Primrose Existing Conditions Photos.pdf

PDF 1 MB Posted

Attached to
Primrose Trail Structures Construction
Solicitation number
1240BJ24Q0011
Issued by

About this file

This document contains photographs of the existing conditions for the Primrose Trail Reconstruction project on the Tongass National Forest. The photographs show issues such as corduroy that needs to be removed, a culvert that requires replacement, eroded tread requiring resurfacing, and other repairs needed to the trail.

The related federal contract opportunity is for the Primrose Trail Structures Construction project, solicitation number 1240BJ24Q0011, issued by the Department of Agriculture Forest Service. The solicitation is for construction work on the trail structures. The deadline for pre-bid questions is August 26, 2024 by 5:00PM AKDT, and proposals must provide a complete response to the Technical Evaluation Factors in Section M to be considered. No other details about the procurement, such as set-asides, pricing, or the incumbent, are provided in the information given.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Primrose Trail Reconstruction

Existing Conditions Photographs

*See the project drawing package for additional photographs of the existing structures.

Corduroy to be removed

Culvert to be replaced

Parallel ditch to be repaired

Erosion with exposed roots

Gully to be filled in

Puncheon/bridge to be replaced

Typical issues with eroded tread requiring resurfacing

Typical issues with eroded tread requiring resurfacing

Eroded tread requiring resurfacing and drainage feature needing replacement

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Blank Page

File details come from the government source that posted it. Updated .