DBOCG_Special_Conditions_Elevator_Modernization.docx
DOCX document 22 KB Posted
- Solicitation number
- 26-B-123JS
- Issued by
- Volusia County, Florida
About this file
This is a Special Conditions document for Volusia County, Florida's Ocean Center Parking Garage Elevator Modernization project. The project involves the modernization of five elevators at the Ocean Center parking garage and pedestrian bridge to meet current code requirements. The awarded contractor must furnish all labor and materials necessary to complete the work, with project pricing including labor, materials, preventative maintenance, service, testing, and part replacement for a 12-month warranty period following final acceptance. Work must commence with the elevator for the pedestrian bridge located near A1A, and modernization must be completed on that elevator before proceeding to another unless approval is granted by the Ocean Center's Project Coordinator. The contract term includes the 12-month warranty period following final acceptance of the modernization work.
The special conditions impose several operational and site management requirements on the contractor. Work must be coordinated around scheduled Ocean Center events, with a blackout calendar provided identifying dates when construction is prohibited. The Ocean Center will designate staging areas in proximity to the project site, though these areas may be relocated as needed for ongoing events. Contractors must provide their own portable restrooms, secure work sites with six-foot chain link fencing and black liners, and park only in designated areas. Four weeks' advance notice is required for any closures of building entrances or exits, while one week's notice is needed for project extensions. The contractor may be required to work 24 hours daily, seven days weekly to maintain the project timeline with minimal downtime. Volusia County will not direct means or methods of work or scheduling to the contractor.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL CONDITIONS
Contractors will work around the Ocean Center scheduled events. The events Calender will be provided for the project timeframe identifying blackout dates with no construction permitted. The Calander is subject to change.
The Ocean Center will set up the location of staging areas and will make the best efforts to be close to the project area. Staging area may be relocated for the ongoing events and client’s needs.
Contractors must park in designated areas only. Parking on sidewalks or outside dedicated workspace is prohibited.
Contractors will provide portable restrooms/ porta johns Contractors are responsible for securing their work site and staging areas with 6-foot chain link fence with black liner and proper signage. All equipment, tools and supplies must be secured at the end of day is agreed staging areas.
The Ocean Center will need 4-week advanced notice for any closures of building entrances/ exits or work affecting direct building access. Extensions beyond approved time will need 1 week’s notic Volusia County will not direct means or methods of replacement or work schedule to the contractor. There may be a time when the scheduled work shift will be 24 hours a day 7 days a week to ensure project timeline is achieved and minimal dark days.
Project will start with elevator for the pedestrian bridge located close to A1A and the modernization must be completed before moving to another elevator to start the modernization unless approval is given from the Ocean Center’s Project Coordinator.