This is a Draft Statement of Work (SOW) for a repair project at Kadena Air Base, Okinawa, Japan. The project (LXEZ201072) involves a comprehensive design-build repair of Building B3524, a single-story, 38,875 square foot concrete facility constructed in 1967. The scope includes complete facility renovation with critical infrastructure upgrades, specifically focusing on:

Architectural Work: Demolishing and replacing the existing roof structure with a new cast-in-place concrete slab, including seismic improvements and new anchoring systems. Electrical Work: Replacing switchboards, motor control centers, lighting systems, and associated electrical components. Mechanical Work: Updating HVAC and plumbing systems while maintaining the existing footprint. Fire/Safety Systems: Installing new fire protection, suppression, alarm, and mass notification systems. The total project duration is 1,087 calendar days, divided into 297 days for design, 760 days for construction, and 30 administrative days. The project requires environmental compliance, including asbestos and hazardous material assessments, and will follow specific design review stages with multiple government checkpoints throughout the process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .