PRIME-SUB_FORM_Ocean_Center_Parking_Garage_Elevator_Modernization.xls
XLS spreadsheet 33 KB Posted
- Solicitation number
- 26-B-123JS
- Issued by
- Volusia County, Florida
About this file
This is a Prime-Subcontractor Form related to Volusia County's Ocean Center Parking Garage Elevator Modernization project in Florida. The project involves the modernization of five elevators at the Ocean Center parking garage and pedestrian bridge to meet current code requirements. The awarded vendor must furnish all labor and materials necessary to complete the work in accordance with Exhibit D specifications. The project scope includes modernization services with a 12-month warranty period following final acceptance, during which the contractor is responsible for preventative maintenance, service, testing, and part replacement as outlined in the Portfolio Master Elevator Service Agreement.
The form appears to be a prime-subcontractor coordination document designed to facilitate communication and documentation between prime contractors and subcontractors bidding on this modernization work. Project pricing must be comprehensive and include labor, materials, preventative maintenance, service, testing, and parts replacement for the entire 12-month warranty period. The contract structure requires adherence to the Portfolio Master Elevator Service Agreement terms, indicating a standardized approach to elevator service and maintenance requirements throughout the project lifecycle.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| General/ Building/ Elevator Contractor | $ - 0 | 0.00% | ||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| Electrical Contractor | $ - 0 | 0.00% | ||||
| Low Voltage Contracor | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .