOR TO PROVIDE
FIRESTOPPING SUBMITTAL TO ARCHITECT OF RECORD FOR REVIEW AND APPROVAL.
SUBMITTAL SHALL INCLUDE FIRESTOPPING DETAILS (WITH APPROVED UL REFERENCE)
COORDINATED WITH A LOCATION FLOOR PLAN. SUBMITTAL TO INCLUDE ENGINEERING
JUDGEMENT IF REQUIRED, SIMILAR FOR FIRE PROOFING PROVISIONS IF NECESSARY.
3. WHERE PROVIDED, THROUGH-PENETRATION FIRESTOP SYSTEM AND MEMBRANE
PENETRATION DETAILS ARE FOR REFERENCE ONLY. THROUGH-PENETRATIONS AND
MEMBRANE PENETRATIONS SHALL BE PROTECTED BY AN APPROVED PENETRATION
FIRESTOP SYSTEM OR MEMBRANE PENETRATION FIRESTOP SYSTEM INSTALLED AS
TESTED IN ACCORDANCE WITH ASTM E 814 OR UL 1479, WITH A MINIMUM POSITIVE
PRESSURE DIFFERENTIAL OF 0.01 INCH (2.49 PA) OF WATER OR AS OTHERWISE
PERMITTED BY CBC, SECTION 714. LISTED THROUGH-PENETRATION FIRESTOP SYSTEMS
AND MEMBRANE PENETRATIONS SHALL BE INSTALLED IN ACCORDANCE WITH THE
INSTALLATION DETAILS FOR LISTED SYSTEMS. LISTED THROUGH-PENETRATION
FIRESTOP SYSTEMS, MEMBRANE PENETRATION PROTECTION AND OTHER PERMITTED
MEANS AND METHODS OF PENETRATION PROTECTION SHALL BE SUBMITTED TO COR
FOR REVIEW AND ACCEPTANCE PRIOR TO INSTALLATION.
4. SEE FIRE-STOPPING REQUIREMENTS SECTION ON THIS PAGE FOR ADDITIONAL
INFORMATION.
08 - OPENINGS
1. MAXIMUM EFFORT TO OPEN DOORS SHALL BE: 5 LBS. INTERIOR, 5 LBS. EXTERIOR, AND
15 LBS AT FIRE DOORS.
2. HAND-ACTIVATED HARDWARE SHALL BE CENTERED BETWEEN 34 INCHES AND 44 INCHES
ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND
WHICH ARE IN A PATH OF TRAVEL, SHALL BE OPERABLE WITH A SINGLE EFFORT BY
HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO
GRASP.
3. ACCESS DOORS - PROVIDE ACCESS DOORS IN ALL HARD CEILINGS CONTAINING
JUNCTION BOXES AND/OR VALVES. LABEL ALL ACCESS DOORS AS TO VALVES LOCATED
ABOVE. NOTIFY HOSPITAL ENGINEERING DEPARTMENT PRIOR TO CLOSING UP CEILING
FOR FINAL REVIEW.
09 - FINISHES
1. FINISH MATERIALS IN EXIT WAYS, CORRIDORS, ROOMS AND ENCLOSED SPACES OF
SPRINKLERED BUILDINGS SHALL HAVE A FLAME SPREAD OF 75 OR LESS (CLASS B) AND A
SMOKE DEVELOPMENT OF 450 OR LESS (CLASS B). FINISH MATERIALS IN EXIT WAYS AND
CORRIDORS OF NON-SPRINKLERED BUILDINGS SHALL HAVE A FLAME SPREAD OF 25 OR
LESS (CLASS A) AND A SMOKE DEVELOPMENT OF 450 OR LESS (CLASS A) AND IN ROOMS
AND ENCLOSED SPACES FLAME SPREAD OF 75 OR LESS (CLASS B) AND A SMOKE
DEVELOPMENT OF 450 OR LESS (CLASS B). PER CBC TABLE 803.5.
2. PAINT SHALL BE THE PRODUCT OF ONE MANUFACTURER AND SHALL BE
DELIVERED TO JOB SITE IN SEALED CONTAINERS.
3. PAINT SHALL BE CONSIST OF MINIMUM TWO (2) COAT APPLICATION AND
APPROPRIATE SEALER.
4. RECESSED MOUNTED FIXTURES IN RATED WALLS/CEILINGS SHALL BE BACK
BOXED WITH MATERIALS EQUAL TO RATED WALL ASSEMBLY.
5. CEILINGS SHALL BE SMOOTH, EASILY CLEANED WITH NO ROUGH TEXTURES.
FLOORS SHALL BE SMOOTH, WATERPROOF AND DURABLE.
6. INTERIOR WALL FINISHES SHALL BE SMOOTH, WATERPROOF AND DURABLE.
7. GYPSUM BOARD SHALL BE PRIMED PRIOR TO INSTALLATION OF CASEWORK.
8. SET ALL TOPSET BASE ON SHEET VINYL IN A CONTINUOUS BEAD OF WATER
RESISTANT CAULKING.
26 - ELECTRICAL
1. 6'-0" MAX. FLEX CONDUIT WILL BE ALLOWED ABOVE LAY-IN CEILINGS FOR LIGHT
FIXTURES ONLY.
2. VERIFY AND PROVIDE SPRAY PAINTED EMERGENCY CIRCUIT CONDUIT AND
BOXES PER FACILITY STANDARD COLOR.
3. VERIFY AND PROVIDE SPRAY PAINTED FIRE ALARM CIRCUIT CONDUIT AND BOXES
PER FACILITY STANDARD COLOR.
4. ELECTRICAL COVER PLATES SHALL BE STAINLESS STEEL IN CLINICAL AREAS AND
IVORY IN OFFICE AREAS. CIRCUITS NUMBERS AND PANELS SHALL BE ENGRAVED
IN STAINLESS STEEL PLATES AND ENGRAVED LABELS SHALL BE ADHERED TO
IVORY PLATES.
5. LABEL ALL JUNCTION BOXES AS TO CIRCUIT NUMBERS LOCATED WITHIN.
6. FLEXIBLE CONDUIT CAN BE USED FOR LOW VOLTAGE WIRING.
1. ADMINISTRATIVE REQUIREMENTS:
A. THE PERSON WITH OVERALL RESPONSIBILITY FOR CONSTRUCTION OR THE PERSON
RESPONSIBLE FOR THE INSTALLATION OF REGULATED MANUFACTURED DEVICES
SHALL POST, OR MAKE AVAILABLE WITH THE BUILDING PERMIT(S) ISSUED FOR THE
BUILDING, THE INSTALLATION CERTIFICATE(S) FOR MANUFACTURED DEVICES
REGULATED BY THE APPLIANCE EFFICIENCY REGULATIONS OR PART 6. SUCH INSTALL
AT ION CERTIFICATE(S) SHALL BE MADE AVAILABLE TO THE ENFORCEMENT AGENCY
FOR ALL APPROPRIATE INSPECTIONS. THESE CERTIFICATES SHALL:
· IDENTIFY FEATURES REQUIRED TO VERIFY COMPLIANCE WITH THE APPLIANCE
EFFICIENCY REGULATIONS AND PART 6.
· INCLUDE A STATEMENT INDICATING THAT THE INSTALLED DEVICES CONFORM TO
THE APPLIANCE EFFICIENCY REGULATIONS AND PART 6 AND THE REQUIREMENTS
FOR SUCH DEVICES GIVEN IN THE PLANS AND SPECIFICATIONS APPROVED BY THE
LOCAL ENFORCEMENT AGENCY.
· STATE THE NUMBER OF THE BUILDING PERMIT UNDER WHICH THE CONSTRUCTION
OR INSTALLATION WAS PERFORMED. SEC. 10-103 (A) 3 A
B. AFTER INSTALLING WALL, CEILING, OR FLOOR INSULATION, THE INSTALLER SHALL
MAKE AVAILABLE TO THE ENFORCEMENT AGENCY OR POST IN A CONSPICUOUS
LOCATION IN THE BUILDING A CERTIFICATE SIGNED BY THE INSTALLER STATING THAT
THE INSTALLATION IS CONSISTENT WITH THE PLANS AND SPECIFICATIONS
DESCRIBED IN SEC. 10-103 (A) 2 A. THE CERTIFICATE SHALL ALSO STATE THE
MANUFACTURER'S NAME, MATERIAL IDENTIFICATION, AND THE INSTALLED R-VALUE.
SEC. 10-103 (A) 4
C. THE APPLICANT SHALL FILE ALL CERTIFICATE(S) OF ACCEPTANCE, REQUIRED BY THE
MECH-1-C, WITH THE ENFORCEMENT AGENCY PRIOR TO RECEIVING A FINAL
OCCUPANCY PERMIT. THE SIGNER(S) SHALL BE ELIGIBLE UNDER DIVISION 3 OF THE
BUSINESS AND PROFESSIONS CODE TO SIGN SUCH DOCUMENTS. SEC. 10-103 (B)
D. THE BUILDER SHALL PROVIDE THE BUILDING OWNER OR THE PERSON(S) RESPONSIBLE
FOR BUILDING MAINTENANCE (IN CASE OF MULTI-TENANT OR CENTRALLY OPERATED
BUILDINGS) AT OCCUPANCY THE FOLLOWING:
2. OPERATING INFORMATION: THE APPROPRIATE CERTIFICATE(S) OF COMPLIANCE AND A LIST
OF THE FEATURES, MATERIALS COMPONENT, AND MECHANICAL DEVICES INSTALLED IN THE
BUILDING AND INSTRUCTIONS ON HOW TO OPERATE THEM EFFICIENTLY.
3. MAINTENANCE INFORMATION: REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE
CLEARLY STATED AND INCORPORATED OR A READILY ACCESSIBLE LABEL. THE LABEL MAY BE
LIMITED TO IDENTIFYING THE OPERATION AND MAINTENANCE MANUAL.
4. VENTILATION INFORMATION: A DESCRIPTION OF THE QUANTITIES OF OUTDOOR AND
RECIRCULATED AIR THAT THE VENTILATION SYSTEMS ARE DESIGNED TO PROVIDE TO EACH
AREA. SEC. 10-103 (C)
E. FOR BUILDINGS THAT HAVE USED A COMPLIANCE OPTION THAT REQUIRES FIELD
VERIFICATION AND DIAGNOSTIC TESTING, THE BUILDING DEPARTMENT SHALL NOT
APPROVE THE BUILDING UNTIL THE BUILDING DEPARTMENT HAS RECEIVED A
CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING THAT HAS BEEN
SIGNED AND DATED BY THE HERS RATER. SEC. 10-103 (E) 2
APPLIANCE EFFICIENCY REGULATIONS
FIRE-STOPPING REQUIREMENTS - HORIZONTAL ASSEMBLIES
1. PENETRATIONS OF THE FIRE RESISTANCE-RATED HORIZONTAL ASSEMBLIES SHALL
COMPLY WITH SECTION 713.4. THROUGH PENETRATIONS SHALL COMPLY WITH SECTION
713.4.1.1.1 OR 713.4.1.1.2, OR AS NOTED BELOW:
A. STEEL, FERROUS, OR COPPER CONDUITS MAY PENETRATE A SINGLE
FIRE-RESISTANCE-RATED FLOOR ASSEMBLY WHEN THE ANNULAR SPACE IS
PROTECTED WITH MATERIAL THAT MEETS ASTM E119. (712.4.1.1 EXCEPTION 1)
B. PENETRATING ITEMS, AS NOTED ABOVE, WITH A MAXIMUM 6-INCH NOMINAL
DIAMETER SHALL NOT BE LIMITED TO THE PENETRATION OF A SINGLE
FIRE-RESISTANCE-RATED, PROVIDED THAT THE AREA OF THE OPENINGS DOES NOT
EXCEED 144 SQ. IN. IN ANY 100 SQ. FT. OF FLOOR AREA. (713.4.1.1 EXCEPTION 1)
C. PENETRATIONS SHALL BE FIRE-STOPPED BY A SYSTEM INSTALLED AS TESTED IN
ACCORDANCE WITH ASTM E814 OR UL 1479. THE SYSTEM SHALL HAVE AN F AND T
RATING OF NOT LESS THAN 1-HR. BUT NOT LESS THAN THE REQUIRED RATING OF
THE FLOOR PENETRATED. (713.4.1.1.2)
D. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL OUTLET BOXES ARE PERMITTED
PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE-RATED
ASSEMBLIES, AND THE SPACE BETWEEN THE CEILING MEMBRANE AND THE BOX
DOES NOT EXCEED 1/8 INCH UNLESS LISTED OTHERWISE. (713.4.1.2 EXCEPTION 3)
E. A FIRE SPRINKLER SHALL BE PERMITTED TO BE UNPROTECTED PROVIDED SUCH
SPACE IS COVERED BY A METAL ESCUTCHEON PLATE. (713.4.1.2 EXCEPTION 4)
FIRE-STOPPING REQUIREMENTS - WALLS:
1. PENETRATION S IN FIRE-RESISTANCE-RATED WALLS SHALL COMPLY WITH SECTION 712.3.
THROUGH PENETRATIONS SHALL COMPLY WITH SECTION 713.3.1.1 OR 713.3.1.2, OR AS
NOTED BELOW:
A. STEEL, FERROUS, OR COPPER PIPES MAY PENETRATE FIRE-RESISTANCE-RATED
WALLS, PROVIDED THE OPENING IS PROTECTED AS FOLLOWS: (713.3.1 EXCEPTION)
i. ITEM PENETRATING CONCRETE OR MASONRY WALLS IS A MAXIMUM OF 6"
NOMINAL DIAMETER AND THE AREA OF THE OPENING THROUGH THE WALL DOES
NOT EXCEED 144 SQ. IN., CONCRETE, GROUT, OR MORTAR IS PERMITTED WHERE
IT IS INSTALLED THE FULL THICKNESS OF THE WALL OR THE THICKNESS
REQUIRED TO MAINTAIN THE FIRE-RESISTANCE-RATING, OR
ii. WHEN THE ANNULAR SPACE IS PROTECTED WITH MATERIAL THAT MEETS ASTM
E119.
B. PENETRATIONS SHALL BE FIRE-STOPPED BY A SYSTEM INSTALLED AS TESTED IN
ACCORDANCE WITH ASTM E814 OR UL 1479, AND SHALL HAVE AN F RATING OF NOT
LESS THAN THE REQUIRED FIRE-RESISTANCE-RATING OF THE WALL PENETRATED.
C. MEMBRANE PENETRATIONS OF MAXIMUM 2 HR. FIRE-RESISTANCE -RATED WALLS BY
STEEL ELECTRICAL BOXES ARE PERMITTED, PROVIDED THAT EACH DOES NOT
EXCEED 16 SQ. IN. IN AREA AND THE TOTAL AREA OF SUCH OPENINGS DOES NOT
EXCEED 100 SQ. IN. FOR ANY 100 SQ. FT OF WALL AREA, AND THE SPACE BETWEEN
THE WALL MEMBRANE AND THE BOX DOES NOT EXCEED 1/8". ADDITIONALLY, OUTLET
BOXES ON OPPOSITE SIDES OF THE WALL SHALL BE SEPARATED BY A HORIZONTAL
DISTANCE OF NOT LESS THAN 24" (713.3.2 EXCEPTION 1)
D. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL BOXES OF ANY MATERIAL ARE
PERMITTED, PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN
FIRE-RESISTANCE-RATED ASSEMBLIES, AND THE SPACE BETWEEN THE WALL
MEMBRANE AND THE BOX DOES NOT EXCEED 1/8", UNLESS LISTED OTHERWISE.
ADDITIONALLY, OUTLET BOXES ON OPPOSITE SIDES OF THE WALL SHALL BE
SEPARATED BY A HORIZONTAL DISTANCE OF NOT LESS THAN 24" (713.3.2 EXCEPTION
2)
E. A FIRE SPRINKLER SHALL BE PERMITTED TO BE UNPROTECTED PROVIDE D SUCH
SPACE IS COVERED BY A METAL ESCUTCHEON PLATE. (713.3.2 EXCEPTION 3)
F. WHERE WALLS ARE PENETRATED BY OTHER MATERIALS OR OPENINGS LARGER
THAN THOSE MENTIONED ABOVE, THEY MUST BE QUALIFIED BY TESTS IN
ACCORDANCE WITH SECTION 703.2.
FIRE DAMPERS, SMOKE AND FIRE DAMPERS, DUCTS AND RETURN AIR PLENUM NOTES:
1. FIRE DAMPERS ARE TO BE INSTALLED IN THE FOLLOWING LOCATIONS:
A. FIRE BARRIERS IN OTHER THAN HIGH-RISE BUILDINGS, GROUP A, E, H, I, L AND R
OCCUPANCIES.
2. SMOKE AND FIRE DAMPERS TO BE INSTALLED AT PENETRATIONS IN THE FOLLOWING
LOCATIONS:
B. SHAFT ENCLOSURES.
3. PENETRATIONS INTO AND OPENINGS THROUGH AN EXIT ENCLOSURE ARE PROHIBITED
EXCEPT FOR REQUIRED EXIT DOORS, EQUIPMENT AND DUCTWORK NECESSARY FOR
INDEPENDENT PRESSURIZATION, SPRINKLER PIPING, STANDPIPES, ELECTRICAL
RACEWAY FOR FIRE DEPARTMENT COMMUNICATION SYSTEMS, AND ELECTRICAL
RACEWAY SERVING THE EXIT ENCLOSURE AND TERMINATING AT A STEEL BOX NOT
EXCEEDING 16 SQ IN. SUCH PENETRATIONS SHALL BE PROTECTED IN ACCORDANCE
WITH SECTION 713.
4. MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL BE NON-COMBUSTIBLE OR
SHALL HAVE FLAME SPREAD INDEX < 25, AND A SMOKE DEVELOPED INDEX < 50. (MC
602.2)
5. NO MECHANICAL DUCT PENETRATIONS ARE PERMITTED (EXCEPT FOR THOSE
INDEPENDENT SYSTEMS SERVING THE EXIT ENCLOSURE WALLS OR CEILINGS (1020.1.2)
* SEE SHEET 1/A503 FOR UL DESIGN FIRE-STOPPING DETAILS FOR MEP PENETRATIONS AT
FIRE-RATED WALLS.
FIRE-STOPPING REQUIREMENTS
ICRA - FOR REFERENCE ONLY
AN INFECTION CONTROL PERMIT (ICRA) MUST BE OBTAINED PRIOR TO BEGINNING OF ANY CONSTRUCTION ACTIVITY. ALL REQUIREMENTS MUST BE MET BY GENERAL CONTRACTOR.
STORM WATER POLLUTION CONTROL REQUIREMENTS FOR CONSTRUCTION ACTIVITIES
MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR AII DEVELOPMENT
CONSTRUCTION PROJECTS/CERTIFICATION STATEMENT
THE FOLLOWING IS INTENDED AS MINIMUM NOTES OR AS AN ATTACHMENT FOR BUILDING AND
GRADING PLANS AND REPRESENT THE MINIMUM STANDARD OF GOOD HOUSEKEEPING THAT
MUST BE IMPLEMENTED ON ALL
CONSTRUCTION SITES REGARDLESS OF SIZE. (APPLIES TO ALL PERMITS)
• ERODED SEDIMENTS AND OTHER POLLUTANTS MUST BE RETAINED ON SITE AND MAY
NOT BE TRANSPORTED FROM THE SITE VIA SHEETFLOW, SWALES, AREA DRAINS,
NATURAL DRAINAGE COURSES OR WIND.
• STOCKPILES OF EARTH AND OTHER CONSTRUCTION RELATED MATERIALS MUST BE
PROTECTED FROM BEING TRANSPORTED FROM THE SITE BY THE FORCES OF WIND OR
WATER.
• FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN
ACCORDANCE WITH THEIR LISTING AND ARE NOT TO CONTAMINATE THE SOIL AND
SURFACE WATERS. ALL APPROVED STORAGE CONTAINERS ARE TO BE PROTECTED
FROM THE WEATHER. SPILLS MUST BE CLEANED UP IMMEDIATELY AND DISPOSED OF IN
A PROPER MANNER. SPILLS MAY NOT BE WASHED INTO THE DRAINAGE SYSTEM.
• NON-STORMWATER RUNOFF FROM EQUIPMENT AND VEHICLE WASHING AND ANY OTHER
ACTIVITY SHALL BE CONTAINED AT THE PROJECT SITE.
• EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY
OTHER DRAINAGE SYSTEM. PROVISIONS SHALL
BE MADE TO RETAIN CONCRETE WASTES ON SITE UNTIL THEY CAN BE DISPOSED OF AS
SOLID WASTE.
• TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITED INTO A
COVERED RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL
BY WIND
• SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE
TRAFFIC. THE CONSTRUCTION ENTRANCE ROADWAYS MUST BE STABILIZED SO AS TO
INHIBIT SEDIMENTS FROM BEING DEPOSITED INTO THE PUBLIC WAY. ACCIDENTAL
DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY AND MAY NOT BE WASHED DOWN BY
RAIN OR OTHER MEANS.
• ANY SLOPES WITH DISTURBED SOILS OR DENUDE D OF VEGETATION MUST BE
STABILIZED SO AS TO INHIBIT EROSION BY WIND AND WATER
• OTHER: ____________________________________________________
AS THE PROJECT OWNER OR AUTHORIZED AGENT OF THE OWNER, I HAVE READ AND
UNDERSTAND THE REQUIREMENTS LISTED ABOVE, NECESSARY TO CONTROL STORM
WATER POLLUTION FROM SEDIMENTS, EROSION, AND CONSTRUCTION MATERIALS, AND
l CERTIFY THAT I WILL COMPLY WITH THESE REQUIREMENTS.
PRINT NAME ___________________________________________
OWNER OR AUTHORIZED AGENT OF THE OWNER)
SIGNATURE ____________________________________________ DATE________________
(OWNER OR AUTHORIZED AGENT OF THE OWNER)
BEST MANAGEMENT PRACTICES
FOR CONSTRUCTION ACTIVITIES
BC
G003
INFECTION PREVENTION GUIDELINES
GENERAL NOTES
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
BC
G004
INFECTION PREVENTION GUIDELINES
GENERAL NOTES
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
G101
FIRST FLOOR OVERALL FIRE LIFE
SAFETY PLAN (FOR REFERENCE ONLY)
CONCRETE WALK
POLICE
VEHICLE
PARKING
ONLY
LANDSCAPE
LANDSCAPE
LANDSCAPE
DRIVEWAY
CONCRETE WALK
GURNEY
MANEUVER
CLEARANCE
POLICE
VEHICLE
PARKING
ONLY
POLICE
VISITOR
ONLY
EMERGENCY
VEHICLE
ONLY
EMERGENCY
VEHICLE
ONLY
EMERGENCY
VEHICLE
ONLY
EMERGENCY
DROP-OFF
ONLY
EMERGENCY
DROP-OFF
ONLY
EMERGENCY
DROP-OFF
ONLY
POLICE
VEHICLE
PARKING
ONLY
POLICE
VEHICLE
PARKING
ONLY
POLICE
VISITOR
ONLY
EMERGENCY
VEHICLE
ONLY
EMERGENCY
VEHICLE
ONLY
EMERGENCY
VEHICLE
ONLY
EMERGENCY
DROP-OFF
ONLY
EMERGENCY
DROP-OFF
ONLY
EMERGENCY
DROP-OFF
ONLY
1A-275A
EQUIPMENT ROOM
1A-275
ROOM
CONTROL
1A-244
ROOM
READING
1A-277
SCAN
CT
1A-276
X-RAY
SERVBAY
SB01-1
EQUIP
SB01-1A
FIRST FLOOR ENLARGED FIRE LIFE SAFTELY PLAN 1SCALE: 1/16" = 1'-0"
NH
G111
PARTIAL SITE PLAN
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
KEYNOTES
KEYPLAN
AREA OF WORK
AREA OF WORK
IN EMERGENCY
DEPARTMENT ABOVE
CEILING TO EQUIPMENT
MOUNTED ON ROOF
EGRESS PATH OF TRAVEL
GRADE LEVEL EXIT
LEGEND
EGRESS PATH OF TRAVEL
GRADE LEVEL EXIT
EXISTING 1-HR SMOKE/FIRE
BARRIER
EXISTING 2-HR FIRE BARRIER
EXISTING 1-HR FIRE BARRIER
SMOKE COMPARTMENT 'C'
19,600 S.F.
CR
EXAM RM
EXAM RM
EXAM RM
C R
CR
C1-06
CORR
1A-322
CORR
1A-241
EXAM 21
C1-01B
CORR
C1-01C
CORR
1A-247
OFFICE
1A-245
OBSERVATION
1A-243
OBSERVATION
1A-242
TOILET
1A-220
HOLD 6
PSYCH
1A-222
HOLD 5
BAR PSYCH
C1-01
CORR
1A-404
MEN
1A-403
WOMEN
1A-117
EXAM RM
1A-118
EXAM RM
1A-113
WAITING RM
1A-301
WAITING RM
SERVBAY
SB01-1
EQUIP
SB01-1A
F O
F
F.O.F.
F O
F
SYMBOL
NON-RATED PARTITION
PARTITION
1 HOUR FIRE BARRIER
NON-RATED PARTITION
NON-RATED PARTITION
EXISTING CONCRETE WALL
TYPE
F
C
A
S
N
PARTITION TO BE DEMOLISHED
EXISTING PARTITION TO REMAIN
AREA NOT IN SCOPE
WALL TYPE (SEE SHEET A500)
NON-RATED PARTITION B
26 25.5 25.4 25 24.9 24 23 22
M
L.5
L
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
FIRST FLOOR DEMOLITON PLAN 1SCALE: 1/4" = 1'-0"
XX KEYNOTE SYMBOL
KEYNOTES KEY PLANLEGEND
NH
AD111
FIRST FLOOR DEMOLITION PLAN
N
GENERAL DEMOLITION NOTES
NOTE: THIS SHEET IS PENDING
COMPLETION OF SURROUNDING
EMERGENCY DEPARTMENT
REMODEL CURRENTLY IN
CONSTRUCTION. FINAL FIELD
VERIFICATION TO TAKE PLACE
AFTER COMPLETION OF
CONSTRUCTION
GENERAL NOTES
2 24
TYP.
EXAM RM
EXAM RM
C R
CR
1A-275A
EQUIPMENT ROOM
1A-275
ROOM
CONTROL
C1-06
CORR
1A-322
CORR
1A-241
EXAM 21
C1-01B
CORR
C1-01C
CORR
1A-247
OFFICE
1A-245
OBSERVATION
1A-243
OBSERVATION
1A-242
TOILET
1A-220
HOLD 6
PSYCH
1A-222
HOLD 5
BAR PSYCH
C1-01
CORR
1A-404
MEN
1A-403
WOMEN
1A-117
EXAM RM
1A-118
EXAM RM
1A-113
WAITING RM
1A-301
WAITING RM
1A-244
ROOM
READING
1A-277
SCAN
CT
1A-276
X-RAY
SERVBAY
SB01-1
EQUIP
SB01-1A
A200
3A
A200
4C
4A
A200
2A
2B
A200
1A
1B
A200
5A
F O
S
F O
S
F O
S
F.O.S.
F.O.F.
F.O.S.
4B
F.O.S.
F O
S
F.O.S.
