Production Surge Plan DID.pdf

PDF 173 KB Posted

Attached to
Overhaul of KC-135 Horizontal Stabilizer Trim Actuator
Solicitation number
FD20302502402
Issued by

About this file

This document is a Data Item Description (DID) for a Production Surge Plan with identification number DI-MGMT-80969, issued by the Department of Defense. The purpose of the Production Surge Plan is to outline a contractor's capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment without a declaration of war or mobilization.

The document provides detailed guidance on preparing a comprehensive Production Surge Plan, which must include specific elements such as: maximum sustainable production rate, lists of subcontracted and non-subcontracted items/components, critical items that could impact production, potential surge impacts, additional labor requirements, strategic or critical materials, and a list of production equipment. The plan requires contractors to identify contract numbers, specific items, production buildup details, potential bottlenecks, and strategies for increasing production capacity by up to 10 percent within current facility limitations. The document is approved for public release with unlimited distribution and supersedes a previous version (DI-P-1634A).

View the file

Other files

File Type Posted
Synopsis FD20302502402 (2).docx DOCX document
GP Inventory DID.pdf PDF
Report of Shipping Packaging Discepancy DID.pdf PDF
CDM DID.pdf PDF
CAV DID.pdf PDF
PWS.pdf PDF
ASDP Teardown Deficiency Report DID.pdf PDF
Test Inspection Report DID.pdf PDF
CDRLS.pdf PDF
TDP DID.pdf PDF
Synopsis FD20302502402_comments.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .