Primrose Work Log.pdf

PDF 78 KB Posted

Attached to
Primrose Trail Structures Construction Federal contract opportunity
Solicitation number
1240BJ24Q0011
Issued by
Department of Agriculture Forest Service

About this file

This document is a work log for the Primrose Trail Reconstruction project, which appears to be related to a federal contract opportunity for the construction of Primrose Trail structures.

The work log details various construction work items, including the installation of glulam bridges, FRP boardwalks, and aluminum box culverts along the Primrose Trail. It provides location references, pay item types, quantities, and other details for the planned work.

The related federal contract opportunity, identified as Solicitation Number 1240BJ24Q0011, is for the "Primrose Trail Structures Construction" project within the Tongass National Forest. The contract is being issued by the Department of Agriculture Forest Service, and the cut-off for pre-bid questions is August 26, 2024. Offerors must provide a complete response to the Technical Evaluation Factors outlined in Section M of the solicitation in order to be considered.

View the file

Other files for this federal contract opportunity

Other files attached to Primrose Trail Structures Construction, newest first.
File Type Posted
Amendment 1_1240BJ24Q0011_SF30.pdf PDF
Amendment 1_1240BJ24Q011_RFI.pdf PDF
Trail Design Parameters.pdf PDF
Staging Area Arieal Image.pdf PDF
PRIMROSE TRAIL STRUCTURE CONSTRUCTION DRAWINGS.pdf PDF
Specifications Primose Trail Reconstruction.pdf PDF
Primrose SOW_struct_rev_02_01.pdf PDF
Primrose Existing Conditions Photos.pdf PDF
Wage Determination AK20240002 01.05.2024.pdf PDF
1240BJ24Q0011 Solicitation Packet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Station Description of Work Pay Item Typ ID Pay Unit QTY Comments Mobilization 90701 LS 1

33+62 Construct Glulam Bridge, 44' x 6' 96301 GLU EA 1 Existing Bridge 5'x33' 43+59 Bedrock gully -18" depth cut 44+24 37 End Gully 55+25 Construct FRP Boardwalk, 25' x 5' 93802 FRP LS 1 Existing Puncheon/Bridge 5'x33' 81+67 Construct Aluminum Box Culvert, 2'8"x10'2" 92111 ALBC EA 1 Existing Bridge 5.5'x18'

104+99 Construct Glulam Bridge, 26' x 6' 96302 GLU EA 1 Existing Bridge 5.5'x23' 109+33 Jct waterfall trail (informal) 123+36 Construct Aluminum Box Culvert, 3'3" x 9'2" 92112 ALBC EA 1 Existing Bridge 4'x18' 182+73 Construct Glulam Bridge, 28' x 6' 96303 GLU EA 1 Existing Bridge 21' x 5.5' 196+17 Jct Cabin Trail (informal)

Reference Point

Reference Point

Reference Point

Primrose Trail Reconstruction Work Log 5/5/2023

Sheet1

File details come from the government source that posted it. Updated .