F O
F
4D
SYMBOL
FURRED PARTITION
PARTITION
EXISTING 1 HOUR FIRE BARRIER
NON-RATED PARTITION
LEAD LINED PARTITION
EXISTING CONCRETE WALL
TYPE
F
B
S
PARTITION TO BE DEMOLISHED
EXISTING PARTITION TO REMAIN
AREA NOT IN SCOPE
WALL TYPE (SEE SHEET A500)
EXISTING 1 HOUR FIRE/SMOKE BARRIER
26 25.5 25.4 25 24.9 24 23 22
M
L.5
L
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
FIRST FLOOR PLAN 1SCALE: 1/4" = 1'-0"
XX KEYNOTE SYMBOL
KEYNOTES KEY PLANLEGEND GENERAL NOTES
BC
A111
FIRST FLOOR PLAN
N
A-300
A-300
1. SOME REFERENCED NOTES MIGHT NOT BE USED ON THIS SHEET.
2. SEE SHEET G000 AND G001 FOR ARCHITECTURAL GENERAL NOTES, ABBREVIATIONS, AND
SYMBOLS.
3. SEE SHEET A600 FOR ROOM FINISH SCHEDULES FOR FLOOR, WALL, AND CEILING FINISH.
4. REFER TO DETAIL 1/A503 FOR FIRE STOPPING AT ALL RATED WALL/FLOOR PENETRATIONS.
5. NO OVERCUTTING OF THE EXISTING CONCRETE SLAB SHALL BE ALLOWED. SEE DETAIL
1/S102.
6. PATCH AND REPAIR ALL CORRIDOR SURFACES DAMAGED BY THE WORK. COLORS AND
MATERIAL TO MATCH EXISTING SURROUNDING SURFACES.
7. FIRE SPRINKLERS IN CONSTRUCTION AREA SHALL REMAIN OPERABLE AT ALL TIMES
DURING CONSTRUCTION.
8. PATCH AND REPAIR INTERSTITIAL FLOOR WHERE HOLES OR DAMAGE IS FOUND.
INTERSTITIAL FLOOR IS RATED. USE FIRE SEALANT WHERE NECESSARY TO REPAIR
WHERE DAMAGE OCCURS.
9. MAINTAIN ALL FIRE RATING AT RATED WALLS. PROVIDE FIRE CHAULKING AT ALL EXISTING
AND NEW PENETRATIONS. SEE 1/A503.
10. FOR ACCESSIBLE HEIGHTS, SEE 3/A503
A-300
A503
A503
EXAM RM
EXAM RM
C R
CR
1A-275A
EQUIPMENT ROOM
1A-275
ROOM
CONTROL
C1-06
CORR
1A-322
CORR
1A-241
EXAM 21
C1-01B
CORR
C1-01C
CORR
1A-247
OFFICE
1A-245
OBSERVATION
1A-243
OBSERVATION
1A-242
TOILET
1A-220
HOLD 6
PSYCH
1A-222
HOLD 5
BAR PSYCH
C1-01
CORR
1A-404
MEN
1A-403
WOMEN
1A-117
EXAM RM
1A-118
EXAM RM
1A-113
WAITING RM
1A-301
WAITING RM
1A-244
ROOM
READING
1A-277
SCAN
CT
1A-276
X-RAY
SERVBAY
SB01-1
EQUIP
SB01-1A
SYMBOL
NON-RATED PARTITION
PARTITION
1 HOUR FIRE BARRIER
NON-RATED PARTITION
NON-RATED PARTITION
EXISTING CONCRETE WALL
TYPE
F
C
A
S
N
PARTITION TO BE DEMOLISHED
EXISTING PARTITION TO REMAIN
AREA NOT IN SCOPE
WALL TYPE (SEE SHEET A500)
NON-RATED PARTITION B
26 25.5 25.4 25 24.9 24 23 22
M
L.5
L
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
FIRST FLOOR SHIELDING PLAN 1SCALE: 1/4" = 1'-0"
XX KEYNOTE SYMBOL
KEYNOTES KEY PLANLEGEND GENERAL NOTES
1.
2.
3.
SOME REFERENCED NOTES MIGHT NOT BE USED ON THIS SHEET.
SEE SHEET G000 AND G001 FOR ARCHITECTURAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
SEE SHEET A-600 FOR ROOM FINISH SCHEDULES FOR FLOOR, WALL AND CEILING
FINISH.
BC
A112
FIRST FLOOR SHIELDING PLAN
N
SHIELDING NOTES
1. NO LEAD SHIELDING IS REQUIRED FOR FLOOR OR CEILING OF CT SCAN 1A-277
OR X-RAY 1A-276
1. NO LEAD SHIELDING IS REQUIRED FOR FLOOR TO CEILING OF CT SCAN 1A-277
OR X-RAY 1A-276
2. ALL LEAD SHIELDING IN WALLS TO BE INSTALLED TO A HEIGHT OF 7'-0" ABOVE
FINISHED FLOOR. REFER TO PHYSICIST'S REPORT FOR ALL SHIELDING
REQUIREMENTS.
2# / SQ.FT. LEAD = 0.79 MM = 1/32"
4# / SQ.FT. LEAD = 1.58 MM = 1/16"
INSTALL:
A-300
A-300
A-300
SHIELDING REPORT
BY: PETAR SESLIJA, M.S., MCCPM
THERAPY PHYSICS, INC.
