This document includes a federal contract opportunity solicitation for construction services to complete a Radiology Suite with CT Scanner and X-Ray Rooms in the Emergency Department at a Veterans Affairs medical center. The solicitation seeks general construction and alteration services per the attached statement of work, drawings, and specifications to demolish and replace elements as required. The period of performance is 180 calendar days from notice to proceed. The magnitude of the project is estimated between $1,000,000 and $2,000,000. The NAICS code is 236220 for commercial and institutional building construction. The small business size standard is $36.5 million. Offerors must be registered in the System for Award Management and VetBiz Vendor Information Pages. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Radiation Protection Shielding Design

Facility: VA Loma Linda Medical Center

Address: 11201 Benton Street, Loma Linda, CA 92357

Contact: Brian Collins (bcollins@c-aarchitects.com) Signature:

Room ID: CT Scan 1A-277 Date: April 1, 2020

CT Scanner Type: Siemens Somatom Force

Calculation Method: NCRP 147

Head Scan Body Scan

Patients / Week: 60 90

Scan Length: 20 50 cm

Pitch: 1 1 mAs: 300 200 kVp: 120 120

CTDI100: 14.800 6.550 mGy/ 100 mAs

Air Kerma at 1 m: 0.151 0.334 mGy/Patient

Barrier Requirements Summary

Existing Recommended Shielded

Structural Additional P/T Air Kerma

Protected Location Material Barrier (mGy/wk) (mGy/wk)

Control Room 1A-275 4 / 64ths inch lead 0.02 0.0064

CT Control Door 1.5 in wood 4 / 64ths inch lead 0.02 0.0043

X-Ray 1A-276 1.25 in gypsum 4 / 64ths inch lead 0.02 0.0081

Corridor Doors 1.5 in wood 4 / 64ths inch lead 0.16 0.0101

Corridor C1-06 1.25 in gypsum 4 / 64ths inch lead 0.1 0.0108

Adj Exam Rm 1A-117 2.5 in gypsum 2 / 64ths inch lead 0.04 0.0132

Wash Rm 1A-403 1.25 in gypsum 4 / 64ths inch lead 0.1 0.0089

Equip Rm 1A-275B 1.25 in gypsum 4 / 64ths inch lead 0.4 0.0043

Adj Psych Exam Rm 1A-228 2.5 in gypsum 2 / 64ths inch lead 0.04 0.0074

Ceiling (Offices above) 5.6 in lt concrete 0.0 - n/a 0.02 0.0166

Floor (No Occup - Slab-on-grade) 6.0 in concrete 0.0 - n/a N/A N/A

Physicist:

Petar Seslija, M.S., MCCPM Certified Radiological Physicist Therapy Physics, Inc.

2501 Cherry Ave, Ste 270, Signal Hill, CA 90755

562.317.0650, FAX 562.317.0661

e-mail: petar@therapyphysics.com

From Siemens provided scatter map:

Air Kerma at 1 m is 0.304 uGy/mAs for 150 kV scan at max collimation of

57.6 mm using 32 cm CTDI phantom.

Assume: (120/150)^2 kV correction factor, and (1/5.76 cm) collimation correction. CTDI for default head/abdo protocols is 47.3/9.8 mGy for 320/150 mAs.

Summary

4/1/2020

VALomaLinda-EmergCT-Shield-20

Therapy Physics, Inc.

562-317-0650

Comments and Recommendations

1. This is a shielding report for a Siemens Somatom Force CT scan room to be installed on the first floor of a multi-story building. The first floor structural deck consists of 6 inches of concrete slab-on-grade. Therefore there is no occupancy below the CT room. There are fully occupied areas above the CT scan room. The 2nd floor structural deck consists of a 4-3/16 inch light-weight concrete slab on top of a metal deck with 3 inch deep flutes. Therefore the average thickness of the 2nd floor deck is 5.6 inches of light-weight concrete. The distance between the first floor and the second floor is 18 feet. No additional lead shielding is required for the ceiling or floor of the CT scan room.

2. All additional lead shielding in the walls will be added to a height of 7 feet (84 inches) to comply with requirements of Title 17, CA Code of Regulations.

3. All shielding requirements are based on NCRP Report #147 (2005): “Structural Shielding Design and Evaluation for Medical Use of X-Rays.” Calculations for each barrier are made using the computer software program based on data and assumptions are from NCRP Report # 147.

4. The additional shielding recommendations are designed to meet Radiation Protection Standards as defined by 10 CFR20. Any future changes in either equipment, workload or room design will necessitate a re-evaluation of these shielding requirements.

5. The following assumptions were used in the shielding calculations:

Head CT Workload: 60 patients per week (Busy Patient Work Load).

Body CT Workload: 90 patients per week (Busy Patient Work Load).

6. All junction boxes and other penetrations in lead lined walls must be lined with equivalent thickness of lead with overlapping lead edges. (No gaps in lead lining)

7. Door frames must be steel with lead lining to provide equivalent shielding to the surrounding walls.

For lead thickness's of 1/32 inch or less, the steel door frames do not need lead lining. For doors in walls with lead thickness's of 1/16 or greater, the steel door frames must be lead lined with the same thickness of lead as is in the wall.

8. Control Area window should be of at least 1.58 mm lead.

9. Equivalent thicknesses of lead for existing walls and floors is assumed to be as follows:

2 #/sq ft lead = 0.79 mm = 1/32 inch 4 #/sq ft lead = 1.58 mm = 1/16 inch 6 #/sq ft lead = 2.38 mm = 3/32 inch.

Comments

4/1/2020

VALomaLinda-EmergCT-Shield-20

Protected Locaton: Control Room 1A-275

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 1

Barrier Type: P/T (mGy/wk): 0.020

Primary or Secondary:

Use Factor:

kVp:

Number of Patients / Week:

Scatter Direction:

Table / Bucky Credit:

Head Body

Distance to Protected Location: 15.0 ft 15.0 ft

Unshielded Air Kerma (mGy/wk): 4.33E-01 1.44E+00

Structural Material Tranmission: 1.00E+00 1.00E+00

Remaining Air Kerma (mGy/wk): 4.33E-01 1.44E+00

Transmission Model: Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 3.40E-03 3.40E-03

Shielded Air Kerma (mGy/wk): 0.0015 0.0049

Existing Structural Material: Material:

Additional Barrier Required: 1.15 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch )

Shielded Air Kerma (mGy/wk): 0.0064

Lead

Lead

N/A N/A

Secondary Wall

Secondary

N/A

Side

N/A

Secondary

60 90

Side

4/1/2020

VALomaLinda-EmergCT-Shield-20

Protected Locaton: CT Control Door

Barrier Type: P/T (mGy/wk): 0.020

Primary or Secondary:

Use Factor:

kVp:

Number of Patients / Week:

Scatter Direction:

Table / Bucky Credit:

Head Body

Distance to Protected Location: 16.0 ft 16.0 ft

Unshielded Air Kerma (mGy/wk): 3.81E-01 1.26E+00

Structural Material Tranmission: 7.78E-01 7.78E-01

Remaining Air Kerma (mGy/wk): 2.96E-01 9.84E-01

Transmission Model: Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 3.40E-03 3.40E-03

Shielded Air Kerma (mGy/wk): 0.0010 0.0033

Existing Structural Material: 1.5 in Material:

Additional Barrier Required: 1.01 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch )

Shielded Air Kerma (mGy/wk): 0.0043

1.5 in wood

Secondary Wall

Lead

Lead

N/A N/A

Wood

60 90

Side Side

Secondary Secondary

120 120

N/A N/A

4/1/2020

VALomaLinda-EmergCT-Shield-20

Protected Locaton: X-Ray 1A-276

Barrier Type: P/T (mGy/wk): 0.020

Primary or Secondary:

Use Factor:

kVp:

Number of Patients / Week:

Scatter Direction:

Table / Bucky Credit:

Head Body

Distance to Protected Location: 11.0 ft 11.0 ft

Unshielded Air Kerma (mGy/wk): 8.06E-01 2.67E+00

Structural Material Tranmission: 6.83E-01 6.83E-01

Remaining Air Kerma (mGy/wk): 5.50E-01 1.83E+00

Transmission Model: Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 3.40E-03 3.40E-03

Shielded Air Kerma (mGy/wk): 0.0019 0.0062

Existing Structural Material: 1.25 in Material:

Additional Barrier Required: 1.24 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch )

Shielded Air Kerma (mGy/wk): 0.0081

1.25 in gypsum

Secondary Wall

Lead

Lead

N/A N/A

Gypsum

60 90

Side Side

Secondary Secondary

120 120

N/A N/A

4/1/2020

VALomaLinda-EmergCT-Shield-20

Protected Locaton: Corridor Doors

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 0.125

Barrier Type: P/T (mGy/wk): 0.160

Primary or Secondary:

Use Factor:

kVp:

Number of Patients / Week:

Scatter Direction:

Table / Bucky Credit:

Head Body

Distance to Protected Location: 10.5 ft 10.5 ft

Unshielded Air Kerma (mGy/wk): 8.84E-01 2.94E+00

Structural Material Tranmission: 7.78E-01 7.78E-01

Remaining Air Kerma (mGy/wk): 6.88E-01 2.28E+00

Transmission Model: Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 3.40E-03 3.40E-03

Shielded Air Kerma (mGy/wk): 0.0023 0.0078

Existing Structural Material: 1.5 in Material:

Additional Barrier Required: 0.61 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch )

Shielded Air Kerma (mGy/wk): 0.0101

1.5 in wood

Secondary Wall

Lead

Lead

N/A N/A

Wood

60 90

Side Side

Secondary Secondary

120 120

N/A N/A

4/1/2020

VALomaLinda-EmergCT-Shield-20

Protected Locaton: Corridor C1-06

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 0.2

Barrier Type: P/T (mGy/wk): 0.100

Primary or Secondary:

Use Factor:

kVp:

Number of Patients / Week:

Scatter Direction:

Table / Bucky Credit:

Head Body

Distance to Protected Location: 9.5 ft 9.5 ft

Unshielded Air Kerma (mGy/wk): 1.08E+00 3.59E+00

Structural Material Tranmission: 6.83E-01 6.83E-01

Remaining Air Kerma (mGy/wk): 7.38E-01 2.45E+00

Transmission Model: Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 3.40E-03 3.40E-03

Shielded Air Kerma (mGy/wk): 0.0025 0.0083

Existing Structural Material: 1.25 in Material:

Additional Barrier Required: 0.78 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch )

Shielded Air Kerma (mGy/wk): 0.0108

1.25 in gypsum

Secondary Wall

Lead

Lead

N/A N/A

Gypsum

60 90

Side Side

Secondary Secondary

120 120

N/A N/A

4/1/2020

VALomaLinda-EmergCT-Shield-20

Protected Locaton: Adj Exam Rm 1A-117

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 0.5

Barrier Type: P/T (mGy/wk): 0.040

Primary or Secondary:

Use Factor:

kVp:

Number of Patients / Week:

Scatter Direction:

Table / Bucky Credit:

Head Body

Distance to Protected Location: 21.0 ft 21.0 ft

Unshielded Air Kerma (mGy/wk): 2.21E-01 7.34E-01

Structural Material Tranmission: 4.67E-01 4.67E-01

Remaining Air Kerma (mGy/wk): 1.03E-01 3.42E-01

Transmission Model: Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 2.95E-02 2.95E-02

Shielded Air Kerma (mGy/wk): 0.0030 0.0101

Existing Structural Material: 2.5 in Material:

Additional Barrier Required: 0.47 mm Material:

Recommended Additional Barrier: 0.79 mm Material: ( 2 / 64ths inch )

Shielded Air Kerma (mGy/wk): 0.0132

2.5 in gypsum

Secondary Wall

Lead

Lead

N/A N/A

Gypsum

60 90

Side Side

Secondary Secondary

120 120

N/A N/A

4/1/2020

VALomaLinda-EmergCT-Shield-20

Protected Locaton: Wash Rm 1A-403

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 0.2

Barrier Type: P/T (mGy/wk): 0.100

Primary or Secondary:

Use Factor:

kVp:

Number of Patients / Week:

Scatter Direction:

Table / Bucky Credit:

Head Body

Distance to Protected Location: 10.5 ft 10.5 ft

Unshielded Air Kerma (mGy/wk): 8.84E-01 2.94E+00

Structural Material Tranmission: 6.83E-01 6.83E-01

Remaining Air Kerma (mGy/wk): 6.04E-01 2.01E+00

Transmission Model: Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 3.40E-03 3.40E-03

Shielded Air Kerma (mGy/wk): 0.0021 0.0068

Existing Structural Material: 1.25 in Material:

Additional Barrier Required: 0.72 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch )

Shielded Air Kerma (mGy/wk): 0.0089

1.25 in gypsum

Secondary Wall

Lead

Lead

N/A N/A

Gypsum

60 90

Side Side

Secondary Secondary

120 120

N/A N/A

4/1/2020

VALomaLinda-EmergCT-Shield-20

Protected Locaton: Equip Rm 1A-275B

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 0.05

Barrier Type: P/T (mGy/wk): 0.400

Primary or Secondary:

Use Factor:

kVp:

Number of Patients / Week:

Scatter Direction:

Table / Bucky Credit:

Head Body

Distance to Protected Location: 15.0 ft 15.0 ft

Unshielded Air Kerma (mGy/wk): 4.33E-01 1.44E+00

Structural Material Tranmission: 6.83E-01 6.83E-01

Remaining Air Kerma (mGy/wk): 2.96E-01 9.83E-01

Transmission Model: Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 3.40E-03 3.40E-03

Shielded Air Kerma (mGy/wk): 0.0010 0.0033

Existing Structural Material: 1.25 in Material:

Additional Barrier Required: 0.19 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch )

Shielded Air Kerma (mGy/wk): 0.0043

1.25 in gypsum

Secondary Wall

Lead

Lead

N/A N/A

Gypsum

60 90

Side Side

Secondary Secondary

120 120

N/A N/A

4/1/2020

VALomaLinda-EmergCT-Shield-20

Protected Locaton: Adj Psych Exam Rm 1A-228

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 0.5

Barrier Type: P/T (mGy/wk): 0.040

Primary or Secondary:

Use Factor:

kVp:

Number of Patients / Week:

Scatter Direction:

Table / Bucky Credit:

Head Body

Distance to Protected Location: 28.0 ft 28.0 ft

Unshielded Air Kerma (mGy/wk): 1.24E-01 4.13E-01

Structural Material Tranmission: 4.67E-01 4.67E-01

Remaining Air Kerma (mGy/wk): 5.80E-02 1.93E-01

Transmission Model: Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 2.95E-02 2.95E-02

Shielded Air Kerma (mGy/wk): 0.0017 0.0057

Existing Structural Material: 2.5 in Material:

Additional Barrier Required: 0.33 mm Material:

Recommended Additional Barrier: 0.79 mm Material: ( 2 / 64ths inch )

Shielded Air Kerma (mGy/wk): 0.0074

2.5 in gypsum

Secondary Wall

Lead

Lead

N/A N/A

Gypsum

60 90

Side Side

Secondary Secondary

120 120

N/A N/A

4/1/2020

VALomaLinda-EmergCT-Shield-20

Protected Locaton: Ceiling (Offices above)

Barrier Type: P/T (mGy/wk): 0.020

Primary or Secondary:

Use Factor:

kVp:

Number of Patients / Week:

Scatter Direction:

Table / Bucky Credit:

Head Body

Distance to Protected Location: 16.5 ft 16.5 ft

Unshielded Air Kerma (mGy/wk): 3.58E-01 1.19E+00

Structural Material Tranmission: 1.00E+00 1.00E+00

Remaining Air Kerma (mGy/wk): 3.58E-01 1.19E+00

Transmission Model: Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 1.07E-02 1.07E-02

Shielded Air Kerma (mGy/wk): 0.0038 0.0127

Other Existing Material: Material:

Structual Material Required: 5.35 in Material:

Existing Structural Materal: 5.60 in Material:

Shielded Air Kerma (mGy/wk): 0.0166

Ceiling

Lt Concrete

Lt Concrete

N/A N/A

60 90

Side Side

Secondary Secondary

120 120

N/A N/A

4/1/2020

VALomaLinda-EmergCT-Shield-20

Radiation Protection Shielding Design

Facility: VA Loma Linda Medical Center

Address: 11201 Benton Street, Loma Linda, CA 92357

Contact: Brian Collins (bcollins@c-aarchitects.com) Signature:

Room ID: X-Ray 1A-276 Date: April 1, 2020

Calculation Method: NCRP 147

Installation Type: Radiographic

Patients / Week: 160

Barrier Requirements Summary

Existing Structural Recommended P/T Shielded Air Kerma

Protected Location Material Additional Barrier (mGy/wk) (mGy/wk)

Control Rm 1A-275 4 / 64ths inch lead 0.02 0.0005

Control Rm Door 1.5 in wood 4 / 64ths inch lead 0.02 0.0004

Reading Room 1A-244 1.25 in gypsum 4 / 64ths inch lead 0.02 0.0002

Observation 1A-246 1.25 in gypsum 4 / 64ths inch lead 0.04 0.0009

Office 1A-248 1.25 in gypsum 4 / 64ths inch lead 0.02 0.0009

Corridor Doors 1.5 in wood 2 / 64ths inch lead 0.16 0.0055

Corridor (Chest Bucky Primary) 1.25 in gypsum 2 / 64ths inch lead 0.1 0.0178

CT Scan 1A-277 1.25 in gypsum 2 / 64ths inch lead 0.02 0.0059

Ceiling (Offices above) 5.6 in lt concrete 0.0 - n/a 0.02 0.0005

Floor (No Occup - Slab-on-grade) 6.0 in concrete 0.0 - n/a N/A N/A

Physicist:

Petar Seslija, M.S., MCCPM Certified Radiological Physicist Therapy Physics, Inc.

2501 Cherry Ave, Ste 270, Signal Hill, CA 90755

562.317.0650, FAX 562.317.0661

Summary 4/1/2020

VALomaLinda-EmergXray-Shield-20

Comments and Recommendations

1. This is a shielding report for an X-Ray room to be installed on the first floor of a multi-story building. The first floor structural deck consists of 6 inches of concrete slab-on-grade. Therefore there is no occupancy below the X-Ray room. There are fully occupied areas above the X-Ray room. The 2nd floor structural deck consists of a 4-3/16 inch light-weight concrete slab on top of a metal deck with 3 inch deep flutes. Therefore the average thickness of the 2nd floor deck is 5.6 inches of light-weight concrete. The distance between the first floor and the second floor is 18 feet. No additional lead shielding is required for the ceiling or floor of the X-Ray room.

2. All additional lead shielding in the walls will be added to a height of 7 feet (84 inches) to comply with requirements of Title 17, CA Code of Regulations.

3. All shielding requirements are based on NCRP Report #147 (2005): “Structural Shielding Design and Evaluation for Medical Use of X-Rays.”

Calculations for each barrier are made using the computer software program based on data and assumptions are from NCRP Report # 147.

4. The additional shielding recommendations are designed to meet Radiation Protection Standards as defined by 10 CFR20. Any future changes in either equipment, workload or room design will necessitate a re-evaluation of these shielding requirements.

5. The following assumptions were used in the shielding calculations:

X-ray Workload: 160 patients per week (Busy Patient Work Load).

6. All junction boxes and other penetrations in lead lined walls must be lined with equivalent thickness of lead with overlapping lead edges. (No gaps in lead lining)

7. Door frames must be steel with lead lining to provide equivalent shielding to the surrounding walls. For lead thickness's of 1/32 inch or less, the steel door frames do not need lead lining. For doors in walls with lead thickness's of 1/16 or greater, the steel door frames must be lead lined with the same thickness of lead as is in the wall.

8. Control Area window should be of at least 1.58 mm lead.

9. Equivalent thicknesses of lead for existing walls and floors is assumed to be as follows:

2 #/sq ft lead = 0.79 mm = 1/32 inch 4 #/sq ft lead = 1.59 mm = 1/16 inch 6 #/sq ft lead = 2.38 mm = 3/32 inch.

Comments 4/1/2020

VALomaLinda-EmergXray-Shield-20

Protected Location: Control Rm 1A-275

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 1 P/T (mGy/wk): 0.020 Barrier Type:

Primary or Secondary:

Use Factor:

Workload Distribution:

Number of Patients / Week:

Scatter Direction:

Use Table / Bucky Preshielding? :

Rad Tube Secondary

Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter

Distance to Protected Location: 10.5 ft 10.5 ft

Unshielded Air Kerma (mGy/wk): 8.28E-03 5.31E-01

Structural Material Transmission: 1.00E+00 1.00E+00

Remaining Air Kerma (mGy/wk): 8.28E-03 5.31E-01

Transmission Model: Secondary Secondary

Preshielding Credit: N/A

Rec + Preshield Transmission: 9.50E-04 9.50E-04

Shielded Air Kerma (mGy/wk): 0.0000 0.0005

Existing Structural Material: Material:

Additional Barrier Required: 0.41 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0005

N/A

Secondary

All Barriers

Secondary Wall

Side

Lead

Lead

N/A

4/1/2020

VALomaLinda-EmergXray-Shield-20

Protected Location: Control Rm Door

Primary or Secondary:

Use Factor:

Workload Distribution:

Number of Patients / Week:

Scatter Direction:

Use Table / Bucky Preshielding? :

Rad Tube Secondary

Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter

Distance to Protected Location: 11.0 ft 11.0 ft

Unshielded Air Kerma (mGy/wk): 7.54E-03 4.84E-01

Structural Material Transmission: 7.50E-01 7.50E-01

Remaining Air Kerma (mGy/wk): 5.66E-03 3.63E-01

Transmission Model: Secondary Secondary

Preshielding Credit: N/A

Rec + Preshield Transmission: 9.50E-04 9.50E-04

Shielded Air Kerma (mGy/wk): 0.0000 0.0003

Existing Structural Material: 1.5 in Material:

Additional Barrier Required: 0.33 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0004

1.5 in wood

Secondary

N/A

Secondary Wall

Lead

Y

All Barriers

Wood

Side

Lead

4/1/2020

VALomaLinda-EmergXray-Shield-20

Protected Location: Reading Room 1A-244

Primary or Secondary:

Use Factor:

Workload Distribution:

Number of Patients / Week:

Scatter Direction:

Use Table / Bucky Preshielding? :

Rad Tube Secondary

Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter

Distance to Protected Location: 15.0 ft 15.0 ft

Unshielded Air Kerma (mGy/wk): 4.06E-03 2.60E-01

Structural Material Transmission: 6.45E-01 6.45E-01

Remaining Air Kerma (mGy/wk): 2.62E-03 1.68E-01

Transmission Model: Secondary Secondary

Preshielding Credit: N/A

Rec + Preshield Transmission: 9.50E-04 9.50E-04

Shielded Air Kerma (mGy/wk): 0.0000 0.0002

Existing Structural Material: 1.25 in Material:

Additional Barrier Required: 0.20 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0002

1.25 in gypsum

Secondary

N/A

Secondary Wall

Lead

N/A

All Barriers

Gypsum

Side

Lead

4/1/2020

VALomaLinda-EmergXray-Shield-20

Protected Location: Observation 1A-246

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 0.5 P/T (mGy/wk): 0.040 Barrier Type:

Primary or Secondary:

Use Factor:

Workload Distribution:

Number of Patients / Week:

Scatter Direction:

Use Table / Bucky Preshielding? :

Cross-Table Rad Tube Over-Table Rad Tube

Primary Leakage Scatter Leakage Scatter Leakage Scatter

Distance to Protected Location: 12.5 ft 11.5 ft 11.5 ft

Unshielded Air Kerma (mGy/wk): 5.16E+00 1.82E-03 3.00E-01

Structural Material Transmission: 5.87E-01 5.94E-01 5.94E-01

Remaining Air Kerma (mGy/wk): 3.03E+00 1.08E-03 1.78E-01

Transmission Model: Primary Secondary Secondary

Preshielding Credit: 0 N/A

Rec + Preshield Transmission: 2.65E-04 3.80E-04 3.80E-04

Shielded Air Kerma (mGy/wk): 0.0008 0.0000 0.0001

Existing Structural Material: 1.25 in Material:

Additional Barrier Required: 0.53 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0009

1.25 in gypsum

Primary Secondary

0.09 N/A

Cross-Table Lateral Wall

Lead

N N/A

Floor/Other Floor/Other

Gypsum

160 160

N/A Side

Lead

4/1/2020

VALomaLinda-EmergXray-Shield-20

Protected Location: Office 1A-248

Primary or Secondary:

Use Factor:

Workload Distribution:

Number of Patients / Week:

Scatter Direction:

Use Table / Bucky Preshielding? :

Cross-Table Rad Tube Over-Table Rad Tube

Primary Leakage Scatter Leakage Scatter Leakage Scatter

Distance to Protected Location: 12.5 ft 11.5 ft 11.5 ft

Unshielded Air Kerma (mGy/wk): 5.16E+00 1.82E-03 3.00E-01

Structural Material Transmission: 5.87E-01 5.94E-01 5.94E-01

Remaining Air Kerma (mGy/wk): 3.03E+00 1.08E-03 1.78E-01

Transmission Model: Primary Secondary Secondary

Preshielding Credit: 0 N/A

Rec + Preshield Transmission: 2.65E-04 3.80E-04 3.80E-04

Shielded Air Kerma (mGy/wk): 0.0008 0.0000 0.0001

Existing Structural Material: 1.25 in Material:

Additional Barrier Required: 0.68 mm Material:

Recommended Additional Barrier: 1.59 mm Material: ( 4 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0009

1.25 in gypsum

Primary Secondary

0.09 N/A

Cross-Table Lateral Wall

Lead

N N/A

Floor/Other Floor/Other

Gypsum

160 160

N/A Side

Lead

4/1/2020

VALomaLinda-EmergXray-Shield-20

Protected Location: Corridor Doors

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 0.125 P/T (mGy/wk): 0.160 Barrier Type:

Primary or Secondary:

Use Factor:

Workload Distribution:

Number of Patients / Week:

Scatter Direction:

Use Table / Bucky Preshielding? :

Over-Table Rad Tube Chest Bucky Exams

Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter

Distance to Protected Location: 10.0 ft 10.0 ft 12.0 ft 6.0 ft

Unshielded Air Kerma (mGy/wk): 2.41E-03 3.96E-01 4.66E-03 2.34E-01

Structural Material Transmission: 7.40E-01 7.40E-01 7.64E-01 7.64E-01

Remaining Air Kerma (mGy/wk): 1.79E-03 2.93E-01 3.56E-03 1.79E-01

Transmission Model: Secondary Secondary Secondary Secondary

Preshielding Credit: N/A N/A

Rec + Preshield Transmission: 4.73E-03 4.73E-03 2.26E-02 2.26E-02

Shielded Air Kerma (mGy/wk): 0.0000 0.0014 0.0001 0.0040

Existing Structural Material: 1.5 in Material:

Additional Barrier Required: 0.09 mm Material:

Recommended Additional Barrier: 0.79 mm Material: ( 2 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0055

1.5 in wood

Secondary Secondary

N/A N/A

Chest Bucky Secondary

Lead

N/A N/A

Floor/Other Chest Bucky

Wood

160 160

Side Side

Lead

4/1/2020

VALomaLinda-EmergXray-Shield-20

Protected Location: Corridor (Chest Bucky Primary)

Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 0.2 P/T (mGy/wk): 0.100 Barrier Type:

Primary or Secondary:

Use Factor:

Workload Distribution:

Number of Patients / Week:

Scatter Direction:

Use Table / Bucky Preshielding? :

Chest Bucky Exams

Primary Leakage Scatter Leakage Scatter Leakage Scatter

Distance to Protected Location: 12.0 ft

Unshielded Air Kerma (mGy/wk): 2.75E+01

Structural Material Transmission: 6.66E-01

Remaining Air Kerma (mGy/wk): 1.83E+01

Transmission Model: Primary

Preshielding Credit: 0.85 mm Lead

Rec + Preshield Transmission: 9.70E-04

Shielded Air Kerma (mGy/wk): 0.0178

Existing Structural Material: 1.25 in Material:

Additional Barrier Required: 0.16 mm Material:

Recommended Additional Barrier: 0.79 mm Material: ( 2 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0178

1.25 in gypsum

Primary

Chest Image Receptor

Lead

Y

Chest Bucky

Gypsum

N/A

Lead

4/1/2020

VALomaLinda-EmergXray-Shield-20

Protected Location: CT Scan 1A-277

Primary or Secondary:

Use Factor:

Workload Distribution:

Number of Patients / Week:

Scatter Direction:

Use Table / Bucky Preshielding? :

Rad Tube Secondary

Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter

Distance to Protected Location: 7.5 ft 7.5 ft

Unshielded Air Kerma (mGy/wk): 1.62E-02 1.04E+00

Structural Material Transmission: 6.45E-01 6.45E-01

Remaining Air Kerma (mGy/wk): 1.05E-02 6.72E-01

Transmission Model: Secondary Secondary

Preshielding Credit: N/A

Rec + Preshield Transmission: 8.66E-03 8.66E-03

Shielded Air Kerma (mGy/wk): 0.0001 0.0058

Existing Structural Material: 1.25 in Material:

Additional Barrier Required: 0.46 mm Material:

Recommended Additional Barrier: 0.79 mm Material: ( 2 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0059

1.25 in gypsum

Secondary

N/A

Secondary Wall

Lead

N/A

All Barriers

Gypsum

Side

Lead

4/1/2020

VALomaLinda-EmergXray-Shield-20

Protected Location: Ceiling (Offices above)

Primary or Secondary:

Use Factor:

Workload Distribution:

Number of Patients / Week:

Scatter Direction:

Use Table / Bucky Preshielding? :

Over-Table Rad Tube

Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter

Distance to Protected Location: 13.5 ft 16.5 ft

Unshielded Air Kerma (mGy/wk): 5.01E-03 3.04E-01

Other Material Transmission: 1.00E+00 1.00E+00

Remaining Air Kerma (mGy/wk): 5.01E-03 3.04E-01

Transmission Model: Leakage Secondary

Preshielding Credit: N/A

Existing Material Tranmission: 2.13E-02 1.44E-03

Shielded Air Kerma (mGy/wk): 0.0001 0.0004

Other Existing Material: Material:

Structual Material Required: 1.49 in Material:

Existing Structural Materal: 5.60 in Material: Shielded Air Kerma (mGy/wk): 0.0005

Secondary

N/A

Ceiling

Lt Concrete

N/A

All Barriers

Fwd/Back

Lt Concrete

4/1/2020

VALomaLinda-EmergXray-Shield-20

VALomaLinda-EmergCT-Shield-20
VALomaLinda-EmergXray-Shield-20
VALomaLinda-CT-Xray-Layout

File details come from the government source that posted it. Updated .