DATE: APRIL 1, 2020
NOTE:
EXAM RM
EXAM RM
C R
CR
1A-275A
EQUIPMENT ROOM
1A-275
ROOM
CONTROL
C1-06
CORR
1A-322
CORR
1A-241
EXAM 21
C1-01B
CORR
C1-01C
CORR
1A-247
OFFICE
1A-245
OBSERVATION
1A-243
OBSERVATION
1A-242
TOILET
1A-220
HOLD 6
PSYCH
1A-222
HOLD 5
BAR PSYCH
C1-01
CORR
1A-404
MEN
1A-403
WOMEN
1A-117
EXAM RM
1A-118
EXAM RM
1A-113
WAITING RM
1A-301
WAITING RM
1A-244
ROOM
READING
1A-277
SCAN
CT
1A-276
X-RAY
SERVBAY
SB01-1
EQUIP
SB01-1A
26 25.5 25.4 25 24.9 24 23 22
M
L.5
L
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
EXIT SIGN
SMOKE DETECTOR
RECESSED DOWN LIGHT
ACCESS PANEL
EXHAUST AIR GRILL
CEILING HEIGHT
2' X 4' FLUORESCENT LIGHT FIXTURE
6" X 4' DIRECT AND INDIRECT LIGHT FIXTURE
2' X 2' FLUORESCENT LIGHT FIXTURE
SPEAKERS
RETURN AIR GRILL
SUPPLY AIR GRILL
REFLECTED CEILING LEGEND
FIRE SPRINKLER
SHADE INDICATES TEXT SIDE. ARROW INDICATES
ARROW SYMBOL AND DIRECTION.
SEE MECHANICAL AND/OR
ELECTRICAL FOR ADDITIONAL
INFORMATION.
FIRST FLOOR REFLECTED CEILING PLAN 1SCALE: 1/4" = 1'-0"
XX KEYNOTE SYMBOL
KEYNOTES KEY PLANGENERAL NOTES
BC
A121
FIRST FLOOR REFLECTED CEILING PLAN
2 3
8 6
A-300
A-300
N
A-300
11 11
S3.3
S3.3
1. SOME REFERENCED NOTES MIGHT NOT BE USED ON THIS SHEET.
2. SEE SHEET G000 AND G001 FOR ARCHITECTURAL GENERAL NOTES, ABBREVIATION AND
SYMBOLS.
3. SEE SHEET A600 FOR ROOM FINISH SCHEDULES FOR FLOOR, WALL AND CEILING FINISH.
4. SEE ELECTRICAL SHEETS E120 AND E121 FOR SMOKE DETECTOR LOCATIONS,
ADDITIONAL LIGHT FIXTURES, AND OTHER LOW VOLTAGE ITEMS.
5. ALL CONDUITS AND DUCT WORK PENETRATIONS THROUGH INTERSTITIAL FLOOR SHALL
BE FIRE CAULKED TO MAINTAIN EXISTING FIRE RATING.
6. FOR FIRE SPRINKLER HEAD LOCATIONS, SEE FIRE PROTECTION SHEETS FP0-01 TO
FP5-10.
EXAM RM
EXAM RM
C R
CR
1A-275A
EQUIPMENT ROOM
1A-275
ROOM
CONTROL
C1-06
CORR
1A-322
CORR
1A-241
EXAM 21
C1-01B
CORR
C1-01C
CORR
1A-247
OFFICE
1A-245
OBSERVATION
1A-243
OBSERVATION
1A-242
TOILET
1A-220
HOLD 6
PSYCH
1A-222
HOLD 5
BAR PSYCH
C1-01
CORR
1A-404
MEN
1A-403
WOMEN
1A-117
EXAM RM
1A-118
EXAM RM
1A-113
WAITING RM
1A-301
WAITING RM
1A-244
ROOM
READING
1A-277
SCAN
CT
1A-276
X-RAY
SERVBAY
SB01-1
EQUIP
SB01-1A
TYP.
"MAA"
26 25.5 25.4 25 24.9 24 23 22
M
L.5
L
ITEM ID
DESCRIPTION
OPERATING CONSOLE
SYNGO ACQUISITION WORKPLACE AND STANDARD COMPONENTS
CONTAINER FOR ICE/IES
SOMATOM FORCE GANTRY
PATIENT TABLE - MULTI PURPOSE TABLE (MPT4) (OPTION)
POWER DISTRIBUTION CABINET
IMAGE RECONSTRUCTION SYSTEM
HEAT EXCHANGER CABINET - WATER/AIR SPLIT
OUTDOOR UNIT - WATER/AIR SPLIT
CARE VISION DUAL MONITOR
MEDREAD DISPLAY CONTROL UNIT/BASE UNIT
CEILING MOUNTED MEDRAD INJECTOR
EATON 9395 U.P.S. ELECTRONICS MODULE - 275KVA
EATON 9395 MAINTENANCE BYPASS PANEL
INTEGRATED ELECTRICAL CABINET
FLUOROSPOT-COMPACT CONTAINER W/ CD-DVD RECORDER - RAD
POLYDOROS F80 (80 KW) GENERATOR CABINET
MULTITOM RAX PATIENT TABLE
TRANSVERSE BRIDGE AND DETECTOR STAND (FIXED DETECTOR)
TRANSVERSE BRIDGE AND X-RAY TUBE STAND
LONGITUDINAL RAILS, 4.25M (ONE FULL SET)
EMERGENCY MECHANICAL STOP SWITCH
GRID HOLDER
MULTIPURPOSE STAND W/ 3D PATIENT STOP
CHARGING STATION FOR MAX DETECTORS
PATIENT LIFT
PORTABLE PATIENT LIFT
STAFF CHAIRS
UP/DOWN DESK
COMPUTERS
PRINTER
UP/DOWN DESK
STAFF CHAIRS
MONITOR
DESCRIPTIONITEM ID
CONTROL ROOM MODULE
IMAGING SYSTEM - KEYBOARD AND MOUSE
CONTROL ROOM LIVE IMAGE MONTIOR
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
XX KEYNOTE SYMBOL
2 3
FIRST FLOOR EQUIPMENT PLAN 1SCALE: 1/4" = 1'-0"
KEYNOTES KEY PLANGENERAL NOTES
1. SOME REFERENCED NOTES MIGHT NOT BE USED ON THIS SHEET.
2. SEE SHEETS G000 AND G001 FOR ARCHITECTURAL GENERAL NOTES,
ABBREVIATIONS AND SYMBOLS.
3. SEE SHEET A600 FOR ROOM FINISH SCHEDULES FOR FLOOR, WALL AND
CEILING FINISH.
4. LAYOUT EQUIPMENT PRIOR TO INSTALLATION AND OBTAIN SIEMANS
APPROVAL.
5. SEE SHEETS Q101 - Q116 FOR SEIMENS DRAWINGS.
6. SEE SHEETS Q121 - Q125 FOR GULDMANN LIFT DRAWINGS.
7. SEE SHEETS A600, S3.1 AND S3.2 FOR EQUIPMENT ANCHORAGE.
BC
A131
FIRST FLOOR EQUIPMENT PLAN
EQUIPMENT LEGEND LEGEND
N
A-300
A-300
A-300
FEC FEC
26 25.5 25 2224 23 21 20 19 18 17 16
M.5
DN UP
MATCH "B"MATCH "A"
2B-118
BHOST
C2-04A
CORR
2B-765
OFF
2B-760
2B-755
CONF RM
2B-750
PAT RM 2B
2B-745A
PAT TOIL
PAT RM 2B
C2-15
CORR
2B-117
PCMH
ST02-1
STAIR
ACC02-1
ACCESS
BAL02-1
BALCONY
2B-119
BHIP
2B-121
BHIP
BHIP PHARMACIST
DEPRESSION
CARE MGMT
2B-131
HUD-VASH
HOMELESS
PROGRAM
DEPRESSION
CARE MGMT SERVICE
HOMELESS
PROGRAM
2B-136
VASH PROGRAM
2B-138
DEPRESSION
CARE MGMT
2B-110
OFFICE
2B-114
PSYCHOLOGY
2B-115
PSYCHOLOGY
2B-116
PSYCHOLOGY
2B-111
TREATMENT
2B-113
TREATMENT
2B-169
OFFICE SHARED
C-104
WAITING 3
MENS
STAFF TOILET
WOMENS
STAFF TOILET
C-109
CORRIDOR
2B-139
GROUP
2B-132
GROUP ROOM E
2B-122
GROUP ROOM D
2B-128
GROUP ROOM C
2B-158
CORRIDOR
2B-126
GROUP ROOM B
2B-120
GROUP ROOM A
2B-168
OFFICE SHARED
2B-123 2B-124
2B-125 2B-133
SOCIAL WORK
2B-127 2B-1342B-129
2B-130
2B-135
2B-137
PROGRAM
HUD-VASH
PROGRAM
C-103
CORRIDOR
PROGRAM RESIDENT
ROOM F
2B-112
PSYCHOLOGY
EQUIPMENT
PLATFORM
18.7 19.520.5
N.3
N.7
P
P.7
Q
Q.2
17.2
Revisions: Date
Approved: VA Project Engineer
ARCHITECT
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Construction and Facilities
Management
Dwg. of
VA FORM 08-6231
o g o t o a r t o t t h r g h t o t o o t t h r a r t e o t o o t o c h o t t h r c h o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
Project Number
11201 BENTON STREET
LOMA LINDA, CA 92357
605- CSI-005
09.04.20
VA Loma Linda
Healthcare System
Expand Emergency Department
ISSUED FOR
100%
SUBMITTAL
CONSTRUCTION
DOCUMENT
DRAWINGS
1497.01
65% VA SUBMITTAL 04.07.20
CT SCANNER & X-RAY
95% VA SUBMITTAL 05.22.20
Stamp
100% VA SUBMITTAL 09.04.20
ROOF PLAN 1SCALE: 1/8" = 1'-0"
BC
A190
ROOF PLAN
KEY PLAN
XX KEYNOTE SYMBOL
KEYNOTES
TYP.
N
GENERAL NOTES
1A
EQUIPMENT ROOM (1A-257B)
CONTROL ROOM (1A-275)
X-RAY (1A-276)
CORRIDOR (C1-06)
1B
2A 2B
4C4A
5A
CT SCAN (1A-277)
3A
4B 4D
ITEM ID
16-20 N/A
DESCRIPTION
OPERATING CONSOLE
SYNGO ACQUISITION WORKPLACE AND STANDARD COMPONENTS
CONTAINER FOR ICE/IES
SOMATOM FORCE GANTRY
PATIENT TABLE - MULTI PURPOSE TABLE (MPT4) (OPTION)
POWER DISTRIBUTION CABINET
IMAGE RECONSTRUCTION SYSTEM
HEAT EXCHANGER CABINET - WATER/AIR SPLIT
OUTDOOR UNIT - WATER/AIR SPLIT
CARE VISION DUAL MONITOR
MEDREAD DISPLAY CONTROL UNIT/BASE UNIT
CEILING MOUNTED MEDRAD INJECTOR
EATON 9395 U.P.S. ELECTRONICS MODULE - 275KVA
EATON 9395 MAINTENANCE BYPASS PANEL
INTEGRATED ELECTRICAL CABINET
CONTROL ROOM MODULE
IMAGING SYSTEM - KEYBOARD AND MOUSE
CONTROL ROOM LIVE IMAGE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .